wellington solar farm appendix c consultation · 2019-07-01 · appendix c consultation. ... final...
TRANSCRIPT
Environmental Impact Statement Wellington Solar Farm
17‐076 Final v1.1 C‐I
APPENDIX C CONSULTATION
www.nghenvironmental.com.au e [email protected]
Sydney Region 18/21 mary st
surry hills nsw 2010 (t 02 8202 8333)
Canberra ‐ NSW SE & ACT 17/27 yallourn st (po box 62)
fyshwick act 2609 (t 02 6280 5053)
Wagga Wagga ‐ Riverina and Western NSW suite 1, 39 fitzmaurice st (po box 5464)
wagga wagga nsw 2650 (t 02 6971 9696)
Newcastle ‐ Hunter and North Coast 7/11 union st
newcastle west nsw 2302 (t 02 4929 2301)
Bega ‐ ACT and South East NSW suite 1, 216 carp st (po box 470) bega nsw 2550 (t 02 6492 8333)
Bathurst ‐ Central West and Orana 35 morrisset st (po box 434)
bathurst nsw 2795 (t 02 6331 4541)
Community Consultation Plan WELLINGTON SOLAR FARM
NOVEMBER 2017
www.nghenvironmental.com.au e [email protected]
Sydney Region 18/21 mary st
surry hills nsw 2010 (t 02 8202 8333)
Canberra ‐ NSW SE & ACT 17/27 yallourn st (po box 62)
fyshwick act 2609 (t 02 6280 5053)
Wagga Wagga ‐ Riverina and Western NSW suite 1, 39 fitzmaurice st (po box 5464)
wagga wagga nsw 2650 (t 02 6971 9696)
Newcastle ‐ Hunter and North Coast 7/11 union st
newcastle west nsw 2302 (t 02 4929 2301)
Bega ‐ ACT and South East NSW suite 1, 216 carp st (po box 470) bega nsw 2550 (t 02 6492 8333)
Bathurst ‐ Central West and Orana 35 morrisset st (po box 434)
bathurst nsw 2795 (t 02 6331 4541)
Document Verification
Project Title: CCP ‐ Wellington Solar Farm
Project Number: 17‐076
Project File Name: Wellington CCP Final v1.1 Revision Date Prepared by (name) Reviewed by (name) Approved by (name)
Draft V1 20/04/17 Jenny Walsh Nick Graham‐Higgs Jenny Walsh
Final v1 19/10/17 Zoe Quaas Brooke Marshall Brooke Marshall
Final v1 06/11/17 Jane Blomfield Minor changes
NGH Environmental prints all documents on environmentally sustainable paper including paper made from bagasse (a by‐product of sugar production) or recycled paper.
NGH Environmental Pty Ltd (ACN: 124 444 622. ABN: 31 124 444 622) and NGH Environmental (Heritage) Pty Ltd (ACN: 603 938 549. ABN: 62 603 938 549) are part of the NGH Environmental Group of Companies.
Community Consultation Plan Wellington Solar Farm
17‐076 v1.1 i
CONTENTS
1 INTRODUCTION .......................................................................................................................... 1
1.1 COMMUNITY CONSULTATION PRINCIPLES ....................................................................................... 1
1.2 AIM OF THIS PLAN ............................................................................................................................ 1
1.3 STRUCTURE ....................................................................................................................................... 2
1.4 IMPLEMENTATION AND REVISION OF THIS DOCUMENT .................................................................. 2
1.5 RELEVANT GUIDELINES ..................................................................................................................... 2
2 PROPOSAL OVERVIEW ................................................................................................................ 3
2.1 WELLINGTON SOLAR FARM .............................................................................................................. 3
2.2 CONSTRUCTION ................................................................................................................................ 3
2.3 PLANNING PATHWAY ....................................................................................................................... 6
3 COMMUNITY PROFILE ................................................................................................................. 7
3.1 DUBBO REGIONAL LOCAL GOVERNMENT AREA ................................................................................ 7
3.1.1 Wellington .......................................................................................................................................... 8
3.1.2 Bodangora .......................................................................................................................................... 9
3.1.3 Geurie ................................................................................................................................................. 9
3.1.4 Dubbo ................................................................................................................................................. 9
3.1.5 Bodangora Wind Farm ...................................................................................................................... 10
4 STAKEHOLDER GROUPS AND CONSULTATION STRATEGIES ........................................................ 11
5 ISSUE MANAGEMENT ................................................................................................................ 16
6 PROJECT BASED ACTIVITIES ....................................................................................................... 19
6.1 ENGAGEMENT TEAM ...................................................................................................................... 19
6.2 MILESTONES ................................................................................................................................... 19
6.3 THROUGHOUT PROCESS ................................................................................................................. 19
7 MONITORING AND EVALUATION .............................................................................................. 26
8 REFERENCES AND RESOURCES ................................................................................................... 27
APPENDIX A COMMUNITY FEEDBACK FORM ..................................................................................A‐I
APPENDIX B CONSULTATION STATUS ............................................................................................ B‐I
Community Consultation Plan Wellington Solar Farm
17‐076 v1.1 1
1 INTRODUCTION
1.1 COMMUNITY CONSULTATION PRINCIPLES
Best practice community consultation involves the community in all decision‐making stages of a project.
There is a role for the community from project conception, through the assessment process and on to
project development. Effective community consultation has three important functions:
1. It facilitates deeper understanding of issues and decisions required for the project;
2. It improves the quality of decisions made for the project; and
3. It allows people to be involved in decisions that affect their lives.
Important community engagement principles for a project include:
Openness – combats assumptions and misinformation.
Inclusiveness ‐ consultation should be diverse and representative, not responding only to
the most vocal stakeholders.
Effective communication – requiring trust between parties and tools appropriate to the
task.
A communication strategy – clarity about what is being undertaken:
o Inform ‐ one‐way communication to deliver information about the project.
o Consult ‐ two‐way communication to seek input into the project.
o Collaborate and involve – seek participation in elements of the project design and
implementation.
Early rather than late – to maximise engagement opportunities.
