west bengal

64
On 24 th & 25 th September, 2013 at PUSA Complex, New Delhi National Conference on Agriculture for Rabi Campaign – 2013 Govt. of West Bengal Department of Agriculture

Upload: vivebajaj

Post on 09-Jul-2016

223 views

Category:

Documents


4 download

DESCRIPTION

National Conference on Agriculture

TRANSCRIPT

Page 1: West Bengal

On 24th & 25th September, 2013 at PUSA Complex, New

Delhi

National Conference on Agriculture for Rabi Campaign

– 2013

Govt. of West BengalDepartment of

Agriculture

Page 2: West Bengal

WEST BENGAL : AN OVERVIEWPART-I

Geographical Area 88752 sq. Km.Nos. of Agricultural Districts 18Nos. of Agricultural Blocks 335Nos. of Gram Panchayets 3354Nos. of Mouza / Village 40782Population (2011 Census) 9,15,94,000Population Density(2011 Census) 1029 / Sq. Km.Agro-Climatic Zones 6 Nos.Gross Cropped Area(2011-12) 9352952 haCultivable Area (2011-12) 5700848 haNet Area Sown(2011-12) 5198146 haIrrigated Area 62% of Net

Cropped AreaTotal Nos. of Agricultural holdings 7123000 NosSize of average Land Holding 0.77 ha / Holding

2

Page 3: West Bengal

3

WEST BENGAL : AN OVERVIEWPART-II

Cropping Intensity (2011-12) 179.93Total Food Grains Production (2011-12)

160.09 Lakh MT

Estimated Total Food Grains Production (2012-2013, 4th Advance Estimate)

165.11 Lakh MT

Target of Total Food Grains Production (2013-2014)

172.30 Lakh MT

Summer Rice Productivity (2011-12) 3174 Kg / haEstimated Summer Rice Productivity (2012-13) 3372 Kg / haTarget of Summer Rice Productivity (2013-2014) 3425 Kg / ha

Page 4: West Bengal

West Bengal : Placing Issues in Perspective

• Has 8% of India’s population with 2.7% of the total area,

• Population Density (1029 per Sq. Km) puts tremendous pressure on land & Natural Resources,

• Marginal and small farmers constitute nearly 96% of the 71.23 lakh holdings, (2010-11 census)

4

Page 5: West Bengal

West Bengal Agriculture : Significant milestones

1st position in Rice production

First position in Vegetables Production,

Second position in Potato Production,

Third in Flowers and seventh in Fruits Production,

Cropping intensity of 179.93% (2011-12) 5

Page 6: West Bengal

Estimated Requirement of Crops in West BengalDuring 12th Plan Period – Part-A

YearPopulatio

n(Lakh)

Rice Cereals

Pulses

Food Grains

2013-14 915.94 144.8

9 166.95 12.87 179.822014-

15 923.89 146.15 168.41 12.98 181.39

2015-16 931.98 147.4

3 169.88 13.10 182.982016-

17 940.35 148.75 171.70 13.21 184.61

In Lakh MT

Page 7: West Bengal

Estimated Requirement of Crops in West BengalDuring 12th Plan Period - Part-B

Year Population(Lakh)

OilSeeds Potato

2013-14 915.94 16.55 50.98

2014-15 923.89 16.69 51.43

2015-16 931.98 16.84 51.88

2016-17 940.35 16.99 52.34

In Lakh MT

Page 8: West Bengal

Region June July August September(Upto 15th)

Normal

Actual(% Dep.)

Normal

Actual(% Dep.)

Normal

Actual(% Dep.)

Normal

Actual(% Dep.)

2011 2012 2013 2011 2012 2013 2011 2012 2013 2011 2012 2013

Sub- Himalayan West Bengal

454 425(-6)

552(22)

405(-11)

635 610(-4)

641(1)

531(-16)

458 454(-1)

279(-39)

421(-8)

221 74(-67)

211(-5)

229(4)

Gangetic West Bengal

256 374(46)

139(-46)

229(-10)

318 229(-28)

303(-5)

239(-25)

311 427(37)

225(-28)

377(21)

135 127(-6)

173(28)

100(-27)

West Bengal

322 391(21)

277(-14)

288(-11)

425 356(-16)

416(-2)

336(-21)

360 436(21)

243(-33)

392(9)

164 109(-34)

186(13)

143(-13)

Rainfall Analysis (m.m.) for the year 2011 - 2013

Page 9: West Bengal

Crops2012-2013 (4th Estimate) 1st Estimate

2013-14

A P Y A P YKharif Rice 4216.055 10881.683 2581 4290.0

0 11203.500 2612

Kharif Maize 40.588 96.769 2384 45.00 117.00 2600

Kharif Pulses 54.096 36.865 681 63.850 49.925 782

Jute 576.7098228.161

(‘000 bales)

14.27(bales) 550.00

8112.50(‘000 bales)

14.75(bales

)

Mesta 6.69682.671(‘000 bales)

12.35(bales) 7.00

87.50(‘000 bales)

12.50(bales

)

