Welcome to the “CII – AP TQM FORUM MEMBERS”. Agenda: Our Company– 5 Minutes Thoughts Sharing on Low Cost Automation– 10 Minutes LCA Projects in Amara Raja Batteries– 15 Minutes Question & Answer Session– 5 Minutes. Core Purpose. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Welcome to the  “CII – AP TQM FORUM MEMBERS”

1

Welcome to the “CII – AP TQM FORUM

MEMBERS”

Page 2: Welcome to the  “CII – AP TQM FORUM MEMBERS”

Agenda:

Our Company – 5 Minutes

Thoughts Sharing on Low Cost Automation – 10 Minutes

LCA Projects in Amara Raja Batteries – 15 Minutes

Question & Answer Session – 5 Minutes

2

Page 3: Welcome to the  “CII – AP TQM FORUM MEMBERS”

Core PurposeCore Purpose

To transform our spheres of influence and to improve the quality Of life by building institutions that provide better access to better opportunities, goods and services to more people….all the time.

3

Page 4: Welcome to the  “CII – AP TQM FORUM MEMBERS”

Amara Raja

InnovationExcellence

EntrepreneurshipExperiences

Responsibility4

Page 5: Welcome to the  “CII – AP TQM FORUM MEMBERS”

Vision 2025Vision 2025

Through the Amara Raja way, and through enduring progressive partnerships, we will be a global leader in batteries and battery technologies and dominant player Indian Ocean Rim

5

Page 6: Welcome to the  “CII – AP TQM FORUM MEMBERS”

Quality systems certifications• ISO-9001 in Feb 1997• QS 9000 in May 1999• TS 16949 in Jan 2004

• Re certifications – Jan 2007, Jan 2010 Environment management systems

• ISO 14001- certification in May 2002• Re certifications - May 2005, May 2008 & May 2011

Occupational Health & Safety Management system OHSAS 18001:2007 - Certified in Aug 2010

Six Sigma initiation in the year 2002 5 S Practices from the year 2004 Total Productive Maintenance initiation in the year 2007 Quality Control Circles initiated from 2007

The Journey….The Journey….

6

Page 8: Welcome to the  “CII – AP TQM FORUM MEMBERS”

8

The Amara Raja Group

Amara Raja Batteries Ltd

 

Amara Raja Power Systems Limited

 

Mangal Precision Products Limited

 Amara Raja Electronics

Limited

 

Galla Foods Ltd

 

Amara Raja Infra Pvt Ltd

Amara Raja

Industrial Services Pvt Ltd

         

          Industrial & Auto

Batteries  Power Electronics

 

Fasteners & Battery Parts  

PCBs/ Home Invertors  

Fruit Processing     

Karakambadi 

Karakambadi 

Karakambadi / Petamitta  

Dighuvamagam 

Putalpattu-Chittoor 

Karakambadi Karakambadi

                                           

26% Galla Family                     26% JCI

48 % Public

Page 9: Welcome to the  “CII – AP TQM FORUM MEMBERS”

9

Amara Raja Batteries Ltd.

Ownership: Public Limited Company Joint venture with JCI, USA Share holding of 26% each - JCI & Gallas

Size and scope of business: Total Land area : 195 acres Built up area : 50,000 sq mts Direct Employment. : 3000 + people Total investment --Mar08 : Rs. 3000mn ( USD 60 Mn) Sales 2005-06 : Rs. 4458 Mn (USD 100 Mn) Sales 2006-07 : Rs. 7451 Mn (USD 166 Mn) Sales 2007-08 : Rs. 13500 Mn (USD 300 Mn) Sales 2008-09 : Rs. 15840 Mn (USD 352 Mn)Sales 2009-10 : Rs. 16904 Mn (USD 382 Mn)Sales 2010-11 : Rs. 20765 Mn (USD 464 Mn)

Page 10: Welcome to the  “CII – AP TQM FORUM MEMBERS”
Page 11: Welcome to the  “CII – AP TQM FORUM MEMBERS”
Page 12: Welcome to the  “CII – AP TQM FORUM MEMBERS”

Under the present regime of globalization and liberalization - Quality enhancement and Cost reduction are two major steps to enhance productivity when many factors (economic recession , slump in demand , risk , lack of funds with long gestation period) make heavy investment not possible.