Accountability – the process should be monitored and evaluated to ensure its aims are being
achieved.
1.2 AIM OF THIS PLAN
NGH Environmental has developed this Community Consultation Plan (CCP) on behalf of First Solar, the
proponent of the proposed Wellington Solar Farm. The aims of the plan are to:
1. Identify effective methods to inform the community about the proposed Wellington Solar
Farm; and
2. Facilitate engagement with the community, including input into the environmental
assessment process and project development.
The plan identifies:
Community stakeholders for the project.
Issues / risks related to the engagement of each stakeholder group.
A consultation strategy for each stakeholder group.
A set of activities against the project development time line to facilitate consultation.
Effective engagement will require an understanding of community stakeholders and prioritisation of
potential impacts. It also relies on the community understanding the project and specific issues of interest
to them, to contribute effectively. The focus of the consultation plan will be on providing this understanding
and engagement.
Community Consultation Plan Wellington Solar Farm
17‐076 v1.1 2
1.3 STRUCTURE
The structure of this plan is:
1. Proposal overview.
2. Identification of community stakeholders for the project.
3. Issue management – what specific issues need consideration.
4. Project based activities – what vehicles will be utilised in the consultation process.
1.4 IMPLEMENTATION AND REVISION OF THIS DOCUMENT
The plan has been developed to coincide with the early planning and assessment stages of the project.
If the project is approved, consultation will also be required to continue into the construction and
operational phases of the project. These phases will require a new or updated plan, to reflect any changes
to consultation objectives but also the increasing knowledge gained about the community.
1.5 RELEVANT GUIDELINES
This CCP has been prepared with reference to the following guidelines / references:
Establishing the social licence to operate large scale solar facilities in Australia: Insights from
social research for industry, Australian Renewable Energy Agency (ARENA).
Beyond Public Meetings: Connecting community engagement with decision making,
Twyford Consulting 2007.
Community Consultation Plan Wellington Solar Farm
17‐076 v1.1 3
2 PROPOSAL OVERVIEW
2.1 WELLINGTON SOLAR FARM
The Wellington Solar Farm site is located approximately 2 kilometres north east of Wellington, in western
central NSW (refer Figure 2‐1), within the Dubbo Regional Local Government Area (LGA). The extent of the
316 hectare solar farm site is illustrated in Figure 2‐2 and defined as: Lots 89, 90, 91, 92, 99, 102, 103 and
104/DP2987; Lot 1/DP34690, Lot 1/DP520396; and Lot 2/DP807187. The solar farm would connect to the
national electricity network via the existing Transgrid substation located to the south of the site (refer
Figure 2‐2), within Lot 1/DP1226751.
Goolma Road forms the southern and eastern boundaries of the site with the Mitchell Highway further
west (Figure 2‐2). The site and surroundings are generally farmed land with the Wellington Correctional
Centre located approximately 400m east of the site.
The proposal would generate photovoltaic (PV) energy up to 174MW capacity and would comprise an array
of solar panels approximately 316 hectares, a 132kV substation and related infrastructure as follows:
PV modules (solar panels).
Single Axis horizontal tracking (likely) or fixed mounting frames.
30‐50 inverter stations with associated transformer.
An onsite substation or substation within the existing Transgrid substation containing one
transformer and associated switchgear.
A 33kV or 132kV or 330kV transmission line to the adjacent existing Wellington Substation
(100m).
Underground or aboveground electrical conduits and cabling to connect the inverters to the
onsite substation or substation within the existing Transgrid substation.
22‐33kV underground and aboveground (mounted to module structure) DC cabling to
connect the modules to the inverter stations.
An access track off Goolma Road, approximately 4.6km north east of Mitchell Highway
junction.
Permanent site office and maintenance building with associated vehicle parking.
Internal access tracks to allow for site maintenance.
Perimeter security fencing up to 2.3m high.
Energy storage.
Native vegetation screening, where required to break up views of infrastructure to specific
receivers, will be planted prior to commencement of operations.
2.2 CONSTRUCTION
Indicative timing for the receipt of Planning Approval for the Wellington Solar Farm is March 2018. The
construction phase of the proposal is expected to take twelve months.
The Wellington Solar Farm is expected to operate for around 30 years. After the operating period the solar
farm would either be decommissioned, removing all above ground infrastructure and returning the site to
its existing land capability, or repowered with new PV equipment.
Community Consultation Plan Wellington Solar Farm
17‐076 v1.1 4
Figure 2‐1 Proposal location
Project boundaryProposed infrastructure
"a Existing substationLocal roadHighwayExisting transmission linesFarm dam / other water bodyRailwayNational Park / ReserveTravelling stock reserve
1:100000
www.nghenvironmental.com.au
0 2 41 Km
A4 @Ref: SW121 EIS_20171113Author: SP Date: 13/11/2017 °
G OOL
MAROADCO
BBOR
ARO
AD
BR O OKFIELD R OAD
TWELVE MILE ROAD
MINE ROAD
GILGOAN
ROAD
DICK
STRE
ET
PONTO FALLS ROAD
BU SHRANGERS CREEK ROAD
BAKERS LANE
S UNTOP R OAD
CAMPBELLS LANE
RENSHA WMC
GIRR
WAY
MARYVALE ROAD
BRENNAN SWAY
TWIGGS ROAD
FAL LS ROAD
LOWRIED
RIV
E
GISBORNE STREET
BELA VISTA LANE
HARVEYSLANE
CURTIS STREET
M ITCHELL HIGHWAY
LINCOLN
MARYVALE
BODANGORA
MOUNT ARTHUR
MAYNGGU GANAI HISTORIC SITE
WELLINGTON
MACQUARIE RIVER
BELL RIVER
Notes:- Base map © Esri and its data suppliers. - Base layers from LPI and Geoscience Aust, 2017
Community Consultation Plan Wellington Solar Farm
17‐076 v1.1 5
Figure 2‐2 Proposal site
"a Existing substationLocal roadExisting transmission linesFarm dam / other water bodyMinor drainage featureDrainage lineRailwayBattery storage facilityProposed arrayProposed overhead transmission line:Option 1Proposed overhead transmission line:Option 2Proposed overhead transmission lineProposed underground transmission lineProposed roadProposed substation: Option 1Proposed substation: Option 2Temporary laydown and turning circleTemporary construction and officeparking
") OAM buildingProject boundaryCadastre
1:22000
www.nghenvironmental.com.au
0 200 400100 m
A4 @Ref: SW121 EIS_20171113Author: SP Date: 13/11/2017 °
Lot 1 DP 1226751
Lot 89 DP 2987
Lot 91 DP 2987
Lot 90 DP 2987
Lot 102 DP 2987
Lot 103 DP 2987
Lot 99 DP 2987
Lot 1 DP 520396
Lot 104 DP 2987
Lot 1 DP 34690
Lot 2 DP 807187
Lot 92 DP 2987
GO OLMARO
AD
COBB
ORA
ROA D
BELA VISTA LANE
TWELVE MILE ROAD
WUULUMAN CREE K
Notes:- Base map © Esri and its data suppliers. - Base layers from LPI and Geoscience Aust, 2017
SITE ACCESS
Community Consultation Plan Wellington Solar Farm
17‐076 v1.1 6
2.3 PLANNING PATHWAY
The proposal to construct and operate Wellington Solar Farm requires development consent under Part 4
of the NSW Environmental Planning and Assessment Act 1979 (EP&A Act). The proposal is development for
the purpose of electricity generating works with a capital cost in excess of $30 million and is therefore
classified as State Significant Development under State Environmental Planning Policy (State and Regional
Development) 2011.
