topaz

45
Your Total Solution Provider Topaz Integrated Technology Sdn. Bhd. TOPAZ

Upload: others

Post on 18-Dec-2021

9 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: TOPAZ

Your Total Solution Provider

Topaz Integrated Technology Sdn. Bhd.

TOPAZ

Page 2: TOPAZ

INTRODUCTION

• Established since 1997, 100% Bumiputera company

• We are CIDB registered G7 Contractor specialized in Civil, M&E and Industrialized Building System (IBS) manufacturing, design and IBS contractor.

• We are ISO 9001, 14001 & 45001 certified

• Our management team is highly experienced in IBS design and construction

TOPAZ

Page 3: TOPAZ

LICENSES

Page 4: TOPAZ

Vision Statement

• To be a leading IBS manufacturer, designer and contractor in Malaysia and also overseas

• To replace all the fire and non-fire rated infill wall with IBS FAST WALL System.

Mission Statement

• To manufacture, supply and install IBS to both government and private sectors to improve the speed, cost and quality of fire and non-fire rated infill wall

• To continue to research for a total green solution to build faster, more cost efficient and better quality home

Page 5: TOPAZ

IBS FAST WALL SYSTEM

U channel fixed to beam/slab soffit

Electrical conduit

Wall Stud 0.8-1.0mm

Insulation Solid Foam

Page 6: TOPAZ

IBS FAST WALL SYSTEM

U channel fixed to beam/slab soffit

Electrical conduit

Insulation Solid Foam

Step 1 Step 2

Step 3 Step 4

Page 7: TOPAZ

MAIN COMPONENT:

FIBRE CEMENT BOARD CERTIFICATION

SIRIM Certificate

Page 8: TOPAZ

IBS FAST WALL SYSTEM APPLICATION

• As a fire or non-fire rated wall (replacement for brick/block wall) for:

▪ Single and double storey house or shop office

▪ Mid rise to high rise apartment

▪ Hotel or motel

▪ Government buildings and complexes

▪ Resettlement or rural housing program (complete solution with steel/RC frame structure)

▪ Rural school program (complete solution with steel/RC frame structure)

Page 9: TOPAZ

FINISH PRODUCTS

Page 10: TOPAZ

IBS FAST WALL SYSTEM

TECHNICAL SPECIFICATIONS:

Fire Resistance

IBS FAST WALL SYSTEM has been tested in accordance with BS 476, fire tests on building

material and structure. Test result as follow :-

• Fire Propagation (BS 476 Part 6) – Index of Performance, I=0, - Sub-Index, I=0

• Surface Spread of Flame (BS 476 Part 7) - Class 1 (No ignition)

• IK insulation solid foam is Polyurethane base which is a fire retardant

• No failure or collapse of surface after 120 minutes

Description of Wall Type Fire Rating

1 76mm thick with 6mm fiber cement board 2 hours

2 104mm thick with 9mm fiber cement board 3 hours

Page 11: TOPAZ

IBS FAST WALL SYSTEM MAIN COMPONENT: FIBRE CEMENT BOARD CERTIFICATION

UNDER THE UBBL MALAYSIA 1984, CLAUSE 204, A MATERIAL IS CLASSIFIED AS MEETING THE “CLASS ‘O’-SURFACE OF NO FLAME SPREAD” REQUIREMENT IF WHEN TESTED TO BS 476 PART 6, HAS AN INDEX OF PERFORMANCE NOT EXCEEDING 12 AND A SUB-INDEX (I) NOT EXCEEDING 6. OUR PRODUCT IS DEEMED NOT-COMBUSTIBLE IN ACCORDANCE WITH THE BUILDING CODE OF

AUSTRALIA.

Bomba Certificate

Page 12: TOPAZ

IBS FAST WALL SYSTEM TECHNICAL SPECIFICATIONS:

Thermal Insulation

IBS FAST WALL SYSTEM is highly resistant to heattransmission. Its thermal conductivity at facial board isrelatively lower than brick and concrete surface. The 3layers of solid panel is giving the wall system a perfectThermal Insulation, R value compare to brick andconcrete.

Page 13: TOPAZ

IBS FAST WALL SYSTEM

TECHNICAL SPECIFICATIONS:

Thermal Conductivity & Insulation Comparison

(Tested to ASTM C518 Standard)

• Passive in thermal conductivity

• Excellent in thermal insulation

Physical Properties IK Fast Wall System Common Brick Wall

ReinforcedConcrete Wall

1. Thermal conductivity, K (W/mk)

0.03 (Int. layer)0.23 (Ext. layer)

1.1 1.7

2. Thermal insulation, R (m2K/W)

7.0 0.28 0.13

Page 14: TOPAZ

IBS FAST WALL SYSTEM TECHNICAL SPECIFICATIONS:

Sound Insulation

IBS FAST WALL SYSTEM is a better sound proof wall thanbrick wall.

