wayneroberts resume 2011 - 2016 310316
TRANSCRIPT
WAYNE ROBERTS
RESUME
QUALIFIEDBOILERMAKER/FABRICATOR
Phone: 0417176627 or (08) 97959251Address: 24 Wornt Rd, Dalyellup WA 6230E-mail: [email protected] Number: 6453008 class C WA______________________________________________________________________________
REFERENCE: PETER MUNN – 040 256 8436
Work HistoryJANUARY 2016 – PRESENT BOILERMAKER/WELDER
CENTRAL SYSTEMS – ROY HILLFabrication and InstallingPainting Hand rails
Primary CrusherPreparation and welding of new installations parts
Site Contact - Robbie Jones 043 720 6088 Supervisor
______________________________________________________________________________
Work HistoryOCTOBER 2015 – DECEMBER 2015 BOILERMAKER/WELDER
TECHFORCE/DECMIL – ROY HILLFabrication and InstallingHand railsFloor penetrationsSupports and pipes
Site Contact - Boz 043 772 9914 Site Supervisor
______________________________________________________________________________
Work HistorySEPTEMBER 2015 BOILERMAKER/WLEDER
CCR - SAMCOASMELTER MAINTENANCE
Site Contact - Matt – 044 853 3066
______________________________________________________________________________
Work HistoryMAY 2015 – AUGUST 2015 PIPEFITTER
CIVMEC – ROY HILLPiping Planning and Preparing Pipe works and ductingInstallation of Poly pipesVictaulic pipes 4” and 6”Reading of drawings – structural and isometric
Setting up pipe store
BoilermakingModification and installation of conveyor belt guard postsRoller framesManufacturing of splice platesModification of handrailsInstallation and manufacturing of cable tray (pipe tray)Repair of digger bucketReading of drawings – structural and isometric
MechanicalInstallations Jacking plates on indexer and outdexerShim on the roller framesPull cable on take up trolley, replacing of hold down boltsAdjusting of Tail pulleyReplacing of hold down and jacking boltsReplacing bolts on car dumper cellAdjusting and leveling of FestoonsTorque up bolts with pneumatic torque wrenchReading of drawings – structural and isometric
Site Contact - Warren Corterill 041 795 6069 Construction ManagerColin 049 932 5904 Mechanical - SupervisorDean Doyle 041 486 3637 Piping - SupervisorPhil Slater 043 768 8359 Deputy Project Manager
JUNE 2014 – APRIL 2015 PIPEFITTERCIVMEC – YANDI
Pipe InstallationsModifications and installations of all pipingBig bore and small boreScrew pipe
Ducting and Support Installation and modificationsShut Down preparation and completionAssisting rigger with pipe rigging and structural installations
Acting Leading hand of a crew of fourLiaise with Engineers and Client regarding TQ and SI’sPlan and ordering for all requirements for jobs assigned to my work area, internal and externalWelding of ducting and supportsManufacturing of screw pipe and butt weld manifoldsModifications of grid meshDaily reportsTime sheetsPermitsReading of drawings – structural and isometric
CommissioningCompletion of all outstanding pipe workModifications of site instructions
Nigh shift CommissionAssisting mechanical fitter to align pumps and install V beltsCleaning of ore spillage on trial runs
______________________________________________________________________________Work HistoryMARCH 2014 – MAY 2014 HEAVY DUTY BOILERMAKER/WELDER
HAMPTON MINING AND CIVILSBucket RepairsHill blocks, bucket teeth, Work plates, repairing cracks
LoadersCutting edges
RepairsHydraulic arm on graderStabilizer arm on dozerRoad train trailerManufacturing sumo for workshop pit
Assisting FittersHydraulic leaksInstall hydraulic pumpsReplace brakes and hubsAssisting LV fitters with various tasks
Site Contacts – Pat Bruke 047 728 9499 Peter 041 709 1081______________________________________________________________________________