An Environmental Impact Statement (EIS) is required to be prepared for State Significant Developments.
The EIS would document all community consultation activities undertaken for the Wellington Solar Farm.
Community Consultation Plan Wellington Solar Farm
17‐076 v1.1 7
3 COMMUNITY PROFILE
Understanding the makeup and values of the community is essential to finding effective ways to reach the
community as well as beginning to identify ways that the project may impact the community. This section
provides a broad overview of the LGA and nearest major town of Wellington, the locality of Bodangora,
village of Geurie and the regional centre of Dubbo.
3.1 DUBBO REGIONAL LOCAL GOVERNMENT AREA
Dubbo Regional Council was established on 12 May 2016 as an amalgamation of the former Dubbo City
and Wellington Shire Councils and covers an area of 7,536 square kilometres. Prior to the amalgamation
the proposal site was located within the Wellington LGA which covered an area of 4,110 square kilometres.
The estimated resident population within the Wellington LGA in 2011 was 8,833, which grew to 9,073 by
2015 (ABS 2017). The median age of residents within the Wellington LGA in 2015 was 42.1 years, higher
than the Australian average of 37.4 and higher than the median estimated age of 40.3 in 2011 (ABS 2017).
The estimated resident population of the Dubbo Regional LGA as at June 30, 2015 was 51,007 people.
Between 2005 and 2015 the Dubbo Region estimated resident population increased by 3,969 people
(8.44%), with an average annual compound population growth of 0.81% between 2005 and 2015. (Dubbo
Regional Council, 2016). Between 2016 and 2036, the population of Dubbo Region is projected to increase
by 5,750 people, which is less than the average growth rates experienced over the previous 10 years
(Department of Planning and Environment, 2016).
The main industries in the Dubbo Regional LGA are health, retail, education, government services, tourism,
manufacturing, construction, agriculture, business services and transport (Dubbo Regional Council, 2016).
The Region is also well positioned as a growing mining services centre with mining and exploration projects,
both established and emerging, flourishing across the surrounding region (Dubbo Regional Council, 2016).
The output generated by Dubbo Region economy is estimated at $5.493 billion, with manufacturing
accounting for $790 million, followed by rental, hiring and real estate services ($597 million) and
construction ($546 million) (Dubbo Regional Council, 2016).
The total employment estimate for Dubbo Region as at the 2011 Census was 19,217 jobs. The health care
and social assistance industry sector is the largest sector (3,084 jobs); followed by retail trade (2,467 jobs)
and education and training (1,870 jobs) (Dubbo Regional Council, 2016). Workers in Dubbo Region are
predominately in the 45 to 54 (23.5%), 35 to 44 (21.8%) and 25 to 34 (18.4%) year age groups, with 4.3%
of workers aged 65 years and over.
Between the 2006 and 2011 Census periods, there was a net increase of 336 jobs in Dubbo Region, building
on the 18,881 jobs in 2006 (ABS 2017). The largest increase in terms of the number of jobs was the health
care and social assistance sector, increasing by 467 jobs (17.84%) (Dubbo Regional Council, 2016). The
agriculture, forestry and fishing sector experienced the largest decline in jobs (Dubbo Regional Council,
2016).
Socio Economic Indexes for Areas (SEIFA) is a suite of indexes that have been created by the Australian
Bureau of Statistics (ABS) from social and economic Census information. Each index ranks geographic areas
across Australia in terms of their relative socio‐economic advantage and disadvantage, with LGA scores
ranging from 121 (most disadvantaged) to 1,193 (least disadvantaged). The SEIFA score for Dubbo Region
in 2011 was 961.
Community Consultation Plan Wellington Solar Farm
17‐076 v1.1 8
3.1.1 Wellington
Wellington is the nearest township to the proposal site, located approximately 2 km to the south. The town
of Wellington has approximately 4,500 people and is located 362 km north‐west of Sydney and 50km south
east of Dubbo (Regional Development Australia – Orana, 2016).
Wellington is located at the junction of the Mitchell Highway, Bushrangers Creek Road, Cobbora Road and
Goolma Road. The town is located on the Main Western railway line and served by a daily NSW TrainLink
XPT service between Sydney and Dubbo.
Agriculture is the key industry in Wellington, with the steeper land to the east supporting mainly grazing
activities and the gentle undulating land to the west supporting mainly cereal production. Mining
exploration activity is of continuing interest, with a number of mineral deposits within the area. (Regional
Development Australia – Orana, 2016).