One of the very practical, safe, economical and rewarding strategies is the application of Low Cost Automation.

INDIAN SENARIO

Page 13: Welcome to the  “CII – AP TQM FORUM MEMBERS”

Introduction of simple machinery like pneumatic , hydraulic ,mechanical and electrical devices into existing production…

WHAT ?

WHY ?To Improve - Productivity ,Quality ,Safety ,Delivery , Ergonomics and reducing cost

Page 14: Welcome to the  “CII – AP TQM FORUM MEMBERS”

High initial cost

Computerization is

required

Skilled labor is

required

Low Investment

Simple Machines can be used

Operation is possible with Semi-Skilled and unskilled labor

AutomationAutomation Low Cost automationLow Cost automation

Page 15: Welcome to the  “CII – AP TQM FORUM MEMBERS”

ApplicationsApplications

• Loading

• Feeding

• Clamping

• Cutting

• Cleaning

• Insertion

• Crimpling

• Pneumatic

• Hydraulic

• Mechanical

• Electrical

LCA MethodsLCA Methods

Page 16: Welcome to the  “CII – AP TQM FORUM MEMBERS”

Increases productivityHighly skilled labour is not requiredProduction time is reducedIncreases the quality of productsComputerization is not requiredCost of production is reducedBetter Utilization of materialLess rejectionsManufacturing Lead-time can be reduced

Page 17: Welcome to the  “CII – AP TQM FORUM MEMBERS”
Page 18: Welcome to the  “CII – AP TQM FORUM MEMBERS”
Page 19: Welcome to the  “CII – AP TQM FORUM MEMBERS”

OLD METHOD:OLD METHOD:Operator has to collect fallen paste from floor and add into hopper in Pasting

CONSTRAINT:CONSTRAINT:

1 Manpower per shift 3 manpower per dayHigh operator fatigue leads to attrition5% Paste loss while manual loading

Developed U type inclined conveyor for loading paste into the hopper

PRESENT PRESENT METHOD :METHOD :

Conveyor system for Bottom paste addition

Page 20: Welcome to the  “CII – AP TQM FORUM MEMBERS”

BEFORE

Benefit

Operator fatigue elimination3 Manpower savedPaste loss eliminationConsistant plate thickness

AFTER

Conveyor system for Bottom paste addition

Manual addition of bottom paste

Page 21: Welcome to the  “CII – AP TQM FORUM MEMBERS”

OLD METHOD:OLD METHOD:Operator manually peel off the label and paste on the battery in batch flow of batteries at Finishing

CONSTRAINT:CONSTRAINT: 12 seconds per batteryLoss of adhesiveness due improper peel off Label damages while handling

Developed label dispenser for auto peel off labelPRESENT PRESENT METHOD :METHOD :

Label dispensing system

Page 22: Welcome to the  “CII – AP TQM FORUM MEMBERS”

Improvement

LABEL DISPENSING SYSTEM

BEFORE AFTER

Benefit

Retention of adhesiveness Auto peel off sticker 9 seconds per label

Page 23: Welcome to the  “CII – AP TQM FORUM MEMBERS”
Page 24: Welcome to the  “CII – AP TQM FORUM MEMBERS”

OLD METHOD:OLD METHOD:Operator manually fixing the charge eye with mallet to the battery at assembly

CONSTRAINT:CONSTRAINT:Uneven orientation of Charge eye Improper fitment of charge eye

PRESENT PRESENT METHOD :METHOD :

CHARGE EYE FEEDING

Indicates the charging status of battery

Auto Charge eye fixing to the battery

Page 25: Welcome to the  “CII – AP TQM FORUM MEMBERS”

1. Consistency in orientation2. Zero chance of improper fitting ( Automatic Operation )

CHARGE EYE FEEDING

BEFORE AFTER

Benefit

Consistency in orientation Zero chance of improper fitting ( Automatic Operation )

