WATERMAN GROUP ON BEHALF OF ACCESS SELF STORAGE NO 1 NESTLES AVENUE, HAYES, PLANNING APPLICATION MAY
2017
ENVIRONMENTAL STATEMENT : NON TECHNICAL SUMMARY
NO1AVENUENESTLES
Client Name: Access Self Storage
Document Reference: WIE10928-100-R.1.1.1_ES_NTS
Project Number: WIE10928
Quality Assurance – Approval Status
This document has been prepared and checked in accordance with Waterman Group’s IMS (BS EN ISO 9001: 2008, BS EN ISO 14001: 2004 and BS OHSAS 18001:2007)
Issue Date Prepared by Checked by Approved by
First May 2017 Ellen Smith
Senior Consultant
Peter Gardner
Principal Consultant
Patrick Duffy
Technical Director
Comments
Disclaimer
This report has been prepared by Waterman Infrastructure & Environment Limited, with all reasonable skill, care and diligence within the terms of the Contract with the client, incorporation of our General Terms and Condition of Business and taking account of the resources devoted to us by agreement with the client.
We disclaim any responsibility to the client and others in respect of any matters outside the scope of the above.
This report is confidential to the client and we accept no responsibility of whatsoever nature to third parties to whom this report, or any part thereof, is made known. Any such party relies on the report at its own risk.
Contents
Environmental Statement: Non-Technical Summary
Document Reference: WIE10928
WIE10928-100-R.1.1.1_ES_NTS N:\Projects\WIE10928\100 Access Self Storage\07_REPORTS\WORKING DRAFTS\03 ES\NTS\WIE10928-100-
R.1.1.1_ES_NTS.docx
Contents
1. Introduction ................................................................................................................................. 2
2. The Existing Site and its Surrounding Content ....................................................................... 3
3. What are the Proposals? ........................................................................................................... 4
4. Alternatives and Design Evolution ........................................................................................... 8
5. Approach and Environmental Impact Assessment Methodology ......................................... 9
6. What are the Likely Significant Environmental Effects and How Would They Be Minimised? ........................................................................................................................................ 10
7. What Will Happen Next? .......................................................................................................... 17
No.1 Nestles Avenue
Environmental Statement: Non-Technical Summary
P a g e | 2
N:\Projects\WIE10928\100 Access Self Storage\07_REPORTS\WORKING DRAFTS\03 ES\NTS\WIE10928-100-
R.1.1.1_ES_NTS.docx
1. Introduction
Access Self Storage (hereafter referred to as the ‘Applicant’) is seeking to obtain detailed planning
permission residential-led mixed use development at the junction of Station Road and Nestles
Avenue, Hayes (hereafter referred to as the ‘Site’). The Site covers an area of 0.6 hectare (ha) and is
within the administrative boundary of the London Borough of Hillingdon. It is currently occupied by a
two storey storage facility and office building owned by Access Self Storage with surrounding areas of
hardstanding. A total of 30 car parking spaces are present at ground level.
The Site is part of a Wider Development Area including the former Nestlé chocolate and coffee factory
and the Buccleuch Properties owned land which are also proposed for residential led mixed use
development.
The proposed redevelopment, known as No.1 Nestle Avenue (the ‘Development’), includes the
demolition of all buildings and provision of 164 residential units, residential amenity (including a gym),
café, office, self-storage, communal amenity space and enclosed play space, employee car parking
and cycle parking facilities. This would be developed within three blocks. Demolition and mobilisation
works are expected to commence in winter 2017. An overall programme of 42 months is estimated
with construction works anticipated to last from summer 2018 to summer 2021.
As part of the detailed planning application an Environmental Impact Assessment (EIA) has been
undertaken. EIA is a formal procedure that must be followed for certain types and scales of
development, where the likely significant environmental effects of the development are systematically
assessed and reported. The purpose is to ensure that appropriate information about the likely
environmental effects of the Development is available for consideration by the relevant Local Planning
Authority (LPA), consultees and the public, and that the LPA has this information before it determines
a planning application. The EIA process can also identify ways in which the development can be
modified, or likely significant adverse effects mitigated, so as to reduce or avoid likely significant
adverse effects and to create and enhance beneficial effects. The legislation relevant to EIA is the
Town and Country Planning (Environmental Impact Assessment) Regulations, 2011 (as amended
2015) (the EIA Regulations).
The findings of the EIA are reported in an Environmental Statement (ES), which has been prepared by
Waterman Infrastructure & Environment Ltd (IE) to accompany the detailed planning application. The
likely significant environmental effects of the Development, both during the demolition and
construction stage, and once completed and operational, have been assessed. This document
provides a summary of the findings of the EIA in non-technical language.