Of the total 19,217 jobs in the Dubbo Region there are: 16,959 jobs in the former Dubbo LGA (88.25 %) and
2,258 jobs in the former Wellington LGA (11.75 %). The SEIFA score for Wellington in 2011 was 788
(compared to 961 for the overall Dubbo Region) (REMPLAN 2017).
Wellington Correctional Centre, an Australian maximum security prison, is located approximately 400m
east of the proposal site, accessed via Goolma Road. The facility is operated by Corrective Services NSW
and employs over 200 staff. The facility is to be expanded during 2017.
The proposed solar farm would provide opportunity of employment diversification as NSW moves towards
a carbon neutral economy by the year 2050. The unemployment rate for the Wellington LGA for 2011 was
high at 8.3%, compared to the Australian average of 5.6% (ABS 2011).
The local newspaper The Wellington Times, a Rural Press title, is published three times a week.
Wellington provides support to the villages of Geurie, Elong Elong, Mumbil, Stuart Town and Euchareena
and its features include:
Tourism attractions including the Wellington Caves Complex, Phosphate Mine and Japanese
Gardens, Lake Burrendong, Burrendong Botanic Garden and Arboretum, Mt Arthur Reserve,
several wineries and boutique galleries (Dubbo Regional Council)
Events include: the annual Wellington Boot race meeting, Agricultural Show and various
markets, (Destinations NSW 2017).
Recreational and sporting facilities include: Burrendong Dam, basketball and netball courts,
soccer, rugby union and rugby league fields, cricket pitches, touch football fields, tennis
courts, athletics track, tennis courts, Olympic and children's swimming pools, parks and
gardens (Destinations NSW 2016b).
Community facilities and clubs include: Soldiers Memorial Club, Race Club a memorial hall,
branch library, cemetery, (Destinations NSW 2017).
Health services include: Wellington Hospital, Wellington Aboriginal Corporation Health
Service, Bellhaven Aged Care Facility and Maranatha House care facility (Service NSW 2017).
Services include: banks, supermarkets, post office, real estate, trades people, machinery
and farming services, hotels, accommodation, cafes and restaurants, fire station
(Destinations NSW 2017).
Education facilities include: pre‐school, primary schools, high school (Dubbo Regional
Council 2017).
Community Consultation Plan Wellington Solar Farm
17‐076 v1.1 9
Churches – Uniting Church, Baptist Church, Anglican Church, Christian Community Church,
Baha’i Faith, Catholic Church, Jehovah's Witnesses, International Network of Churches,
Jachin Boaz Ministries (Dubbo Regional Council 2017).
The Wellington Airport, also known as Bondangora Airport, is owned and operated by
Dubbo Regional Council.
3.1.2 Bodangora
Bodangora is a small rural locality approximately 12 kilometres north east of Wellington and approximately
6 kilometres north east of the Wellington Solar Farm site. The locality of Bodangora is a collection of larger
rural properties accessed from Goolma Road. Bodangora has an airfield for small planes and an old
cemetery.
There was no data available from the Australian Bureau of Statistics (ABS) on population, businesses or
number of dwellings in the Bodangora locality.
3.1.3 Geurie
Geurie is a small village located between Wellington (21 km) and Dubbo (29 km) on the Mitchell Highway.
Geurie is approximately 17 kilometres north west of the proposed Wellington Solar Farm site. The village
is on the Main Western railway line and served by a daily NSW TrainLink XPT service between Sydney and
Dubbo.
At the 2011 census, Geurie had a population of 895 (REMPLAN 2017). The SEIFA score for Geurie in 2011
was 996, (compared to 961 for the overall Dubbo Region) (REMPLAN 2017).
Geurie has a swimming pool, some services, cross country mountain biking trails, parks and reserves.
3.1.4 Dubbo
Dubbo is a major regional centre located approximately 50 km northwest of Wellington and 45 km north
west of the proposal site. Dubbo is located at the junction of the Mitchell, Newell and Golden Highways
(three major highways). Dubbo is also serviced by Main Western Railway Line (with daily XPT services) and
the Dubbo City Regional Airport (180 flights a week to/from Dubbo).
The population of Dubbo in 2011 was 32,326. The estimated population for Dubbo in 2016 was 41,934 with
a median age of 39 (Evocities http://evocities.com.au/dubbo/ ).
Dubbo’s facilities include:
14 primary schools (7 public and 7 private); 6 secondary schools (3 public and 3 private), 4
tertiary education campuses, 5 Preschools and 12 Long Day Care Options.
Retail Services: 6 shopping centres, with over 90 speciality stores and CBD specialty shops.
Leisure and Dining: In excess of 120 eateries including licensed hotels and clubs, restaurants,
cafes and food halls.
Health: 5 aged‐care centres, 1 public, 1 private and 1 rehabilitation hospital.
The Dubbo arts industry includes the Dubbo Regional Theatre and Convention Centre and
the Western Plains Cultural Centre.
There are more than 66 resident GP’s as well as specialists in key areas including oncology,
paediatrics, mental and aged care.
Community Consultation Plan Wellington Solar Farm
17‐076 v1.1 10
Tourist attractions include: Taronga Western Plains Zoo, historic Dundullimal Homestead
and the historic Old Dubbo Gaol.
The unemployment rate in Dubbo is typically below the State average and is currently at 4.9% compared
to 5.6% for NSW (Dubbo City 2017).
It is estimated that 16,959 people work in Dubbo^, the majority of whom work a 35‐39 hour week. By
August 2018 is estimated that total employment in Dubbo will be at 21,919 jobs, which represents an
annualised growth rate of 2.20%. Of the 16,959 workers in Dubbo 17.98% are classified as Professionals,
12.02% Managers, 14.62% Technicians and Trade Workers, and 10.75% Labourers. (Evocities 2017).
Dubbo has a proud and passionate sporting heritage and boasts more than 120 sporting and interest clubs
and more than 150 acres of dedicated sporting grounds and facilities. In addition to sport, there are a host
of other recreational activities including the nationally recognised Taronga Western Plains Zoo.
Local print media includes The Daily Liberal (called the Weekend Liberal on Saturdays).
