weatherization assistance program
DESCRIPTION
WEATHERIZATION ASSISTANCE PROGRAM. Photo courtesy of MT Wx Training Center. Lead Safe Weatherization for Crews and Managers. Weatherization Assistance Program Standardized Training Curriculum. September 2012. Lead-Based Paint Overview. Lead-Safe Weatherization for Crews and Managers. - PowerPoint PPT PresentationTRANSCRIPT
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – December 2012 eere.energy.gov
WEATHERIZATION ASSISTANCE PROGRAM
Lead Safe Weatherization for Crews and Managers
September 2012Weatherization Assistance Program Standardized Training Curriculum
Photo courtesy of MT Wx Training Center
2 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – December 2012 eere.energy.gov
Lead-Based Paint OverviewLead-Safe Weatherization for Crews and Managers
WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – September 2012
3 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – December 2012 eere.energy.gov
LEAD-BASED PAINT OVERVIEW
Learning Objectives
By attending this session, participants will be able to:
•Explain what lead is.
•Explain why and when lead was used throughout history.
•Describe where lead can be found today.
•Discuss the lead paint hazards faced in Weatherization.
•Discuss compliance requirements of DOE, EPA and OSHA.
4 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – December 2012 eere.energy.gov
LEAD-BASED PAINT OVERVIEW
What is Lead?
• Pb = Latin word Plumbum.
• A heavy, durable, soft gray metal.
• Does not break down or decay with time.
• A poison if inhaled or ingested.
• Is most dangerous as dust and fumes.
5 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – December 2012 eere.energy.gov
LEAD-BASED PAINT OVERVIEW
Why Was Lead Used
• Ancient Egypt – Used in sculpting and as a pigment and binder in paints. Used in Egyptian eye makeup. Used as roadway sealant. Knew it could be lethal.
• Ancient Greece – Used in sculpting. First to document lead poisoning.
• Ancient Rome – Used in pipes for water systems and to line goblets. Continued to use even though they were aware of lead poisoning.
6 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – December 2012 eere.energy.gov
LEAD-BASED PAINT OVERVIEW
Why Was Lead Used? Cont.
• Europe – Used in pipes and waterproofing roofs. Recognized health risks of lead exposure. As early as 1400 A.D. prohibited addition of lead to wine. Lead-free paints available in the 1800’s.
• United States – Lead paint promoted in advertisements even though lead poisoning was studied and documented.
Image courtesy of the National Lead Company
7 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – December 2012 eere.energy.gov
LEAD-BASED PAINT OVERVIEW
Where Can Lead be Found Today?
Photo courtesy of the Centers for Disease Control
• Imported pottery• Water pipes• Mini-blinds• Painted toys• Painted furniture• Craft products• Others
Photo courtesy of the Centers for Disease Control
Photo courtesy of the Cincinnati Children's Hospital
Photo courtesy of CPSC
Image courtesy of Mike Vogel
Photo courtesy of the Marin County Health & Human Services
8 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – December 2012 eere.energy.gov
LEAD-BASED PAINT OVERVIEW
Problems with Lead
Most problems with lead come from old paint, stains and varnishes on buildings built before 1978.
Photo courtesy of NPS.gov
Photo courtesy of US Dept. of Justice
9 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – December 2012 eere.energy.gov
LEAD-BASED PAINT OVERVIEW
Benefits of Lead in Surface Coatings
Lead was added to:
• Increase durability.
• Add color.
• Resist mold and mildew growth.
• Prevent corrosion of metal surfaces.
• Help paint dry faster.
• Lead may be found in paint, stains and even varnish.
Image courtesy of the Lead Industries Association
10 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – December 2012 eere.energy.gov
LEAD-BASED PAINT OVERVIEW
Lead-Based Paint Percent by Component – Year of Construction
11 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – December 2012 eere.energy.gov
LEAD-BASED PAINT OVERVIEW
What is Lead-Based Paint?
Federal Standards define lead-based paint as:
• Any paint or surface coatings that contain lead equal to or in excess of 1.0 milligrams per square centimeter or more than 0.5% by weight.