Sugarcane 16.077 1685 104808 20.00 21000 10500

0

A=Area in ’000 ha, P= Production in ’000mt, Y= Yield in Kg/ha

KHARIF ASSESSMENT – 2013

9

Page 10: West Bengal

Crops4th Advanced

EstimatesRABI 2012-2013

RABI PLANNING (TARGET)’2013-14

A P Y A P YSummer Rice 1210 4080 3372 1500 5137.5 3425

Wheat 322 960 2817 350 1004.5 2870

Rabi Maize 65 320 4923 80 400.00 5000

Rabi Pulses 168.42 171.492 1018 200 210.00 1050

Food Grains 1768.38 5482.842 3100 2134 6752.00 3170

Oilseeds 717.339 821.06 1145 750 870.00 1160

Potato 386.607 11598.21 30000 400 18200 32000

A=Area in ’000 ha, P= Production in ’000mt, Y= Yield in Kg/haRABI PLANNING - 2013

10

Page 11: West Bengal

11

Progress on Kissan Credit Card and Credit Flow

Year Item Target Achievement 2012-13

KCC (Nos.) 10,00,000

1000215

Credit Flow (Rs. In crore)

23500.00

17,000.00 (72.3%)

2013-14

KCC (Nos.) 12,00,000

1,80,000(1st Qrt)

Credit Flow (Rs. In crore)

37100.00

7120 (20%) (1st qtr)Source: Lead Bank - UBI

Page 12: West Bengal

NATIONAL FOOD SECURITY MISSION

2013-14

Page 13: West Bengal

Area of Operation….

13

NFSM – Rice NFSM – Wheat NFSM-Pulse 1. Jalpaiguri 1. Jalpaiguri All the 17 Districts2. Coochbehar 2. Coochbehar 3. Uttar Dinajpur 3. Uttar Dinajpur 4. South 24 Pgrs. 4. Dakshin Dinajpur 5. Purulia 6. Howrah 7. Purba Medinipur 8. Paschim Medinipur

Page 14: West Bengal

Fund Statement under NFSM during 2012-13

ComponentApproved

Outlay

Unspent Balance of

2011-12As per AUC

Accrued Interest up to 2011-12

Fund Released by GOI during

2012-13

Total Fund Available

during 2012-13

Expenditure during 2012-13

Unspent Balance of 2012-13 as on 01.04.13

NFSM – Rice 3662.85 336.60 280.85 2840.18 3457.63 2601.69 855.94

NFSM – Wheat 831.84 89.12 -- 604.57 693.69 684.78 8.91

NFSM – Pulse 897.49 92.63 -- 757.05 849.68 653.74 195.94

A 3 P 540.00 127.28 -- 277.72 405.00 306.49 98.51

Publicity -- 20.58 -- -- 20.58 - 20.58

TOTAL 5932.18 666.21 280.85 4479.52 5426.58 4246.70 1179.88

( Rs in Lakh)

Page 15: West Bengal

Fund Statement under NFSM during 2013-14

ComponentApproved Outlay by

GOI

Additional Action Plan for

Unspent Balance as on

01.04. 13 approved by

GOI

Revised Action Plan approved by GOI during

2013-14 (2+3)

Total Fund Released by

GOI till date (1st & 2nd

Installment)

Expenditure during

2013-14 up to July, 2013

Remarks

1 2 3 4 5 6 7

NFSM – Rice 3799.98 715.96 4515.94 2485.86 1017.6081

94 DC during Kharif out of

149 DCs

NFSM – Wheat 721.57 187.34 908.91 672.78 - Yet to be started

NFSM – Pulse 1291.1685 104.771 1395.939 167.00 2.566

To be conducted during Rabi

Summer

A 3 P 898.60 - 898.60 35.89 - -Do-

TOTAL 6711.3185 1008.071 7719.3895 3361.53 1020.1741

( Rs in Lakh)

Page 16: West Bengal

Sl. No. District No. of DC @ 100 ha Seed Requirement (MT)1 Coochbehar 6 9.0

2 Jalpaiguri 10 15.03 Uttar Dinajpur 5 7.5

4 Purulia 10 15.0

5 Paschim Medinipur 10 15.0

6 Purba Medinipur 4 6.0

7 Howrah 4 3.08 South 24 Parganas 6 9.0

Total 55 79.5

District wise No. of Hybrid Rice Cluster DC during 2013-14 under NFSM-Rice

Page 17: West Bengal

Sl. No. District No. of Cluster DC @100 ha

WHEAT Seed Requirement (including Additional DCs) in

MTVariety

1 Coochbehar 2 20.0 PBW-343

2 Jalpaiguri 5 50.0 PBW-343

3 Uttar Dinajpur 4 40.0 PBW-343

4 Dakshin Dinajpur 1 10.0 PBW-343

Total 12 120.0

District wise No. of HYV Cluster DC during 2013-14 under NFSM-Wheat

Page 18: West Bengal

Sl. District No. of DCs @ 100 ha Total Seed Requirement in MT

1 Coochbehar 1 3.02 Jalpaiguri 2.5 7.53 Uttar Dinajpur 2.5 7.54 Dakshin Dinajpur 1 3.05 Maldah 8 24.06 Murshidabad 16 48.07 Nadia 13 39.08 Birbhum 6 18.09 Purulia 4.5 13.510 Paschim Medinipur 1 3.011 Purba Midnapur 1 3.012 Bankura 3 9.013 Bardhaman 6.5 19.514 North-24 Parganas 1 3.015 South-24 Parganas 2 6.016 Howrah 9 15.017 Hooghly 2 6.0

