with peruvian trust fund for national parks and …...activity 3.2.1: address cofide’s gaps for...

19
with Peruvian Trust Fund for National Parks and Protected Areas (Profonanpe) for Republic of Peru 06 December 2019 | Entity Support

Upload: others

Post on 08-Jun-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: with Peruvian Trust Fund for National Parks and …...Activity 3.2.1: Address COFIDE’s gaps for GCF accreditation. The gaps are mainly focused on ESS, gender mainstreaming, and grant

with Peruvian Trust Fund for National Parks and Protected Areas

(Profonanpe) for Republic of Peru

06 December 2019 | Entity Support

Page 2: with Peruvian Trust Fund for National Parks and …...Activity 3.2.1: Address COFIDE’s gaps for GCF accreditation. The gaps are mainly focused on ESS, gender mainstreaming, and grant

Programme title: Actions towards accessing different GCF funding modalities in Peru

Country: Peru

National designated authority: Ministry of Economy and Finance

Implementing Institution: Profonanpe

Date of first submission: 29 August 2019

Date of current submission / version number

21 November 2019 V.06

Page 3: with Peruvian Trust Fund for National Parks and …...Activity 3.2.1: Address COFIDE’s gaps for GCF accreditation. The gaps are mainly focused on ESS, gender mainstreaming, and grant

Readiness and Preparatory Support Page 2 of 12

How to complete this document?

- Please visit the Empowering Countries page of the GCF website to download the Readiness Guidebook and learn how to access funding under the GCF Readiness and Preparatory Support Programme.

- This document should be completed by National Designated Authorities (NDA) or focal points with support from their Delivery Partners where relevant. Once completed, this document should be submitted to the GCF by the NDA or focal point to [email protected].

- Please be concise. If you need to include any additional information, please attach it to the proposal. - If the Delivery Partner implementing the Readiness support is not a GCF Accredited Entity for project

Funding Proposals, please complete the Financial Management Capacity Assessment (FMCA) questionnaire and submit it prior to or with this Readiness proposal. The FMCA is available for download at the Library page of the GCF website.

Where to get support?

- If you are not sure how to complete this document, or require support, please send an e-mail to [email protected].

- You can also complete as much of this document as you can and then send it to [email protected], copying both the Readiness Delivery Partner and the relevant GCF Country Dialogue Specialist and Regional Advisor. Please refer to the Country Profiles page of the GCF website to identify the relevant GCF Country Dialogue Specialist and Regional Advisor.

- We will get back to you within five (5) working days to acknowledge receipt of your submission and discuss the way forward.

Please submit the completed form to:

[email protected]

Please use the following naming convention for the file name: “GCF Readiness Proposal-[Country]-[yymmdd]”

Note: Environmental and Social Safeguards and Gender

Throughout this document, when answering questions and providing details, please make sure to pay special attention to environmental, social and gender issues, particularly to the situation of vulnerable populations, including women and men. Please be specific about proposed actions to address these issues. Consult Annex IV of the Readiness Guidebook for more information.

Page 4: with Peruvian Trust Fund for National Parks and …...Activity 3.2.1: Address COFIDE’s gaps for GCF accreditation. The gaps are mainly focused on ESS, gender mainstreaming, and grant

Readiness and Preparatory Support Page 3 of 12

1. SUMMARY

Country submitting the proposal

Country name: Peru

Name of institution representing NDA or Focal Point: Ministry of Economy and Finance (MEF)

Name of contact person: Pedro Herrera Catalán

Contact person’s position: General Director of International Economy, Competition and Productivity Affairs

Telephone number: +511 3115930

Email: [email protected]

Full office address: Jr. Lampa N°277, Cercado de Lima, Lima, Peru

Additional email addresses that need to be copied on correspondences:

Date of initial submission 29 August 2019

Last date of resubmission 21 November 2019 Version number V.06

Which institution will implement the Readiness and Preparatory Support project?

☐ National designated authority ☒ Accredited entity ☐ Delivery partner Please provide contact information if the implementing partner is not the NDA/focal point

Name of institution: Profonanpe

Name of official: Anton Willems

Position: Executive Director

Telephone number: +511 2181097

Email: [email protected]

Full office address: Av. Javier Prado Oeste 2378, San Isidro, Lima, Peru

Additional email addresses that need to be copied on correspondences: [email protected]

Title of the Readiness support proposal

Actions towards accessing different GCF funding modalities in Peru

Type of Readiness support sought

Please select the relevant GCF Readiness activity area below (click on the box): ☐ I. Country capacity for engagement with GCF ☐ II. Country programming process ☒ III. Direct access to climate finance ☐ IV. Climate finance accessed ☐ V. Formulation of national adaptation planning and/or other adaptation planning

processes

Page 5: with Peruvian Trust Fund for National Parks and …...Activity 3.2.1: Address COFIDE’s gaps for GCF accreditation. The gaps are mainly focused on ESS, gender mainstreaming, and grant

Readiness and Preparatory Support Page 4 of 12

Brief summary of the request

Peru is working to access the different financing modalities available by GCF. In this sense, the NDA (i) has identified a potential Direct Access Entity (DAE) within the country that will be complementary to Profonanpe; and (ii) wishes to boost Profonanpe’s capacity for funds management, given the new strategies that the institution is envisioning.

