www.drpt.virginia.gov virginias approach to innovative intercity passenger rail development and...
TRANSCRIPT
www.drpt.virginia.gov
Virginia’s Approach to
Innovative Intercity Passenger Rail Development
and Funding
Kevin B. PageChief Operating Officer
Virginia Department of Rail and Public Transportation
September 24, 2013
2
High Speed Rail Map
3
44
Federal High Speed Rail Projects
4
5
Amtrak Corridor Services –PRIIA NEC Spine: Excluded from Section 209
State Supported Routes: Require consistent agreements under Section 209
System Corridor Routes: Require new agreements, no state support in place
Mixed State/System Routes: Requires conversion of system trains to state support
6
What do These Map Segments Represent for Virginia?
Richmond to Washington, D.C. $1.8B – MAS 90 MPH
Richmond to Hampton Roads $.5B – MAS 90 MPH
Richmond to Raleigh $2.4B cost, $1.3B in VA– MAS 110 MPH
VA must pay for all regional Amtrak service or lose six daily round trip trains
7
State Rail Agency ChallengesJustify the Decision to Pay for It
Balancing the perception of what should be achieved with the reality of what can be achieved.
Wait for the federal program or go it alone.– Advancing intercity passenger rail incrementally utilizing
limited state resources while continuing project readiness in preparation for a sustainable federal program for high speed intercity passenger rail development
Retaining existing regional intercity passenger rail in the advent of PRIIA Section 209– Virginia is one of a small handful of states that appear ready
for October 2013 implementation
To find the money, one must find their place in the transportation arena.
8
Virginia Highway and Rail Miles Competition or Part of an Overall
Transportation System?
4,395 3,929 3,365
57,865
69,114
7,191
0
10,000
20,000
30,000
40,000
50,000
60,000
70,000
80,000
1930 1970 2007
Sy
ste
m M
ilea
ge
Rail Miles Highway Miles
9
Virginia Gets It Virginia’s Passenger and Freight Rail System is perceived as an
integral part of the Commonwealth’s Transportation System Virginia has some of the most innovative codified rail funding
programs in the United States– 1987 Rail Industrial Access Fund – HCF funded annually– 2005 Rail Enhancement Fund – dedicated funding– 2007 Rail Preservation and Development Fund (budget funded since
1992)– 2008 Rail Capital Bonds for REF and RPF– 2011 Intercity Passenger Rail Operating and Capital Fund (dedicated
funding provided 2013) Virginia initiated intercity passenger rail service starts
– 2009 – Lynchburg– 2010 – Richmond– 2012 – Norfolk– Within 4 years – Roanoke– Within 10 years – Trains 2 and 3 Norfolk
Through the support of the State Legislature and the Administration, DRPT continues to position Virginia to achieve a greater vision on passenger and freight rail development.
10
Setting Up a Passenger Rail Program
PRIIA 2008 Section 209 was a game changer for Virginia
DRPT reacted quickly to begin setting up a funding program for regional intercity passenger rail and capital development of expanding conventional service and higher speed rail
Virginia followed a three step approach to program development– SJ63 2010 called for DRPT to study and recommend funding
strategies for state sponsored intercity and high speed passenger rail. Report published as Senate Document 14 of the VA General Assembly
– 2011 DRPT authors legislation to establish the Intercity Passenger Rail Operating and Capital Fund (IPROC) and provided 2 years of funding for stop gap security to start Amtrak Section 209 funding
– 2013 Landmark transportation funding legislation includes dedicated funding for IPROC
11
2013 Transportation Funding BillHB2313 – Finance Intercity Passenger Rail Impact to DRPT
– $300 million for the Dulles Metrorail Corridor Extension– Designated revenue source for Intercity Passenger Rail
Operating and Capital Fund (IPROC) – Approx. $44.3M in the first year
• Operating funds for continued and expanded Intercity Passenger Rail Service
– Extension of passenger train service to Roanoke– Addition of trains 2 & 3 for Norfolk-Washington route
• Capital funds for Intercity Passenger Rail Projects– Track Performance Improvements
» Newport News-Richmond» Richmond-Washington
– Increase of transit funding• Approximately $66.5M in the first year
– Funding - 3% statewide sales tax increase and increased MTTF dollars from the TTF
11
12
2013 DRPT Legislative ActionsHB1828 – Position the Agency
Codifies the Supreme Court decision that a state’s rail system does provide a highway benefit
Authorizes the Department of Rail and Public Transportation to acquire and hold title to land for constructing rail infrastructure
Currently DRPT may lease, construct and improve rail infrastructure, but is not expressly authorized to own rail infrastructure.
This legislation adds the authority for DRPT to hold title to abandoned rail way and to preserve it for future rail development.