TOTAL 80.00 237

District wise No. of HYV Cluster DC during 2013-14 under NFSM-Pulse

Page 19: West Bengal

Sl. No. Crop

District wise No. of Units (@ 100 Ha each) of A3P

Maldah Murshidabad Nadia Birbhum Purulia Total

1. Black gram 5 - 17 - 6 28

2. Lentil 3 60 42 10 2 117

3. Gram - 20 - 10 2 32

TOTAL 8 80 59 20 10 177

District wise & Crop wise Allotment of A3P units (@ 100 ha each) under NFSM – Pulse for Implementation in West Bengal during 2013-14

Page 20: West Bengal

Bringing Green Revolution to Eastern India

(BGREI)2013-14

Page 21: West Bengal

SLSC APPROVED ACTION PLAN FOR 2013-14

Sl. No. Intervention

Financial Outlay

(Rs. in lakh)1 Block Demonstration 10027.65542 Asset Building Activities 1412.10003 Site Specific Activities 2587.24464 Marketing Support 1100.0000

TOTAL 15127.0000

Page 22: West Bengal

I) Progress of Block Demonstration during 2013-14

Sl. No.

Agro-eco situation

Targets as approved by SLSC Achievement

Physical (ha.) Financial (Rs. in lakh) Physical (ha.) Financial

(Rs. in lakh)

A. PADDYI. Kharif1 Up-land 30300 2157.5138 30300 -2 Shallow Lowland 87400 6192.9404 86200 -

3 Medium Deep Water 9700 687.2062 9700 -

II. Boro

4 Irrigated HYV 50200 532.1200 - -

5 Hybrid Rice 3500 70.8750 - -Total Paddy 181100 9640.6554 126200 -

B WHEAT 18000 387.0000 - -

Total (Rice + Wheat) 199100 10027.6554 126200 -

Page 23: West Bengal

B. Asset Building Activity

SL. NO.

INTERVENTIONS

PHYSICAL (NO.)

RATE OF ASSISTANCE

(Rs.)

APPROVED FINANCIAL OUTLAY

(Rs.in lakh)1 PUMP SETS 14121 10000 1412.10

C. Site Specific Activity:Sl. No. Intervention Approved Financial Outlay

(Rs. in lakh)

1 Construction of irrigation channel 800.0000

2 Electrification of Pump Set @ Rs. 8000/- 1687.2000

3 Monitoring & Documentation 100.0446

TOTAL 2568.1150

D. MARKETING SUPPORT:

SL. NO. INTERVENTIONS PHYSICAL

(NO.)UNIT COST (Rs.in lakh)

APPROVED FINANCIAL

OUTLAY (Rs.in lakh)

1 KRISHAK BAZAR 2 550 (approx) 1100.00

Page 24: West Bengal

Rashtriya Krishi Vikas Yojana (RKVY)

2013-14

Department of Agriculture

Government of West Bengal

Page 25: West Bengal

Outlay and Expenditure on Agriculture and Allied Sectors compared to total Annual Plan size.

State: West BengalAnnual Plan Year Total State Plan

Expenditure (A.E./R.E./B.E.)

Outlay/Expdt. for Agric. & Allied

sector(Excluding RKVY)

GOI release of RKVY fund

Expenditure of Agriculture & Allied Sectors as % of

Total Plan Outlay

2007-08 (A.E.) 9073.09 357.81 54.93 3.942008-09 (A.E.) 10396.90 503.20 147.38 4.842009-10 (A.E.) 12121.59 597.36 147.38 4.932010-11 (A.E.) 11784.94 674.95 335.98 5.732011-12 (A.E.) 21029.67 867.62 486.65 4.132012-13 (R.E.) 23029.19 1137.89 374.58* 4.942013-14 (R.E.) 26674.00 **1390.47 NA 5.21

Rs. In Crore

N.B.- * GOI Allocation was Rs.464.81 Crore but released Rs. 374.58 Crore including Sub-schemes. ** State Nodal Department has mooted a proposal to Finance Deptt. for enhancement of outlay under Agri & Allied sector to the tune of Rs. 1600 crore in lieu of Rs. 1390.47 crore.

Page 26: West Bengal

Allocation, release and U/C of RKVY fund during XI Plan Period and 2012-13

Year Allocation Release by GOI

Release by Deptt.

