Page 1: Wellington Solar Farm APPENDIX C CONSULTATION · 2019-07-01 · appendix c consultation. ... final v1 19/10/17 zoe quaas brooke marshall brooke marshall ... bo r n e st r e e t b

Environmental Impact Statement Wellington Solar Farm 

17‐076 Final v1.1  C‐I 

APPENDIX C CONSULTATION

Page 2: Wellington Solar Farm APPENDIX C CONSULTATION · 2019-07-01 · appendix c consultation. ... final v1 19/10/17 zoe quaas brooke marshall brooke marshall ... bo r n e st r e e t b

www.nghenvironmental.com.au        e [email protected] 

Sydney Region 18/21 mary st  

surry hills  nsw  2010  (t 02 8202 8333) 

Canberra ‐ NSW SE & ACT  17/27 yallourn st  (po box 62) 

fyshwick  act  2609  (t 02 6280 5053) 

Wagga Wagga ‐ Riverina and Western NSW suite 1, 39 fitzmaurice st  (po box 5464) 

wagga wagga  nsw  2650  (t 02 6971 9696) 

Newcastle ‐ Hunter and North Coast 7/11 union st  

newcastle west  nsw  2302  (t 02 4929 2301) 

Bega ‐ ACT and South East NSW suite 1, 216 carp st  (po box 470) bega  nsw  2550  (t 02 6492 8333) 

Bathurst ‐ Central West and Orana 35 morrisset st  (po box 434) 

bathurst  nsw  2795  (t 02 6331 4541)  

 

 

 

 

Community Consultation Plan WELLINGTON SOLAR FARM 

 

 

 

 

 

NOVEMBER 2017 

 

 

Page 3: Wellington Solar Farm APPENDIX C CONSULTATION · 2019-07-01 · appendix c consultation. ... final v1 19/10/17 zoe quaas brooke marshall brooke marshall ... bo r n e st r e e t b

www.nghenvironmental.com.au        e [email protected] 

Sydney Region 18/21 mary st  

surry hills  nsw  2010  (t 02 8202 8333) 

Canberra ‐ NSW SE & ACT  17/27 yallourn st  (po box 62) 

fyshwick  act  2609  (t 02 6280 5053) 

Wagga Wagga ‐ Riverina and Western NSW suite 1, 39 fitzmaurice st  (po box 5464) 

wagga wagga  nsw  2650  (t 02 6971 9696) 

Newcastle ‐ Hunter and North Coast 7/11 union st  

newcastle west  nsw  2302  (t 02 4929 2301) 

Bega ‐ ACT and South East NSW suite 1, 216 carp st  (po box 470) bega  nsw  2550  (t 02 6492 8333) 

Bathurst ‐ Central West and Orana 35 morrisset st  (po box 434) 

bathurst  nsw  2795  (t 02 6331 4541)  

 

 

 

 

Document Verification 

 

Project Title:  CCP ‐ Wellington Solar Farm 

Project Number:  17‐076 

Project File Name:  Wellington CCP Final v1.1 Revision  Date  Prepared by (name)  Reviewed by (name)  Approved by (name) 

Draft V1  20/04/17  Jenny Walsh  Nick Graham‐Higgs   Jenny Walsh 

Final v1  19/10/17  Zoe Quaas  Brooke Marshall  Brooke Marshall  

Final v1  06/11/17  Jane Blomfield  Minor changes   

NGH Environmental prints all documents on environmentally sustainable paper including paper made from bagasse (a by‐product of sugar production) or recycled paper. 

 NGH Environmental Pty Ltd (ACN: 124 444 622. ABN: 31 124 444 622) and NGH Environmental (Heritage) Pty Ltd (ACN: 603 938 549. ABN: 62 603 938 549) are part of the NGH Environmental Group of Companies. 

 

 

Page 4: Wellington Solar Farm APPENDIX C CONSULTATION · 2019-07-01 · appendix c consultation. ... final v1 19/10/17 zoe quaas brooke marshall brooke marshall ... bo r n e st r e e t b

Community Consultation Plan Wellington Solar Farm 

17‐076 v1.1  i   

CONTENTS 

1  INTRODUCTION .......................................................................................................................... 1 

1.1  COMMUNITY CONSULTATION PRINCIPLES ....................................................................................... 1 

1.2  AIM OF THIS PLAN ............................................................................................................................ 1 

1.3  STRUCTURE ....................................................................................................................................... 2 

1.4  IMPLEMENTATION AND REVISION OF THIS DOCUMENT .................................................................. 2 

1.5  RELEVANT GUIDELINES ..................................................................................................................... 2 

2  PROPOSAL OVERVIEW ................................................................................................................ 3 

2.1  WELLINGTON SOLAR FARM .............................................................................................................. 3 

2.2  CONSTRUCTION ................................................................................................................................ 3 

2.3  PLANNING PATHWAY ....................................................................................................................... 6 

3  COMMUNITY PROFILE ................................................................................................................. 7 

3.1  DUBBO REGIONAL LOCAL GOVERNMENT AREA ................................................................................ 7 

3.1.1  Wellington .......................................................................................................................................... 8 

3.1.2  Bodangora .......................................................................................................................................... 9 

3.1.3  Geurie ................................................................................................................................................. 9 

3.1.4  Dubbo ................................................................................................................................................. 9 

3.1.5  Bodangora Wind Farm ...................................................................................................................... 10 

4  STAKEHOLDER GROUPS AND CONSULTATION STRATEGIES ........................................................ 11 

5  ISSUE MANAGEMENT ................................................................................................................ 16 

6  PROJECT BASED ACTIVITIES ....................................................................................................... 19 

6.1  ENGAGEMENT TEAM ...................................................................................................................... 19 

6.2  MILESTONES ................................................................................................................................... 19 

6.3  THROUGHOUT PROCESS ................................................................................................................. 19 

7  MONITORING AND EVALUATION .............................................................................................. 26 

8  REFERENCES AND RESOURCES ................................................................................................... 27 

APPENDIX A  COMMUNITY FEEDBACK FORM ..................................................................................A‐I 

APPENDIX B  CONSULTATION STATUS ............................................................................................ B‐I 

 

 

Page 5: Wellington Solar Farm APPENDIX C CONSULTATION · 2019-07-01 · appendix c consultation. ... final v1 19/10/17 zoe quaas brooke marshall brooke marshall ... bo r n e st r e e t b

Community Consultation Plan Wellington Solar Farm 

17‐076 v1.1  1   

1 INTRODUCTION 

1.1 COMMUNITY CONSULTATION PRINCIPLES 

Best practice community consultation involves the community in all decision‐making stages of a project. 

There  is a  role  for the community  from project conception,  through the assessment process and on to 

project development. Effective community consultation has three important functions: 

1. It facilitates deeper understanding of issues and decisions required for the project; 

2. It improves the quality of decisions made for the project; and 

3. It allows people to be involved in decisions that affect their lives. 

Important community engagement principles for a project include: 

Openness – combats assumptions and misinformation. 

Inclusiveness ‐ consultation should be diverse and representative, not responding only to 

the most vocal stakeholders. 

Effective  communication –  requiring  trust  between parties  and  tools  appropriate  to  the 

task. 

A communication strategy – clarity about what is being undertaken: 

o Inform ‐ one‐way communication to deliver information about the project. 

o Consult ‐ two‐way communication to seek input into the project. 

o Collaborate and involve – seek participation in elements of the project design and 

implementation. 

Early rather than late – to maximise engagement opportunities. 

Accountability – the process should be monitored and evaluated to ensure its aims are being 

achieved. 