No.1 Nestles Avenue
Environmental Statement: Non-Technical Summary
P a g e | 3
N:\Projects\WIE10928\100 Access Self Storage\07_REPORTS\WORKING DRAFTS\03 ES\NTS\WIE10928-100-
R.1.1.1_ES_NTS.docx
2. The Existing Site and its Surrounding Content
The Site is located to the south of Hayes town centre on the western edge of Greater London. The
Site is at the junction of Nestle Avenue and Station Road located south of the mainline railway that
goes into/out of Paddington Station and from/to places such as Reading and Oxford. The Grand
Union Canal is located 80 metres (m) north of the Site beyond the railway line.
A plan showing the location of the Site is presented in Figure 1. The planning application boundary
of the Site is shown in Figure 2. The Site is bounded by:
a Network Rail owned car park between the northern boundary of the Site (proposed for
redevelopment) and the Great Western railway line further north;
land owned by Buccleuch, currently a motor museum and Claremont House, proposed for
residential led mixed use redevelopment to the east;
Nestle Avenue, a residential street to the south; and
Station Road to the west.
The Site is located within the strategic employment and Hayes Growth Area and designated suitable
for mixed use development within the London Borough of Hillingdon Local Plan.
The Site is located in a residential and commercial area close to the Reading to London mainline.
There are numerous shops within 500m including a Tesco express and ASDA superstore. As noted
previously, the Site forms part of the ‘Wider Development Area’, which includes the former Nestle
factory and land owned by Buccleuch. Numerous other developments are either underway or
proposed in the area around the Site. The Old Vinyl Factory on Blyth Road is currently being
development as an ‘incubator’ for high-tech businesses. Trident House and Waterside Developments
are other regeneration initiatives nearby and the Crossrail new station is proposed on the northern
boundary of the Site.
Figure 1: Site Location Figure 2: Site Boundary
No.1 Nestles Avenue
Environmental Statement: Non-Technical Summary
P a g e | 4
N:\Projects\WIE10928\100 Access Self Storage\07_REPORTS\WORKING DRAFTS\03 ES\NTS\WIE10928-100-
R.1.1.1_ES_NTS.docx
3. What are the Proposals?
The planning application includes proposals drawn in detail, forming a set of planning application
drawings, which have been submitted to LBH for approval as part of the detailed planning application.
The Development includes the demolition of the existing structures on-site and seeks the
redevelopment of the Site to incorporate the construction of three blocks (five buildings in total)
referred to Buildings A, B and C. The three basement levels, ground level and first level run the full
extent of the Development and join all three blocks together. The second floor will be a podium level
that provides public realm. From this level upwards the Blocks become independent buildings. Figure
3 shows the layout of the proposed buildings within the Site and Figure 4 shows an illustrative view of
the proposed Development.
The Development would provide:
164 residential units and residential amenity space, including a mini theatre, gym and communal
meeting areas;
1,349 (GIA) square metres (sqm) of office use;
119 (GIA) sqm of café use;
10,478 (GIA) sqm of storage use;
a total of 230 sqm play space on the podium levels;
car parking and ancillary space; and
public realm and pedestrian/cycling improvements.
Figure 3: Proposed Layout of the Development (roof level plan)
No.1 Nestles Avenue
Environmental Statement: Non-Technical Summary
P a g e | 5
N:\Projects\WIE10928\100 Access Self Storage\07_REPORTS\WORKING DRAFTS\03 ES\NTS\WIE10928-100-
R.1.1.1_ES_NTS.docx
Figure 4: Illustrative View of the Development
Block A would be located in the south west of the Site close to the junction of Station Road and
Nestle Avenue. Block A consists of two joined hexagonal shaped buildings, one 11 storeys and one 8
storeys in height above ground level, which would reach a maximum height of approximately 67.85 m
Above Ordnance Datum (approximately 35.13 m from ground level). The ground floor building
footprint of Block A will contain the front of house and offices utilised by Access Self Storage as well
as a double height café and single height gym. Floor one contains more of the gym, cycle storage, and
a meeting room and common room for residents. Level 2 upwards is a mixture of studio, 1 bed, 2 bed
and 3 bed apartments. This block will have a ‘Viewing Roof Garden’ roof on the higher section and a
‘Wellness Roof Garden’ roof on the lower section.
Block B, located to the northern portion of the Site, is the nearest block to the railway line. Block B is
formed of two joined hexagonal shaped buildings, one 11 storeys high and one 8 storeys high above
ground level, which would reach a maximum height of 67.845 m Above Ordnance Datum (35.14 m
from ground level). The ground floor building footprint of Block B is office space and associated
amenity space plus residential bin store. The first floor of Block B is a mixture of office and residential
entrance lobby. Level 2 upwards is a mixture of studio, 1 bed, 2 bed and 3 bed apartments plus a mini
theatre. This block will have photovoltaics on a sedum roof on the higher section and a ‘Growing Roof
Garden’ roof on the lower section.