A number of community organisations across a range of interests, plus business and professional
organisations including the Dubbo City Development Corporation, Dubbo Chamber of Commerce and
Orana Business Enterprise Centre.
3.1.5 Bodangora Wind Farm
The approved Bodangora Wind Farm, located approximately 10 kilometres to the north east of the
Wellington Solar Farm site is due to begin construction mid‐2017.
The EIS for the original wind farm proposal was publicly exhibited in mid‐2012, with the Department of
Planning and environment receiving over 100 objections. Opposition to the wind farm was covered in the
local press.
The previous negative publicity associated with the wind farm, may influence local community members’
perception of the solar farm proposal in either a positive or negative manner. When meeting with members
of the local community, the community engagement team should emphasise the unobtrusive visual nature
of the Wellington Solar Farm proposal.
Community Consultation Plan Wellington Solar Farm
17‐076 v1.1 11
4 STAKEHOLDER GROUPS AND CONSULTATION
STRATEGIES
It is important to identify all key stakeholder groups and relevant characteristics and tailor engagement
strategies to suit each group. Different levels of engagement suit varying degrees of potential impacts in
the community. Where impacts are less significant, for example, the International Association for Public
Participation (IAP2) consultation spectrum suggests approaches such as ‘Inform’ and ‘Consult’. Greater
impacts on communities require approaches such as ‘Involve’, ‘Collaborate’ and ‘Empower’. Appropriate
strategies are set out below for each stakeholder group.
Table 4‐1 Summary of stakeholder groups and strategies, to be detailed further in the next table
Inform only Inform and Consult
Local Media
Broader community
Mid‐Western Shire
Adjacent neighbours
Near neighbours
Local businesses
o Wellington Correctional Centre
Special Interest groups
o Quota International o Wellington Race Club o Wellington Pony club o Aero club o Golf Club o Polo Club
Representative bodies
o Wellington Business Chamber
o Dubbo Regional Council
Community Consultation Plan Wellington Solar Farm
17‐076 v1.1 12
Stakeholder group Defining characteristics Consultation strategies Status and timing
1. Adjacent
neighbours
Neighbours adjacent to the project and those
who may be directly affected, for example:
those with a view of infrastructure, noise or
vibration from haulage route or construction
activities.
Meet first – Inform and consult
Understanding the values and potential
impacts to this group is highly important.
Face to face consultation and direct feedback
is required.
Mitigation strategies may require changes to
the project or the development of specific
plans of management i.e. screening visual
impact.
All consultation should be documented.
First consultation occurred in May/June 2017
Letters and feedback forms have been left
when neighbours weren’t available
Follow up consultation as needed
2. Near neighbours Neighbours to the project and those who may
be directly affected, for example: those with
a view of infrastructure, noise or vibration
from haulage route or construction activities.
Being a major development close to a town,
direct impacts may be of great interest to
residents and businesses. This is a large
development with potential to define the
locality in many ways.
This group includes residences within 2km of
the site (including residences on the northern
side of Wellington) and may experience direct
impacts.
Inform and Consult
Understanding the values and potential
impacts to this group is highly important. It will
assist the assessment process and
development of appropriate mitigation
strategies.
Face to face consultation and direct feedback
is required.
All consultation should be documented.
First consultation occurred in May/June 2017
Letters and feedback forms have been left
when neighbours weren’t available
Follow up consultation as needed
Community Consultation Plan Wellington Solar Farm
17‐076 v1.1 13
Stakeholder group Defining characteristics Consultation strategies Status and timing
3. Local Businesses Businesses within 2km of the site which may
experience direct impacts.
This includes Wellington Correctional Centre,
which is accessed via Goolma Road, in close
proximity to the solar farm site.
Inform and Consult
Understanding the values of this group will
assist the assessment process and
development of appropriate mitigation
strategies.
Direct contact and direct feedback is required.
Potential opportunity to distribute project
information and understand community
sentiment.
All consultation should be documented.
First consultation occurred in May/June 2017
Letters and feedback forms have been left
when business owners weren’t available
Follow up consultation as needed
4. Special interest
groups
Special interest groups, for example,
recreational groups, sporting groups.
A number were identified specific to this
proposal. These include:
Quota International
Wellington Race Club
Wellington Pony club
Aero club
Golf Club
Polo Club
Rotary Club
Inform and Consult
These should be directly contacted.
Specific information or assessment may be
required to understand and mitigate impacts
for these groups.
An avenue to provide feedback or ask
questions should be provided.
Community Consultation Plan Wellington Solar Farm
17‐076 v1.1 14
Stakeholder group Defining characteristics Consultation strategies Status and timing
5. Representative
bodies
Representatives of groups such as:
Wellington Business Chamber
Dubbo Regional Council
Inform and Consult
Specific information may be required for this
group.
An avenue to receive information and provide
specific feedback or ask questions should be
provided.
Dubbo Regional Council has been consulted in
June; First Solar stays in direct contact with
Dubbo Regional Council.
Presentation to Councillors is expected to take
place in October/November 2017.
Consultation with the Wellington Business
Chamber has occurred in October 2017. A
letter to the business is schedule to be provide
in November 2017.
6. Media Outlets to ensure a clear message is
delivered:
Local radio, television, newspapers.
Inform
A contact should be provided to this group, for
further information if required.
Wellington Time advertised for Community
Open Day 27 September 2017
7. Broader
community
The town of Wellington is approximately 2 km
from the proposed solar farm. There are
numerous residences and business located in
and around the township.
Direct impacts are a possibility for residences
on the northern side of Wellington and the
project would be a large new development for
the broader community.
Inform
Newspaper articles, website information used
to relay information about the project.
A contact should be provided to this group, for
further information if required.
First Solar completed a mail out to broader
community 19 April 2017, 3 July 2017, 7
August, 13 September 2017.
Community Consultation Plan Wellington Solar Farm
17‐076 v1.1 15
Stakeholder group Defining characteristics Consultation strategies Status and timing
8. Mid‐Western
shire
The region has had a rich agricultural history.
The proposed solar farm would provide an
economic stimulus for the area, during
construction, and would be a positive step
forward in the renewable energy sector.