On one hand, a first Readiness support provided by the GCF through Price Waterhouse and Cooper (PwC), assessed the capacity of COFIDE to become a GCF’s accredited entity. The result of this assessment was promising, but a series of recommendations were given from which COFIDE has started to address. In order to expedite this process, the NDA considers that Profonanpe could support COFIDE to address some gaps that are still to be covered, given the experience it has already gained with the GCF.

On the other hand, Profonanpe is rethinking and planning new ways of approaching climate change mitigation and adaptation and biodiversity conservation through its work and the services it provides. This includes, among other, new fiduciary functions to be explored. Therefore, the NDA supports this initiative that could lead to an additional upgrade for Profonanpe, allowing the country to access additional GCF funding resources.

Total requested amount and currency

• USD 766,874 (Outcome budget + contingency + PMC)

• USD 65,1841 (DP) USD 832,058 (Total)

Anticipated duration 12 months

Has the country received or is expecting to receive other Readiness and Preparatory Support funding allocations (including adaptation planning) from GCF or other donors?

☒ Yes ☐ No

Peru has previously received four Readiness supports from the GCF: 1. To assess COFIDE’s conformity and gaps regarding GCF’s fiduciary standards and ESS, with the support of PwC as Delivery Partner. 2. To strengthen the NDA, prepare a country programme and develop strategic frameworks according to the GCF’s guidelines, with GIZ as Delivery Partner. 3 and 4. To strengthen Profonanpe’s capacities to better manage future GCF projects both as an implementing and executing entity; in both cases with Profonanpe as Delivery Partner. Resources of the last request were recently disbursed and therefore activities have just started.

1 These include the services provided by the administrative area of Profonanpe, in charge of procurement, accountability, and treasuring, among other. The fee also includes the time spend by Profonanpe’s Directors who will assess the advances made. Finally, the fee will contribute to cover maintenance expenses, including communication services which will be required for the implementation of this proposal.

Page 6: with Peruvian Trust Fund for National Parks and …...Activity 3.2.1: Address COFIDE’s gaps for GCF accreditation. The gaps are mainly focused on ESS, gender mainstreaming, and grant

Readiness and Preparatory Support Page 5 of 12

2. BACKGROUND

Profonanpe continues to be the only GCF ‘s DAE in Peru and is currently implementing two Readiness projects to strengthen its role as implementing and executing entity. Moreover, characterized by its constant improvement and cooperation with other institutions, Profonanpe is envisioning new ways of approaching climate change mitigation and adaptation, and biodiversity conservation. These include exploring on-lending and blending fiduciary functions, and in order to achieve them new institutional gaps will need to be addressed. These will require for example, develop operational guidelines/manuals for new fiduciary functions and carryout legal arrangements.

In parallel, Peru’s NDA has also identified an additional DAE that will be complementary to Profonanpe: COFIDE, a state owned second-tier development bank established in 1992, which is involved in project finance, financial intermediation and blended investments execution. COFIDE intends to use GCF financing for public and private sector projects across a variety of areas: energy generation, access and efficiency; transport, cities, industries and appliances; land use, forestry (REDD+) and built environment.

Through a previous Readiness support, COFIDE received a gap assessment and an action plan conducted by PwC. In order to be addressed, the NDA brought together COFIDE and Profonanpe, given Profonanpe’s increased knowledge and capacities regarding the GCF operating procedures and its ability to meet its requirements. Thus, COFIDE and Profonanpe started working together by (i) arranging their interinstitutional agreements, (ii) reviewing and organizing the information to be uploaded for the application, (iii) preparing draft terms of references for the required consultancies, and (iv) preparing the current proposal to address the identified gaps which are mainly focused, but not limited, on gender, ESS and grant award.

Therefore, the NDA and Peru as a whole are the main beneficiaries of this proposal as it will generate a new DAE and boost its current one, ultimately allowing the country to access additional GCF funding resources by having two DAE working in perfect match to achieve the NDCs.

Page 7: with Peruvian Trust Fund for National Parks and …...Activity 3.2.1: Address COFIDE’s gaps for GCF accreditation. The gaps are mainly focused on ESS, gender mainstreaming, and grant

Readiness and Preparatory Support Page 6 of 12

3. LOGICAL FRAMEWORK AND IMPLEMENTATION SCHEDULE

Outcomes Baseline Targets Activities2 (brief description and deliverables)

Anticipated duration: 12 months

Monthly implementation plan of activities

1 2 3 4 5 6 7 8 9 10 11 12

Outcome 3: Direct access to climate finance

Sub-Outcome 3.2: Accreditation of direct access entities

0 1

New DAE has submitted its application: Activity 3.2.1: Address COFIDE’s gaps for GCF accreditation. The gaps are mainly focused on ESS, gender mainstreaming, and grant award fiduciary function, which will be address with support from international and national consultants. In addition, COFIDE’s documentation needs to be translated to be assessed by the Secretariat and external panel, and adjustments in their webpage are foreseen in order to respond to GCF requirements. Deliverables 3.2.1: - Policy and action plan developed to ensure gender mainstreaming.

X

- ESS Policy and Environmental and Social risk management procedures updated. X - Policy and procedures developed for grant award fiduciary function. X - Updated web page. X - Report on every training, including list of participants. X - Report on meetings. X

0 1

Previous DAE accredited by the GCF is assessed and prepared for future upgrade: Activity 3.2.2: Assessment and preparation for new fiduciary functions within Profonanpe. These will consider having consultancies for a gap analysis and development of the corresponding operational guidelines (please see more details in the budget notes). Additional work is thought to (i) train staff to respond to new businesses; (ii) hire services to prepare corresponding legal documents, translate them and update Profonanpe’s webpage accordingly; and (iii) start involving private business sector to develop potential proposals with them. Deliverables 3.2.2: - Gap assessment.