Block C, located to the south-eastern portion of the Site, is on the junction of Nestle Avenue and
Gilbert Place. Block C will be an elongated hexagon shape of 8 storeys at its highest with a 7 storey
section, which would reach a maximum height of approximately 58.98 m Above Ordnance Datum
(approximately 24.88 m above ground level). Ground floor and first floor will be offices with plant
beside the gated entrance to the secure parking area on the ground floor. Level 2 upwards will be a
mixture of 1 bed, 2 bed and 3 bed apartments. The majority of the roof space will be designated as a
‘Sensory Roof Garden’ with a ‘Terrace’ at the lower level.
No.1 Nestles Avenue
Environmental Statement: Non-Technical Summary
P a g e | 6
N:\Projects\WIE10928\100 Access Self Storage\07_REPORTS\WORKING DRAFTS\03 ES\NTS\WIE10928-100-
R.1.1.1_ES_NTS.docx
The Development would provide a total of 111 car parking spaces, which includes 76 car parking
spaces for residential tenants, eight accessible car spaces, five car parking spaces for residential
visitor spaces, seven residential motorcycle spaces (1 per 20 cars), one general delivery space, one
commercial articulated lorry space, four Large Goods Vehicle (LGV) spaces, six commercial visitor
spaces, and one general accessible visitor space, one club car space and one general visitor or
delivery space. Car parking spaces would be provided in Basement Level 1 for the residential tenants
and on the ground floor for delivery and servicing vehicles. In addition, a total of 311 cycle parking
spaces would be provided.
Three new levels of basement, covering the full extent of the Development will require ~14m of below
ground level excavation to accommodate the existing Access Self Storage business and provide car
parking for residents. Basement level 3 will be all storage space (3,062 sqm Net Internal Area (NIA)).
Level 2 will have 2,721 sqm NIA of storage space plus a boiler unit and Combined Heat and Power
System (CHP) under Block A, air handling plant under Block B and cold water, mechanical and fan
plant under Block C. Basement level 1 will contain 76 spaces of residential parking.
A total of 2,478 sqm of public realm would be provided across the Development. Public realm would
mainly be located at ground level within Gilbert Place and along Nestle Avenue. A ‘pocket park’
consisting of hard and soft landscaping would be created between Blocks A and B along Station Road
on the first floor. A second area around the north western and western faces of Block B will be public
realm as an accessible level for pedestrian access from Station Road.
As part of the Development a number of street trees would be provided within the podium level. New
habitats would be introduced to the Site on the podium and in roof garden areas.
Vehicle access to the Site would be from Gilbert Place and no changes to the existing highway
network are proposed. Vehicles would access the secured ground and basement car park via a two-
way entrance from Gilbert Place. Residents parking in Basement Level 01 would access this level via
the ramp from the ground floor to basement level 1. The Access Self Storage vehicles would use the
same gated access but remain on the ground floor. Larger delivery articulated vehicles would turn off
Nestle Avenue into a specifically designed bay on the south side of the Development for unloading
into lifts to the basement levels.
A detailed surface water drainage strategy has been developed which includes the use of permeable
paving to store rainfall and control the rate of discharge of this water to the local sewer network. This
would lead to a reduction in the surface water run-off from the Site by 50% compared to the existing
situation.
Waste storage and management facilities would be provided in accordance with LBH standards. All
three residential blocks would have their own dedicated waste storage areas accessed directly from
the stair/lift cores. Waste storage facilities would be sized to accommodate at least two separate
waste streams to allow the segregation of general waste and recyclable materials. A Site Waste
Management Plan (SWMP) would be produced detailing how waste will be disposed and managed
during demolition and construction. The SWMP will ensure that waste production is minimised and
that recycling and re-use is maximised through monitoring, recording, sorting and separating waste
wherever practically possible.
It is proposed that a Construction Management Plan (CMP) would be prepared for the Development.
The CMP would include details of relevant environmental management controls necessary for
environmental protection during the demolition and construction works.
No.1 Nestles Avenue
Environmental Statement: Non-Technical Summary
P a g e | 7
N:\Projects\WIE10928\100 Access Self Storage\07_REPORTS\WORKING DRAFTS\03 ES\NTS\WIE10928-100-
R.1.1.1_ES_NTS.docx
Following planning approval, which is anticipated to be in Autumn 2017, demolition and mobilisation
works are expected to commence in winter 2017. An overall programme of 42 months is estimated
with construction works anticipated to last from summer 2018 to summer 2021.
