west accommodation review committee working group …€¦ · proposed west wing reconstruction:...
TRANSCRIPT
![Page 1: West Accommodation Review Committee Working Group …€¦ · Proposed West Wing Reconstruction: New Construction = 8,775 sq. ft. x $189.15 ft2 = $ 1,659,800 New Mechanical / Electrical](https://reader035.vdocuments.mx/reader035/viewer/2022071214/6042f71d2969461a9f5f3a06/html5/thumbnails/1.jpg)
Secondary Pupil Accommodation Review Committee
West Accommodation Review CommitteeWest Accommodation Review Committee
Working Group Meeting #11
HWDSB – Education Centre – Board Room
December 13, 2011
![Page 2: West Accommodation Review Committee Working Group …€¦ · Proposed West Wing Reconstruction: New Construction = 8,775 sq. ft. x $189.15 ft2 = $ 1,659,800 New Mechanical / Electrical](https://reader035.vdocuments.mx/reader035/viewer/2022071214/6042f71d2969461a9f5f3a06/html5/thumbnails/2.jpg)
Ancaster West Wing Review - RevisitAncaster West Wing Review - Revisit
Capital & Planning Implications
2
![Page 3: West Accommodation Review Committee Working Group …€¦ · Proposed West Wing Reconstruction: New Construction = 8,775 sq. ft. x $189.15 ft2 = $ 1,659,800 New Mechanical / Electrical](https://reader035.vdocuments.mx/reader035/viewer/2022071214/6042f71d2969461a9f5f3a06/html5/thumbnails/3.jpg)
Assumptions/Clarifications:
• Assumes that the Auditorium structure allows for retention after demolition of
the remaining building structure.
• Assumes that the existing Shop / Tech Rooms (x2) structure allows for retention
after demolition of the remaining building structure.
• After demolition the facility will require the construction of the following • After demolition the facility will require the construction of the following
elements:
• New Gymnasium
• New Lobby / Entrance to school, Gymnasium and Auditorium
• New Building Plant services (Boiler, A/C) to service both new and
existing structures as well as the existing Recreation Centre.
3
![Page 4: West Accommodation Review Committee Working Group …€¦ · Proposed West Wing Reconstruction: New Construction = 8,775 sq. ft. x $189.15 ft2 = $ 1,659,800 New Mechanical / Electrical](https://reader035.vdocuments.mx/reader035/viewer/2022071214/6042f71d2969461a9f5f3a06/html5/thumbnails/4.jpg)
Capital related costs:
Construction Costs:
Proposed West Wing Reconstruction:
New Construction = 8,775 sq. ft. x $189.15 ft2 = $ 1,659,800
New Mechanical / Electrical = boiler, connect to Rec Centre = $ 750,000New Mechanical / Electrical = boiler, connect to Rec Centre = $ 750,000
Upgrades to exist. / site, etc. = lump sum = $ 500,000
Demolition area = 33,703 sq. ft. x $15/ft2 = $ 505,545
Total = $ 3,415,345
Funding Sources:
• MOE = $ TBD
4
![Page 5: West Accommodation Review Committee Working Group …€¦ · Proposed West Wing Reconstruction: New Construction = 8,775 sq. ft. x $189.15 ft2 = $ 1,659,800 New Mechanical / Electrical](https://reader035.vdocuments.mx/reader035/viewer/2022071214/6042f71d2969461a9f5f3a06/html5/thumbnails/5.jpg)
Ancaster High – New School on Ancaster High – New School on
Existing Site
Capital & Planning Implications
5
![Page 6: West Accommodation Review Committee Working Group …€¦ · Proposed West Wing Reconstruction: New Construction = 8,775 sq. ft. x $189.15 ft2 = $ 1,659,800 New Mechanical / Electrical](https://reader035.vdocuments.mx/reader035/viewer/2022071214/6042f71d2969461a9f5f3a06/html5/thumbnails/6.jpg)
Planning Related Information:
Area Calculations:
Proposed Square Footage = 135,737 sq. ft. (utilizing MOE Planning template for
1000 student pupil population)
Site Constraints:
• The plan attached indicates a severance in which 20 acres of the existing site would
be retained for a new school. This could be potentially less, should the existing
recreation centre be relocated.