X

- Operation guidelines for new fiduciary functions. X - Legal documents updated. X - Report on every training, including list of participants, certificates and evaluation results. X - Updated webpage. X - Report on meetings and workshops held with the private business sector. X Activity 3.2.3: Update Profonanpe’s documents according to GCF’s new approved policies. This consider a consultancy to reinforce indigenous peoples’ engagement and mainstreaming, as well as a consultancy that reviews and update other aspects that could include: anti-money laundry, terrorism, sexual exploitation, abuse or harassment, among other. The activity also considers

X

2 Please include tangible and specific deliverables for each activity proposed, and the timeframe (month number) in which it will be delivered to GCF. Please note that during implementation all deliverables should be included within the implementation reports for GCF consideration.

Page 8: with Peruvian Trust Fund for National Parks and …...Activity 3.2.1: Address COFIDE’s gaps for GCF accreditation. The gaps are mainly focused on ESS, gender mainstreaming, and grant

Readiness and Preparatory Support Page 7 of 12

workshops with staff members to present the results of such consultancies and a material related to the indigenous people engagement. Deliverables 3.2.3: - Indigenous peoples engagement and mainstreaming plan. - Updated Profonanpe’s documents aligned with GCF’s new approved policies. X - Report on every workshop, including list of participants. X - Indigenous peoples engagement material. X

Page 9: with Peruvian Trust Fund for National Parks and …...Activity 3.2.1: Address COFIDE’s gaps for GCF accreditation. The gaps are mainly focused on ESS, gender mainstreaming, and grant

Readiness and Preparatory Support Page 8 of 12

4. ADDITIONAL INFORMATION (ONLY FOR ADAPTATION PLANNING SUPPORT)

N/A

5. BUDGET, PROCUREMENT, IMPLEMENTATION, AND DISBURSEMENT

5.1 Budget plan Please see the Budget Plan in Excel file. 5.2 Procurement plan Please see the Procurement Plan in Excel file. 5.3 Disbursement schedule

☒ Readiness Proposal that requires a bilateral Grant Agreement to be signed with the GCF (please add more disbursement as needed)

• The first disbursement amounting USD 665,646 will be transferred upon approval of the readiness request and effectiveness of the Grant Agreement;

• The second disbursement amounting USD 166,412 will be transferred upon submission of a completion report and financial report, in form and substance acceptable to the Fund, including an audited expenditure statement.

Page 10: with Peruvian Trust Fund for National Parks and …...Activity 3.2.1: Address COFIDE’s gaps for GCF accreditation. The gaps are mainly focused on ESS, gender mainstreaming, and grant

Readiness and Preparatory Support Page 9 of 12

6. IMPLEMENTATION ARRANGEMENTS AND OTHER INFORMATION 6.1 Implementation map Please describe how funds will be managed by the NDA and/or the Readiness Delivery Partner.

Profonanpe, as GCF’s AE, will be in charge of technical and financial execution of this proposal. Therefore, Profonanpe will assume the following responsibilities:

- Receive and manage all funds received through the Readiness Program for preparatory support as described in the proposal.

- Coordinate with the NDA and COFIDE to organize periodic meetings. - Carry out procurement and activities as planned. - Prepare reports stated as deliverables for each programed activity and the corresponding interim,

completion and financial report. - Coordinate the external audit.

A visual representation of the implementation map is presented below:

The start date for project implementation will be in accordance with the grant agreement to be enter between the grant recipient and the GCF or UNOPS as agent for the GCF and from that date, the end date of implementation will be calculated taking into account the total duration of the project as presented in the approved proposal.

6.2 Risks, monitoring and evaluation (M&E), and other relevant information

Risks:

The identified risks and corresponding mitigation actions are the following: Risk category

Risks Likelihood

of occurrence

Impact level

Entity to manage the risk

Mitigation actions

Project implementation The agenda of

representatives of the NDA difficult coordination meetings.

Medium Low Profonanpe Profonanpe agenda will be kept flexible in order to carry out meetings on NDA convenience. COFIDE’s agenda will also be requested to be flexible.

Project implementation

Changes are made in the designation of representatives

Medium Low Profonanpe Profonanpe will keep a cordial relation with any NDA and MINAM

GCF

Profonanpe MEF (NDA)

Other stakeholders

COFIDE

Legend: Funds flow

Report flow

Coordination flow

Page 11: with Peruvian Trust Fund for National Parks and …...Activity 3.2.1: Address COFIDE’s gaps for GCF accreditation. The gaps are mainly focused on ESS, gender mainstreaming, and grant

Readiness and Preparatory Support Page 10 of 12

from national authorities.

representative assigned to follow up GCF activities, and will coordinate initial meetings to update them on previous arrangements and decisions taken in order to facilitate continuity.

Project implementation

Interest and commitment of COFIDE representatives decline because of changing directors.

Low High Profonanpe Profonanpe will signed a Memorandum of Understanding to define the commitment of COFIDE and assure the continuity of the activities.

Project implementation

Applications for COFIDE’s accreditations and Profonanpe’s upgrade delay their approval by the Board because of extensive revision processes.