UC submitted

2007-08 54.93 54.93 54.93 54.932008-09 147.38 147.38 147.38 147.382009-10 147.38 147.38 147.38 147.382010-11 476.15 335.98 335.98 335.982011-12 486.65 486.65 486.65 486.65

Total (11th Plan)

1312.49 1172.32 1172.32 1172.32

2012-13 464.81 374.58 374.58 317.01*Figure shown under RKVY includes RKVY (Normal) & Sub-schemes (viz. BGREI,NMPS, NVIUC & INSIMP)

State – West Bengal (Rs. in crore)

Page 27: West Bengal

GOI Allocation & Release under RKVY & Sub-schemes during 2013-14 For WEST BENGAL

Sl. No. Name of the Project/sub-

schemesAllocation(Rs. In crore)

Released(Rs. In crore)

1 RKVY (Normal) 334.10 153.082 RKVY Sub-schemea BGREI 151.27 75.64b NVIUC (Vegetable cluster) 4.35 2.18c INSIMP (Nutri-cereal) 0.02 0.01d NMPS 14.40 7.20

Total 504.14 238.11

Page 28: West Bengal

SYNOPSIS OF RKVY SCHEMES/ PROJECTS (AGRICULTURE DEPARTMENT)Sl. No.

Name of the projects/ schemes (Stream-I) 2013-14 SLSC Approved Outlay

(Rs. In Lakh)1 Production of quality seeds 1325.60

2 Infrastructure development of State Agril. Farms/ Research Stations/ SAU Farms for agricultural development in West Bengal.

210.80

3 Initiatives for Crop Development in West Bengal 567.40

4 Support to Plant Protection & Integrated Pest Management

21.30

5 Support to Soil Health & Integrated Nutrient Management 432.50

6 Farm Mechanization 6000.00

Total 8557.60

N.B.- 1st Instalment of fund for RKVY Stream – I projects has been released by GoI, the Nodal Deptt. is expected to release the fund soon.

Page 29: West Bengal

SYNOPSIS OF RKVY SCHEMES/PROJECTS (AGRICULTURE DEPARTMENT)Sl.

No.Name of the project/schemes (Stream – II) 2013-14 SLSC Approved outlay

(Rs. in Lakh)

1 Infrastructure Development of Agril. Training Centres & Research Institutes.

271.61

2 Agri- Research Projects for providing support to growth & development of agriculture and allied sectors in the State.

224.98

3 Support to Extension functionaries for facilitating Agricultural Extension & mass campaign in the state of West Bengal

480.57

4 Strengthening of Govt. Agricultural Farms for Seed Production 1135.232

5 Integrated Farming system approach-Demonstration cum training center for agriculture and allied sectors.

50.00

6 Comprehensive Development of Kumari Kanan Integrated Farm in Purulia District

50.00

7 Special programme for Agricultural Development of Darjeeling district under GTA.

242.50

Total 2454.89

N.B.- 1st Instalment of fund for RKVY Stream – II projects has been released to the implementing agencies.

Page 30: West Bengal

INTEGRATED SCHEME OF OILSEEDS, PULSES, OILPALM AND MAIZE (ISOPOM) 2013-14

Page 31: West Bengal

Achievement under ISOPOM during Kharif-2013-14

Name of District.

Demonstration Centres (Ha.) Groundnut DC Maize DC

Physical (ha)

Financial (Rs. in Lakhs)

Physical (ha)

Financial (Rs. in Lakhs)

Bankura 25 1.00 200 8.00

Purulia 100 4.00 300 12.00

Paschim Midnapore

50 2.00

Total 175 7.00 500 20.00

Rest of the programmes as per Annual Action Plan of ISOPOM 2013-14 for our state will be executed during Rabi and Rabi- Summer.

Page 32: West Bengal

Physical and Financial Targets for Oilseeds under ISOPOM for 2013-14 (ANNUAL ACTION PLAN)

Financial Targets under ISOPOM (Rs. in Lakhs) Sl. No.

Interventions Unit Physical Target under ISOPOM GOI share State Share Total

I. Seed Component (a) Purchase of Breeder Seeds Qtls. 70 2.625 0.875 3.50 (b) Production of Foundation Seeds. Qtls. 1000 7.50 2.50 10.00 (c) Production of Certified Seeds Qtls. 18150 136.125 45.375 181.5 TOTAL 146.25 48.75 195.00 III. Transfer of Technology Rape & Mustard D.C. ha. 1000 15 5 20.00 Groundnut D.C. ha. 1000 30 10 40.00 Sunflower D.C. ha. 2000 37.5 12.5 50.00 Sesame D.C. ha. 4000 45 15 60.00 Farmer’s Training Nos. 50 5.625 1.875 7.50 Officers/ Extension Workers Training Nos. 15 1.8 0.6 2.40 IPM D.C./ FFS Nos. 20 3.402 1.134 4.536 TOTAL 138.327 46.109 184.436 IV. NON SEED INPUTS Distribution of P.P. Chemicals ha. 3200 12.00 4.00 16.00 Distribution of Dolomite/ Pyrite/ Lime etc. ha. 1000 5.625 1.875 7.50 Distribution of Rhizobium/ PSB etc. ha. 8000 6 2 8.00 Pipe for carrying water. Nos. 970 109.125 36.375 145.5 Distribution of Micronutrients ha. 3000 11.25 3.75 15.00 Distribution of Implements Nos. 100 (Power Driven) 11.25 3.75 15.00 Staff & Contingencies 37.173 12.391 49.564 TOTAL 192.423 64.141 256.564 V. Innovative Components Distribution of Metallic Seed Bins. (2.5

Quintals Capacity & above) at 50% of the cost with a maximum of Rs.2000.00 per Bin.

