What: Replace or rehabilitate ten wastewater pump stations in six years. The Sewer Utility owns and operates 23 pump stations throughout its service area. When: Now–2025 Why: If a pump station fails there is a risk that raw sewage will back up into homes or businesses, or overflow into Lake Sammamish and other natural waterways. Ten out of the 23 wastewater pump stations are at, or past, their useful life. Mechanical and electrical equipment in pump stations usually lasts 20–30 years. Some of the pump stations are over 30 years old, some are failing now, and some have equipment for which replacement parts are no longer available. How: The sewer pump stations will be replaced using sewer rates, development connection charges, and bonded debt so that the stations are in good working order by 2025. Cost: $44 million. All lift stations projects are funded by the Sewer Utility Capital Improvement Program. The City maintains the wastewater system in a manner which protects human health and the environment, the public investment, ensures compliance with state and federal mandates, and ensures that reliable service is available to all customers of the City utility system. Wastewater Pump Station Program Contact: Mike Haley, (425) 556-2843, [email protected] Due to hills and valleys in the landscape, sewer systems include locations where sewage needs to be pumped from low points to higher elevations, from which it will ultimately flow via gravity to a King County treatment plant. Once sewage arrives at the treatment plant it is treated and discharged to Puget Sound. What is a pump station?

Upload: others

Post on 09-Nov-2021

3 views

Category:

Documents


0 download

TRANSCRIPT

What: Replace or rehabilitate ten wastewater pump stations in six years. The Sewer Utility owns and operates 23 pump stations throughout its service area.

When: Now–2025

Why: If a pump station fails there is a risk that raw sewage will back up into homes or businesses, or overflow into Lake Sammamish and other natural waterways. Ten out of the 23 wastewater pump stations are at, or past, their useful life. Mechanical and electrical equipment in pump stations usually lasts 20–30 years. Some of the pump stations are over 30 years old, some are failing now, and some have equipment for which replacement parts are no longer available.

How: The sewer pump stations will be replaced using sewer rates, development connection charges, and bonded debt so that the stations are in good working order by 2025.

Cost: $44 million. All lift stations projects are funded by the Sewer Utility Capital Improvement Program.

The City maintains the wastewater system in a manner which protects human health and the environment, the public investment, ensures compliance with state and federal mandates, and ensures that reliable service is available to all customers of the City utility system.

Wastewater Pump Station Program

Contact: Mike Haley, (425) 556-2843,[email protected]

Due to hills and valleys in the landscape, sewer systems include locations where sewage needs to be pumped from low points to higher elevations, from which it will ultimately flow via gravity to a King County treatment plant. Once sewage arrives at the treatment plant it is treated and discharged to Puget Sound.

What is a pump station?

520

520

188t

hA

VE

NE

N E 124th S T

A V O ND A L E

WY

C L E V EL A N D

NE 24th ST

NE 40th ST

16

6th

AV

EN

E

15 6

thA

VE

NE

172n

dA

VE

NE

16

0th

AV

EN

E

N E 116th S T

N E 80th S TNE 80th S T

NE 104th S T

NE 20th S T

16

4th

AV

EN

E

132

nd A

VE N

E

N E 79th S T

N E 76th S T

162n

dA

VE

NE

154thP

LN

E

154t

hA

VE

NE

NE 111th ST

NE 90th ST

ELK

SAM

MA

MI S

HPKW

Y

152n

dA

VE

NE

18 5

thA

VE

NE

1 80

thA

VE

NE

NE 128th S T

U N IO N H ILL RD

B E A R

CR

EE

K

P K W Y

N E 60th S T

154th

AV

EN

E

NE 124th W Y

NE 36th S T

178thPL

NE

132

nd A

VE N

E

NE 116th ST

O LD R EDM O ND RD

WL K

S AMMAMIS H PKWY

RE

D-W

OO

DR

D

148t

hA

VE

NE

BE L -RED

RD

17

1s

tA

VE

NE

WIL

LO

WS

RD

180

thA

VE

NE

1 40t

hA

VE

NE

16

1s

tA

VE

NE

160thA

VE

NE

NE 100th ST

AVONDALE

RD

NE 85th ST

NE 83rd ST

172n

d A

VE N

E

RE D

MO

NDW

Y

148 t

hA

VE

NE

NE 75th ST

N E 5 1s t ST

150

th A

VE N

E

REDMO ND WY

AV

ON

DA

LE

RD

L a k e L a k e S a m m a mishS a m m a mish

GrassLawn

Spiritbrook

ViewpointOpen Space

Viewpoint

IdylwoodBeach

CascadeView

Westside

Bridle CrestTrail Site

Redmond WestWetlands

Anderson Park

Target

Sixty Acres(King County)

Marymoor (King County)

Juel

Farrel-McWhirter

MOC

Meadow

NERedmond

SammamishValley

Willows Creek

ScottsPond

WatershedPreserveand Trails

City Hall

MOC

2

65

8

13

14

12

11

15

Se wer Pump Sta tion Replacement ProgramCity of Redmond, Washington

9/13/2018 •Disclaimer: This map is created and maintained by GIS Services Group,Finance and Information Services, City of Redmond,Washington, for reference purposes only.The City makes no guarantee as to the accuracy of the features shown on this map.

File

Nam

e:Q

:\Q:\N

RD

ivis

ion\

NR

Func

tions

\04M

appi

ngG

ISD

atab

ase\

SE

CTI

ON

0 10.5Miles

Legend

fi Pump Stations Needing Replacement

fi Pump Stations

2

3

56

13

8

11

12

1514

Wastewater Pump Stations Six Year Plan:

Document Last Updated March 10, 2020

2019 Pumps

2 & 14 2021 Pumps

12 & 15 2022 Pumps

5 & 6 2024 Pumps

8 & 112020 Pumps

3 & 13

The City of Redmond assures that no person shall, on the grounds of race, color, national origin, or gender, as provided by Title VI of the Civil Rights Act of 1964 and the Civil Rights Restoration Act of 1987, be excluded from participation in, be denied the benefits of, or be otherwise subjected to discrimination under any program or activity. For more information about Title VI, please visit redmond.gov/TitleVI.无歧视声明可在本市的网址 redmond.gov/TitleVI 上查阅 | El aviso contra la discriminación está disponible en redmond.gov/TitleVI.