1.2 AIM OF THIS PLAN 

NGH Environmental has developed this Community Consultation Plan (CCP) on behalf of First Solar, the 

proponent of the proposed Wellington Solar Farm. The aims of the plan are to: 

1. Identify effective methods to inform the community about the proposed Wellington Solar 

Farm; and 

2. Facilitate engagement with the community, including input into the environmental 

assessment process and project development. 

The plan identifies: 

Community stakeholders for the project. 

Issues / risks related to the engagement of each stakeholder group. 

A consultation strategy for each stakeholder group. 

A set of activities against the project development time line to facilitate consultation.  

Effective  engagement  will  require  an  understanding  of  community  stakeholders  and  prioritisation  of 

potential impacts. It also relies on the community understanding the project and specific issues of interest 

to them, to contribute effectively. The focus of the consultation plan will be on providing this understanding 

and engagement. 

Page 6: Wellington Solar Farm APPENDIX C CONSULTATION · 2019-07-01 · appendix c consultation. ... final v1 19/10/17 zoe quaas brooke marshall brooke marshall ... bo r n e st r e e t b

Community Consultation Plan Wellington Solar Farm 

17‐076 v1.1  2   

1.3 STRUCTURE 

The structure of this plan is: 

1. Proposal overview. 

2. Identification of community stakeholders for the project. 

3. Issue management – what specific issues need consideration. 

4. Project based activities – what vehicles will be utilised in the consultation process. 

1.4 IMPLEMENTATION AND REVISION OF THIS DOCUMENT 

The plan has been developed to coincide with the early planning and assessment stages of the project.  

If  the  project  is  approved,  consultation  will  also  be  required  to  continue  into  the  construction  and 

operational phases of the project. These phases will require a new or updated plan, to reflect any changes 

to consultation objectives but also the increasing knowledge gained about the community. 

1.5 RELEVANT GUIDELINES 

This CCP has been prepared with reference to the following guidelines / references: 

Establishing the social licence to operate large scale solar facilities in Australia: Insights from 

social research for industry, Australian Renewable Energy Agency (ARENA). 

Beyond  Public  Meetings:  Connecting  community  engagement  with  decision  making, 

Twyford Consulting 2007. 

  

Page 7: Wellington Solar Farm APPENDIX C CONSULTATION · 2019-07-01 · appendix c consultation. ... final v1 19/10/17 zoe quaas brooke marshall brooke marshall ... bo r n e st r e e t b

Community Consultation Plan Wellington Solar Farm 

17‐076 v1.1  3   

2 PROPOSAL OVERVIEW 

2.1 WELLINGTON SOLAR FARM 

The Wellington Solar Farm site is located approximately 2 kilometres north east of Wellington, in western 

central NSW (refer Figure 2‐1), within the Dubbo Regional Local Government Area (LGA). The extent of the 

316 hectare solar farm site is illustrated in Figure 2‐2 and defined as: Lots 89, 90, 91, 92, 99, 102, 103 and 

104/DP2987; Lot 1/DP34690, Lot 1/DP520396; and Lot 2/DP807187. The solar farm would connect to the 

national electricity network via  the existing Transgrid  substation  located to  the south of  the site  (refer 

Figure 2‐2), within Lot 1/DP1226751.  

Goolma Road forms the southern and eastern boundaries of the site with the Mitchell Highway further 

west (Figure 2‐2). The site and surroundings are generally farmed land with the Wellington Correctional 

Centre located approximately 400m east of the site.  

The proposal would generate photovoltaic (PV) energy up to 174MW capacity and would comprise an array 

of solar panels approximately 316 hectares, a 132kV substation and related infrastructure as follows: 

PV modules (solar panels). 

Single Axis horizontal tracking (likely) or fixed mounting frames. 

30‐50 inverter stations with associated transformer. 

An onsite substation or substation within the existing Transgrid substation containing one 

transformer and associated switchgear. 

A 33kV or 132kV or 330kV transmission line to the adjacent existing Wellington Substation 

(100m). 

Underground or aboveground electrical conduits and cabling to connect the inverters to the 

onsite substation or substation within the existing Transgrid substation. 

22‐33kV  underground  and  aboveground  (mounted  to  module  structure)  DC  cabling  to 

connect the modules to the inverter stations. 

An  access  track  off  Goolma  Road,  approximately  4.6km  north  east  of Mitchell  Highway 

junction.  

Permanent site office and maintenance building with associated vehicle parking. 

Internal access tracks to allow for site maintenance. 

Perimeter security fencing up to 2.3m high. 

Energy storage. 

Native vegetation screening, where required to break up views of infrastructure to specific 

receivers, will be planted prior to commencement of operations. 

2.2 CONSTRUCTION 

Indicative timing for the receipt of Planning Approval for the Wellington Solar Farm is March 2018. The 

construction phase of the proposal is expected to take twelve months.  

The Wellington Solar Farm is expected to operate for around 30 years. After the operating period the solar 

farm would either be decommissioned, removing all above ground infrastructure and returning the site to 

its existing land capability, or repowered with new PV equipment. 

 

Page 8: Wellington Solar Farm APPENDIX C CONSULTATION · 2019-07-01 · appendix c consultation. ... final v1 19/10/17 zoe quaas brooke marshall brooke marshall ... bo r n e st r e e t b

Community Consultation Plan Wellington Solar Farm 

17‐076 v1.1  4   

 

Figure 2‐1 Proposal location 

Project boundaryProposed infrastructure

"a Existing substationLocal roadHighwayExisting transmission linesFarm dam / other water bodyRailwayNational Park / ReserveTravelling stock reserve

1:100000

www.nghenvironmental.com.au

0 2 41 Km

A4 @Ref: SW121 EIS_20171113Author: SP Date: 13/11/2017 °

G OOL

MAROADCO

BBOR

ARO

AD

BR O OKFIELD R OAD

TWELVE MILE ROAD

MINE ROAD

GILGOAN

ROAD

DICK

STRE

ET

PONTO FALLS ROAD

BU SHRANGERS CREEK ROAD

BAKERS LANE

S UNTOP R OAD

CAMPBELLS LANE

RENSHA WMC

GIRR

WAY

MARYVALE ROAD

BRENNAN SWAY

TWIGGS ROAD

FAL LS ROAD

LOWRIED

RIV

E

GISBORNE STREET

BELA VISTA LANE

HARVEYSLANE

CURTIS STREET

M ITCHELL HIGHWAY

LINCOLN

MARYVALE

BODANGORA

MOUNT ARTHUR

MAYNGGU GANAI HISTORIC SITE

WELLINGTON

MACQUARIE RIVER

BELL RIVER

Notes:- Base map © Esri and its data suppliers. - Base layers from LPI and Geoscience Aust, 2017

Page 9: Wellington Solar Farm APPENDIX C CONSULTATION · 2019-07-01 · appendix c consultation. ... final v1 19/10/17 zoe quaas brooke marshall brooke marshall ... bo r n e st r e e t b

Community Consultation Plan Wellington Solar Farm 

17‐076 v1.1  5   

 

Figure 2‐2 Proposal site 

"a Existing substationLocal roadExisting transmission linesFarm dam / other water bodyMinor drainage featureDrainage lineRailwayBattery storage facilityProposed arrayProposed overhead transmission line:Option 1Proposed overhead transmission line:Option 2Proposed overhead transmission lineProposed underground transmission lineProposed roadProposed substation: Option 1Proposed substation: Option 2Temporary laydown and turning circleTemporary construction and officeparking

") OAM buildingProject boundaryCadastre

1:22000

www.nghenvironmental.com.au

0 200 400100 m

A4 @Ref: SW121 EIS_20171113Author: SP Date: 13/11/2017 °

Lot 1 DP 1226751

Lot 89 DP 2987

Lot 91 DP 2987

Lot 90 DP 2987

Lot 102 DP 2987

Lot 103 DP 2987

Lot 99 DP 2987

Lot 1 DP 520396

Lot 104 DP 2987

Lot 1 DP 34690

Lot 2 DP 807187

Lot 92 DP 2987

GO OLMARO

AD

COBB

ORA

ROA D

BELA VISTA LANE

TWELVE MILE ROAD

WUULUMAN CREE K

Notes:- Base map © Esri and its data suppliers. - Base layers from LPI and Geoscience Aust, 2017

SITE ACCESS

Page 10: Wellington Solar Farm APPENDIX C CONSULTATION · 2019-07-01 · appendix c consultation. ... final v1 19/10/17 zoe quaas brooke marshall brooke marshall ... bo r n e st r e e t b

Community Consultation Plan Wellington Solar Farm 

17‐076 v1.1  6   

2.3 PLANNING PATHWAY 

The proposal to construct and operate Wellington Solar Farm requires development consent under Part 4 

of the NSW Environmental Planning and Assessment Act 1979 (EP&A Act). The proposal is development for 

the purpose of electricity generating works with a capital cost  in excess of $30 million and  is therefore 

classified as State Significant Development under State Environmental Planning Policy (State and Regional 

Development) 2011.  