Page 26: Welcome to the  “CII – AP TQM FORUM MEMBERS”
Page 27: Welcome to the  “CII – AP TQM FORUM MEMBERS”

OLD METHOD:OLD METHOD: Battery type is hot punched on cover in Assembly

ONLINE ENGRAVING

PHASE :1PHASE :1Engraving battery type on cover by manually holding cover in offline

PHASE : 2PHASE : 2Engraving battery type on cover by clamping cover in offline

PHASE : 3PHASE : 3 Engraving battery type on cover by clamping cover in online

Page 28: Welcome to the  “CII – AP TQM FORUM MEMBERS”

ENGRAVING AUTOMATION

BEFORE AFTER

Benefit

1. Holding the cover ,Movement of operator eliminated

2.No additional manpower is required add this activity to line operator

Page 29: Welcome to the  “CII – AP TQM FORUM MEMBERS”
Page 30: Welcome to the  “CII – AP TQM FORUM MEMBERS”

OLD METHOD:OLD METHOD: Shims are manually cutting using cutter in Plastics

CONSTRAINT:CONSTRAINT: Operator cut the shim 1 piece per cycle Unable to meet the requirement3 manpower per day is required

Automatic shim cutting will cut 4 pieces per cycle PRESENT PRESENT METHOD :METHOD :

SHIM CUTTING

Page 31: Welcome to the  “CII – AP TQM FORUM MEMBERS”

SHIMCUTTING SETUP

BEFORE AFTER

Benefit

1 In single cutting we can produce 4 shims at a time.

2.Operator fatigue reduced. 3.Productivity raised by 134% 4.Manpower saved-3 No’s

Page 32: Welcome to the  “CII – AP TQM FORUM MEMBERS”

OLD METHOD:OLD METHOD: Manual foam cutting using knife at Packing

CONSTRAINT:CONSTRAINT: 6 manpower per day Unable to meet the requirementOperator safety

Semiautomatic setup will cut the foamPRESENT PRESENT METHOD :METHOD :

FOAM CUTTING

Page 33: Welcome to the  “CII – AP TQM FORUM MEMBERS”

FOAM CUTTING SETUP

BEFORE AFTER

Scale to measure length

Auto Cutting with hand valve

Easy to pull

Benefit

Minimize operator fatigue Optimum work content Good workplace management

Page 34: Welcome to the  “CII – AP TQM FORUM MEMBERS”
Page 35: Welcome to the  “CII – AP TQM FORUM MEMBERS”

OLD METHOD:OLD METHOD: Cables are scrapped due to lug damages in Formation process

CONSTRAINT:CONSTRAINT: 30000 cables are ready to scrap

Developed semi automatic set up for cut the lug of cable and crimple the new lug.

PRESENT PRESENT METHOD :METHOD :

RE USAGE OF CABLES

PURPOSE:PURPOSE: Cables are used to interconnect cells at charging process

Cable cost Rs 30

Lug cost Rs 1.25

Each cable has 2 lugs

Page 36: Welcome to the  “CII – AP TQM FORUM MEMBERS”

BEFORE AFTER

CRIMPLING SETUP

Cable ready for reuse

Directly scrapping the cables in ABD,IBD & SBD formation after usage.

Lug(sleeve is open) damaged Cable after usage

Cable cutting

Benefit

Cable cost Rs 30 Lug cost Rs 1.25 Each cable has 2 lugs Cost saving by each cable Rs27.50, Savings/Annum Rs 825000

Cable crimpling

Page 37: Welcome to the  “CII – AP TQM FORUM MEMBERS”

OLD METHOD:OLD METHOD: Hot number punching on Battery with Punching gun

Automatic setup for Number PunchingPRESENT PRESENT METHOD :METHOD :

NUMBER PUNCHING

PHASE 1:PHASE 1: Semi automatic setup for Number punching

CONSTRAINT:CONSTRAINT: 3manpower per dayUneven location of the punchOperator fatigue & punch visibility was not good ( Manual Operation)