Physical Properties IK Fast Wall System Common brick wall

1 Accoustic Insulation 60 dB (104mm)45 dB (76mm)

50dB (230mm)38dB (100mm)

Page 15: TOPAZ

IBS FAST WALL SYSTEM TECHNICAL SPECIFICATIONS:

Water Resistance

IBS FAST WALL SYSTEM Fibre Cement Board has been subjected to rigorous test andsubsequently demonstrate high degree of resistance to prolonged moisture exposure thatcould lead to premature system failure. The following test have been conducted :-

• MS 1296

- Warm water (Clause 6.1)

• AS/NZS 2908.2

- Water permeability (Clause 8.2.2)

- Frost resistance (Clause 8.2.3)

- Warm water (Clause 8.2.4)

- Heat-rain (Clause 6.5)

- Soak-dry (Clause 8.2.5)

Page 16: TOPAZ

IBS FAST WALL SYSTEMTECHNICAL DATA

Water Resistance

Physical Properties Test Result

1 Water Absorption ≤29.5%

2 Moisture content ≤10%

3 Moisture movement ±0.054%

4 Water tightness Pass

Page 17: TOPAZ

IBS FAST WALL SYSTEM TECHNICAL SPECIFICATIONS:

Durability

IBS FAST WALL SYSTEM is designed for multi-functional used as structural and non-structural application.

Physical Properties IK Fast Wall System Common brick wall

1 Modulus of Elasticity 5500 Mpa (saturated) 1600 MPa

2 Flexural Strength >7MPa (saturated) 3.55 Mpa

Note: Based on Fiber Cement Board Data

Page 18: TOPAZ

IBS FAST WALL SYSTEM TECHNICAL SPECIFICATIONS:

Durability

Other Physical Properties test.

Physical Properties IK Fast Wall System

1 Freeze/Thaw Resistance Pass

2 Warm Water Resistance Pass

3 Heat/Rain Resistance Pass

4 Soak/Dry Resistance Pass

5 Screw Pull Out Test 0.7KN (70 kg)

6 HD Weight Anchorage Test 4KN (400kg per 4 anchor)

7 Door Slam Test (100 times of 60kg door slam)

Pass

Page 19: TOPAZ

IBS FAST WALL SYSTEM TECHNICAL SPECIFICATIONS:

Density

IBS FAST WALL SYSTEM is durable and lightweight compare to brick wall. This will greatly increase your productivity and reducing your labour cost and speed up your construction by shortening overall construction period.

Physical Properties IK Fast Wall System Common Brick wall

1 Density (dry) 28 kg/m2 190-200 kg/m2

Page 20: TOPAZ

ADVANTAGES

OF

IBS FAST WALL SYSTEM

Page 21: TOPAZ

IBS FAST WALL SYSTEM

• Light & easy to transport from factory to any site

• Cut down transportation cost ranging from 30-60% especially if project is located at rural area.

Page 22: TOPAZ

IBS FAST WALL SYSTEM

➢No plastering needed, only skim coat at panel joint.

➢Cut down high wastages on brick work & plastering

Page 23: TOPAZ

IBS FAST WALL SYSTEM

➢ Less defect & quality issues as brick wall often uneven and crack or leak.

➢ Fast and simple installation with all M&E conceal inside the wall.

Page 24: TOPAZ

IBS FAST WALL SYSTEM

Less energy cost as the building is insulated from heat

Reduce construction time between 30-70%

Page 25: TOPAZ

IBS FAST WALL SYSTEM

It is a CIDB certified Industrialized Building System

It is a Green Building Product certified by Green Label of Singapore

Meeting the criteria of Green Building Index for certification

IBS

Page 26: TOPAZ

IBS FAST WALL SYSTEM

Last but not least, it reduced overall construction cost of the project.

❑ Reduction of infill wall weight by 70%

❑ Reduction of piling & foundation cost by 10-15%

❑ Reduction of superstructure cost by 8-10%

❑ Reduction of preliminary cost 15-30%

Page 27: TOPAZ

IBS FAST WALL SYSTEM

Anti-termite Weather Resistance

Water Resistance

Fire Resistance

Green Product Heat Insulation

SoundInsulation

Impact Resistance

Page 28: TOPAZ

IBS FAST WALL SYSTEM

FINISHES

Page 29: TOPAZ

IBS FAST WALL SYSTEM

FINISHES

Paint Wall Paper Texture Tiles

Page 30: TOPAZ

IBS FAST WALL SYSTEM

Paint finishes

Page 31: TOPAZ

IBS FAST WALL SYSTEM

Tile finishing

Page 32: TOPAZ

IBS FAST WALL SYSTEMINSTALLATION METHOD:

Door & Window

Page 33: TOPAZ

PROJECT REFERENCES

Page 34: TOPAZ

ON-GOING PROJECTS

Mata Air, Kangar, Perlis

Page 35: TOPAZ

ON-GOING PROJECTS

Mata Air, Kangar, Perlis

Page 36: TOPAZ

COMPLETED PROJECTS

Padang Central Hotel, Padang Besar, Thailand

Page 37: TOPAZ

ON-GOING PROJECTS

KTM Quarter, Sg Petani, Kedah

Page 38: TOPAZ

COMPLETED PROJECTS

Tikam Batu, Kedah

Page 39: TOPAZ

COMPLETED PROJECTS

Lembah Bujang, Merbok, Kedah

Page 40: TOPAZ

PROJECT USING HUME FIBRE CEMENT BOARD

YTL Casper Residences @ Sentul

Page 41: TOPAZ

PROJECT USING HUME FIBER CEMENT BOARD

Kuching General Hospital Refurbishment Works

Page 42: TOPAZ

Mydin Mall, Gopeng IPOH

Page 43: TOPAZ
Page 44: TOPAZ
Page 45: TOPAZ

IBS FAST HOME SYSTEM

YOUR COMPLETE DREAM HOME SOLUTION…

TOPAZ