An Environmental Impact Statement (EIS) is required to be prepared for State Significant Developments. 

The EIS would document all community consultation activities undertaken for the Wellington Solar Farm. 

   

Page 11: Wellington Solar Farm APPENDIX C CONSULTATION · 2019-07-01 · appendix c consultation. ... final v1 19/10/17 zoe quaas brooke marshall brooke marshall ... bo r n e st r e e t b

Community Consultation Plan Wellington Solar Farm 

17‐076 v1.1  7   

3 COMMUNITY PROFILE 

Understanding the makeup and values of the community is essential to finding effective ways to reach the 

community as well as beginning to identify ways that the project may impact the community. This section 

provides a broad overview of the LGA and nearest major town of Wellington, the locality of Bodangora, 

village of Geurie and the regional centre of Dubbo. 

3.1 DUBBO REGIONAL LOCAL GOVERNMENT AREA 

Dubbo Regional Council was established on 12 May 2016 as an amalgamation of the former Dubbo City 

and Wellington Shire Councils and covers an area of 7,536 square kilometres. Prior to the amalgamation 

the proposal site was located within the Wellington LGA which covered an area of 4,110 square kilometres. 

The estimated resident population within the Wellington LGA in 2011 was 8,833, which grew to 9,073 by 

2015 (ABS 2017). The median age of residents within the Wellington LGA in 2015 was 42.1 years, higher 

than the Australian average of 37.4 and higher than the median estimated age of 40.3 in 2011 (ABS 2017). 

The estimated resident population of  the Dubbo Regional  LGA as at  June 30, 2015 was 51,007 people. 

Between  2005  and  2015  the  Dubbo  Region  estimated  resident  population  increased  by  3,969  people 

(8.44%), with an average annual compound population growth of 0.81% between 2005 and 2015. (Dubbo 

Regional Council, 2016). Between 2016 and 2036, the population of Dubbo Region is projected to increase 

by  5,750  people, which  is  less  than  the  average  growth  rates  experienced over  the  previous  10  years 

(Department of Planning and Environment, 2016). 

The main industries in the Dubbo Regional LGA are health, retail, education, government services, tourism, 

manufacturing, construction, agriculture, business services and transport (Dubbo Regional Council, 2016). 

The Region is also well positioned as a growing mining services centre with mining and exploration projects, 

both established and emerging, flourishing across the surrounding region (Dubbo Regional Council, 2016). 

The  output  generated  by  Dubbo  Region  economy  is  estimated  at  $5.493  billion,  with  manufacturing 

accounting  for  $790  million,  followed  by  rental,  hiring  and  real  estate  services  ($597  million)  and 

construction ($546 million) (Dubbo Regional Council, 2016). 

The total employment estimate for Dubbo Region as at the 2011 Census was 19,217 jobs. The health care 

and social assistance industry sector is the largest sector (3,084 jobs); followed by retail trade (2,467 jobs) 

and education and  training  (1,870  jobs)  (Dubbo Regional Council,  2016). Workers  in Dubbo Region are 

predominately in the 45 to 54 (23.5%), 35 to 44 (21.8%) and 25 to 34 (18.4%) year age groups, with 4.3% 

of workers aged 65 years and over.  

Between the 2006 and 2011 Census periods, there was a net increase of 336 jobs in Dubbo Region, building 

on the 18,881 jobs in 2006 (ABS 2017). The largest increase in terms of the number of jobs was the health 

care and social assistance sector,  increasing by 467  jobs  (17.84%)  (Dubbo Regional Council,  2016). The 

agriculture, forestry and fishing sector experienced the  largest decline  in  jobs (Dubbo Regional Council, 

2016). 

Socio Economic Indexes for Areas (SEIFA) is a suite of indexes that have been created by the Australian 

Bureau of Statistics (ABS) from social and economic Census information. Each index ranks geographic areas 

across Australia  in terms of their relative socio‐economic advantage and disadvantage, with LGA scores 

ranging from 121 (most disadvantaged) to 1,193 (least disadvantaged). The SEIFA score for Dubbo Region 

in 2011 was 961. 

Page 12: Wellington Solar Farm APPENDIX C CONSULTATION · 2019-07-01 · appendix c consultation. ... final v1 19/10/17 zoe quaas brooke marshall brooke marshall ... bo r n e st r e e t b

Community Consultation Plan Wellington Solar Farm 

17‐076 v1.1  8   

3.1.1 Wellington 

Wellington is the nearest township to the proposal site, located approximately 2 km to the south. The town 

of Wellington has approximately 4,500 people and is located 362 km north‐west of Sydney and 50km south 

east of Dubbo (Regional Development Australia – Orana, 2016).  

Wellington is located at the junction of the Mitchell Highway, Bushrangers Creek Road, Cobbora Road and 

Goolma Road. The town is located on the Main Western railway line and served by a daily NSW TrainLink 

XPT service between Sydney and Dubbo.  

Agriculture is the key industry in Wellington, with the steeper land to the east supporting mainly grazing 

activities  and  the  gentle  undulating  land  to  the  west  supporting  mainly  cereal  production.  Mining 

exploration activity is of continuing interest, with a number of mineral deposits within the area. (Regional 

Development Australia – Orana, 2016). 

Of the total 19,217 jobs in the Dubbo Region there are: 16,959 jobs in the former Dubbo LGA (88.25 %) and 

2,258  jobs  in  the  former Wellington  LGA  (11.75  %).  The  SEIFA  score  for Wellington  in  2011  was  788 

(compared to 961 for the overall Dubbo Region) (REMPLAN 2017). 

Wellington Correctional Centre, an Australian maximum security prison,  is  located approximately 400m 

east of the proposal site, accessed via Goolma Road. The facility is operated by Corrective Services NSW 

and employs over 200 staff. The facility is to be expanded during 2017. 

The proposed solar farm would provide opportunity of employment diversification as NSW moves towards 

a carbon neutral economy by the year 2050. The unemployment rate for the Wellington LGA for 2011 was 

high at 8.3%, compared to the Australian average of 5.6% (ABS 2011). 

The local newspaper The Wellington Times, a Rural Press title, is published three times a week. 

Wellington provides support to the villages of Geurie, Elong Elong, Mumbil, Stuart Town and Euchareena 

and its features include: 

Tourism attractions including the Wellington Caves Complex, Phosphate Mine and Japanese 

Gardens, Lake Burrendong, Burrendong Botanic Garden and Arboretum, Mt Arthur Reserve, 

several wineries and boutique galleries (Dubbo Regional Council)  

Events  include:  the annual Wellington Boot  race meeting, Agricultural Show and various 

markets, (Destinations NSW 2017). 