No.1 Nestles Avenue
Environmental Statement: Non-Technical Summary
P a g e | 8
N:\Projects\WIE10928\100 Access Self Storage\07_REPORTS\WORKING DRAFTS\03 ES\NTS\WIE10928-100-
R.1.1.1_ES_NTS.docx
4. Alternatives and Design Evolution
In line with the EIA regulations, the ES provides a description of the main alternatives to the Development
which were considered by the Applicant. In addition, a description of how the design of the Development
evolved over time is presented.
No alternative development sites were considered by the Applicant because the Site is already identified
as a Site for redevelopment by LBH in their Local Plan Part 2 Draft Proposed Site Allocations and
Designations (2013). Although other sites near the station have also been identified as development
sites, these are considered as additional sites for other developments rather than alternative sites for this
development.
Guidance on the preparation of an ES stipulates that it is good practice to consider the evolution of a site
in the absence of specific proposals, i.e. the 'No Development' Scenario. The ‘No Development’ scenario
is based on leaving the Site in its current state. It is considered that under this scenario, the Site would
remain as a commercial only site and without redevelopment would lead to a number of missed
opportunities including the provision of new homes, play spaces, café, gym and public realm, as well as
increased public connectivity and environmental and landscaping improvements.
On establishing the need and acceptability for a residential-led mixed-use scheme, the Applicant and their
design team worked up a Development in which the overall design, massing, external materiality and
landscaping was informed by the Site’s constraints and opportunities; particularly those relating to
townscape and visual matters, microclimate, and pedestrian permeability. The final Development design
emerged as a result of these factors together with an extensive programme of consultation with officers at
LBH and other statutory and non-statutory consultees.
No.1 Nestles Avenue
Environmental Statement: Non-Technical Summary
P a g e | 9
N:\Projects\WIE10928\100 Access Self Storage\07_REPORTS\WORKING DRAFTS\03 ES\NTS\WIE10928-100-
R.1.1.1_ES_NTS.docx
5. Approach and Environmental Impact Assessment Methodology
The EIA was undertaken in accordance with the EIA Regulations and best practice guidance using
established methods such as site surveys, reviews of available reports and data, computer modelling,
consultations with relevant organisations and specialist assessments.
The first stage of the EIA process involved undertaking a ‘Scoping Study’. The purpose of the
Scoping Study was to identify the likely significant environmental effects that could arise from the
Development and therefore provide the focus of the EIA. An EIA Scoping Report was submitted to
LBH in May 2016, to provide LBH and the relevant statutory consultees with an opportunity to
comment on the content and the methodology to be used for the EIA. The scope of the EIA was
formally agreed with LBH via their formal ‘Scoping Opinion’ which was received on 12th July 2016.
The Scoping process confirmed that the Development would likely give rise to a number of issues
which need to be considered in the EIA. These comprise:
Ground Conditions and Contamination;
Transportation and Access;
Air Quality;
Socio-economics;
Archaeology;
Water Resources and Flood Risk;
Daylight, Sunlight, Overshadowing and Solar Glare;
Townscape and Visual; and
Cumulative Effects.
Each of the above issues are addressed in the ES, with a chapter dedicated to each of these issues
(with Townscape and Visual forming Volume 3 of the ES due to its size). In each chapter, a
description of the assessment methodology is given together with a description of the relevant
environmental aspects of the Site and surrounding area. This is followed by an assessment of the
likely significant effects of the Development (both beneficial and adverse) and any measures that
should be adopted to reduce or offset any significant adverse effects identified during the assessment.
The ES also provides an assessment of the residual effects that would remain after mitigation
measures have been implemented, as well as the cumulative effects of the scheme. Cumulative
effects can arise due to the combination of individual effects (e.g. dust and noise during construction
works) or as a result of a combination of effects from several developments.
Where adverse or beneficial effects have been identified these have typically been assessed being
either:
insignificant - no significant effect (either adverse or beneficial) to an environmental resource or
receptor;
effect of minor significance - slight, very short or highly localised effect of low significance;
effect of moderate significance - noticeable effect (by extent, duration or magnitude) which may
be considered significant; and
effect of substantial significance - considerable effect (by extent, duration or magnitude) of more
than local significance or in breach of recognised acceptability, legislation, policy or standards.
No.1 Nestles Avenue
Environmental Statement: Non-Technical Summary
P a g e | 10
N:\Projects\WIE10928\100 Access Self Storage\07_REPORTS\WORKING DRAFTS\03 ES\NTS\WIE10928-100-
R.1.1.1_ES_NTS.docx
6. What are the Likely Significant Environmental Effects and How
Would They Be Minimised?