Low High Profonanpe

Profonanpe will coordinate with COFIDE to create a timeline according with the GCF processes to match the schedule of the Board meetings.

There are no risks, threats or challenges in the project that could make it vulnerable to money laundering, terrorist financing, corruption or prohibited practices, given that Profonanpe will be in charge of hiring the consultancies and services, applying the policies and guidelines for which it was accredited.

Monitoring and Evaluation:

In order to monitor the performance of programmed activities, deliverables and reports, as well as the occurrence of risks and the appliance of the corresponding mitigation actions, Profonanpe will apply the following:

- Assign a technical staff member responsible for the implementation of the proposal. - Assign the Director of Development and Supervision Direction (DSD) to monthly assess the advances

made according to the programed activities and commitments with GCF under the Readiness Grant Agreement.

- Adjust this proposal to the institutional documents used for annual programing and upload it to its technical and financial system to facilitate follow up and later reporting to the GCF.

- Inform the NDA the progress of programmed activities during periodic meetings. - Share interim, completion and financial report with the NDA before its submission to the GCF in order

to include any observations raised.

In addition, Profonanpe will implement the following monitoring and evaluation plan:

Aspect Monitoring/evaluation action Responsible Periodicity

Technical

Follow up consultancies and review of their deliverables; and coordination with COFIDE

Program officer of the DSD Continuously

Monitor risks occurrences and application of mitigation actions

Program officer of the DSD Monthly

Assess advances according to programed activities Director of the DSD Monthly

Inform the NDA the progress of programmed activities Director of the DSD Bimonthly

Fiduciary Financial follow up Internal control Monthly

External financial audit External audit company By the end of the project

Page 12: with Peruvian Trust Fund for National Parks and …...Activity 3.2.1: Address COFIDE’s gaps for GCF accreditation. The gaps are mainly focused on ESS, gender mainstreaming, and grant

Readiness and Preparatory Support Page 11 of 12

Technical & Fiduciary

Preparation of reports for the NDA and GCF

Program officer of the DSD 7 and 19 months from

the project start date Review and dispatch of reports to the NDA and GCF Director of the DSD

Exit strategy:

Given that the activities considered in this proposal will be done to improve capacities within COFIDE and Profonanpe, results will be inserted within their daily procedures and will therefore be sustained after project closure. In that sense, the planned workshops will allow that information and results obtained from the consultancies are shared along staff members, generating the required institutional culture around each topic. Moreover, capacity building is also practiced within Profonanpe through periodic internal meetings and therefore knowledge gained among staff members is always shared between peers. This will be applied for activities considered in this proposal. Finally, activities regarding Profonanpe will allow the institution broaden its scope and therefore generate the required income to be sustainable and to maintain the practices and tools provided by this Readiness support.

Other relevant information:

A. The following table describes the expected outputs of the previous and present readiness grants, to facilitate the comprehension of how they are linked together while avoiding duplicative work. It also shows the additional activities that are being executed by Profonanpe involving GCF and in coordination with different stakeholders:

Readiness name

Gaps to be addressed with the proposal Expected outputs

Additional activities done in parallel while

executing the Readiness

Strengthening institutional capacities of Profonanpe as GCF’s National Implementing Entity in Peru

• Limited capacities within Profonanpe to better manage project in mainly the following subjects:

ESS Climate change Project management

• Under developed project pipeline.

• More prepared and trained staff to oversee and assess project execution, financial and contractual obligations.

• Updated Manual of Operations and enhanced technical tools to expedite the assistance and support provided to Profonanpe’s stakeholders.

• Concept notes developed.

• GCF project implementation in Datem del Marañon.

• GCF project development with different stakeholders and at different stages (names are referential and subject to change): - Ecosystem-based

Adaptation and Financing for Alpacas Herders and Vicuña

- Peru’s Natural Legacy

- Adaptation and mitigation in indigenous landscapes of the Peruvian Amazon

- Leveraging Private Sector in Forest Conservation in the Peruvian Amazon

- Perú: makes prevention and attention expand faster than forest

Increasing Profonanpe’s capacities as DAE of Peru – Stage II

• Meet GCF new requirements given Profonanpe’s upgrade, mainly regarding:

Better-quality project design and monitoring Gender mainstreaming Transparency and accountability Institutional management effectiveness Impact evaluation

• More prepared and trained staff to respond to GCF requirements.

• Technical Evaluation Committee established.

Page 13: with Peruvian Trust Fund for National Parks and …...Activity 3.2.1: Address COFIDE’s gaps for GCF accreditation. The gaps are mainly focused on ESS, gender mainstreaming, and grant

Readiness and Preparatory Support Page 12 of 12

Actions towards accessing different GCF funding modalities in Peru

• Limited access to different funding modalities of the GCF through NIE.

Application of an additional NIE submitted. Current NIE’s capacity to apply new fiduciary functions assessed and started

fires and other climate-related disasters

The NDA has selected Profonanpe as the Delivery Partner for this proposal as the country is prioritizing working with its national entities in the extent of their abilities in order to continue strengthening internal capacities; and Profonanpe is a private institution created by law specifically to support public interests. In addition, Profonanpe is the only GCF accredited entity which has already presented 2 of the 4 Readiness approved in the country, apart from being the only one currently executing a GCF project in Peru. Profonanpe has been involved with GCF since its establishment, is in continuous coordination with the NDA and has a track record helping other national institutions in identifying and addressing their gaps to access accreditations.