Recreational and sporting facilities include: Burrendong Dam, basketball and netball courts, 

soccer,  rugby union and  rugby  league  fields, cricket pitches,  touch  football  fields,  tennis 

courts,  athletics  track,  tennis  courts, Olympic  and  children's  swimming pools,  parks  and 

gardens (Destinations NSW 2016b).  

Community facilities and clubs include: Soldiers Memorial Club, Race Club a memorial hall, 

branch library, cemetery, (Destinations NSW 2017). 

Health  services  include:  Wellington  Hospital,  Wellington  Aboriginal  Corporation  Health 

Service, Bellhaven Aged Care Facility and Maranatha House care facility (Service NSW 2017). 

Services  include: banks,  supermarkets, post office,  real estate,  trades people, machinery 

and  farming  services,  hotels,  accommodation,  cafes  and  restaurants,  fire  station 

(Destinations NSW 2017). 

Education  facilities  include:  pre‐school,  primary  schools,  high  school  (Dubbo  Regional 

Council 2017). 

Page 13: Wellington Solar Farm APPENDIX C CONSULTATION · 2019-07-01 · appendix c consultation. ... final v1 19/10/17 zoe quaas brooke marshall brooke marshall ... bo r n e st r e e t b

Community Consultation Plan Wellington Solar Farm 

17‐076 v1.1  9   

Churches – Uniting Church, Baptist Church, Anglican Church, Christian Community Church, 

Baha’i  Faith,  Catholic  Church,  Jehovah's  Witnesses,  International  Network  of  Churches, 

Jachin Boaz Ministries (Dubbo Regional Council 2017). 

The Wellington  Airport,  also  known  as  Bondangora  Airport,  is  owned  and  operated  by 

Dubbo Regional Council. 

3.1.2 Bodangora 

Bodangora is a small rural locality approximately 12 kilometres north east of Wellington and approximately 

6 kilometres north east of the Wellington Solar Farm site. The locality of Bodangora is a collection of larger 

rural  properties  accessed  from  Goolma  Road.  Bodangora  has  an  airfield  for  small  planes  and  an  old 

cemetery.  

There was no data available from the Australian Bureau of Statistics (ABS) on population, businesses or 

number of dwellings in the Bodangora locality. 

3.1.3 Geurie 

Geurie is a small village located between Wellington (21 km) and Dubbo (29 km) on the Mitchell Highway. 

Geurie is approximately 17 kilometres north west of the proposed Wellington Solar Farm site. The village 

is on the Main Western railway line and served by a daily NSW TrainLink XPT service between Sydney and 

Dubbo.  

At the 2011 census, Geurie had a population of 895 (REMPLAN 2017). The SEIFA score for Geurie in 2011 

was 996, (compared to 961 for the overall Dubbo Region) (REMPLAN 2017).  

Geurie has a swimming pool, some services, cross country mountain biking trails, parks and reserves.  

3.1.4 Dubbo 

Dubbo is a major regional centre located approximately 50 km northwest of Wellington and 45 km north 

west of the proposal site. Dubbo is located at the junction of the Mitchell, Newell and Golden Highways 

(three major highways). Dubbo is also serviced by Main Western Railway Line (with daily XPT services) and 

the Dubbo City Regional Airport (180 flights a week to/from Dubbo).  

The population of Dubbo in 2011 was 32,326. The estimated population for Dubbo in 2016 was 41,934 with 

a median age of 39 (Evocities http://evocities.com.au/dubbo/ ).  

Dubbo’s facilities include: 

14 primary schools (7 public and 7 private); 6 secondary schools (3 public and 3 private), 4 

tertiary education campuses, 5 Preschools and 12 Long Day Care Options. 

Retail Services: 6 shopping centres, with over 90 speciality stores and CBD specialty shops. 

Leisure and Dining: In excess of 120 eateries including licensed hotels and clubs, restaurants, 

cafes and food halls. 

Health: 5 aged‐care centres, 1 public, 1 private and 1 rehabilitation hospital. 

The Dubbo arts industry includes the Dubbo Regional Theatre and Convention Centre and 

the Western Plains Cultural Centre. 

There are more than 66 resident GP’s as well as specialists in key areas including oncology, 

paediatrics, mental and aged care. 

Page 14: Wellington Solar Farm APPENDIX C CONSULTATION · 2019-07-01 · appendix c consultation. ... final v1 19/10/17 zoe quaas brooke marshall brooke marshall ... bo r n e st r e e t b

Community Consultation Plan Wellington Solar Farm 

17‐076 v1.1  10   

Tourist attractions  include: Taronga Western Plains Zoo, historic Dundullimal Homestead 

and the historic Old Dubbo Gaol. 

The unemployment rate in Dubbo is typically below the State average and is currently at 4.9% compared 

to 5.6% for NSW (Dubbo City 2017). 

It  is estimated that 16,959 people work  in Dubbo^,  the majority of whom work a 35‐39 hour week. By 

August 2018  is estimated  that  total employment  in Dubbo will be at 21,919  jobs, which  represents an 

annualised growth rate of 2.20%. Of the 16,959 workers in Dubbo 17.98% are classified as Professionals, 

12.02% Managers, 14.62% Technicians and Trade Workers, and 10.75% Labourers. (Evocities 2017).  

Dubbo has a proud and passionate sporting heritage and boasts more than 120 sporting and interest clubs 

and more than 150 acres of dedicated sporting grounds and facilities. In addition to sport, there are a host 

of other recreational activities including the nationally recognised Taronga Western Plains Zoo. 

Local print media includes The Daily Liberal (called the Weekend Liberal on Saturdays).  

A  number  of  community  organisations  across  a  range  of  interests,  plus  business  and  professional 

organisations  including  the  Dubbo  City  Development  Corporation,  Dubbo  Chamber  of  Commerce  and 

Orana Business Enterprise Centre. 

3.1.5 Bodangora Wind Farm 

The  approved  Bodangora  Wind  Farm,  located  approximately  10  kilometres  to  the  north  east  of  the 

Wellington Solar Farm site is due to begin construction mid‐2017.  

The EIS for the original wind farm proposal was publicly exhibited in mid‐2012, with the Department of 

Planning and environment receiving over 100 objections. Opposition to the wind farm was covered in the 

local press. 

The previous negative publicity associated with the wind farm, may influence local community members’ 

perception of the solar farm proposal in either a positive or negative manner. When meeting with members 

of the local community, the community engagement team should emphasise the unobtrusive visual nature 

of the Wellington Solar Farm proposal. 

 

 

 

 

 

 

   

Page 15: Wellington Solar Farm APPENDIX C CONSULTATION · 2019-07-01 · appendix c consultation. ... final v1 19/10/17 zoe quaas brooke marshall brooke marshall ... bo r n e st r e e t b

Community Consultation Plan Wellington Solar Farm 

17‐076 v1.1  11   

4 STAKEHOLDER GROUPS AND CONSULTATION 

STRATEGIES 

It is important to identify all key stakeholder groups and relevant characteristics and tailor engagement 

strategies to suit each group. Different levels of engagement suit varying degrees of potential impacts in 

the community. Where impacts are less significant, for example, the International Association for Public 

Participation  (IAP2)  consultation  spectrum suggests approaches  such as  ‘Inform’ and  ‘Consult’. Greater 

impacts on communities require approaches such as ‘Involve’, ‘Collaborate’ and ‘Empower’. Appropriate 

strategies are set out below for each stakeholder group.  