Work HistoryJULY 2013 – FEBRUARY 2014PIPEFITTER/LEADING HAND
FORGE GROUP NEWMAN KBR FUEL HUBS
Upgraded as of January to leading hand
Pressure and leak testingManufacturing of Pipelines (butt welds)2”, 3”, 4”, 5”, 6” and 8” schedule 40 1” and 4” schedule 80Schedule 40 elbows2” Stainless schedule 4040mm schedule 801” socket welds 45 and 90 degrees1½” socket welds 45 and 90 degreesSocket weld valvesManufacturing of expansion joints on pipelinesWeld neck flanges 150nb 2”, 4”, 5”T pieces schedule 40 2”Socket welds 1” T pieces schedule 40150nb slip on flanges 1”300nb slip on flanges 1”Thread olet ¾ and 1”Weld olet 1”
Manufacturing of Threaded PipesScrew pipes schedule 40 Galvanised – 3/4”, 1”Screw pipes schedule 40 stainless – 1”
Punch ListingPunch listing – leading handPaintingTaggingManufacturing and Installation of access doors on staircase, brackets and drainsAltering of pipelines – 1”, 2” and 3”Wrapping insulation around pipesInstallation of hand rails and basins, pipe meshCutting shorter of studsFabrication of supports, hose standsFlange managementModification of light posts
Stand in as Leading Hand before upgraded in January 2014Guiding of crewChristmas break cyclone tie downGetting drawings from officeLiaising with EngineersWhile leading hand was on R&R
Site contacts COBUS VAN ROOYEN – 045 848 0421 CONSTRUCTION MANAGER______________________________________________________________________________
Work HistoryJUNE 2013 – JULY 2013 BOILERMAKER/WELDER
TRANSFIELD WORLEY SERVICES MUJA POWER STATION
Assist fitter to remove actuator on B turbineManufacturing of D9 damper skin casing (oxy cutting)Assisting boilermaker welder to dog and wedge in skin casing platesModifying (grinding cutting stick and mig welding) and installing hot air ducts on mill A, B, C, D Calculating measurements on the hot air ducts
Site contacts DAVE BERRY – 043 792 2529 SUPERVISOR______________________________________________________________________________
Work HistoryAPRIL 2013 - JUNE 2013 BOILERMAKER
ECM YARRALYI MAY PROJECT KARRATHA
Welding in staircase and cleats on structures to access platforms. Tacking in access laddersManufacturing and installations of pipe supports (welding and drilling)Modifications of handrails and lamp postsBuilding and installation of cable ladders and bracketsFabricating of 1” stainless steel pipe linesInstallation of mount down bolts for fire hydrant cabinetEWP spottingFirst AiderIsolation officerFire watchBus driver Punch listing itemsRepairing of floorGrid mesh removal and reinstallationRigging assistance,
Site contacts MICK HIRSCH – 040 818 9185 RIGGING SUPERVISOR
______________________________________________________________________________
Work History
JANUARY 2013 – MARCH 2013 BOILERMAKER TR7 – RCR - SOLOMONS
FINES CRUSHERSource and refabricate belt feed stoppersWelding: Checkered plates beneath belt feedersNuts on guard postsRepairing stud on fines crusherFabricatingDucting supportsInserts for checkered plating on floorFlange for ductingsCut anchor supports for cyclone preparationSortingDucting pipes and guard posts and installing themLiaising with supervisorsLiaise with rigging supervisor for mobile transportRemovingTemporary stoppers and install new stoppersTemporary ducting supports
Tie down grid mesh
FAR AWAY DOWNSFabricating and installingTemporary supports for dust coversRemoval of temporary supports and reinstalling new supports (welding and drilling)Clamps for conveyor belt (temporary)Dust spray booth for the vaultModifyingShoot on transfer station (2700),View port cover on conveyor beltHoles in dust suppression inside vaultRemoving and installationSlip strips on stair caseReplace incorrect structural boltsInstall dust spray booth.