B. Title to goods and other property financed by GCF, will be in accordance with the provisions in the standard template grant agreement to be entered into between the grant recipient and the GCF or an agent of the GCF such as UNOPS. Most of the deliverables will be reflected in Profonanpe’s and COFIDE’s webpages, and those that are not will be uploaded and shared in a google drive folder associated to the reports and means of verifications of this grant support.

Page 14: with Peruvian Trust Fund for National Parks and …...Activity 3.2.1: Address COFIDE’s gaps for GCF accreditation. The gaps are mainly focused on ESS, gender mainstreaming, and grant

The following considerations are important when completing the budget:

1. Before preparing the Readiness and PPF budget, please read the full guidance on our website

2. You can select the appropriate budget categories from the dropdown list in the budget plan:

3. To insert additional rows, right click on the row number below where you wish to insert the new row and choose INSERT.

4. Additional budget categories may be added by manually typing them on the Budget Category sheet. :

Project Management Cost: Project management costs (PMC) are the direct administrative costs incurred to execute a project. They should cover only incremental costs incurred due to the GCF contribution. In most cases, these costs are directly related to the support of a dedicated project management unit (PMU) which managesthe day to day execution related activities of the project.

General Principles for PMC costs: 1. The percentage of PMC financed by GCF should not be more than the percentage share of the overall budget financed by GCF 2. PMC budget thresholds: Up to 7.5 per cent of total activity budget. > PMC exceeding 7.5 per cent for the readiness (including NAPs) proposals, and PPF proposals, up to $ 3 million will require detailed documentation and justification supporting the entire PMC budget. > The PMC should be shown as a separate component in the project budget. A detailed breakdown of PMC should be provided by budget category. > Indicative list of eligible project management costs:

> Project staffing and consultants: Project manager, Project Assistant, Procurement personnel, Finance personnel & Support/admin. Personnel> Other direct costs: Office equipment, Mission related travel cost of the PMU, Project management systems and information technology, Office supplies, Audit cost

Contingency :1. Select the appropriate % of Contingency Budget from the dropdown list :

2. Contingency budget for unforeseen costs arising during the project implementation should not be included in the outcome budget separately.3. Contingency budget must be used for any unforeseen programme (output level) cost that is unrelated to implementation/service fee.4. Any use of contingency must be reported to and agreed by the GCF Secretariat in writing in advance provided with justifications that are acceptable to the GCF5. If you get to the end of the project and you haven’t spent Contingency, you can’t increase the scope of the project or buy some more equipment to use it up.

6. The Budget Notes sheet should be used to record explanations, further details or cost breakdowns for individual lines

(https://www.greenclimate.fund/how-we-work/empowering-countries).

If you are unsure about how to complete the budget template, please send your query to: [email protected]

Readiness Grant Budget Preparation Guidelines

Page 15: with Peruvian Trust Fund for National Parks and …...Activity 3.2.1: Address COFIDE’s gaps for GCF accreditation. The gaps are mainly focused on ESS, gender mainstreaming, and grant

5.1 Budget PlanPlease add rows for Outcomes, Outputs and Cost Categories as required. Additional budget categories may be added by manually typing them on the Budget Category sheet.

3.2.1.1 Consultant - Individual - International W/Day 150 600.00 90,000.00 90,000.00

3.2.1.2 Consultant - Individual - International W/Day 180 600.00 108,000.00 108,000.00

3.2.1.3 Consultant - Individual - Local W/Day 180 400.00 72,000.00 72,000.00

3.2.1.4 Professional Services – Companies/Firm Lumpsum 1 3,000.00 3,000.00 3,000.00

3.2.1.5 Professional Services – Companies/Firm Lumpsum 1 1,500.00 1,500.00 1,500.00

3.2.1.6 Workshop/Training Lumpsum 6 2,000.00 12,000.00 12,000.00

3.2.1.7 Workshop/Training Meeting 18 100.00 1,800.00 1,800.00

3.2.2.1 Consultant - Individual - Local W/Day 120 400.00 48,000.00 48,000.00

3.2.2.2 Consultant - Individual - Local W/Day 210 400.00 84,000.00 42,000.00 42,000.00

3.2.2.3 Workshop/Training Workshop 4 2,500.00 10,000.00 10,000.00

3.2.2.4. Workshop/Training Staff 2 4,500.00 9,000.00 9,000.00

3.2.2.5 Workshop/Training Staff 8 7,000.00 56,000.00 56,000.00

3.2.2.6 Workshop/Training Staff 3 5,000.00 15,000.00 15,000.00

3.2.2.7 Professional Services – Companies/Firm Hourly rate 75 400.00 30,000.00 15,000.00 15,000.00

3.2.2.8 Professional Services – Companies/Firm Lumpsum 1 3,000.00 3,000.00 1,500.00 1,500.00

3.2.2.9 Professional Services – Companies/Firm Lumpsum 1 1,500.00 1,500.00 1,500.00

3.2.2.10 Workshop/Training Meeting 5 1,000.00 5,000.00 2,500.00 2,500.00

3.2.3.1 Consultant - Individual - International W/Day 120 600.00 72,000.00 36,000.00 36,000.00

3.2.3.2 Professional Services – Companies/Firm Lumpsum 1 3,000.00 3,000.00 3,000.00

3.2.3.3 Consultant - Individual - Local W/Day 180 400.00 72,000.00 36,000.00 36,000.00

3.2.3.4 Workshop/Training Workshop 4 2,500.00 10,000.00 5,000.00 5,000.00

706,800.00 540,300.00 166,500.00 - - - - PMC 1 Staff Month 12 2,833.00 33,996.00 PMC 2 Staff Month 12 1,192.50 14,310.00 PMC 3 Audit Fee Lumpsum 1 4,700.00 4,700.00 do not change the formula do not change the formula