Table 4‐1 Summary of stakeholder groups and strategies, to be detailed further in the next table 

Inform only  Inform and Consult 

Local Media 

Broader community  

Mid‐Western Shire 

Adjacent neighbours  

Near neighbours  

Local businesses  

o Wellington Correctional Centre 

Special Interest groups  

o Quota International o Wellington Race Club o Wellington Pony club o Aero club o Golf Club o Polo Club 

Representative bodies  

o Wellington Business Chamber  

o Dubbo Regional Council  

 

Page 16: Wellington Solar Farm APPENDIX C CONSULTATION · 2019-07-01 · appendix c consultation. ... final v1 19/10/17 zoe quaas brooke marshall brooke marshall ... bo r n e st r e e t b

Community Consultation Plan Wellington Solar Farm 

17‐076 v1.1  12   

Stakeholder group  Defining characteristics  Consultation strategies   Status and timing 

1. Adjacent 

neighbours 

Neighbours adjacent to the project and those 

who may  be  directly  affected,  for  example: 

those with a view of  infrastructure, noise or 

vibration from haulage route or construction 

activities. 

 

Meet first – Inform and consult 

Understanding  the  values  and  potential 

impacts to this group is highly important. 

Face to face consultation and direct feedback 

is required. 

Mitigation  strategies may  require  changes  to 

the  project  or  the  development  of  specific 

plans  of  management  i.e.  screening  visual 

impact. 

All consultation should be documented. 

First consultation occurred in May/June 2017 

Letters  and  feedback  forms  have  been  left 

when neighbours weren’t available 

Follow up consultation as needed 

2. Near neighbours   Neighbours to the project and those who may 

be directly affected, for example: those with 

a  view  of  infrastructure,  noise  or  vibration 

from haulage route or construction activities. 

Being a major development close to a town, 

direct  impacts  may  be  of  great  interest  to 

residents  and  businesses.  This  is  a  large 

development  with  potential  to  define  the 

locality in many ways. 

This group includes residences within 2km of 

the site (including residences on the northern 

side of Wellington) and may experience direct 

impacts. 

Inform and Consult  

Understanding  the  values  and  potential 

impacts to this group is highly important. It will 

assist  the  assessment  process  and 

development  of  appropriate  mitigation 

strategies. 

Face to face consultation and direct  feedback 

is required. 

All consultation should be documented.  

First consultation occurred in May/June 2017 

Letters  and  feedback  forms  have  been  left 

when neighbours weren’t available 

Follow up consultation as needed 

Page 17: Wellington Solar Farm APPENDIX C CONSULTATION · 2019-07-01 · appendix c consultation. ... final v1 19/10/17 zoe quaas brooke marshall brooke marshall ... bo r n e st r e e t b

Community Consultation Plan Wellington Solar Farm 

17‐076 v1.1  13   

Stakeholder group  Defining characteristics  Consultation strategies   Status and timing 

3. Local Businesses  Businesses within 2km of the site which may 

experience direct impacts.  

This includes Wellington Correctional Centre, 

which  is accessed via Goolma Road,  in  close 

proximity to the solar farm site. 

Inform and Consult  

Understanding  the  values  of  this  group  will 

assist  the  assessment  process  and 

development  of  appropriate  mitigation 

strategies. 

Direct contact and direct feedback is required. 

Potential  opportunity  to  distribute  project 

information  and  understand  community 

sentiment. 

All consultation should be documented.  

First consultation occurred in May/June 2017 

Letters  and  feedback  forms  have  been  left 

when business owners weren’t available 

Follow up consultation as needed 

4. Special  interest 

groups 

Special  interest  groups,  for  example, 

recreational groups, sporting groups.  

A  number  were  identified  specific  to  this 

proposal. These include: 

Quota International 

Wellington Race Club 

Wellington Pony club 

Aero club 

Golf Club 

Polo Club 

Rotary Club 

Inform and Consult 

These should be directly contacted. 

Specific  information  or  assessment  may  be 

required  to  understand  and mitigate  impacts 

for these groups. 

An  avenue  to  provide  feedback  or  ask 

questions should be provided. 

 

Page 18: Wellington Solar Farm APPENDIX C CONSULTATION · 2019-07-01 · appendix c consultation. ... final v1 19/10/17 zoe quaas brooke marshall brooke marshall ... bo r n e st r e e t b

Community Consultation Plan Wellington Solar Farm 

17‐076 v1.1  14   

Stakeholder group  Defining characteristics  Consultation strategies   Status and timing 

5. Representative 

bodies 

Representatives of groups such as: 

Wellington Business Chamber  

Dubbo Regional Council 

Inform and Consult 

Specific  information may be  required  for  this 

group. 

An avenue to receive information and provide 

specific  feedback  or  ask  questions  should  be 

provided. 

Dubbo Regional Council has been consulted in 

June;  First  Solar  stays  in  direct  contact  with 

Dubbo Regional Council. 

Presentation to Councillors is expected to take 

place in October/November 2017. 

Consultation  with  the  Wellington  Business 

Chamber  has  occurred  in  October  2017.  A 

letter to the business is schedule to be provide 

in November 2017. 

6. Media  Outlets  to  ensure  a  clear  message  is 

delivered: 

Local radio, television, newspapers. 

 

Inform 

A contact should be provided to this group, for 

further information if required. 

Wellington  Time  advertised  for  Community 

Open Day 27 September 2017 

7. Broader 

community 

The town of Wellington is approximately 2 km 

from  the  proposed  solar  farm.  There  are 

numerous residences and business located in 

and around the township. 

Direct impacts are a possibility for residences 

on  the  northern  side  of Wellington  and  the 

project would be a large new development for 

the broader community. 

Inform  

Newspaper articles, website information used 

to relay information about the project. 

A contact should be provided to this group, for 

further information if required. 

 

First  Solar  completed  a  mail  out  to  broader 

community  19  April  2017,  3  July  2017,  7 

August, 13 September 2017. 

Page 19: Wellington Solar Farm APPENDIX C CONSULTATION · 2019-07-01 · appendix c consultation. ... final v1 19/10/17 zoe quaas brooke marshall brooke marshall ... bo r n e st r e e t b

Community Consultation Plan Wellington Solar Farm 

17‐076 v1.1  15   

Stakeholder group  Defining characteristics  Consultation strategies   Status and timing 

8. Mid‐Western 

shire 

The region has had a rich agricultural history. 

The  proposed  solar  farm  would  provide  an 

economic  stimulus  for  the  area,  during 

construction,  and  would  be  a  positive  step 

forward in the renewable energy sector. 

While direct impacts are unlikely, the project 

would  be  a  large  new  development  for  the 

broader community. 

Inform  

Newspaper  articles  and  website  information 

used to release information about the project. 

A contact should be provided to this group, for 

further information if required. 

Direct  contact  with  specific  representative 

groups (Chamber of Commerce). 

First  Solar made  contact  with  Viv Wellington 

and  Barry  Jeffrey,  Wellington  Business 

Chamber in October 2017. 

 

 

 

 

Page 20: Wellington Solar Farm APPENDIX C CONSULTATION · 2019-07-01 · appendix c consultation. ... final v1 19/10/17 zoe quaas brooke marshall brooke marshall ... bo r n e st r e e t b

Community Consultation Plan Wellington Solar Farm 

17‐076 v1.1  16   

5 ISSUE MANAGEMENT  

A set of project‐specific issues and risks to maximising community engagement in the project have been identified below. These issues pose potential risks to the 

effective identification and mitigation of impacts important to the community. Mitigation strategies have been developed below, specific to the identified issues. 

These have been incorporated into the Project‐based Activities, in Section 6. 

Issue   Risks   Mitigation strategies  

The  project  may  define  / 

overwhelm the locality 

 

This may polarise the community. 

They may not feel that the project 

reflects their values. 

The  scale  of  the  project  may 

overwhelm  the  existing  local 

character.  

 

Education material about the role of solar energy in the country’s energy mix, the technology 

and its impacts. 