Ground Conditions and Contamination
A ground conditions and contamination assessment has been undertaken to establish the likely
contamination risks posed to construction site workers, future occupants of the Development, surface
water resources, groundwater and fauna and flora. The assessment involved the use of a range of
information sources including a review of historical maps, geological maps and ground investigations
undertaken for the Site.
Historical records indicate that previous on-site land use included a road embankment and a depot;
with railway sidings which subsequently became the Network Rail car park along the northern
boundary. During World War One, the Site and Wider Area was occupied by a Munitions Filling
Factory, with the Site being occupied by the main office.
Due to the presence of buildings over the majority of the Site, the ground investigation survey was
limited to the edges of the Site. The survey recorded a man-made layer containing contaminates in the
first one to two metres, over old river floodplain soils underlain with a layer of clay up to 50m thick. An
isolated area of perched ground water was recorded at ~4m below ground in the old river soils, with a
larger aquifer located 15m below ground. The Site lies about 200m south west of the Grand Union
Canal, and approximately 800m north west of the River Crane.
The majority of the ground will be excavated to form a 15m deep basement, thereby removing
contaminated material. Landscape areas would either be capped and covered by clean soil or covered
by hard standing, removing the contamination risk once the Site is complete. However, during
construction, the contamination beneath the Site could have adverse effects to construction workers,
neighbours (through dust), surface drainage and both shallow and deeper groundwater and should be
quantified as part of a geo-environmental investigation to inform protection measures during
construction. Potential effects on workers, the (current & future) environment and future occupants
have been examined and mitigation in line with CLR11 requirements recommended.
A potential effect to the completed Development from ground gas arising from the surrounding
contaminated land was identified. As part of the geo-environmental investigation, mitigation measures
could be defined in the detailed basement design if required.
It is expected that a Verification Report will provide the evidence needed for Regulators/Planners to
confirm that all risks have been minimised in accordance with current legislation and technology.
Unexploded Ordnance was identified as a risk and so measures have been recommended to identify
and, if required, control this risk.
Following completion of the Development and implementation of remedial measures there would be
negligible effects to all receptors identified.
Transportation and Access
The effects of the Development on the local highway and public transport networks have been
quantified in a Transport Assessment (TA) and the Development will be supported by a Travel Plan.
The main construction phase effects of the Development include the increase in construction traffic
and any temporary changes to waiting, loading and pedestrian crossing facilities. These effects could
increase severance (high traffic levels or speeds creating a physical and/or psychological barrier to
No.1 Nestles Avenue
Environmental Statement: Non-Technical Summary
P a g e | 11
N:\Projects\WIE10928\100 Access Self Storage\07_REPORTS\WORKING DRAFTS\03 ES\NTS\WIE10928-100-
R.1.1.1_ES_NTS.docx
mobility), driver and pedestrian delay and accidents and decrease pedestrian amenity with an
additional effect on pedestrian fear and intimidation. These effects will be effectively managed by way
of a Construction Logistics Plan (CLP), which will include matters such as vehicle routeing, hours of
access, vehicle call up procedures, appropriate arrangements for pedestrians and suspension of
parking to ensure safe access and reduced congestion.
Once occupied the Development will result in a minor increase in traffic on the local network and will
contribute towards an enhanced walking and cycling environment. In combination with a Travel Plan,
the Development will have no noticeable effect on severance, driver and pedestrian delay and
accidents, while having a beneficial effect of minor significance on pedestrian amenity and pedestrian
fear and intimidation.
The Development provides car parking quantum in-line with LBH’s standards. Where this is not the
case for the storage areas, parking is provided based on evidence from the existing Site’s parking
capacity and demand. The Site is located in an area of excellent connectivity to public transport as
evidenced by Transport for London (TfL)’s PTAL measures where the Site scores 6b, with 1 being the
lowest level of public transport and 6b being the highest. Cycle parking is provided to the standards
set out in the London Plan and the Development will contribute towards improvements to the walking
and cycling environment. The proposed Development therefore accords with the National Planning
Policy Framework and is consistent with the Mayor’s London Plan and Hillingdon’s Local Plan.
Air Quality
The main likely effects on local air quality during construction relates to dust. However, nuisance
caused from dust, is only likely to be experienced by those living within 200m of the Site boundary. A
range of measures to minimise or prevent dust would be implemented and it is considered that
following mitigation measures the effects from nuisance dust emissions would be insignificant.
Air quality computer modelling has been undertaken of the construction traffic. This has found that,
based on professional judgement, the overall effect of construction vehicles entering and egressing
the Site during the construction period would in the worst-case, be insignificant.
