What’s happening at Planning Panels Victoria?
Kathy Mitchell, Chief Panel Member
VPELA Hot Topics – 23 February 2016
Planning Panels Victoria - Staff Update
Arrivals
• 27 new Sessional Members through three-yearly review of Sessional Members
• Brett Davis, Senior Panel Member
• Elissa Bell, Senior Project Manager
• Andrea Harwood, Senior Project Manager
• Emily To, Project Officer
• Stefanie Poulos, Administration Officer
Departures
• Cathie McRobert, Senior Panel Member (secondment)
• Jenny Moles, Senior Panel Member (retired)
• Jess Cutting, Senior Project Manager (secondment, then
City of Port Phillip)
Planning Panels Victoria - Staff Update
4 Senior Project Managers / Officers
6 Administration Support Staff
Chief Panel Member
6 Senior Members (full time)
4 Senior Sessional Members
71 Sessional Members
includes 6 technical experts
PPV in 2015 – An overview
149
4,653
145
Panels and committees appointed
Submissions considered
Reports completed
1 Jan – 31 Dec 2015
Major Advisory Committee matters at PPV
Animal Industries
Ballarat Station Precinct
Flemington Hill and Epson Road
Level Crossing Removal
Government Land
Major Hazard Facilities
Macedon Ranges Protection
Managing Residential Development
Ombersley Quarry (call in from VCAT)
Punt Road Public Acquisition Overlay
Animal Industries AC
Appointed: November 2015
Purpose: ‘Report on how the planning system can support the establishment and expansion of productive, competitive and market-responsive animal industries’
• Livestock production systems are changing and the trend towards more intensive productions systems is likely to continue.
• Committee to consider options to better manage the potential impacts from animal industries while supporting them to grow and be competitive.
Key Dates:
Public Hearings 22 – 26 February 2016
Final Report 29 April 2016
Flemington Hill and Epsom Road AC
Appointed: September 2015
Purpose: “To report on the suitability of two draft planning scheme amendments that seek to rezone and facilitate development of two precincts within the Flemington Racecourse known as ‘Flemington Hill’ and Epsom Road”.
• Minister for Planning Responsible Authority for all land proposed to be rezoned.
• Victorian Racing Club propose to rezone the precincts to Comprehensive Development Zone to facilitate the development of high rise residential towers with associated low-rise commercial precincts.
• VRC with the support of both Councils, requested the appointment of an Advisory Committee to consider the development proposals and best way forward.
Key Dates:
Directions Hearing - 1 March 2016
Public Hearings – week commencing 14 March 2016 (3-4 weeks)
Level Crossing Removal Project Integrated Development Opportunities Standing AC
Appointed: December 2015
Purpose: “To provide advice on integrated development opportunities created by the removal of level crossings”.
Key Issues: • Intended to provide a consistent process for considering integrated development opportunities created by some level crossing removals.
• Minister for Planning to refer a site or sites to the Committee.
• No matters referred to date.
Key Dates:
Committee to submit written report within four weeks from the last hearing day.
Government Land Standing AC
Appointed: August 2015
Purpose: “To report on the suitability of changes to the planning provisions to land owned by the Victorian Government”.
• Standing Advisory Committee will provide a consistent and transparent process to facilitate the sale of government land identified as surplus.
• Three sites have recently been referred to the Committee:
8-20 & part of 22-28 Phillip Street, Dallas
1080 Frankston-Flinders Road, Somerville
Corner Wills and Brudenell Street, St Arnaud
Key Dates:
For the above sites:
Exhibition - 15 February to 25 March 2016
Public Hearings - 11 to 22 April 2016
Final Report - Late May 2016
Macedon Ranges Protection AC
Appointed: December 2015
Purpose: “To provide advice on an appropriate policy to achieve protection of the significant, values and attributes and character of the Macedon Ranges and support changes to legislative framework”.
The TOR provides the following context; • ‘There is significant concern and interest among state
government, key stakeholders and the local community to ensure the area is protected from inappropriate development’.
Key Dates:
Discussion Paper – early March 2016
Final Report – 15 July 2016
Managing Residential Development AC
Upcoming Key Milestones
Appointed: November 2015
Purpose: “To report on the application of zones that provide for residential
development”.
• Third state-wide review of the zones that provide for residential
development since 2009.
• Committee seeking to take the zones forward, suggesting
improvements.
Key Dates:
14 March 2016 - Submissions Close
1 April 2016 - Directions Hearing
Mid April - May 2016 - Hearings (to run concurrently by subregions in
metro and regional locations)
30 June 2016 - Final Report Submitted
Major Hazard Facilities AC
Appointed: September 2015
Purpose: “To report on improvements to the way land use buffers around Major
Hazard Facilities are determined and implemented” .
• Considers Victoria’s 40 Worksafe registered MHF and how the land use planning system can assist in managing risks and any adverse impacts, including the potential roles of land use buffers.
• 72 submissions received on the Discussion Paper prepared by the Advisory Committee.
Key Dates:
17-24 March 2016 - Public Hearings
June 2016 - Final Report Submitted
Punt Road Public Acquisition Overlay AC
Appointed: March 2015
Purpose: “To report and recommend on whether to retain, modify or remove the
PAO affecting Punt Road within the City of Stonnington”.
• The 20m wide Public Acquisition Overlay has been in place since
1954 and affects 140 properties.
• Punt Road / Hoddle Street is one of Melbourne’s busiest key arterial
roads, used by around 33,000 vehicles per day.
• 121 submissions received.
Key Dates:
9 - 19 February 2016 – Public Hearings
April 2016 - Final Report
Major Panels at PPV
Bass Coast C140 Implements Bass Coast Rural Land Use Strategy & Coast Shire Review of Rhyll Wetland
Bayside C140 Bayside Housing Strategy
Casey C189 Casey Central Town Centre Structure Plan
Macedon Ranges C98 Woodend Town Structure Plan
Macedon Ranges C99, C109, C105 Kyneton Structure Plan
Macedon Ranges C100 Riddles Creek Structure Plan
Melton C140 Rockbank Structure Plan and PSP
Mitchell / Whittlesea GC28 Donnybrook / Woodstock Structure Plan
Moreland C158 Moreland Industrial Land Strategy
Warrnambool C93 Stage 1 of Warrnambool Planning Scheme Rewrite Project
Various Heritage matters
Part A and Part B submissions
• Part A and Part B submissions from Planning Authority to assist in reducing time and cost of Panel process
• Trialled in Warrnambool, Wellington and Casey amongst others
• Part A submissions – to be provided at the time of lodgement of expert evidence and other information:
– Includes background, strategic assessment, site context, other strategic considerations, issues raised in submissions
• Part B submissions – to be provided by Planning Authority (generally) on Day 1 of the Hearing:
– Includes response to evidence, matters raised by Panel, key issues, conclusions, final form of Amendment, permit conditions
PPV Roundtables
PPV to hold three round table meetings with;
1. Local Councils
2. Planning Industry (Includes consultants / legal)
3. Stakeholders
Sessions to have a community engagement focus, specifically:
Targeting regular submitters experiences in participating in a Panel process.
Identifying areas to improve participant experience.