Early dissemination of information about the project and its specific justification and benefits, 

particularly  with  reference  to  developing  new  income  streams  on  agricultural  land  and  the 

ability to restore the land capability after decommissioning. 

Seek direct input into how the project may reflect the communities ‘personality’ and values and 

how the benefits of the project may be spread to the local community.  

Clear communication of key environmental impacts and mitigation strategies of the project. 

Offer direct contact to project manager. 

Misinformation: Word of mouth / 

rumours  first  source  of 

information 

Feel  left  out,  disengaged, 

misinformed. 

Direct communication early to local community – adjacent landowners first, near neighbours 

second, then the wider community. 

Page 21: Wellington Solar Farm APPENDIX C CONSULTATION · 2019-07-01 · appendix c consultation. ... final v1 19/10/17 zoe quaas brooke marshall brooke marshall ... bo r n e st r e e t b

Community Consultation Plan Wellington Solar Farm 

17‐076 v1.1  17   

Issue   Risks   Mitigation strategies  

Lack of support for project  

 

Lack  of  interest,  leading  to  low 

levels of public support. 

Unaddressed  concerns  may 

generate  opponents  of  this 

project. 

Large  proportion  of  jobs  in  local 

area are reliant on coal mining may 

influence support of development 

of renewable infrastructure. 

Early dissemination of information about the project and its justification and project benefits. 

Clear communication of key environmental impacts and mitigation strategies. 

Make participation easy – to ensure all concerns are addressed. 

Be creative – seek support for renewable project that demonstrates how benefits are felt at the 

local level.  

The  approvals  process  can  be 

complex. 

 

Perception that the process is too 

difficult to become involved in. 

Suspicion  that  input  will  not  be 

valued. 

Clearly illustrate approvals process. 

Clearly  define  opportunities  for  community  input  including what  is  required  and when  it  is 

required. 

Communicate back, identifying where input has been used. 

Reinforce  this  at  each  relevant  stage  for  community  input  –  pre  lodgement,  during  public 

exhibition etc. 

Distrust  in  environmental 

assessment process.  

 

Distrust  of  impact  identification 

and mitigation strategies. 

Establish  credentials  of  assessment  team  and  First  Solar.  Present  these  in  the  EIS  and  in 

newsletters etc. 

Make participation easy – create opportunities to discuss issues with the team. 

Fear  of  unknown  /  complex 

information 

 

Exaggerated  fears  / 

misunderstanding of information. 

Layman explanations of issues. 

Offer to follow up – one on one, or special interest meetings. 

Page 22: Wellington Solar Farm APPENDIX C CONSULTATION · 2019-07-01 · appendix c consultation. ... final v1 19/10/17 zoe quaas brooke marshall brooke marshall ... bo r n e st r e e t b

Community Consultation Plan Wellington Solar Farm 

17‐076 v1.1  18   

Issue   Risks   Mitigation strategies  

Relationship with community  Risk that during the long approval 

and  assessment  process,  the 

community  will  lose  enthusiasm, 

become disengaged or negative. 

Milestone events should be identified early and celebrated. 

Representative 

 

Risk of biased consultation, serving 

only  the  most  vocal  community 

members. 

Sections of the community may be 

“overpowered”  and  may  be 

marginalised. 

Ensure community is engaged in a forum that minimises risk of debate being side tracked. 

Follow up with smaller groups where required. 

Use established social (and media) channels in dissemination of materials, i.e. sport clubs. 

Unified message  Differing  messages  may  create 

confusion and mistrust. 

Limit points of contact. 

Have message clearly set out for use, rather than reinventing it for each consultation activity. 

Unequal distribution of benefits 

 

Residents  close  to  the 

development  are  likely  to  feel 

more strongly.  

Identification of stakeholder groups should reflect differences in impacts.  

 

Page 23: Wellington Solar Farm APPENDIX C CONSULTATION · 2019-07-01 · appendix c consultation. ... final v1 19/10/17 zoe quaas brooke marshall brooke marshall ... bo r n e st r e e t b

Community Consultation Plan Wellington Solar Farm 

17‐076 v1.1  19   

6 PROJECT BASED ACTIVITIES  

The following table outlines the different project stages and associated community consultation objectives 

and activities, in chronological order. The stages include: 

Decision to proceed with early investigations, proposal development 

Receipt of SEARs 

Detailed assessment and proposal development  

EIS on public exhibition, submissions reporting  

Approval determination 

Construction contract award 

Construction commences 

Operation commences 

Decommissioning commences 

6.1 ENGAGEMENT TEAM  

First Solar’s engagement team will consist of the project developer and support team. 

Mirjam Tome First Solar (Australia) Pty Ltd Project Manager will lead the engagement.  

Support will be provided by Jennifer Abbott, Senior Manager – Communications and Public Affairs and 

Bianca Alexander – Development Support.  

6.2 MILESTONES 

Milestone events  should be celebrated,  and used as an opportunity  to keep  the community on board. 

Milestones can include: 

1. Announce project – notify near residents first, follow up with consistent information 

2. Receipt of SEARs 

3. Early studies update – meet the community face to face 

4. EIS submitted – explain avenues for input 

5. Submissions Report submitted – explain avenues for input 

6. Approval – celebrate in a way that involves the community 

7. Construction contractors awarded ‐ opportunity for local employment 

8. Construction commences ‐ sod turning ceremony 

9. Operation commences – public open day 

6.3 THROUGHOUT PROCESS 

Relevant to all activities: 

One  person  would  remain  key  spokesperson,  this  would  be  Mirjam  Tome,  First  Solar 

(Australia) Pty Ltd Project Manager, to:  

o Limit  points  of  contact,  ensuring  a  clear  message  and  no  contradictions  in 

terminology or project information. 

o Retain personal direct relationship with the community,  identifiable  face for the 

project. 

Page 24: Wellington Solar Farm APPENDIX C CONSULTATION · 2019-07-01 · appendix c consultation. ... final v1 19/10/17 zoe quaas brooke marshall brooke marshall ... bo r n e st r e e t b

Community Consultation Plan Wellington Solar Farm 

17‐076 v1.1  20   

Feedback would be sought using a standard form where possible, allowing this information 

to  inform  the  assessment  (example provided  in Appendix A).  This  form would be made 

available during meetings and on the project website. 

Page 25: Wellington Solar Farm APPENDIX C CONSULTATION · 2019-07-01 · appendix c consultation. ... final v1 19/10/17 zoe quaas brooke marshall brooke marshall ... bo r n e st r e e t b

Community Consultation Plan Wellington Solar Farm 

17‐076 v1.1  21   

Stakeholder 

group  

Issue   Consultation 

objective 

Community engagement activities  Format 

Decision to proceed with early investigations, proposal development, and receipt of SEARs 

Adjacent 

landowners 

May  define 

locality 

Lack of support 

Other concerns 

Inform and engage   Early  dissemination  of  information  about  solar  development 

generally. 

Early  dissemination  of  information  about  the  project  and  its 

justification and benefits. 

Seek  direct  input  to  include  in  assessment  approach  and 

development of proposal. 

Face to face meeting  

Include  feedback  form  and 

encourage  direct  contact  with 

Project Manager. 

Council  Misinformation 

Lack of support 

 

 

Inform and engage  Ensure that the information is available  

Build relationship to understand their key issues 

Face to face meeting  

Near neighbours 

 

May  define 

locality 

Lack of support 

Unequal 

distribution  of 

benefits 

Other concerns 

 

Inform and engage  Early  dissemination  of  information  about  solar  development 

generally. 

Early  dissemination  of  information  about  the  project  and  its 

justification and benefits. 

Provide  contact  information  for  near  neighbours  to  seek 

further information, provide comments on the proposal and to 

register for regular updates. 

