winners losers best_practice_cmmi_v3-3

12
© Copyright © Demix 2014 Demix Best Practice, www.demix.org Page 1 Document version 3.1 A tale of losers, winners Losers & Winners and Best Practice

Upload: dr-pieter-van-zyl

Post on 17-Jul-2015

52 views

Category:

Services


1 download

TRANSCRIPT

©

Co

pyr

igh

t ©

Dem

ix 2

01

4

Dem

ix B

est

Pra

ctic

e, w

ww

.dem

ix.o

rg

Page 1Document version 3.1

A tale of losers, winners

Losers & Winners

and Best Practice

©

Co

pyr

igh

t ©

Dem

ix 2

01

4

Dem

ix B

est

Pra

ctic

e, w

ww

.dem

ix.o

rg

Tale of two project executive

Page 2

• Mandy does not know what is wrong, but does not want to acknowledge it.

• Mandy’s projects stay in trouble.

• Scope continues to creep.

• The project is very late and way over budget.

• Mandy is re-assigned to a less demanding project.

Mandy

Projects that are in trouble

• Jason speaks to his friend at Demix on project management.

• Jason puts requirements change control discipline in place.

• Jason gets control of his project.

• Jason delivers his project, gets the bonus and the next big important project.

Jason

Best Practice

©

Co

pyr

igh

t ©

Dem

ix 2

01

4

Dem

ix B

est

Pra

ctic

e, w

ww

.dem

ix.o

rg

Tale of two service executive

Page 3

Both have unhappy customers

• Ben tries to offer new products.

• The complaints on poor service increase.

• Ben tries utilizing more staff.

• The complaints increase.

• Ben starts looking for a new job.

Ben

• Jenny speaks to her friend at Demix about Service Delivery.

• Jenny puts service agreements and a simple service request management system in place.

• Jenny controls service requests against commitments.

• The customer satisfaction is increased. Jenny gets the big bonus at the end of the year.

Jenny

Best Practice

©

Co

pyr

igh

t ©

Dem

ix 2

01

4

Dem

ix B

est

Pra

ctic

e, w

ww

.dem

ix.o

rg

Tale of two CIOs

Page 4

Both have problems with defects in production

• Frans threatens his managers.

• Frans gets resistance from staff and the problems get worse.

• Severe outages in production results.

• Frans is called in with the CEO, COO and HR for a discussion on restructuring!

Frans

• Susan speaks to her friend at Demix about development.

• Susan puts configuration management and peer reviews in place.

• The production defects are significantly reduced.

• Susan is on the shortlist for the next COO.

Susan

Best Practice

©

Co

pyr

igh

t ©

Dem

ix 2

01

4

Dem

ix B

est

Pra

ctic

e, w

ww

.dem

ix.o

rg

I adopt

Page 5

Most people want to be ahead, now!

Best Practice

©

Co

pyr

igh

t ©

Dem

ix 2

01

4

Dem

ix B

est

Pra

ctic

e, w

ww

.dem

ix.o

rg

From the USA, Carnegie Mellon University, CMMI Institute

for Acquisition (CMMI for Acq)

for Service Delivery (CMMI for Svc)

for Software Development (CMMI for Dev)

People

Internal Audit

Data Maturity

Information Security Secure+

Page 6

Use proven to help you nowBest Practice

Best Practice

Best Practice

Best Practice

Best Practice

Best Practice

Best Practice

Best Practice

©

Co

pyr

igh

t ©

Dem

ix 2

01

4

Dem

ix B

est

Pra

ctic

e, w

ww

.dem

ix.o

rg

Page 7

• Siemens Information Systems Ltd. reduced its cost of quality from over 45 % to under 30% over a three-year period.

• TATA Consultancy Services saved $4.6 million across all development centres.

• General Dynamics Advanced Information Systems reduced maintenance staff costs by 64% while doubling the size of the organization.

Organisational benefit of

Decreased costs through

• IBM Australia Application Management Services improved account productivity over 20%.

• SAIC System and Network Solutions Group doubled its productivity.• Warner Robins reduced effort to deliver test programs sets by 25%.

Improved productivity through

Best Practice

Best Practice

Best Practice

©

Co

pyr

igh

t ©

Dem

ix 2

01

4

Dem

ix B

est

Pra

ctic

e, w

ww

.dem

ix.o

rg

Page 8

• Siemens Information Systems Ltd. reduced defect density an average of 71% in three technical areas.

• IBM Australia Application Management Services closed 95% of problems within the customer-specified time frame.

• Tufts Associated Health Plans decreased software defects identified in testing 25%.

Improved quality through

• General Motors improved the percent of milestones met from 50% to 85%.

• Raytheon North Texas Software Engineering improved schedule performance by 8% with a 50% decrease in variation.

• JPMorgan Chase reduced average slippage of project delivery dates by 70-80%.

Improved on-time delivery through

Organisational benefit of Best Practice

Best Practice

Best Practice

©

Co

pyr

igh

t ©

Dem

ix 2

01

4

Dem

ix B

est

Pra

ctic

e, w

ww

.dem

ix.o

rg

Page 9

• Accenture experienced 5 to 1 ROI for quality activities.• Siemens Information Systems Ltd. experienced 2 to 1 ROI over 3 years.• Reuters experienced over 3 to 1 ROI from reducing post-release

defects.

Impressive return on investment through

• Lockheed Martin Management and Data Systems increased their award fees by 55%.

• Siemens Information Systems Ltd. increased their customer satisfaction index an average of 42% in three technical areas.

• Northrop Grumman IT, Defence Enterprise Solutions received more than 98% of possible customer award fees.

Improved customer satisfaction through

Organisational benefit of Best Practice

Best Practice

Best Practice

©

Co

pyr

igh

t ©

Dem

ix 2

01

4

Dem

ix B

est

Pra

ctic

e, w

ww

.dem

ix.o

rg

Don’t re-invent the wheel

Page 10Losers

Winners adopt

Best Practice

©

Co

pyr

igh

t ©

Dem

ix 2

01

4

Dem

ix B

est

Pra

ctic

e, w

ww

.dem

ix.o

rg

Page 11

Choose to win, use proven best practice

Best Practice

BadPractice

©

Co

pyr

igh

t ©

Dem

ix 2

01

4

Dem

ix B

est

Pra

ctic

e, w

ww

.dem

ix.o

rg

Contact us

Dr Pieter van Zyl - 082 000 0008

[email protected]

www.demix.org

www.facebook.com/mydemix

Page 12

Winners adopt

Best Practice