2/26/2015 Chapter 6: Specifications and Drawings *Refer to Construction Engineering notes on Construction Specifications* CSI format: o (Sub) Division of the format referred to when dealing with project features such as valve chamber, landscape & irrigation, street and parking, etc. Chapter 7: Using the Specification in Contract Administration Addendum (addenda) : modification of specs/drawings e.g. bid documents o Bid becomes baseline for contract; any changes (addendum/addenda) are part of the bid documents. o When designers are completely done, that is the final contract Some cases- people don’t receive memo, keep making changes When last addendum decided, everything after is included in supplementary instructions (of architecture/designer) aka ASI. Construction Permit Master Permit List contains the types of permits needed o Compliances and regulations and permission (zoning, building permits, landscape, etc.) 3/12/2015 Chapter 8: Construction Laws and Labor Relations Performance of contracts regulated by laws o Making of contract; the law involved; contract law (both public and private) o Laws affecting execution Issuance, ordinances, regulations, etc. o Laws relating to disputes and differences over performance of contract o Licensing laws

Upload: zaid-shah

Post on 16-Aug-2015

217 views

Category:

Documents


3 download

DESCRIPTION

Test Upload

TRANSCRIPT

2/26/2015Chapter 6: Specifcations and Drawings*Refer to Construction Engineering notes on Construction Specifcations* CS for!at:o "Su#$ Di%ision of the for!at referred to when dea&ing with pro'ect features such as %a&%e cha!#er( &andscape ) irrigation( street and par*ing( etc+ Chapter ,: -sing the Specifcation in Contract .d!inistration .ddendu! "addenda$ : !odifcation of specs/drawings e+g+ #id docu!ents o /id #eco!es #ase&ine for contract0 an1 changes "addendu!/addenda$ are part of the #id docu!ents+o 2hen designers are co!p&ete&1 done( that is the fna& contract So!e cases3 peop&e don4t recei%e !e!o( *eep !a*ing changes 2hen &ast addendu! decided( e%er1thing after is inc&uded in supp&e!entar1 instructions "of architecture/designer$ a*a .S+ Construction 5er!it 6aster 5er!it 7ist contains the t1pes of per!its neededo Co!p&iances and regu&ations and per!ission "8oning( #ui&ding per!its( &andscape( etc+$9/12/2015Chapter :: Construction 7aws and 7a#or Re&ations 5erfor!ance of contracts regu&ated #1 &awso 6a*ing of contract0 the &aw in%o&%ed0 contract &aw "#oth pu#&ic and pri%ate$o 7aws a;ecting eua&? pro%ided in specs when #rand na!e product specifed .ward to &owest( responsi%e( responsi#&e #idder Etc+ @raAc re>uire!ents during constructiono Contractor needs per!it to enforce traAc regu&ations which #eco!e part of contract pro%isions 2or* in%o&%ing na%iga#&e waterwa1so Contractor o#&igated to a%oid na%igation ha8ards or interference with na%igation routes e