12
1313
Virginia Rail System
– Two passenger rail operators – Amtrak and Virginia Railway Express– Eleven freight railroads –
• Two national Class I Railroads: Norfolk Southern and CSX • Nine local shortline railroads
14
Corridor Passenger and Freight Rail Initiatives
14
15
Shortline Initiatives Rail Preservation and Development Program
9 shortlines in VA Provide “last mile” service Maintain FRA class 2 standards
– safety, signaling and reliability
16
Passenger Rail Service In VirginiaPresent and Future
16
Amtrak VA – Lynchburg, Richmond/Norfolk Amtrak Regional – 2 Newport News, 2 Richmond
All go into Northeast Corridor All same seat to Boston
Amtrak Long Distance – Cardinal, Crescent, Carolinian, Palmetto, Silver Meteor, Silver Star Auto Train
17
Virginia Regional Amtrak Passenger Service Projected Population Areas
17
18
Set the Vision and Show How to Get ThereStates Need a Rail Plan and a
Resource Allocation Plan
Virginia’s Rail Plan is accompanied by a Resource Allocation Plan
Rail Plans need a vision of greater than the Six Year Improvement Program– Constrained Six Year Program– 2035-2040 longer range vision plan of projects
19
Amtrak Virginia Near Future
- 1 Lynchburg train extended to Roanoke (approx. 2016 - 2017)
- 2 Richmond trains extended to Norfolk (approx. 2022)
Amtrak Virginia Future
- 1 new train to Lynchburg - 1 Roanoke train extended to Bristol- 1 Lynchburg train extended to Roanoke- 1 new train Richmond to Lynchburg
Richmond to Hampton Roads Passenger Rail – 1 new to Newport News + 6 total Norfolk from Richmond
SEHSR – 4 new trains DC to Raleigh
Virginia State Rail PlanIntercity Passenger Rail
20
Virginia’s Second PathFederal Funding
In order to achieve the vision for higher speed passenger rail in Virginia, a strong federal participation is necessary, but comes with requirements: – Lengthy federal environmental process can require more than
eight years to complete– Performance requirements are difficult to achieve without full
funding for corridor-wide improvements– Opportunities to apply for funding limited and may not
coincide with planning/construction phases
State-funded projects can advance faster, but not sufficient state funding available to meet all needs
On some projects, states may need to join forces
21
Established in 1994 in VA by SB 126 2004 and in NC by NC General Statutes - Chapter 136 Article 18 § 136-220
Made up of ten members of the VA and NC legislature To study, develop, and promote a plan for the design, construction,
financing, and operation of interstate high-speed rail service through and between points in the Commonwealth of Virginia and the State of North Carolina and adjacent states
To coordinate efforts to establish high-speed rail service at the federal, state, and local governmental levels
To advocate for federal funding to support the establishment of high-speed interstate rail service within and through Virginia and North Carolina and to receive federal funds made available for rail development
Virginia-North Carolina Interstate
High-Speed Rail Compact
Two States Join Forces
22
Points of Discussion for Passenger Rail Development and Funding
What is the policy for passenger rail development and funding for your state?
Affordability of conventional incremental service development VS high speed rail development – What can you deliver?– State Program
• Establish a good working relationship with railroads by establishing Framework Agreements
• Incremental State service can be implemented quickly• Track capacity is achieved through agreements, service is
operated by Amtrak under Amtrak’s access and performance agreements already in place
– Federal Program• 20% capital match to FRA grants, 20 year Maintenance of Project
Commitment, 20 year commitment to fund additional service operations, Corridor Service Development Programs VS individual projects (commitment to build entire corridor VS segments)
• Risk/Payback - Performance payback (on time performance), loss of passenger service payback (all Amtrak service ceases), and failure to provide additional service payback (additional trains committed)
23
To Get to the Funding, You Need a Plan
Need for a National Rail Plan– Guiding principles on defining passenger and freight rail
development• High speed intercity passenger rail and at what speed – is it co-
mingled with freight as high capacity corridors or right-of-way of its own?
• What is the federal role and participation both in planning and function?
What is the definition of your state’s passenger rail corridors?– Do your corridor improvements benefit other states
or are they joint freight and passenger rail projects? Be able to answer the sequencing of individual
projects and who will pay for the improvements.
24
Key Points Regarding Funding Innovative financing for passenger rail begins with trust
of the administration and legislature and the ability to deliver. Virginia is competing nationally for federal funds but has some advantages:
– Framework agreements in place with railroads– Agreement with Amtrak for state sponsored passenger rail
service under PRIIA Section 209– State funding program for rail capital and intercity passenger rail
operating projects– VA High Speed Rail Corridor program links the Northeast
CorridorVirginia has PPTA and PPEA business models in place for
innovative private and public venture partnerships. Virginia has sustainable rail programs that continue to
provide and expand passenger rail.
25
Thank You!