Letter Drop 

Provide contact information to of 

the Project Manager 

Distrust  in 

environmental 

assessment 

process 

 

Inform  Ensure the timelines and the stages  for community  input are 

clearly documented ‐ use graphics and indicate where we are 

now at for the assessment. 

Make  information on  the project  team and assessment  team 

available 

Factsheet  showing  stage  of  the 

process  and  opportunities  for 

input  

Website,  links  to  other  projects 

and accreditations 

Page 26: Wellington Solar Farm APPENDIX C CONSULTATION · 2019-07-01 · appendix c consultation. ... final v1 19/10/17 zoe quaas brooke marshall brooke marshall ... bo r n e st r e e t b

Community Consultation Plan Wellington Solar Farm 

17‐076 v1.1  22   

Stakeholder 

group  

Issue   Consultation 

objective 

Community engagement activities  Format 

Local  business 

owners 

Misinformation 

 

Inform and engage  Ensure that the information is available to the local community 

first.  

As well as letter drop, meet local business owners and offer to 

leave information with them to distribute. 

Build  relationship  with  these  owners  and  staff  as  they  may 

assist to ‘get the word out’. 

Face  to  face  meeting  with  local 

business owners as requested 

Broader 

community 

Distrust  in 

environmental 

assessment 

process.  

The  approvals 

process  can  be 

complex. 

Inform  Preliminary  project  announcement,  including  stage  of 

assessment, likely timelines, ways in which the community can 

be involved. 

Media release, link to website 

 

Detailed assessment and proposal development 

Adjacent 

landowners 

May  define 

locality 

Lack of support 

Inform and engage   Feed information into the final assessment to ensure all their 

issues have been identified and addressed by the project. 

Face to face meeting / Phone call 

Near neighbours  May  define 

locality 

Lack of support 

 

Inform and engage  Identify ways the community can participate in the project and 

seek input on these: 

Vegetation  screen  planting,  adopt  a  tree  (one  for 

project, one for landowner?) 

Signage / logo for solar farm (will be prominent part of 

the town?) 

Other renewable or energy saving programs that the 

proponent could support? 

Depends on initiative identified 

Page 27: Wellington Solar Farm APPENDIX C CONSULTATION · 2019-07-01 · appendix c consultation. ... final v1 19/10/17 zoe quaas brooke marshall brooke marshall ... bo r n e st r e e t b

Community Consultation Plan Wellington Solar Farm 

17‐076 v1.1  23   

Stakeholder 

group  

Issue   Consultation 

objective 

Community engagement activities  Format 

Near neighbours  Fear of  unknown, 

complex 

information 

Inform and engage  Identify ways  simplify  and  present  the  key  information,  seek 

feedback. 

 

Open  house  –  specialist  and 

project information 

Broader 

community  

Unequal 

distribution  of 

benefits 

Risk  of  biased 

consultation, 

serving  only  the 

most  vocal 

community 

members. 

Consult and inform   Feed  information  into  the  final  assessment  to  ensure  all 

community  issues have been identified and addressed by the 

project, differentiating between stakeholder groups 

 

 

Fact Sheet, Website 

EIS on public exhibition, submissions reporting 

Adjacent 

landowners 

Relationship  with 

landowners  and 

community 

Inform and engage   Reinforce stage in the project and ways to have input   Face to face meeting / Phone call 

Near neighbours  Relationship  with 

community 

Inform and engage  Celebrate milestone, reinforce stage in the project and ways to 

have input 

Newspaper article, Website link 

Near neighbours  Fear of  unknown, 

complex 

information 

Inform and engage  Special interest groups – address specifically in meeting. 

 

Meeting with group, if required. 

Approval determination 

Near neighbours  Relationship  with 

community 

Inform and engage  Celebrate milestone, reinforce stage in the project and ways to 

have input. 

Thank the community for their support 

 

Letter Drop 

Page 28: Wellington Solar Farm APPENDIX C CONSULTATION · 2019-07-01 · appendix c consultation. ... final v1 19/10/17 zoe quaas brooke marshall brooke marshall ... bo r n e st r e e t b

Community Consultation Plan Wellington Solar Farm 

17‐076 v1.1  24   

Stakeholder 

group  

Issue   Consultation 

objective 

Community engagement activities  Format 

Broader 

community 

Differing 

messages  may 

create  confusion 

and mistrust. 

The  approvals 

process  can  be 

complex. 

Inform   Keep project information up to date. 

Provide link to relevant information including feedback form. 

Provide a contact for further information. 

 

 

 

Newspaper article 

Website 

 

Construction contract award 

Near neighbours  Relationship  with 

community 

Inform and engage  Celebrate milestone, reinforce stage in the project and ways to 

have input. 

What opportunities for local employment? 

Media Release 

Construction commences 

Near neighbours  Relationship  with 

community 

Inform and engage  Celebrate milestone, reinforce stage in the project and ways to 

have input. 

Notify  about  impacts  that  can  be  expected,  avenues  to 

complain, for more information. 

Letter Drop 

Event: first module install 

Broader 

community 

Differing 

messages  may 

create  confusion 

and mistrust. 

Inform   Keep project information up to date 

Provide link to relevant information including feedback form 

Provide a contact for further information 

Website 

 

Operation commences 

Near neighbours  Relationship  with 

community 

Inform and engage  Celebrate milestone, reinforce stage in the project and ways to 

have input 

Notify  about  impacts  that  can  be  expected,  avenues  to 

complain, for more information. 

Letter Drop 

Event: public open day 

Page 29: Wellington Solar Farm APPENDIX C CONSULTATION · 2019-07-01 · appendix c consultation. ... final v1 19/10/17 zoe quaas brooke marshall brooke marshall ... bo r n e st r e e t b

Community Consultation Plan Wellington Solar Farm 

17‐076 v1.1  25   

Stakeholder 

group  

Issue   Consultation 

objective 

Community engagement activities  Format 

Broader 

community 

Differing 

messages  may 

create  confusion 

and mistrust. 

Inform   Keep project information up to date 

Provide link to relevant information including feedback form 

Provide a contact for further information 

Website 

 

Decommissioning commences  

Near neighbours  Relationship  with 

community 

Inform and engage  Reinforce stage in the project and ways to have input 

Notify about impacts that can be expected, avenues to complain, 

for more information. 

Letter Drop 

 

Broader 

community 

Differing 

messages  may 

create  confusion 

and mistrust. 

Inform   Keep project information up to date 

Provide link to relevant information including feedback form 

Provide a contact for further information 

Website 

 

 

 

Page 30: Wellington Solar Farm APPENDIX C CONSULTATION · 2019-07-01 · appendix c consultation. ... final v1 19/10/17 zoe quaas brooke marshall brooke marshall ... bo r n e st r e e t b

Community Consultation Plan Wellington Solar Farm 

17‐076 v1.1  26   

7 MONITORING AND EVALUATION 

To ensure  this plan  is effective during  the  implementation of activities, and adapts as  required to new 

information, the following review actions will be undertaken alongside implementation activities: 

Appoint and maintain a consultation manager for the project to  implement activities 

and review this plan regularly. 

Keep  an  accurate  record  of  all  feedback  from  consultation  activities  and  all 

correspondence with the community. 

Monitor regularly and respond promptly to email and phone queries.  

Are the activities reaching a diverse and representative section of the community; do 

new activities need to be implemented? 

Has relevant information been passed back to: 

o Project developers 

o Assessment staff. 