• The plan attached indicates a severance in which the remaining 23 acres of the
existing site would be surplus and could be sold to fund the proposed new school
• The City of Hamilton existing Recreation Centre could potentially remain on the
site, but would require new plant infrastructure for heating and electrical provision.
6
![Page 7: West Accommodation Review Committee Working Group …€¦ · Proposed West Wing Reconstruction: New Construction = 8,775 sq. ft. x $189.15 ft2 = $ 1,659,800 New Mechanical / Electrical](https://reader035.vdocuments.mx/reader035/viewer/2022071214/6042f71d2969461a9f5f3a06/html5/thumbnails/7.jpg)
Proposed Building Site Plan
7
![Page 8: West Accommodation Review Committee Working Group …€¦ · Proposed West Wing Reconstruction: New Construction = 8,775 sq. ft. x $189.15 ft2 = $ 1,659,800 New Mechanical / Electrical](https://reader035.vdocuments.mx/reader035/viewer/2022071214/6042f71d2969461a9f5f3a06/html5/thumbnails/8.jpg)
Capital related costs:
Construction Costs:
New School = 135,737 sq. ft. x $189.15 /sq. ft. = $25,674,653
Site Cost = existing = $0
Funding Sources:
• MOE = $ TBD• MOE = $ TBD
• Proceeds of Disposition (23 acres of existing site) = $ 9,200,000
8
![Page 9: West Accommodation Review Committee Working Group …€¦ · Proposed West Wing Reconstruction: New Construction = 8,775 sq. ft. x $189.15 ft2 = $ 1,659,800 New Mechanical / Electrical](https://reader035.vdocuments.mx/reader035/viewer/2022071214/6042f71d2969461a9f5f3a06/html5/thumbnails/9.jpg)
Ancaster High – New School on Ancaster High – New School on
Meadowlands Site
Capital & Planning Implications
9
![Page 10: West Accommodation Review Committee Working Group …€¦ · Proposed West Wing Reconstruction: New Construction = 8,775 sq. ft. x $189.15 ft2 = $ 1,659,800 New Mechanical / Electrical](https://reader035.vdocuments.mx/reader035/viewer/2022071214/6042f71d2969461a9f5f3a06/html5/thumbnails/10.jpg)
Planning Related Information:
Area Calculations:
Proposed Square Footage = 135,737 sq. ft. (utilizing MOE Planning template for
1000 student pupil population)
Site Constraints:
• The plan attached indicates a general site location within the Meadowlands area
that would be required to be purchased.
• The existing 43 acre Ancaster High site could be sold in order to finance the
purchase of the new site
• Discussions with the City of Hamilton would need to be undertaken to discuss the
need to;
i) retain the existing recreation centre on the existing Ancaster High site, or
ii) build a new recreation centre on the new school site.
10
![Page 11: West Accommodation Review Committee Working Group …€¦ · Proposed West Wing Reconstruction: New Construction = 8,775 sq. ft. x $189.15 ft2 = $ 1,659,800 New Mechanical / Electrical](https://reader035.vdocuments.mx/reader035/viewer/2022071214/6042f71d2969461a9f5f3a06/html5/thumbnails/11.jpg)
Proposed Building Site Plan
11
Proposed Meadowlands site
![Page 12: West Accommodation Review Committee Working Group …€¦ · Proposed West Wing Reconstruction: New Construction = 8,775 sq. ft. x $189.15 ft2 = $ 1,659,800 New Mechanical / Electrical](https://reader035.vdocuments.mx/reader035/viewer/2022071214/6042f71d2969461a9f5f3a06/html5/thumbnails/12.jpg)
Capital related costs:
Construction Costs:
New School = 135,737 sq. ft. x $189.15 /sq. ft. = $25,674,653
Site Cost (20 Acres – incl. Rec Centre) = $ 8,000,000
Total = $ 33,674,653
Funding Sources:Funding Sources:
• MOE = $ TBD
• Proceeds of Disposition (43 Acres of Existing site) = $ 17,200,000
12