In accordance with the London Plan all construction plant would need to adhere to the emissions
standards for nitrogen dioxide (NO2) and particulate matter (PM10) set out for non-road mobile
machinery. These emissions standards are likely to be included as part of the planning conditions
attached to the planning permissions. It is therefore considered the likely effect on local air quality
would be insignificant.
Computer modelling has been carried out to predict the effect of future traffic-related exhaust
emissions and heating plant emissions on local air quality following the completion of the
Development. The effect of the Development on local air quality has been predicted for several
existing residential locations surrounding the Site and for future users of the Development.
Following completion of the Development, and considering uncertainty in future nitrogen oxides (NOx)
and NO2 reductions, the Development is predicted to have an insignificant effect on NO2, PM10 and
PM2.5 concentrations, at all existing receptors considered.
The Development has been designed to minimise exposure of future occupants of the Development
with residential uses located above ground level. In addition, the Development will have a mechanical
ventilation system, which will be fitted with filters to remove the excess NO2 from the air prior to
ventilating the units. Therefore, the effect of introducing residential uses to the Site is insignificant.
No.1 Nestles Avenue
Environmental Statement: Non-Technical Summary
P a g e | 12
N:\Projects\WIE10928\100 Access Self Storage\07_REPORTS\WORKING DRAFTS\03 ES\NTS\WIE10928-100-
R.1.1.1_ES_NTS.docx
Socio-economics
During demolition and construction, the Development would provide economic benefits to the Local
Area, creating 1,780 person years of employment over the three year build period. This could
potentially generate in the order of 595 full time jobs during the construction period.
Once operational the Development would generate up to 70.5 new direct jobs (70 full time and 1 part
time). Based on the proposed employment, it is estimated that over £3 million in Gross Value Added
(GVA) could also be generated. The residents of the Development would also spend money in the
wider LBH area and this is estimated to be in the region of £1.9 million per year.
The provision of 164 residential dwellings would positively contribute to the housing targets within LBH
and London, and contribute to addressing the overall housing shortfall. Similarly, the provision of 43
affordable homes would contribute towards local and regional housing targets.
It is estimated that the Development would accommodate 260 residents. Given the existing and likely
future capacity of local GP practices within the Local Area, it is considered that that there may not be
sufficient capacity within existing healthcare facilities to provide for the additional demand for services
that the new population on the Site would create. A Section 106 contribution towards an additional GP
could help mitigate the effect the new population will have on primary healthcare.
It is estimated that the Development would result in a requirement for up to 16 nursery places, 6
primary school places and 3 secondary school places. Based on existing school places and future
education provision, there is sufficient capacity within the relevant catchment areas of the Site.
The Development incorporates a range of interconnected public amenity open spaces which allow
connections with the wider open space network beyond the Site. The Development will also provide
sufficient play space to meet the additional demand generated by the Site.
The proposed mix and layout of land uses and publicly accessible spaces would provide active
frontages at ground floor level and increased activity levels around the Site. This would maximise
natural surveillance, thereby reducing the opportunity for crime and improving perceptions of safety
and wellbeing. This would help to ensure a safer environment for pedestrians and visitors to the Site.
Archaeology
The likely effects of the Development on heritage assets within the Site have been assessed in line
with national, regional and local planning policy and in accordance with the standards specified by the
Chartered Institute for Archaeologists and the Greater London Archaeological Advisory Services
(GLAAS).
The Site is not located in an archaeological priority area, but contains known archaeology from the late
nineteenth and twentieth centuries, with a possibility of material from earlier periods including highly
important material from the Palaeolithic.
A review of available information suggests that the Site has a medium potential for archaeology from
the Palaeolithic, and a low potential for archaeology from all other periods except the twentieth
century, for which there is a high potential. Development from the twentieth century phase of the Site’s
history is likely to have truncated or severely disturbed pre-existing archaeological remains at shallow
level across most of the Site, but may have caused less disturbance at depth.
The likely effects of the Development would be associated with excavation and foundation works
required to facilitate the Development. Accordingly, archaeological mitigation has been proposed in
the form of a geo-archaeological investigation to take place prior to any ground intrusive works. The
No.1 Nestles Avenue
Environmental Statement: Non-Technical Summary
P a g e | 13
N:\Projects\WIE10928\100 Access Self Storage\07_REPORTS\WORKING DRAFTS\03 ES\NTS\WIE10928-100-
R.1.1.1_ES_NTS.docx
results of this investigation should determine if any further investigations are required. If required, an
archaeological watching brief (programme of monitoring and recording) on the construction phases
would be carried out to record any archaeological deposits encountered.
There will be no further effects on heritage assets once the Development is completed.