- 53,006.00 53,010.00

- 7.50% 7.50%

Total (per budget category)

-

4,700.00

270,000.00

276,000.00

42,000.00 Project Management Cost (PMC) 7.5% requested

- Contingency requested

-

-

-

118,800.00

48,306.00

-

-

-

-

759,806.00

Total Outcome Budget

Actual amount and % of PMC requested:

Maximum PMC that can be requested:

Breakdown (per budget category)

Workshop/Training

Staff

0

Delivery Partner Fee (DP) - Up to 8.5% of the Sub-Total

Project Management Cost (PMC)Up to 7.5% of Total Activity Budget

Total Outcome Budget + PMC

0

Consultant - Individual - International

Consultant - Individual - Local

Professional Services – Companies/Firm

IT Equipment

Unit 6m

Outcome 3. Direct access to climate finance

24m18mUnit CostOutcomes

Sub-outcome 3.2 Accreditation of direct access entities

Code

65,184.29

Total Budget(per sub-outcome)

Sub-Total (Total Outcome Budget + Contingency + PMC)

7,068.00

706,800.00

1%

Total Outcome Budget

36mTotal Budget(per budget category)

53,006.00

Total Budget(per outcome) 12m

706,800.00

Disbursement PlanDetailed Budget (in US$)

Budget Categorieschoose from the drop-down list

Office Supplies

Travel - International

Travel – Local

# of Unit

Total Project Budget (Total Activity Budget + Contingency + PMC + DP)

Audit Fee

288,300.00

0

0

FOR GREEN CLIMATE FUND SECRETARIAT'S USE ONLY

FOR GREEN CLIMATE FUND SECRETARIAT'S USE ONLY

Audio Visual & Printing

832,058.00$

30m

418,500.00

766,874.00

Page 16: with Peruvian Trust Fund for National Parks and …...Activity 3.2.1: Address COFIDE’s gaps for GCF accreditation. The gaps are mainly focused on ESS, gender mainstreaming, and grant

Budget Note Detailed Description

Budget category3.2.1.1 The budget is considered for an international consultant that will address ESS gaps indentified for COFIDE's accreditation.

Budget category3.2.1.2

The budget is considered for an international consultant that will address gender mainstreaming gaps indentified for COFIDE's accreditation.

Budget category3.2.1.3

The budget is considered for an national consultant that will address grant award fiduciary functions gaps indentified for COFIDE's accreditation.

Budget category3.2.1.4 The budget is considered for the adjustements of COFIDE's webpage according t to GCF requirements.

Budget category3.2.1.5 The budget is considered for translation services of the information to be presented to the GCF as part of the accreditation process.

Budget category3.2.1.6 The budget is considered for at least 6 trainning workshops to strengthen COFIDE's staff capacity regarding ESS, gender and grant award.

Budget category3.2.1.7 The budget is considered to cover the costs related to COFIDE-MEF-Profonanpe periodic meetings.

Budget category3.2.2.1

The budget is considered to cover a highly specialized local consultant who will identify Profonanpe's gaps to fulfill new fiduciary functions. The work to be done under this consultancy will not be as a usual gap assessment, in which procedures and documentation are reviewed to verify if they comply or not with the required standard. Given that the proposed fiduciary function is new for Profonanpe and no material has been ever prepared regarding on lending and blending, Profonanpe has already an idea of the gaps it has and requires a specialist to organize what the institution will require for the transformation. This means that the consultant will at least do the following tasks:- Review GCF’s requirements to accredit an institution at the on lending and blending category.- Search among green banks that share similarities with Profonanpe, their operation procedures, structure, decision levels, and resources, to provide examples and alternatives to Profonanpe of how it can operate.- Search and provide the steps to carry out the legal transformation.- Review Profonanpe’s documentation (ie. Code of Ethics, Transparency policy, Committees conformation, control procedures, organizational chart, etc.) to identify and propose modifications if required to be compatible with the new fiduciary function.- Prepare all terms of references that will be required to carry out the transformation (ie. To prepare the policies and operational guidelines, for the legal firm, and for others to be identify).- Identify proposals (topics, scopes and potential institutions that could be approach by Profonanpe for financial resources) that could be later be use to create a track record.- Work with staff members along the consultancy, to start building a mindset regarding the new fiduciary function and guide the increase capacities to be develop in order to properly achieve this new challenge.

Budget category3.2.2.2

The budget is considered to cover a local consultant that will prepare the operation guidelines to achieve the new fiduciary functions. One of the clearest gap to be address by Profonanpe, and which should start first, is to have its policies and procedures in place regarding (i) due diligence, (ii) financial management, (iii) investment management and (iv) financial risk management, for on lending and blending. This senior consultancy will develop such documents along with all the associated forms, and will present them to Profonanpe’s Board of Directors and to staff members to operationalize them. It will start almost in parallel with the previous consultancy, as they will have to coordinate to reflect the proposed modifications in both of their products.