While direct impacts are unlikely, the project
would be a large new development for the
broader community.
Inform
Newspaper articles and website information
used to release information about the project.
A contact should be provided to this group, for
further information if required.
Direct contact with specific representative
groups (Chamber of Commerce).
First Solar made contact with Viv Wellington
and Barry Jeffrey, Wellington Business
Chamber in October 2017.
Community Consultation Plan Wellington Solar Farm
17‐076 v1.1 16
5 ISSUE MANAGEMENT
A set of project‐specific issues and risks to maximising community engagement in the project have been identified below. These issues pose potential risks to the
effective identification and mitigation of impacts important to the community. Mitigation strategies have been developed below, specific to the identified issues.
These have been incorporated into the Project‐based Activities, in Section 6.
Issue Risks Mitigation strategies
The project may define /
overwhelm the locality
This may polarise the community.
They may not feel that the project
reflects their values.
The scale of the project may
overwhelm the existing local
character.
Education material about the role of solar energy in the country’s energy mix, the technology
and its impacts.
Early dissemination of information about the project and its specific justification and benefits,
particularly with reference to developing new income streams on agricultural land and the
ability to restore the land capability after decommissioning.
Seek direct input into how the project may reflect the communities ‘personality’ and values and
how the benefits of the project may be spread to the local community.
Clear communication of key environmental impacts and mitigation strategies of the project.
Offer direct contact to project manager.
Misinformation: Word of mouth /
rumours first source of
information
Feel left out, disengaged,
misinformed.
Direct communication early to local community – adjacent landowners first, near neighbours
second, then the wider community.
Community Consultation Plan Wellington Solar Farm
17‐076 v1.1 17
Issue Risks Mitigation strategies
Lack of support for project
Lack of interest, leading to low
levels of public support.
Unaddressed concerns may
generate opponents of this
project.
Large proportion of jobs in local
area are reliant on coal mining may
influence support of development
of renewable infrastructure.
Early dissemination of information about the project and its justification and project benefits.
Clear communication of key environmental impacts and mitigation strategies.
Make participation easy – to ensure all concerns are addressed.
Be creative – seek support for renewable project that demonstrates how benefits are felt at the
local level.
The approvals process can be
complex.
Perception that the process is too
difficult to become involved in.
Suspicion that input will not be
valued.
Clearly illustrate approvals process.
Clearly define opportunities for community input including what is required and when it is
required.
Communicate back, identifying where input has been used.
Reinforce this at each relevant stage for community input – pre lodgement, during public
exhibition etc.
Distrust in environmental
assessment process.
Distrust of impact identification
and mitigation strategies.
Establish credentials of assessment team and First Solar. Present these in the EIS and in
newsletters etc.
Make participation easy – create opportunities to discuss issues with the team.
Fear of unknown / complex
information
Exaggerated fears /
misunderstanding of information.
Layman explanations of issues.
Offer to follow up – one on one, or special interest meetings.
Community Consultation Plan Wellington Solar Farm
17‐076 v1.1 18
Issue Risks Mitigation strategies
Relationship with community Risk that during the long approval
and assessment process, the
community will lose enthusiasm,
become disengaged or negative.
Milestone events should be identified early and celebrated.
Representative
Risk of biased consultation, serving
only the most vocal community
members.
Sections of the community may be
“overpowered” and may be
marginalised.
Ensure community is engaged in a forum that minimises risk of debate being side tracked.
Follow up with smaller groups where required.
Use established social (and media) channels in dissemination of materials, i.e. sport clubs.
Unified message Differing messages may create
confusion and mistrust.
Limit points of contact.
Have message clearly set out for use, rather than reinventing it for each consultation activity.
Unequal distribution of benefits
Residents close to the
development are likely to feel
more strongly.
Identification of stakeholder groups should reflect differences in impacts.
Community Consultation Plan Wellington Solar Farm
17‐076 v1.1 19
6 PROJECT BASED ACTIVITIES
The following table outlines the different project stages and associated community consultation objectives
and activities, in chronological order. The stages include:
Decision to proceed with early investigations, proposal development
Receipt of SEARs
Detailed assessment and proposal development
EIS on public exhibition, submissions reporting
Approval determination
Construction contract award
Construction commences
Operation commences
Decommissioning commences
6.1 ENGAGEMENT TEAM
First Solar’s engagement team will consist of the project developer and support team.
Mirjam Tome First Solar (Australia) Pty Ltd Project Manager will lead the engagement.
Support will be provided by Jennifer Abbott, Senior Manager – Communications and Public Affairs and
Bianca Alexander – Development Support.
6.2 MILESTONES
Milestone events should be celebrated, and used as an opportunity to keep the community on board.
Milestones can include:
1. Announce project – notify near residents first, follow up with consistent information
2. Receipt of SEARs
3. Early studies update – meet the community face to face
4. EIS submitted – explain avenues for input
5. Submissions Report submitted – explain avenues for input
6. Approval – celebrate in a way that involves the community
7. Construction contractors awarded ‐ opportunity for local employment
8. Construction commences ‐ sod turning ceremony
9. Operation commences – public open day
6.3 THROUGHOUT PROCESS
Relevant to all activities:
One person would remain key spokesperson, this would be Mirjam Tome, First Solar
(Australia) Pty Ltd Project Manager, to:
o Limit points of contact, ensuring a clear message and no contradictions in
terminology or project information.
o Retain personal direct relationship with the community, identifiable face for the
project.
Community Consultation Plan Wellington Solar Farm
17‐076 v1.1 20
Feedback would be sought using a standard form where possible, allowing this information
to inform the assessment (example provided in Appendix A). This form would be made
available during meetings and on the project website.
Community Consultation Plan Wellington Solar Farm
17‐076 v1.1 21
Stakeholder
group
Issue Consultation
objective
Community engagement activities Format
Decision to proceed with early investigations, proposal development, and receipt of SEARs
Adjacent
landowners
May define
locality
Lack of support
Other concerns
Inform and engage Early dissemination of information about solar development
generally.
Early dissemination of information about the project and its
justification and benefits.
Seek direct input to include in assessment approach and
development of proposal.