Water Resources and Flood Risk
An assessment on the effect of the Development on increasing flood risk, surface water and drainage
has been undertaken. A Flood Risk Assessment and Drainage Strategy has been prepared as part of
the planning application.
The Site is located in Flood Zone 1 and the Environment Agency’s online flood maps suggest that the
Site lies in a “very low” risk area for tidal and fluvial flooding. In terms of surface water flooding, the
Site mostly lies within a “very low” risk area with a “medium” risk area to the east.
Flood risk from groundwater is considered for the Site is considered to be low to medium. As such,
groundwater levels would be monitored and water resistant materials would be used during the
demolition and construction works to minimise the risk of groundwater flooding.
A Construction Management Plan (CMP) would include details of relevant environmental management
controls necessary for environmental protection regarding disposal of water from excavations,
dewatering and pumping as well as plant and wheel washing.
The surface water flows from the completed Development would be reduced by 50% of the existing, in
line with the London Plan, through onsite attenuation and source control features. Runoff would be
managed by the use of permeable pavement and green roof prior to discharge to the existing Thames
Water public sewer along Nestles Avenue. Foul flows would discharge directly into the public sewer
located under Station Road.
The assessment has concluded that providing the recommended mitigation measures are adopted
during construction and after completion, the Development should have no significant adverse effects
on the wider water environment.
Daylight, Sunlight and Overshadowing
Construction of the Development would have a gradually increasing effect on the levels of daylight,
sunlight and overshadowing to residential and educational properties and amenity spaces surrounding
the Site as the construction progresses. These would be similar, albeit lesser, to those of the
completed Development.
As would be expected given the relative low rise building on the Site, there are moderate adverse
effects to some of the neighbouring properties in relation to daylight (i.e. 2-4 Nestles Avenue, with
minor adverse effects on the Nestles Avenue Children’s Centre). However, the number of properties
that experience moderate adverse effects with the Development in place is low and the majority of
effects would be to secondary windows or windows situated beneath overhanging eaves that self-limit
the amount of daylight that can reach the window face and therefore already have daylight levels
below the suggested BRE guidelines.
There would be no noticeable effects to sunlight on neighbouring receptors nor to overshadowing on
existing or proposed amenity areas with the Development in place.
No.1 Nestles Avenue
Environmental Statement: Non-Technical Summary
P a g e | 14
N:\Projects\WIE10928\100 Access Self Storage\07_REPORTS\WORKING DRAFTS\03 ES\NTS\WIE10928-100-
R.1.1.1_ES_NTS.docx
Townscape and Visual
The Site is not within, nor does it border, any areas covered by the local designation Area of Special
Local Character (ASLC) or conservation areas. The nearest is Nestles Conservation Area,
approximately 190 m to the east. The nearest listed building is Benlow Works, Grade II listed, a factory
building dating from c.1909, approximately 350 m to the north east.
The Site lies within a townscape area where is increasing pressure for redevelopment for new
residential and commercial purposes. Aside from the identified heritage assets, the area is considered
to be of low value with a substantial capacity to accommodate change. The sensitivity of this area is
considered to be Medium.
The nature of Hillingdon’s topography, settlement pattern, open spaces and tree cover limits the
opportunities for vantage points from which to view the Site. The large scale buildings of the industrial
areas, including where the Site is located, also serve to prevent views. Nonetheless, as part of the
Townscape and Visual Impact Assessment, 12 viewpoint locations with representative views towards
the Site were identified and assessed.
During demolition and construction, local adverse effects would occur as a result from noise and dust
from plant and vehicular movements. Site hoardings will initially curtail changes to street level views
for pedestrians, however as the development evolves and taller buildings are constructed, the skyline
and general visual amenity of the area will change.
The use of hoarding and adoption of a CMP to ensure good site management and housekeeping, and
to detail hours of working etc. would minimise nuisance to neighbours and effects to the townscape
character of the area.
The completed development is not considered to affect the significance of the Conservation Areas nor
does it form part of the setting of any listed buildings. For the majority of townscape and visual
receptors, the Development is assessed as having beneficial effects of up to moderate significance.
Cumulative Effects
Cumulative effects can be categorised into two types:
Synergistic: these arise from the reaction between effects of the Development on different aspects
of the environment, for example noise, dust and visual intrusion, upon a set of defined sensitive
receptors; and
Additive: those that result from the additive effects caused by other past, present and reasonably
foreseeable developments, together with the Development itself.
Effect interactions were assessed for both the demolition and construction phase and for the
Development once completed and operational. However, no effect interactions were found to arise for
the completed Development.