• Testing is the only way to determine if and how much lead is present in a surface coating.
• Some states and localities regulate paint with lower concentrations of lead.
12 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – December 2012 eere.energy.gov
LEAD-BASED PAINT OVERVIEW
Lead Paint Hazards
• Deteriorated, flaking, or peeling lead paint.
• Lead paint surfaces accessible to infants.
• Demolition exposing lead.
• Renovation exposing lead.
Photos courtesy of Marin County Health & Human Services
13 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – December 2012 eere.energy.gov
LEAD-BASED PAINT OVERVIEW
Why are Dust and Debris a Problem?
• Lead-based paint is the primary source of lead-contaminated dust in housing.
• Lead-contaminated dust is poisonous.
• Very small amounts of lead-contaminated dust can poison children and adults:
- Children swallow & inhale dust during ordinary play activities.
- Adults swallow and breathe dust during work activities.
14 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – December 2012 eere.energy.gov
LEAD-BASED PAINT OVERVIEW
Who is at Risk From Lead?
Lead Dust can harm everyone. The most vulnerable are:
•Babies.
•Young children.
•Pregnant women and their unborn babies.
•Workers.
Photos courtesy of Montana State University Extension
15 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – December 2012 eere.energy.gov
LEAD-BASED PAINT OVERVIEW
Consumer Product Safety Commission – Ban on Lead Paint
• In 1978, the Consumer Products Safety Commission (CPSC) banned the use of lead paint in residences, schools, hospitals, parks, playgrounds, and other public places; however, any home built before 1978 may contain lead-based paint.
• Lead can still be found in all types of buildings.
• Lead is still found in paint used for industrial and commercial purposes.
16 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – December 2012 eere.energy.gov
LEAD-BASED PAINT OVERVIEW
Lead Paint Hazard in Weatherization
• Weatherization IS Renovation
• Renovation activities (sawing, drillings, cutting, scrapping, etc.) that disturb lead-based paint create debris and tiny particles of dust.
• Many jobs, including Weatherization work, can expose occupants and workers to lead dust.
• Unless protected, Weatherization workers swallow and breathe poisonous lead dust during work activities.
17 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – December 2012 eere.energy.gov
LEAD-BASED PAINT OVERVIEW
Take Home Lead Exposure
Weatherization workers can be a source of lead:
• Lead dust on work clothes can contaminate cars and homes.
• Lead dust from work clothes can be transferred to the office and home; co-workers and family members including children.
Photo courtesy of MT Wx Training Center
18 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – December 2012 eere.energy.gov
LEAD-BASED PAINT OVERVIEW
Lead-Safe Weatherization (LSW)
• Lead-Safe Work Practice is not new to Weatherization.
• First defined, May 10, 2001 – Weatherization Program Notice 02-1 required LSW to be applied to pre-1978 homes.
19 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – December 2012 eere.energy.gov
LEAD-BASED PAINT OVERVIEW
EPA RRP Program
EPA EPA ““Lead, Renovation, Repair and Painting (RRP) Lead, Renovation, Repair and Painting (RRP) Program. Program.
Effective – April 22, 2010.
• “Renovation” includes weatherization.
•Requires “Certified Renovators and Firms”
•Defines required work practices and tools.
•Requires documentation.
•Enforced by U.S. EPA and “approved states”
20 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – December 2012 eere.energy.gov
LEAD-BASED PAINT OVERVIEW
DOE’s Response to RRP
WPN 08-6 – September 22, 2008.
• Interim LSW Guidance “When the EPA RRP is in full effect, DOE will require as part of it’s LSW Minimum Standards all additional requirements as outlined in the EPA RRP April
22, 2010, published rule.”
WPN 09-6 – January 7, 2009.
• LSW – Additional Materials and Information with “benchmark” LSW training curriculum.
WPN 10-6 – LSW Training.
WPN 11-6 – WAP H&S Matrix.