Budget category3.2.2.3

The budget is considered to collect initial information from staff members and stakeholders, and to present preliminary and final results of the gap assessment and new guidelines resulting from addressing such gaps. During the consultancies, several additional meetings are expected and the resources could also help covering expenses risen from these meetings. These workshops are key in order to permeate the new information generated by the consultancy within all staff members. They assure that project results are sustained and long lasting, contributing in such manner to the exit strategy.

Budget category3.2.2.4

The budget is considered for tuition fees of 2 staff members in green banking and finances course to be apply in the development of new businesses. Specific course details and the instituion are yet to be decided, but the following links can provide reference information: https://www.esan.edu.pe/diplomas/financiamiento-para-proyectos-de-desarrollo-sostenible/http://pbs.edu.pe/educacion-ejecutiva/diplomado-banca/

Budget category3.2.2.5

The budget is considered for tuition fees of 8 staff members in a business and organizational management course to be apply in the development of new businesses. Specific course details and the instituion are yet to be decided, but the following links can provide reference information: https://www.esan.edu.pe/pae/business-administration/https://gerens.pe/educacion-ejecutiva/programa-internacional-en-habilidades-directivas/

Budget category3.2.2.6

The budget is considered for tuition fees of 3 staff members in innovation and disruptive businesses. Specific course details and the instituion are yet to be decided, but the following links can provide reference information: http://www.ulima.edu.pe/departamento/prog-especializado-en-competencias/pec-innovacion-startups-y-negocios-disruptivoshttp://pbs.edu.pe/educacion-ejecutiva/programa-innovacion-estrategica/https://www.esan.edu.pe/pae/gestion-de-la-innovacion/http://www.posgradoupch.pe/programa/diplomado-gestion-la-creatividad-la-innovacion-empresarial/#1479997658201-821008b1-6b83

Budget category3.2.2.7

The budget is considered to hire a Law firm that prepares the documentation that will be requiered to adjust Profonanpe's bylaws and other legal documents to fit the new fiduciary functions.

Page 17: with Peruvian Trust Fund for National Parks and …...Activity 3.2.1: Address COFIDE’s gaps for GCF accreditation. The gaps are mainly focused on ESS, gender mainstreaming, and grant

Budget category3.2.2.8

The budget is considered for the adjustements of Profonanpe's webpage according to new fiduciary functions. Profonanpe regularly covers the maintenance and updating cost associated to its webpage, but more significant changes such as those related to the new fiduciary functions could represent one-time higher costs. After that investment is made, Profonanpe will be able to keep covering the recurrent costs.

Budget category3.2.2.9 The budget is considered for translation services of the information to be presented to the GCF as part of the upgrade process.

Budget category3.2.2.10 The budget is considered to visit and engage with private business sector, and identify potential proposals involving them.

Budget category3.2.3.1

The budget is considered to cover a highly specialized international consultant to reinforce indigenous peoples engagement and mainstreaming within Profonanpe.

Budget category3.2.3.2

The budget is considered to contract a service provider that will use information generated from the previous consultancy to design communication material that is friendlier to any user and that could be downloaded from Profonanpe's webpage.

Budget category3.2.3.3

The budget is considered to cover a local consultancy that reviews the policies aproved by the GCF's Board and update Profonanpe's documents accordingly as established in the AMA. Expected aspects to be reviewed could include: anti-money laundry, terrorism, sexual exploitation, abuse or harassment, among other.

Budget category3.2.3.4

The budget is considered to present results of the consultancies regarding indigenous peoples and application of GCF new policies. A minimum of 2 workshops are planned for each of the 2 consultancies. The consultancies will require to present preliminary results to collect any observations that may emerge from participants, and final results to evidence that comments were incorporated. In addition, at the beginning and during the consultancies, several additional meetings are expected, with different staff members and external stakeholders. The resources could also help covering expenses risen from these meetings. These workshops are key in order to permeate the new information generated by the consultancies within all staff members. They assure that project results are sustained and long lasting, contributing in such manner to the exit strategy.

PMC 1-2

The budget is considered to cover 2 Profonanpe staff that will be asigned to implement the proposed activities. They will be in charge of writing terms of references, guide selection processes, oversee the fulfilment of all planned activities, coordinate with stakeholders and consultants, review products prepared by consultants and prepared reports for the GCF, among others.

Other management cost will be considered in the delivery partner fee. These include the services provided by the administrative area of Profonanpe, in charge of procurement, accountability, and treasuring, among other. The fee also includes the time spend by Profonanpe's Directors who will assess the advances made. Finally, the fee will contribute to cover maintenance expenses, including communication services which will be required for the implementation of this proposal.

PMC 3 The budget is considered for 1 audit to be hired specifically for this grant and its corresponding report.

Page 18: with Peruvian Trust Fund for National Parks and …...Activity 3.2.1: Address COFIDE’s gaps for GCF accreditation. The gaps are mainly focused on ESS, gender mainstreaming, and grant

Budget CategoriesAudio Visual & PrintingAudit FeeConsultant - Individual - InternationalConsultant - Individual - LocalProfessional Services – Companies/FirmIT EquipmentOffice SuppliesTravel - InternationalTravel – LocalWorkshop/Training Staff

Indicate additional budget categories

Page 19: with Peruvian Trust Fund for National Parks and …...Activity 3.2.1: Address COFIDE’s gaps for GCF accreditation. The gaps are mainly focused on ESS, gender mainstreaming, and grant

5.2 Procurement Plan

Item Estimated Cost (US$)