Page 38: Welcome to the  “CII – AP TQM FORUM MEMBERS”

BEFORE AFTER

AUTO HOTNUMBER PUNCH

1. Consistency in location of the punching 2. Visibility of the serial number is good ( Automatic operation ) 3. No operator fatigue 4.Work content reduced by 42%

Benefit

Page 39: Welcome to the  “CII – AP TQM FORUM MEMBERS”

OLD METHOD:OLD METHOD: one manpower per shift is assigned to fix and release

bolts in post of the cell to check is it freely moving or

sulphation form in the cells at Finishing Sulphation is formed due to cell is not cleaned

after leak testing

Auto air pulsing is provided to eliminate sulphationPRESENT PRESENT METHOD :METHOD :

AUTO AIR PULSING

Water getting stayed on post threadsSulphation formed in threadsMore thread damagesManual cleaning of water in post threadsMore water spills on floor due to manual cleaning Additional man power to clean the post waterAir loss

CONSTRAINT:CONSTRAINT:

Page 40: Welcome to the  “CII – AP TQM FORUM MEMBERS”

BEFORE AFTER

AUTO AIR PULSING

No sulphation observed(QA Approved).Elimination of thread damages due to sulphation.Elimination of manual cleaning of water droplets on posts.No additional man power required to clean water on posts.Elimination of repetitive thread inspection in finishing.

Benefit

Page 41: Welcome to the  “CII – AP TQM FORUM MEMBERS”

OLD METHOD:OLD METHOD: Operator has to manually align the group in COS Operation in Assembly

Auto aligner will align the groups in COS OperationPRESENT PRESENT METHOD :METHOD :

AUTO ALIGNER

CONSTRAINT:CONSTRAINT: Manual alignment leads to operator Fatigue

Page 42: Welcome to the  “CII – AP TQM FORUM MEMBERS”

BEFORE AFTER

AUTO ALIGNER

No operator fatigue

Benefit

Page 43: Welcome to the  “CII – AP TQM FORUM MEMBERS”

OLD METHOD:OLD METHOD:

Manual lifting of around 60 kgs batteries is difficultHigh operator Fatigue2000 times bend and raise for 1000 batteriesDifficult to handle on conveyor2 manpower/shift totally 6 manpower day is required

PRESENT PRESENT METHOD :METHOD :

CARTON INSERTION

CONSTRAINT:CONSTRAINT:

Manual inserting the batteries in carton box in Finishing

Semi automatic setup for carton insertion .

Page 44: Welcome to the  “CII – AP TQM FORUM MEMBERS”

BEFORE AFTER

No bend and raise Fatigue Reduction Easy to operate 3 Manpower per day is enough

Benefit

CARTON INSERTION

Page 45: Welcome to the  “CII – AP TQM FORUM MEMBERS”

OLD METHOD:OLD METHOD:

Spillage/Wastage of oil

PRESENT PRESENT METHOD :METHOD :

NP OIL FILLING

CONSTRAINT:CONSTRAINT:

Manually filling of NP Oil on vent cap for lubrication purpose in Formation process

NP Oil filling on vent cap through saline bottle

Page 46: Welcome to the  “CII – AP TQM FORUM MEMBERS”

BEFORE AFTER

NP OIL FILLING

No Spillage of NP Oil

Benefit

Saline bottle

Page 47: Welcome to the  “CII – AP TQM FORUM MEMBERS”

OLD METHOD:OLD METHOD:

Difficult to insert

Operator fatigue

PRESENT PRESENT METHOD :METHOD :

GROUP INSERTION

CONSTRAINT:CONSTRAINT:

Groups inserted in to the container manually at Assembly

Pneumatic setup developed to insert the groups in container

Page 48: Welcome to the  “CII – AP TQM FORUM MEMBERS”

BEFORE AFTER

GROUP INSERTION

Easy to insert Operator fatigue reductionBenefit

Page 49: Welcome to the  “CII – AP TQM FORUM MEMBERS”
Page 50: Welcome to the  “CII – AP TQM FORUM MEMBERS”

Open to

Questions, Suggestions, ……