Nos. 700 10.50 3.50 14

TOTAL 10.50 3.50 14.00 GRAND TOTAL 487.50 162.50 650.00

Page 33: West Bengal

Physical and Financial Targets for Maize under ISOPOM for 2013-14 (ANNUAL ACTION PLAN)

Financial Targets under ISOPOM (Rs. in Lakhs) Sl. No.

Interventions Unit Physical Target under ISOPOM GOI share State Share Total

I. Seed Component (a) Purchase of Breeder Seeds Qtls. 6 0.225 0.075 0.30 (b) Production of Certified Seeds Qtls. 5970 44.775 14.925 59.7 TOTAL 45.00 15.00 60.00 III. Transfer of Technology Maize D.C. ha. 1200 36.00 12.00 48.00 Farmer’s Training Nos. 40 4.50 1.50 6.00 Officers/ Extension Workers Training Nos. 10 1.20 0.40 1.60 TOTAL 41.70 13.90 55.60 IV. NON SEED INPUTS Distribution of P.P. Chemicals ha. 1000 3.75 1.25 5.00 Distribution of Dolomite/ Pyrite/ Lime etc. ha. 1000 5.625 1.875 7.50 Distribution of Rhizobium/ PSB etc. ha. 3000 2.25 0.75 3.00 Pipe for carrying water. Nos. 210 23.625 7.875 31.50 Distribution of Micronutrients ha. 1000 3.75 1.25 5.00 Distribution of Implements Nos. 50 (Power Driven) 5.625 1.875 7.50 Staff & Contingencies 11.175 3.725 14.90 TOTAL 55.8 18.6 74.4 V. Innovative Components Distribution of Metallic Seed Bins. (2.5

Quintals Capacity & above) at 50% of the cost with a maximum of Rs.2000.00 per Bin.

Nos. 500 7.50 2.50 10.0

TOTAL 7.50 2.50 10.00 GRAND TOTAL 150.00 50.00 200.00

Page 34: West Bengal

Proposed Physical & Financial Outlay for Oil Palm Development Programme under ISOPOM during 2013-14 in West Bengal

Sl.

No. Interventions Unit Approved rate of

assistance Sharing of

expenditure Physical target

Financial Target (Rs. in Lakhs)

GOI STATE Total

I Promotional components

(a) Demonstration Ha @Rs.17,750/- (Rs. 10,000/-per ha as planting materials and Rs.7,750/-per ha as for cultivation cost for 1st year )

75:25 587 78.144375 26.048125 104.1925

(b) Training/publicity etc

i. Training Extension Officers/staff

No. @ Rs. 15,000/- ( for 2-day training of 30 officials)

75:25 8 0.90 0.30 1.20

ii. Training to farmers No. @ Rs. 15,000/- ( for 1-day training of 50 farmers)

75:25 20 2.25 0.75 3.00

iii. Publicity 100:00 0.25 0.25 00 0.25 iv. Contingency 10% of total allocation 75:25 11.3307 3.7768 15.1075 (c) Drip Irrigation Ha As per NMMI Norms 90:10 200 1.125 0.125 1.25 (d) Diesel pump sets No. @ Rs. 10,000/- 75: 25 50 3.75 1.25 5.00 (e) Development of

Wasteland 75: 25 30.00 10.00 40.00

Total 127.750075 42.249925 170.00

Page 35: West Bengal

PROGRESS REPORT ON SOIL TESTING LABORATORIES (STLs) FOR THE YEAR (2013-14) UPTO JULY 2013

Soil Testing Laboratories under:

No. of Laboratories Annual Analyzing Capacity

No. of samples Analyzed for nutrients

Capacity utilized (%)

No. of Distt. having STL

No. of Distt. not having STL

No. of STL having AAS

Static Mobile Total

1. State Govt. 10 8 18 104000 13533 13.7 10 9 72. Public undertaking Sector

Nil Nil Nil

3. Private Sector Nil Nil Nil

Total 10 8 18 104000 13533 13.01 10 9 7

Progress of distribution of Soil Health Cards:

Period No. of cards made available to farmersKharif 2013 up to July 2013 13533Rabi 2013-14(Target) 104000

Page 36: West Bengal

Progress Report on Fertilizer Quality Control Laboratories for the year

2013-14 (up to July 2013)

Fertilizer Quality Control Laboratory under:

No. of Laboratories

Annual Analyzing Capacity

No. of samples Analyzed

Capacity utilized (%)

No. of FQCL having AAS

1. State Govt. 3 4500 949 21.0 32. Public Undertaking Sector Nil Nil Nil Nil Nil

3. Private Sector Nil Nil Nil Nil Nil

Total 3 4500 949 21.0 3

Proforma-9

Page 37: West Bengal

Hybrid Maize Seed Production: HQPM 1, HQPM 5,

Page 38: West Bengal

SEED REPLACEMENT RATE (SRR) OF DIFFERENT CROPS DURING 2012-2013 AND TARGET DURING 2013-2014 IN WEST BENGAL.