3.2.1.6. Workshop/training 12,000.00

3.2.1.7. Workshop/training 1,800.00

3.2.2.3. Workshop/training 10,000.00

3.2.2.4. Workshop/training 9,000.00

3.2.2.5. Workshop/training 56,000.00

3.2.2.6. Workshop/training 15,000.00

3.2.2.10. Workshop/training 5,000.00

3.2.3.4. Workshop/training 10,000.00

$ 118,800.00

3.2.1.1. International consultant 90,000.00

3.2.1.2. International consultant 108,000.00

3.2.1.3. Local consultant 72,000.00

3.2.1.4. Professional services 3,000.00

3.2.1.5. Professional services 1,500.00

3.2.2.1. Local consultant 48,000.00

3.2.2.2. Local consultant 84,000.00

3.2.2.7. Firm services 30,000.00

3.2.2.8. Professional sevices 3,000.00

3.2.2.9. Professional services 1,500.00

3.2.3.1. International consultant 72,000.00

3.2.3.2. Professional services 3,000.00

3.2.3.3. Local consultant 72,000.00

PMC2. Firm 4,700.00

$ 592,700.00

Direct Procurement

Quality- and cost-based selection (QCBS)

1-Mar-2020

> $ 10,500 1-Jan-2020

International consultant that will address gender mainstreaming gaps indentified for COFIDE's accreditation.

Selection based on consultants’ qualifications (CQS)

> $ 10,500 1-Jan-2020

For goods, services, and consultancies to be procured, please list the items, descriptions in relation to the activities in Section 3, estimated cost, procurement method, relevant threshold, and the estimated dates. Please include the procurement plan for at least the first tranche of disbursement requested below and provide a full procurement plan for the entire duration of the implementation period if available at this stage.

1 audit to be hired specifically for this grant and its corresponding reports. Quality- and cost-based selection (QCBS) 1-Oct-2020 1-Dec-2020

Local consultant that will address grant award fiduciary functions gaps indentified for COFIDE's accreditation. Quality- and cost-based selection (QCBS) > $ 10,500 1-Jan-2020 1-Sep-2020

Adjustements of COFIDE's webpage according to GCF requirements. Direct Procurement < $ 10,500 1-Mar-2020 1-Sep-2020

Selection based on qualifications > $ 10,500

International consultant that will address ESS gaps indentified for COFIDE's accreditation.

1-May-2020 1-Dec-2020

International consultant to reinforce indigenous peoples engagement and mainstreaming within Profonanpe.

Develop material related to the indigenous peoples' consultancy.

Local consultancy that reviews the policies aproved by the GCF's Board and update Profonanpe's documents accordingly as established in the AMA.

Selection based on consultants’ qualifications (CQS)

1-Aug-2020

1-Dec-2020

1-Nov-2020

> $ 10,500

< $ 10,500

> $ 10,500

1-Mar-2020

1-Aug-2020

1-Mar-2020

Presentation of results of the gap assessment and new guidelines resulting from addressing such gaps.

Direct Procurement < $ 10,500 1-Jan-2020 1-Dec-2020

Train 3 staff members in innovation and disruptive businesses.

1-Dec-2020

Sub-Total (US$)

Law firm that will adjust Profonanpe's bylaws and other legal documents to fit the new fiduciary functions. Quality- and cost-based selection (QCBS) > $ 10,500 1-May-2020 1-Sep-2020

Adjustements of Profonanpe's webpage according to new fiduciary functions. Direct Procurement < $ 10,500 1-Sep-2020 1-Dec-2020

Translation services of the information to be presented to the GCF as part of Profonanpe's second upgrade process. Direct Procurement < $ 10,500

> $ 10,500

Goods and Non-Consulting Services

Item Description Procurement MethodThresholds

(Min-Max monetary value for which indicated procurement method must be used)

Estimated Start Date

Projected Contracting Date

COFIDE-MEF-Profonanpe periodic meetings. Direct Procurement < $ 10,500 1-Jan-2020 1-Dec-2020

At least 6 trainning workshops to strengthen COFIDE's staff capacity regarding ESS, gender and grant award.

Direct Procurement < $ 10,500 1-Jan-2020 1-Sep-2020

1-Jul-2020

Visit and engage with private business sector, and identify potential proposals involving them.

Direct Procurement < $ 10,500 1-May-2020 1-Dec-2020

Present results of the consultancies regarding indigenous peoples and application of GCF new policies.

Direct Procurement < $ 10,500 1-Aug-2020

Train 2 staff members in green banking and finances to be applied in the development of new businesses.

Direct Procurement < $ 10,500 1-Jul-2020 1-Dec-2020

Train 8 staff members in business and organizational management to be applied in the development of new businesses.

Selection based on qualifications > $ 10,500 1-Mar-2020 1-Dec-2020

1-Sep-2020

Highly specialized local consultant that will prepare the operation guidelines to achieve the new fiduciary functions.

Selection based on consultants’ qualifications (CQS)

> $ 10,500 1-Feb-2020 1-Dec-2020

Highly specialized local consultant who will identify Profonanpe's gaps to fulfill new fiduciary functions.

Selection based on consultants’ qualifications (CQS)

> $ 10,500 1-Jan-2020 1-Jun-2020

Translation services of the information to be presented to the GCF as part of COFIDE's accreditation process. Direct Procurement < $ 10,500 1-Mar-2020 1-Sep-2020

Sub-Total (US$)

Selection based on consultants’ qualifications (CQS)

1-Aug-2020

Consultancy Services