Face to face meeting
Include feedback form and
encourage direct contact with
Project Manager.
Council Misinformation
Lack of support
Inform and engage Ensure that the information is available
Build relationship to understand their key issues
Face to face meeting
Near neighbours
May define
locality
Lack of support
Unequal
distribution of
benefits
Other concerns
Inform and engage Early dissemination of information about solar development
generally.
Early dissemination of information about the project and its
justification and benefits.
Provide contact information for near neighbours to seek
further information, provide comments on the proposal and to
register for regular updates.
Letter Drop
Provide contact information to of
the Project Manager
Distrust in
environmental
assessment
process
Inform Ensure the timelines and the stages for community input are
clearly documented ‐ use graphics and indicate where we are
now at for the assessment.
Make information on the project team and assessment team
available
Factsheet showing stage of the
process and opportunities for
input
Website, links to other projects
and accreditations
Community Consultation Plan Wellington Solar Farm
17‐076 v1.1 22
Stakeholder
group
Issue Consultation
objective
Community engagement activities Format
Local business
owners
Misinformation
Inform and engage Ensure that the information is available to the local community
first.
As well as letter drop, meet local business owners and offer to
leave information with them to distribute.
Build relationship with these owners and staff as they may
assist to ‘get the word out’.
Face to face meeting with local
business owners as requested
Broader
community
Distrust in
environmental
assessment
process.
The approvals
process can be
complex.
Inform Preliminary project announcement, including stage of
assessment, likely timelines, ways in which the community can
be involved.
Media release, link to website
Detailed assessment and proposal development
Adjacent
landowners
May define
locality
Lack of support
Inform and engage Feed information into the final assessment to ensure all their
issues have been identified and addressed by the project.
Face to face meeting / Phone call
Near neighbours May define
locality
Lack of support
Inform and engage Identify ways the community can participate in the project and
seek input on these:
Vegetation screen planting, adopt a tree (one for
project, one for landowner?)
Signage / logo for solar farm (will be prominent part of
the town?)
Other renewable or energy saving programs that the
proponent could support?
Depends on initiative identified
Community Consultation Plan Wellington Solar Farm
17‐076 v1.1 23
Stakeholder
group
Issue Consultation
objective
Community engagement activities Format
Near neighbours Fear of unknown,
complex
information
Inform and engage Identify ways simplify and present the key information, seek
feedback.
Open house – specialist and
project information
Broader
community
Unequal
distribution of
benefits
Risk of biased
consultation,
serving only the
most vocal
community
members.
Consult and inform Feed information into the final assessment to ensure all
community issues have been identified and addressed by the
project, differentiating between stakeholder groups
Fact Sheet, Website
EIS on public exhibition, submissions reporting
Adjacent
landowners
Relationship with
landowners and
community
Inform and engage Reinforce stage in the project and ways to have input Face to face meeting / Phone call
Near neighbours Relationship with
community
Inform and engage Celebrate milestone, reinforce stage in the project and ways to
have input
Newspaper article, Website link
Near neighbours Fear of unknown,
complex
information
Inform and engage Special interest groups – address specifically in meeting.
Meeting with group, if required.
Approval determination
Near neighbours Relationship with
community
Inform and engage Celebrate milestone, reinforce stage in the project and ways to
have input.
Thank the community for their support
Letter Drop
Community Consultation Plan Wellington Solar Farm
17‐076 v1.1 24
Stakeholder
group
Issue Consultation
objective
Community engagement activities Format
Broader
community
Differing
messages may
create confusion
and mistrust.
The approvals
process can be
complex.
Inform Keep project information up to date.
Provide link to relevant information including feedback form.
Provide a contact for further information.
Newspaper article
Website
Construction contract award
Near neighbours Relationship with
community
Inform and engage Celebrate milestone, reinforce stage in the project and ways to
have input.
What opportunities for local employment?
Media Release
Construction commences
Near neighbours Relationship with
community
Inform and engage Celebrate milestone, reinforce stage in the project and ways to
have input.
Notify about impacts that can be expected, avenues to
complain, for more information.
Letter Drop
Event: first module install
Broader
community
Differing
messages may
create confusion
and mistrust.
Inform Keep project information up to date
Provide link to relevant information including feedback form
Provide a contact for further information
Website
Operation commences
Near neighbours Relationship with
community
Inform and engage Celebrate milestone, reinforce stage in the project and ways to
have input
Notify about impacts that can be expected, avenues to
complain, for more information.
Letter Drop
Event: public open day
Community Consultation Plan Wellington Solar Farm
17‐076 v1.1 25
Stakeholder
group
Issue Consultation
objective
Community engagement activities Format
Broader
community
Differing
messages may
create confusion
and mistrust.
Inform Keep project information up to date
Provide link to relevant information including feedback form
Provide a contact for further information
Website
Decommissioning commences
Near neighbours Relationship with
community
Inform and engage Reinforce stage in the project and ways to have input
Notify about impacts that can be expected, avenues to complain,
for more information.
Letter Drop
Broader
community
Differing
messages may
create confusion
and mistrust.
Inform Keep project information up to date
Provide link to relevant information including feedback form
Provide a contact for further information
Website
Community Consultation Plan Wellington Solar Farm
17‐076 v1.1 26
7 MONITORING AND EVALUATION
To ensure this plan is effective during the implementation of activities, and adapts as required to new
information, the following review actions will be undertaken alongside implementation activities:
Appoint and maintain a consultation manager for the project to implement activities
and review this plan regularly.
Keep an accurate record of all feedback from consultation activities and all
correspondence with the community.
Monitor regularly and respond promptly to email and phone queries.
Are the activities reaching a diverse and representative section of the community; do
new activities need to be implemented?
Has relevant information been passed back to:
o Project developers
o Assessment staff.