 

 

   

Page 31: Wellington Solar Farm APPENDIX C CONSULTATION · 2019-07-01 · appendix c consultation. ... final v1 19/10/17 zoe quaas brooke marshall brooke marshall ... bo r n e st r e e t b

Community Consultation Plan Wellington Solar Farm 

17‐076 v1.1  27   

8 REFERENCES AND RESOURCES 

Australian  Bureau  of  Statistics,  2017, Wellington  LGA  Census Quickstats,  accessed  13  April  2017  from 

http://stat.abs.gov.au/itt/r.jsp?RegionSummary&region=18150&geoconcept=REGION&dataset=ABS_REG

IONAL_LGA&datasetLGA=ABS_REGIONAL_LGA&datasetASGS=ABS_REGIONAL_ASGS&regionLGA=REGION

&regionASGS=REGION  

ARENA (n.d). Establishing the social licence to operate large scale solar facilities in Australia: Insights from 

social research for industry, Australian Renewable Energy Agency (ARENA). 

Department of Planning and Environment, 2016, Population Projections 2016 Edition, New South Wales 

Government. 

Destinations  NSW,  2017,  accessed  18  April  2017,  http://www.visitnsw.com/destinations/country‐

nsw/dubbo‐area/wellington/events  

Dubbo City, 2017, accessed 18 April 2017 http://dubbo.com.au/Invest/population‐demographic  

Dubbo Regional Council, 2017, accessed 18 April 2017, https://www.dubbo.nsw.gov.au/  

Dubbo Regional Council, 2016, Dubbo Regional Council Local Government Area Economic Profile. 

Regional Development Australia – Orana, 2016, accessed 13 April 2016, 

http://www.lovethelifewelive.com.au/our‐towns/wellington/  

REMPLAN,  2017,  Dubbo  Regional  Council  Economic  Profile,  accessed  18  April  2017  from 

http://www.economicprofile.com.au/dubboregionalcouncil/  

Service NSW, 2017, Wellington Health Service, 

https://www.service.nsw.gov.au/nswgovdirectory/wellington‐health‐service  

Twyford Consulting (2007) Beyond Public Meetings: Connecting community engagement with decision 

making 

 

Page 32: Wellington Solar Farm APPENDIX C CONSULTATION · 2019-07-01 · appendix c consultation. ... final v1 19/10/17 zoe quaas brooke marshall brooke marshall ... bo r n e st r e e t b

Community Consultation Plan Wellington Solar Farm 

17‐076 v1.1  A‐i   

APPENDIX A COMMUNITY FEEDBACK FORM 

 

Page 33: Wellington Solar Farm APPENDIX C CONSULTATION · 2019-07-01 · appendix c consultation. ... final v1 19/10/17 zoe quaas brooke marshall brooke marshall ... bo r n e st r e e t b

     

             

COMMUNITY FEEDBACK FORM: WELLINGTON SOLAR FARM 

Your feedback is important to develop a solar farm project that best suits the local area and community. 

Your comments ensure local feedback is understood by the developers and assessment team. 

Please send your feedback to (or seek further information directly, from): 

Mirjam Tome, First Solar Australia Pty Ltd 

Level 3 16 Spring Street, Sydney, NSW 2000 

[email protected] 

 

For further information about the project, please see the project website at www.wellingtonsolarfarm.com.au  

 

Your contact details: (this information will be treated as confidential) 

 

Name: ………………………………………. Address: ………………………………………………………………………………….. Ph: ………………………..  

 

Circle which best describes how far you live from the proposed Wellington Solar Farm: 

<1 km     1‐2 km     2‐5 km     >5 kilometres     Not a member of the local community 

Tell us what you value about the local area: 

What do you value most about the local area? 

…………………………………………………………………………………………………………………………………………………………………………………………

…………………………………………………………………………………………………………………………………………………………………………………………

……………………………………………………………..…………………………………………………………………………………………………………………………

………………………………………………………………………………………………………………………………………………………………………………………… 

What views or landscape characteristics in the region and local area are important to you? 

…………………………………………………………………………………………………………………………………………………………………………………………

…………………………………………………………………………………………………………………………………………………………………………………………

…………………………………………………………………………………………………………………………………………………………………………………………

………………………………………………………………………………………………………………………………………………………………………………………… 

What do you like about solar farms?  

…………………………………………………………………………………………………………………………………………………………………………………………

…………………………………………………………………………………………………………………………………………………………………………………………

…………………………………………………………………………………………………………………………………………………………………………………………

………………………………………………………………………………………………………………………………………………………………………………………… 

Do you have any concerns about solar farms?  

…………………………………………………………………………………………………………………………………………………………………………………………

…………………………………………………………………………………………………………………………………………………………………………………………

…………………………………………………………………………………………………………………………………………………………………………………………

………………………………………………………………………………………………………………………………………………………………………………………… 

Do you have any specific concerns regarding the proposed solar farm at Wellington?  

…………………………………………………………………………………………………………………………………………………………………………………………

…………………………………………………………………………………………………………………………………………………………………………………………

…………………………………………………………………………………………………………………………………………………………………………………………

………………………………………………………………………………………………………………………………………………………………………………………… 

Page 34: Wellington Solar Farm APPENDIX C CONSULTATION · 2019-07-01 · appendix c consultation. ... final v1 19/10/17 zoe quaas brooke marshall brooke marshall ... bo r n e st r e e t b

Community Consultation Plan Wellington Solar Farm 

17‐076 v1.1  B‐i   

APPENDIX B CONSULTATION STATUS Date  Activity  

April 2017  Letter has been sent to all landowners within 2km of the proposed solar farm. 

May 2017  Project Manager and Project Support Officer provided introduction to  the  project  and  provided  a  notification  letter  with  the  project contact  information and a feedback form to all adjacent and close neighbours, including local businesses and agencies.  

Project Manager met with  Kathy Webb, Business Manager  of  the Wellington Correctional Centre. 

An  email was  sent  to  Kathy Webb  detailing  interactions  between solar  panels  and  security  cameras  as  well  as  responses  to  the questions raised.  

June 2017  Neighbours with potential views of the solar farm were met with in person.  

Follow up calls and emails were send to neighbours with potential views of solar farm. 

Dubbo Regional Council (Liz Rich and Darryl Quigley) were consulted regarding the proposed solar farm. 

July 2017  Letters have been sent out to all  landowners and members of the community who are on the distribution list, notifying them that the Secretary’s Environmental Assessment Requirements (SEARs) to the NSW  Department  of  Planning  and  Environment  (DPE)  have  been requested. 

Letters have been sent out to all  landowners and members of the community who are on the distribution list, notifying them that the Secretary’s Environmental Assessment Requirements (SEARs) to the NSW  Department  of  Planning  and  Environment  (DPE)  have  been received.  

August 2017  Neighbours with potential views of the solar farm were visited for a visual assessment consultant to take photos from viewpoints.  

Meetings were  scheduled  with  the  project manager  to  share  the photomontages,  discuss  impacts  and  mitigation  options  if appropriate. 

Mineral Licence owners were consulted. 

Aboriginal Parties were consulted for Cultural Heritage Study on site. 

Dubbo  Regional  Council  was  consulted  and  informed  about  the progress of the project. 

September 2017  The Community Open Day took place at the Wellington Civic Centre.  

Dubbo  Regional  Council  was  consulted  and  informed  about  the progress of the project. 

Wellington Business Chamber has been consulted. 

October 2017  Wellington  Correctional  Centre  has  been  consulted  and  kept informed of progress. 

Page 35: Wellington Solar Farm APPENDIX C CONSULTATION · 2019-07-01 · appendix c consultation. ... final v1 19/10/17 zoe quaas brooke marshall brooke marshall ... bo r n e st r e e t b

Community Consultation Plan Wellington Solar Farm 

17‐076 v1.1  B‐ii   

Date  Activity  

Dubbo  Regional  Council  was  consulted  and  informed  about  the progress of the project. A date to present to Councillors has been requested.  

Neighbours have been visited and kept informed of progress.