DRY SCREENINGModifying and installationShoot linersDrive motor standsVibration screens to install springs,26mm steel pull wire ropePunch ListHand railsStaircaseRepair of counter weightsRepair of guards and rock mesh,
Site contacts DEON DAMON – 046 707 3663DENZIL FREDERICK – 043 994 6325
______________________________________________________________________________Work HistoryNOVEMBER 2012 – DECEMBER 2012 BOILERMAKER
ECMCLOUDBREAK - FMG
FabricationCable ladders and brackets
Welding Cable ladder and bracketsSite contact JOHN CRICHTON – SUPERINDENTANT
0407 087 869GEOFFREY YEO – FOREMAN0448 040 986
______________________________________________________________________________Work HistoryAUGUST 2012 -NOVEMBER 2012 BOILERMAKER
SPANNAS ENGINEERINGNULLLAGINE - MILLENIUM
Supports, pipe ladders Polywelding – 255 and 160 SDR11 dcam line and tail ends
BOILERMAKER SPANNAS ENGINEERING
WORKSHOPBuilding workshop containerBuilding trollies for the 600 welding machinesAssisting in fabricating of 800 pipeModifying trailers355 and 500 pipe lines SDR11160 SDR11 gas line – Albany200 irrigation repair
BOILERMAKER SPANNAS ENGINEERING
CUE – SILVER LAKES MINE
90mm, 63mm and 32mm SDR17 water lines for service points.Hydro lines 160 SDR11 Writing and maintaining of stock systemsMaintaining of the computersSite establishment
BOILERMAKER SPANNAS ENGINEERING
DORRAL MINE
Replacing of hopper feed pipeBERNIE KENNEDY – 041 993 0495Work HistoryFEBRUARY 2012 – AUGUST 2012 BOILERMAKER
KING SPRING CONTRACTING
Building guards and structural beamsPatio framesDust cover framesModifying of truck ramp and expansion below
BOILERMAKER KING SPRING CONTRACTING
CLIENT EDNA MAY GOLDMINE Building guardsModifications of flangesInstallations of values and air bleeds on Polyprop linesBuilding and Installing of drip trays – stainless steelInstallation of stainless brackets, pressure vessel, surge tank, stainless steel drip trays and pipes to the scar damCommissioning of pipe lines
BOILERMAKER KING SPRING CONTRACTING
MUJA POWER STATION
Drawn up the drawings for the conveyor safety guards as well as manufacturing the guardsModifications of shoot skirtings and grid mesh on flooring
BOILERMAKER KING SPRING CONTRACTING
MEEKATHERA – KENTOR GOLDBuilding brackets, Cable racksInstallation of pipe racksPolywelding : 32, 63,90,110,160, 250, SDR11
High temperature under the gold room – 63,90,110
Galvanised pipe: 1” at pump area
Site Contact- Supervisor – Bernie Kennedy – 041 993 0495
King Spring Contact - Bradley Gregg – 0402 669 702Mick Humphries – 0400 798 157
Reason for leaving- Retrenched
Work History
SEPTEMBER 2011 – DECEMBER 2011 BOILERMAKER STEINMULLER AFRICA
Assembling of registers to compile the boiler wall Squaring of the wallMarking off all attachments including cut outs Refitting of bendsInstallation of boxes for man holes and soot blowers, leak detector pipes and temperature view Offset bends and Fin barsModification of the registers and scholar plates Booking quality inspections of completed work Substitute for absent charge hand. Morning health and safety talk
Materials used: 13 and 16 nominal chrome, chrome and libus.
Reason for leaving - Visa for migration to Australia was approvedContact - Nelson - +27 83 624 9161/Frans +27 72 230 5203
Work HistoryAUGUST 2010 – APRIL 2011 PLANNER/FACTORY SCHEDULER/SAFETY
MANAGER/QA QC MANAGERFORMQUIP
Implementing of the QA QC system: including writing of all the policies and procedures documentation as well as the training of these.Planning of all material required for all work receivedOrdering of material for the 30 staff members to do prep work for all jobs Supervising preparation teamImplementing of the safety policies and proceduresHelping hands on with assembly and preparations where neededStanding in for the logistics manager in his absence.
Systems used - MS Projects
Reason for leaving - Company was liquidatedManufacturing and installation of all piping on the sag and bore mill and supports42mm, 30mm 4” 6” pvc and steel pipingLiaising with scaffolding company to erect scaffolding,Responsible for 3 crew members.
Reason for leaving - Better job opportunityContact - Johan Jooste +27 78-988-1304
Computer Skills
Excel, Word, Powerpoint, Access, Micro soft email, windows XP & 7, autocad, MS Projects
Licenses and CertificatesHealth and safety representative course
Qualifications
BOILERMAKER/FABRICATOR/GENERAL PURPOSE WELDER
______________________________________________EducationVereeniging Technical High schoolGrade 11Subjects: Mathematics, Technical Drawing, Electrical Trade theory and Practical, Science, English, Afrikaans
Port Shepstone Technical CollegeN1 and N2 Electronic PracticalSubjects: Mathematics, Science, Electronic Theory, Electrical Trade History
Centurion College PretoriaN3Subjects: Mathematics, Science, Electrical Trade HistoryDamelin College PretoriaVisual Basic 6
IRCAHealth and Safety Representative
EWP ticketConfined space Ticket ForkliftWhite CardAustralian standard Trade CertificateMiner’s health cardWorking at Heights Ticket (Rio Tinto Gap Training)Lock Holders Level 2 (Rio Tinto)Isolation Officer (Rio Tinto)Senior First AiderHSE Induction (Rio Tinto)OPF induction FMGPortable Fire Hydrant Equipment