Community Consultation Plan Wellington Solar Farm
17‐076 v1.1 27
8 REFERENCES AND RESOURCES
Australian Bureau of Statistics, 2017, Wellington LGA Census Quickstats, accessed 13 April 2017 from
http://stat.abs.gov.au/itt/r.jsp?RegionSummary®ion=18150&geoconcept=REGION&dataset=ABS_REG
IONAL_LGA&datasetLGA=ABS_REGIONAL_LGA&datasetASGS=ABS_REGIONAL_ASGS®ionLGA=REGION
®ionASGS=REGION
ARENA (n.d). Establishing the social licence to operate large scale solar facilities in Australia: Insights from
social research for industry, Australian Renewable Energy Agency (ARENA).
Department of Planning and Environment, 2016, Population Projections 2016 Edition, New South Wales
Government.
Destinations NSW, 2017, accessed 18 April 2017, http://www.visitnsw.com/destinations/country‐
nsw/dubbo‐area/wellington/events
Dubbo City, 2017, accessed 18 April 2017 http://dubbo.com.au/Invest/population‐demographic
Dubbo Regional Council, 2017, accessed 18 April 2017, https://www.dubbo.nsw.gov.au/
Dubbo Regional Council, 2016, Dubbo Regional Council Local Government Area Economic Profile.
Regional Development Australia – Orana, 2016, accessed 13 April 2016,
http://www.lovethelifewelive.com.au/our‐towns/wellington/
REMPLAN, 2017, Dubbo Regional Council Economic Profile, accessed 18 April 2017 from
http://www.economicprofile.com.au/dubboregionalcouncil/
Service NSW, 2017, Wellington Health Service,
https://www.service.nsw.gov.au/nswgovdirectory/wellington‐health‐service
Twyford Consulting (2007) Beyond Public Meetings: Connecting community engagement with decision
making
Community Consultation Plan Wellington Solar Farm
17‐076 v1.1 A‐i
APPENDIX A COMMUNITY FEEDBACK FORM
COMMUNITY FEEDBACK FORM: WELLINGTON SOLAR FARM
Your feedback is important to develop a solar farm project that best suits the local area and community.
Your comments ensure local feedback is understood by the developers and assessment team.
Please send your feedback to (or seek further information directly, from):
Mirjam Tome, First Solar Australia Pty Ltd
Level 3 16 Spring Street, Sydney, NSW 2000
For further information about the project, please see the project website at www.wellingtonsolarfarm.com.au
Your contact details: (this information will be treated as confidential)
Name: ………………………………………. Address: ………………………………………………………………………………….. Ph: ………………………..
Circle which best describes how far you live from the proposed Wellington Solar Farm:
<1 km 1‐2 km 2‐5 km >5 kilometres Not a member of the local community
Tell us what you value about the local area:
What do you value most about the local area?
…………………………………………………………………………………………………………………………………………………………………………………………
…………………………………………………………………………………………………………………………………………………………………………………………
……………………………………………………………..…………………………………………………………………………………………………………………………
…………………………………………………………………………………………………………………………………………………………………………………………
What views or landscape characteristics in the region and local area are important to you?
…………………………………………………………………………………………………………………………………………………………………………………………
…………………………………………………………………………………………………………………………………………………………………………………………
…………………………………………………………………………………………………………………………………………………………………………………………
…………………………………………………………………………………………………………………………………………………………………………………………
What do you like about solar farms?
…………………………………………………………………………………………………………………………………………………………………………………………
…………………………………………………………………………………………………………………………………………………………………………………………
…………………………………………………………………………………………………………………………………………………………………………………………
…………………………………………………………………………………………………………………………………………………………………………………………
Do you have any concerns about solar farms?
…………………………………………………………………………………………………………………………………………………………………………………………
…………………………………………………………………………………………………………………………………………………………………………………………
…………………………………………………………………………………………………………………………………………………………………………………………
…………………………………………………………………………………………………………………………………………………………………………………………
Do you have any specific concerns regarding the proposed solar farm at Wellington?
…………………………………………………………………………………………………………………………………………………………………………………………
…………………………………………………………………………………………………………………………………………………………………………………………
…………………………………………………………………………………………………………………………………………………………………………………………
…………………………………………………………………………………………………………………………………………………………………………………………
Community Consultation Plan Wellington Solar Farm
17‐076 v1.1 B‐i
APPENDIX B CONSULTATION STATUS Date Activity
April 2017 Letter has been sent to all landowners within 2km of the proposed solar farm.
May 2017 Project Manager and Project Support Officer provided introduction to the project and provided a notification letter with the project contact information and a feedback form to all adjacent and close neighbours, including local businesses and agencies.
Project Manager met with Kathy Webb, Business Manager of the Wellington Correctional Centre.
An email was sent to Kathy Webb detailing interactions between solar panels and security cameras as well as responses to the questions raised.
June 2017 Neighbours with potential views of the solar farm were met with in person.
Follow up calls and emails were send to neighbours with potential views of solar farm.
Dubbo Regional Council (Liz Rich and Darryl Quigley) were consulted regarding the proposed solar farm.
July 2017 Letters have been sent out to all landowners and members of the community who are on the distribution list, notifying them that the Secretary’s Environmental Assessment Requirements (SEARs) to the NSW Department of Planning and Environment (DPE) have been requested.
Letters have been sent out to all landowners and members of the community who are on the distribution list, notifying them that the Secretary’s Environmental Assessment Requirements (SEARs) to the NSW Department of Planning and Environment (DPE) have been received.
August 2017 Neighbours with potential views of the solar farm were visited for a visual assessment consultant to take photos from viewpoints.
Meetings were scheduled with the project manager to share the photomontages, discuss impacts and mitigation options if appropriate.
Mineral Licence owners were consulted.
Aboriginal Parties were consulted for Cultural Heritage Study on site.
Dubbo Regional Council was consulted and informed about the progress of the project.
September 2017 The Community Open Day took place at the Wellington Civic Centre.
Dubbo Regional Council was consulted and informed about the progress of the project.
Wellington Business Chamber has been consulted.
October 2017 Wellington Correctional Centre has been consulted and kept informed of progress.
Community Consultation Plan Wellington Solar Farm
17‐076 v1.1 B‐ii
Date Activity
Dubbo Regional Council was consulted and informed about the progress of the project. A date to present to Councillors has been requested.
Neighbours have been visited and kept informed of progress.