During the construction phase, a combination of environmental effects such as increased traffic,
daylight, visual and townscape effects could be experienced particularly at the closest properties to
the Development. The implementation of environmental control measures through the CMP would
minimise the nuisance effects on residents, occupiers of nearby commercial properties and
pedestrians, cyclists and other road users during demolition and construction.
The cumulative effects of the Development, together with other cumulative schemes have been
assessed. The other planned developments that have been considered comprise schemes that are
No.1 Nestles Avenue
Environmental Statement: Non-Technical Summary
P a g e | 15
N:\Projects\WIE10928\100 Access Self Storage\07_REPORTS\WORKING DRAFTS\03 ES\NTS\WIE10928-100-
R.1.1.1_ES_NTS.docx
presently reasonably foreseeable as coming forward and were agreed with LBH. The following
cumulative schemes were considered as part of the assessment:
1. Hayes and Harlington Station improvements;
2. Former Powergen Site North Hyde Gardens (planning ref: 13226/APP/2012/2185);
3. The Old Vinyl Factory Blyth Road (planning ref: 59872/APP/2015/1798);
4. Blyth Road, 20-30 Blyth Road (planning ref: 1425/APP/2011/3040);
5. Unit 3 Millington Road Hayes – Westlands (planning ref: 332157/APP/2011/872);
6. Silverdale Industrial Estate (planning ref: 71374/APP/2016/4027);
7. Hayes Town Centre Road Improvement schemes;
8. Hayes Swimming Pool (planning ref: 1942/APP/2014/4039);
9. Golden Cross Hotel (planning ref: 4607/APP/2013/3144);
10. Southall Gas Works (planning ref: 54814/APP/2009/430);
11. Former EMI site, Dawley Road (planning ref: 8294/APP/2015/1406);
12. Enterprise House, Blyth Road (planning ref: 11623/APP/2013/3606);
13. Wider Development Area (not consented schemes): Land South of Hayes and Harlington, Squirrel
Trading Estate, Old Nestle Factory;
14. Hyde Park Hayes (planning ref: 40652/APP/2012/2030); and
15. Site of former Blue Anchor PH, House Lane (planning ref: 2734/APP/2016/4592).
The location of these schemes are presented in Figure 5 below.
Figure 5: Cumulative Schemes
During demolition and construction of the Development, similar works on the other planned
developments would likely result in temporarily increased traffic, and visual effects on the local
townscape. The Development and cumulative schemes together would bring about additional
demolition and construction jobs and spending at the local to regional scale.
No.1 Nestles Avenue
Environmental Statement: Non-Technical Summary
P a g e | 16
N:\Projects\WIE10928\100 Access Self Storage\07_REPORTS\WORKING DRAFTS\03 ES\NTS\WIE10928-100-
R.1.1.1_ES_NTS.docx
The key cumulative effects of the Development, once completed, in conjunction with the planned
developments were generally found to be minimal. Exceptions comprise the following cumulative
effects as follows:
In addition to the proposed Development, other schemes would provide residential units –
estimated to be about 6,900 new homes which would make a substantial contribution towards
LBH’s housing targets;
In isolation, the Development would generate up to 72 FTE gross jobs. Owing to the mixed-use
nature of many of the cumulative schemes, further additional jobs would be generated as part of
the cumulative schemes. This has been estimated to be in the region of up to 3,000 gross
additional jobs. This level of employment generation would make a substantial contribution towards
employment targets and support the objectives for the area and the London Plan as a whole.
The cumulative schemes would result in some increased local expenditure, either as a result of
employee spend or household spend;
By achieving planning permission, all planned developments, would be approved by the
Environment Agency and therefore would not result in an unacceptable increase in flood risk. With
all of the cumulative schemes adhering to the requirements of The London Plan guidance, then
there would be significant reductions to existing surface water run-off; and
The Development and other planned developments would have a beneficial effect on a number of
viewpoints and Townscape Character Areas.
No.1 Nestles Avenue
Environmental Statement: Non-Technical Summary
P a g e | 17
N:\Projects\WIE10928\100 Access Self Storage\07_REPORTS\WORKING DRAFTS\03 ES\NTS\WIE10928-100-
R.1.1.1_ES_NTS.docx
7. What Will Happen Next?
Following the submission of the detailed planning application, there would be an opportunity for any
interested parties to comment on the proposals. The ES and a set of documents supporting the detailed
planning application can be viewed on London Borough of Hillingdon’s website:
London Borough of Hillingdon Website: http://www.hillingdon.gov.uk/
Additional copies of the ES can be purchased from Waterman on request (contact details below). A CD
version of the ES can be purchased at a cost of £20.
Waterman Infrastructure & Environment Ltd
Pickfords Wharf
Clink Street
London
SE1 9DG
Tel: 020 7928 7888
Email: [email protected]