Sl. No. Name of Crop 2011 – 2012 (%)

2012 – 2013(%)

2013 – 2014

(Target)

1. Paddy 33.6 34.0 35.0

2. Wheat 43.4 45.7 47.0

3. Maize 29.0 30.0 33.0

4. Gram 26.9 27.92 33.0

5. Kalai(Urd) 35.6 36.47 37.0

6. Moong 33.6 33.39 35.0

7. Khesari 21.1 22.0 50.22

8. Lentil 29.6 29.8 32.99

9. Pigeon Pea 45.0 46.0 46.50

10. Ground-nut 40.4 41.0 44.47

11. Mustard 41.5 46.19 50.0

12. Sesame 34.9 36.91 37.5

14. Potato 26.7 27.17 33.04

Page 39: West Bengal

Requirement and Availability of C/Q Seed for Rabi 2013-14 & Target 2014-15

Sl. No. CROP

2013-14 Target 2014-15

Requirement

(Q)

Production

/

Availability

Deficit/

Surplus(Q)

Requiremen

t(Q)

Production

/

Availability

Deficit/

Surplus(Q)

1. Paddy 560000 560000 0 563000 563000 -

2. Hybrid

Paddy

2200 160 (-)2040 2300 210 (-)2090

3. Maize 6000 6000 - 6000 6000 -

4. Pulses 25735 25740 (+)5 25800 25800 -

5. Ground-

nut

17010 17010 - 19350 19350 -

6. Wheat 169200 160000 (-)9200 177600 177600 -

7. Potato 2280000 1884000 (-)396000 2680000 2000000 (-)680000

8. Mustard 11220 16523 (+)5303 13310 16850 (+)3540

(Quantity In Qtls)* After inclusion of the Pulse D/Cs under NFSM into Certification, the availability during 2014-15 will increase as per area covered.

Page 40: West Bengal

Seed Certification

Page 41: West Bengal

Seed Testing Status for 2012-13 & Target for 2013-14

Sl. Number

Type of Seed Seed samples analyzed in 2012-13

Target for 2013-14

1. Service 576 1000

2. Certified 19695 20000

3. Official 2816 3000

4. Total 23087 24000

Page 42: West Bengal

Sl. No.

Name of the

States/UTs

2010-11 2011-12 2012-13 (Upto March 2013)

2013-14(upto Aug-2014)

Sample analyzed

Misbranded (%)

Sample analyzed

Misbranded (%)

Sample analyzed

Misbranded (%)

Sample analyzed

Misbranded (%)

1 West

Bengal 512

5 (0.98)417 3

(0.72)

718 11(1.53) 242 1(0.41)

STATEMENT SHOWING THE STATISTICS OF THE ANALYSIS OFPESTICIDE SAMPLES FOR QUALITY CONTROL IN

Quality Control & Insecticide Control Laboratory

Page 43: West Bengal

PROGRESS OF FARM MECHANISATION SCHEMES DURING 2012-13

Scheme

Target for 2012-13(Rs. in Crore)

Up to date Achievement

of 2012-13(Rs. in Crore)

Nos. of FarmMachinery

Distributed so far

Rate of Subsidy(Rs.)

RKVY 19.071 14.70 Tractor-132Power tiller-1517Power reaper-97Zerotillege-2Pumpset-6625

Tractor- :45,000/-Power Tiller- :45,000/-Power Reaper- :40,000/-Zero Tillage Machine - :15,000/-Pump set- :10,000/-

BGREI

53.15 37.59 Tractor-249Power tiller-2820Power reaper-190Zerotillege-06Pumpset-21715

Name of Scheme :Financial Support scheme for Farm Mechanisation (FSSM)”

Page 44: West Bengal

PROGRESS OF FARM MECHANISATION SCHEMES DURING 2012-13

Scheme TARGET Uptodate No. of Achievement Machinery

Distributed

NFSM Rs. 8.573 Rs.3.33884 Tractor-11 No. Crore Crore Power Tiller -

179Pump set -

2382Power Reaper - 23

Page 45: West Bengal

• Target for 2013-14

• Target for FSSM 2013-14: Rs. 84.77725 Crores• Target for Small Farm Implements: Rs. 20 Crores

Page 46: West Bengal

Budget for Farm Mechanization for 2013-14 under Sub-Mission on Agricultural Mechanization (SMAM) in West Bengal

Sl No Scheme/Component Target for 2013-14 (Rs. in Lakh)

1 Establishment of Farm Machinery Bank for Custom Hiring.

6676.00

2 Promotion & Strengthening of Agricultural Mechanization through Training, Testing and Demonstration.a) Demonstration Component 693.60b) Outsourcing of Training 82.875

3 Subsidy for selected Agril. Machinery and Equipment 7870.00

4 Input Subsidy to small & marginal farmers for adopting suitable Farm Mechanisation

3000.00

5 Enhancing farm productivity at village level by introducing appropriate Farm Mechanization in selected villages

600.00

6 Post Harvest Technology & Management 69.65TOTAL 18922.475

Page 47: West Bengal

Requirement And Availability Of Fertilizers During Rabi,2013 -14

Sl. No.