21 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – December 2012 eere.energy.gov
LEAD-BASED PAINT OVERVIEW
Worker Protection - OSHA
• Even if DOE and EPA did not have rules dealing with lead exposure to workers, implementing Lead-Safe Weatherization, the Occupational Safety and Health Administration (OSHA) is an agency of the Department of Labor which writes and enforces rules protecting workers on the job.
• To protect employees from lead hazards, the OSHA Lead in Construction Standard (29 CFR 1926.62) was developed. The standard became law on June 3, 1993.
• Weatherization agencies and crews must always comply to OSHA worker protection standards.
22 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – December 2012 eere.energy.gov
LEAD-BASED PAINT OVERVIEW
OSHA Compliance
Personal Air Monitoring
• OSHA has established Permissible Exposure Levels (PEL) for workers exposed to lead. These levels must not be exceeded.
• To test for lead, air is pulled through a filter which traps particles.
• The filter is analyzed by a laboratory to determine the lead concentration.
23 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – December 2012 eere.energy.gov
LEAD-BASED PAINT OVERVIEW
The 12 Core Elements of LSW
Weatherization agencies and crews must be in compliance with EPA RRP Rule, DOE LSW Standards AND OSHA
Worker Safety Rules.
24 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – December 2012 eere.energy.gov
LEAD-BASED PAINT OVERVIEW
The 12 Core Elements of LSW
1.Training for all Weatherization workers. 2.Client notification “pre-renovation education.”3.Pre-1978 lead testing or presume presence of lead. 4.Barriers and Signage to restrict occupant access5.Interior and Exterior Containment. 6.PPE/respiratory protection. 7.Safe work practices/prohibited tools and methods.8.Work-site cleanup. 9.Debris disposal10.Work-site visual inspection. 11.Cleaning verification. 12.Documentation.
25 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – December 2012 eere.energy.gov
LEAD-BASED PAINT OVERVIEW
LSW Minimum Standards
Re
See Lesson 3 of this training curriculum for a reviewof all Lead-Safe Weatherization (LSW) standards andhow LSW compares to the EPA Renovation, Repair
and Paint (RRP) Rule.
For a overview of LSW view WxTV episode“12 Steps to Lead Safety”
at www.wxtvonline.org Length : 45:26
26 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – December 2012 eere.energy.gov
LEAD-BASED PAINT OVERVIEW
Exercise
Exercise: Identifying common Weatherization practices that produce a lot of dust and debris.
45 minutes
27 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – December 2012 eere.energy.gov
LEAD-BASED PAINT OVERVIEW
Exercise
Identifying common Weatherization practices that produce a lot of dust and debris.
Rank the work practice descriptions according to the amount of dust and paint chips you think they make. In the table on the next slide, under the column labeled “rank,” write:
•1 next to the work practice that makes the most dust.
•2 next to the work practice that makes the second most dust.
•3 next to the work practice that makes the third most dust.
•Continue to rank until you have ranked each work practice. Some practices may be given the same rank.
28 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – December 2012 eere.energy.gov
LEAD-BASED PAINT OVERVIEW
Exercise
1.For the work practice(s) that you ranked #1, tell why you think it makes the most dust and debris.
2.For the work practice(s) that you ranked last, tell why you think it makes the least amount of dust and debris.
3.If you actually did any of the jobs described above, what would you do to clean up when the job was finished?
29 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – December 2012 eere.energy.gov
LEAD-BASED PAINT OVERVIEW
Points for Discussion
1.Does it make a difference if there is a lot or a little lead dust generated?
2.Why should Weatherization crews be aware of the physical condition of a home before conducting an audit?
3.How does the amount of lead dust generated by Weatherization activities depend upon the work practices?
30 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – December 2012 eere.energy.gov
LEAD-BASED PAINT OVERVIEW
Summary
• Lead is a heavy metal and a dangerous poison.
• Lead can be found in paint on homes, buildings, furniture, toys, cars, bridges, etc.
• Weatherization agencies and crews must be in compliance with EPA RRP Rule, DOE LSW Standards AND OSHA Worker Safety Rules