Fertilizers Potential Requirement

Assessed Requirement [Finalized In ‘Zonal Conference Rabi 2013-14]

1. UREA 8,90,180 8,90,000

2. DAP 2,84,363 2,50,000

3. MOP 2,16,440 2,16,000

4. SSP 2,92,474 4,00,000

5. NPK Complexes 6,49,320 5,50,000

TOTAL 23,32,777 23,06,000

IN MT

Page 48: West Bengal

Status Of Quality Control Of Fertilizers During 2013-14

Sl.No No. of Laboratory Annual Capacity

Samples Received

Samples Analysed

Found Non-standard

3 4500 1011 927 144

Page 49: West Bengal

Consumption Of Fertilizers During Rabi 2012-13

Fertilizers Consumption In MTUREA 868507DAP 281571SSP 233111MAP 64AS 5216MOP 136543NPK COMPLEX 476992

Page 50: West Bengal

Use of bio-fertilizers, organic manures , Compost & green manure during Rabi-

2012-13 BIO-FERTILIZER

ORGANIC MANURE

VERMI -COMPOST

RURAL & CITY COMPOST

GREEN MANURING

1650

MT

43.35

LAKH MT

23.95

LAKH MT

87.7

LAKH MT

685100

HA

Page 51: West Bengal

InMTZinc

Sulphate

Ferrous Sulpha

te

Copper Sulpha

te

Borax/ Boric Acid

Manganese

Sulphate

Magnesium

SulphateOthers

4400 175 398 3585 295 2600 6491

USE OF MICRONUTRIENTS DURING RABI 2012-13 (in MT)

Page 52: West Bengal

1 SEWP – 2013-14 IDWG approved SEWP Submitted to GOI

2 Provisional AUC, 2012-13 Submitted to GOI

3 Annual Progress Report 2012-13 Submitted to GOI

4 Cumulative Progress Report up to 31/07/2013

Submitted to GOI

5 Statement of Expenditure, 2012-13 Submitted to GOI

Fund for the Year 2013-14 is yet to be released to West Bengal.

ATMA –West Bengal: Present Status

Page 53: West Bengal

Unspent opening balance as on 01/04/2013 1542.93909

Central Share 1031.23173

State Share 90.55588

Funds received from DAC Nil

Release of State’s Matching Share Nil

Total Expenditure as on 31/08/2013 968.452

Central Share 877.89612

State Share 90.55588

Unspent closing balance as on 01/09/2013 574.48709

Central Share 153.33561

State Share Nil

Fund for the Year 2013-14 is yet to be release to West Bengal.

Financial Statement: 2013-14 (Up to 31/08/2013)

Page 54: West Bengal

Financial Achievement: 2012-13 and Target 2013-14

Sl No.

ACTIVITIES Utilized during 2012-13

(Lakh Rs.)

Proposed for 2013-14 under SEWP

(Lakh Rs.)

1 Training of Farmers 489.38 1164.7102 Demonstration 81.300 377.5203 Exposure Visit of Farmers 142.080 230.4504 Mobilization of Farmers’ Groups 42.630 199.3005 Farm Information Dissemination 58.640 190.000

6 Agril. Tech. Refinement, Validation & Adoption

64.070 210.960

7 Farm School 105.500 346.8378 Innovative Activities 55.630 173.0009 Administrative Expenses 638.008 2088.8610 Farmers’ Friend Nil 804.0811 Developing SREP Nil 47.50012 SAMETI level Activities 92.732 129.58013 State level Activities Nil 210.130

TOTAL 1769.970 6172.927

Page 55: West Bengal

Physical Achievement: 2012-13 and Target 2013-14

Sl No.

ACTIVITIES Achievement during 2012-13

Target for 2013-14 under SEWP

1 Training of Farmers 57884 mandays

128093 mandays

2 Demonstration 2032 no. DCs 6864 no. DCs3 Exposure Visit of Farmers 3683 mandays 38930 mandays4 Mobilization of Farmers’ Groups 287 groups 774 groups5 Farm Information Dissemination 412 leaflets/

booklets650 leaflets/ booklets

6 Agril. Tech. Refinement, Validation & Adoption

16448 mandays

35550 mandays

7 Farm School 315 FSs 1038 FSs8 Farmers Award 210 farmers &

29 groups1029 farmers & 95 groups

9 Kissan Mela / Exhibition 5 nos. 19 nos.10 Farmers’ Friend Nil 20102 nos.11 Developing SREP Nil 1912 SAMETI level Activities 87 courses 80 courses

Page 56: West Bengal

Sl.no. Name of the post No.ofpost Recruitment position

1 State Coordinator 1 Not recruited

2 Project Director, District 18 16 posts filled up through Secondment

3 Deputy PD, District 38 36 posts filled up through Secondment

4 Accountant Clerk, District

19 19 posts filled up through Secondment. Process initiated for recruitment

5 Computer Programmer, District

19 Recruited -2 (Coochbehar , Malda) , Advt. published -4 (Burdwan. Nadia, North 24 Paraganas & Howrah)

6 BTM, Block 347 Recruited - 57 (12 in Coochbehar, 30 in South 24 Paraganas & 15 in Malda). Advt. published -4 (Burdwan. Nadia, North 24 Paraganas & Howrah)

7 S M S at Block 694 Recruited -2 (Siliguri ATMA dist). Advt. published -4 (Burdwan. Nadia, North 24 Paraganas & Howrah)

8 Deputy Director, SAMETI 8 Filled up through Secondment9 Accountant Clerk,

SAMETI1 Filled up through Secondment

10 Computer Programmer, SAMETI

1 Process going on.

11 Farmers Friend at Village 20102 Not recruited.

SPECIALISTS AND FUNCTIONARY SUPPORT, 2013-14

Page 57: West Bengal

Contingent Plan-2013-14

• Under post kharif season, crops like Black Gram,Maize will be grown.

• Promotion of Khesari, Toria, like crop will also increase area & production of Pulse & Oilseed crops even under rainfed condition.

• Rabi crops like Wheat, Mustard, Lentil, Maize, Groundnut & Summer crops like Sesame and Moong are the best suited crops under West Bengal situation.

Page 58: West Bengal

Challenges & Strategies ………..

Challenges: 1. Departure of rainfall from normal rhythm particularly in rainy months,2. Reduced span of winter period to grow cold loving Rabi crops

resulting restricted VRR,3. More than 64% of the Geographical Area is under cultivation with

180% cropping intensity & putting pressure on natural resources.4. High cost of Phosphatic & Potassic fertilizer facilitates imbalanced

NPK ratio in soil(2.92:1.6:1.0).

Page 59: West Bengal

Strategies:1. Under Low area & High productivity Zone, increased C/Q Seed

availability from increased Seed Certification Programme.2. Under High area & low productivity zone, increased Mechanization

with Zero Till machine & use of quality seed.3. Utilization of potential Rice fallow areas under Relay(poira)

cropping of Lentil, Khesari, Toria & mustard.4. Integrated Planning for supply of Quality Resources to the

production systems.5. Increased production of Vermicompost, other low cost indigenous

nutrient sources & increased employment generation, 6. Reducing the Gap of IPC & IPU.7. Better income realization by farmers with market linkage

Page 60: West Bengal

‘ ‘Area Expansion’.

– Strategic Technological Tools :1. Farm Mechanization with Zero/Minimal seed-drill to utilize

residual moisture for timely sowing of Wheat, Pulses & Oilseeds.2. Extension of Intercropping, Mixed cropping, Relay cropping of

Pulse, Oilseed & Maize to low lying Rice Fallow & upland field during Early/Rabi and Rabi season respectively,

3. Expansion of irrigation potential & reducing the gap between IPC & IPU through micro irrigation, Reduction of conveyance loss, Soil & Water conservation and Dry land & rainfed farming, & to convert cultivable Waste land to cultivated Land.

4. Research with new crops & varieties & under diversified soil and changing climatic condition for improved SRR & VRR.

Page 61: West Bengal

‘‘Vertical Expansion’ through ‘Productivity Augmentation’.

– Strategic Technological Tools :– Increased Seed &Variety Replacement rate.– Expanding SRI Boro Area & with saved water resources,

increasing irrigated Wheat, Pulse, Oilseed & Maize cultivation.– Training ,Extension & e-Governance.– Farm mechanization : Electrical pumps, Zero till seed drill,

Tractor, PowerTiller, Drum Seeder ,Delivery Pipe etc. – Soil Health Management & Soil Test based nutrient

Management, INM & IPM,– Resource conservation technology: Mulching, Efficient irrigation

Conveyance , to holding size of the farmers.

Page 62: West Bengal

‘Better income’ realization by farmers

– Providing alternative input production capacity to farmers through:

Azolla/Vermi/Compost/Green/Leaf manuring.– Demonstration & research on Integrated Farming

System with livelihood support, – Selection of popular market crops and varieties, – Better provision of Storage and linking post harvest

processing to Agro-Industries in PPP mode for value addition.

– Reducing cost of production: Stress on location specific technology development integrating the ITKs.

– Providing bio-fertilizers, bio-pesticides etc to combat high cost P & K Fertilizers &synthetic pesticides.

Page 63: West Bengal

Prioritised Issues of West Bengal• Due to Climatic aberration during Kharif & Rabi, early Duration Rabi

Varieties of Wheat, Lentil, Mustard, Khesari (Lathyrus), Groundnut, Sunflower with high yield potentiality under the region and availability of Quality/Certified seeds and it’s integration with Seed Rolling Plan.

• Intensified Mechanisation programme with funding support as per choice of farmers for high area with low productivity zone.

• Resource conservation technology with Zero Till/FIRB or other technological Tools for Rabi crops like Wheat, Rice, Maize, Pulses & Oilseeds.

• Marketing infrastructure for increased price realization• Micro-Irrigation facility with rational subsidies under all the Departments.• Value addition through Intensified Post Harvest Management Programme

including Food Processing. • Establishment of Custom Hiring Service for farm mechinaries.

Page 64: West Bengal