NNEX 5
etailed Design Report
anuary 2008
SECOND EMERGENCY WATER SUPPLY AND
SANITATION PROJECTDETAILED DESIGN FOR WATERWORKS AND
TREATMENT PLANT AT WASIT
REPUBLIC OF IRAQ
MINISTRY OF MUNICIPALITIES AND PUBLIC WORKS
C LOTTI & ASSOCIATI
-
8/10/2019 Wasit_Detailed Design Report_updated.pdf
2/180
SEWSSP
WASIT WATER TREATMENT PLANT
1,000 m3/h CAPACITY
DETAILED DESIGN REPORT
November, 2007
-
8/10/2019 Wasit_Detailed Design Report_updated.pdf
3/180
C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universi ty and Engicon
CONTENTS
Page
1. INTRODUCTION1.1 Background 7
1.2 Summary and Scope of Work 7
2. Design of Process Units
2.1 Scope of Work 8
2.2 Approach and Methodology 8
2.2.1 WTP Capacity 9
2.2.2 Raw Water Quality 92.2.3 Design Criteria 9
2.2.4 Process Unit Sizing 10
2.2.5 Process Flow / Mass Balance Diagrams 10
2.2.6 Process and Instrumentation Diagrams 10
2.3 Basis of Design 10
2.3.1 Process Design Overview 10
2.3.2 Process Functions 11
2.3.3 Process Flow 112.3.4 Water Quality 12
2.3.4.1 Raw Water Quality 12
2.3.4.2 Treated Water Quality 12
2.3.4.3 Determination of the Chemical Dose with Jar Tests 12
2.3.4.4 In-Line Chemical Dispenser 12
2.3.5 Design Parameters 13
2.3.5.1 Sludge Mass Balance 13
2.3.5.2 Filters 13
2.3.5.2.1 Filter backwash 13
2.3.5.2.2 Filter dump volume 14
2.3.5.3 Clean wash water tank 14
2.3.5.4 Wastewater holding tank 14
2.3.5.5 Elevated Storage Tank 14
2.3.5.6 Chlorination System 14
2.3.5.6 Chemical dose rates and storage 142.3.5.6.1 Alum 15
2.3.5.6.2 Chlorine 15
2.3.5.7 Service water 15
2.4 Process Calculations 15
2.4.1 Basis of Design for all Plant Flows 16
-
8/10/2019 Wasit_Detailed Design Report_updated.pdf
4/180
C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universi ty and Engicon
2.4.13 Service Water Requirment 32
2.4.14 Mass Balance 33
3. Hydraulics and Hydrology3.1 Hydraulics Study 34
3.2 Hydrological Study in Al-Dujaila- River 34
4. Mechanical Design
4.1 Mechanical Equipment- General 35
4.1.1 Introduction 35
4.1.2 Scope of the Work 35
4.1.3 Design Criteria 36
4.1.4 Calculations 36
4.1.5 References 37
4.1.6 Sample of Calculations 37
4.1.6.1 Head losses calculation for raw water pumps 38
4.1.6.2 Head losses calculation for treated water pumps 39
4.1.6.3 Head losses calculation for waste water pumps 40
4.1.6.4 Head losses calculation for over flow pumps 41
4.1.6.5 Head losses calculation for backwash water pumps 424.1.6.6 Head losses calculation for service water pumps 43
4.2 Pump Station and Pipeline Hydraulic Transient Analysis 45
4.2.1 Purpose 45
4.2.2 Transient Mathematical Model 45
4.2.3 Criteria and Analysis 46
4.2.3.1 Raw Water Pump Station 46
4.2.3.2 Treated Water Pump Station 47
4.2.4 Analysis Summary and Recommendation 48
4.2.5 References 48
4.3 Mechanical Equipment-HVAC 53
4.3.1 Introduction 53
4.3.2 Design Criteria 53
4.3.2.1 Cooling 53
4.3.2.2 Heating 53
4.3.2.3 Ventilation 534.3.3 Systems 54
4.3.3.1 Cooling system 54
4.3.3.2 Heating system 54
4.3.3.3 Ventilation systems 54
4.3.4 Sample of calculations 55
-
8/10/2019 Wasit_Detailed Design Report_updated.pdf
5/180
C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universi ty and Engicon
4.4.4 Emergency Showers 68
5. Electrical Equipment
5.1 Introduction 695.2 Scope of Work 69
5.3 Design Criteria and Parameters 69
5.3.1 Compliance with Regulations and Standards 69
5.3.2 The Incoming Supply 69
5.3.3 Transformers 69
5.4 Methodology 69
5.5 Sample of Calculations 70
5.5.1 Load Estimation 70
5.5.2 Voltage Drop Calculations 71
5.5.3 Indoor Lighting Calculations 73
5.6 Drawings 74
5.7 Bills of Quantity 74
5.8 Specifications 74
6. Instrumentation Control and Automation
6.1 Instrumentation and Controls System 756.1.1 Introduction 756.1.2 Main Process Control Center 756.1.3 Control Network 756.1.4 Local Control Panels 766.1.5 Distributed PLCs 76
6.2 Local/Remote control 77
6.3 General Guidelines for Control Logic 776.3.1 General Control Loop Functions 786.4 SCADA Failure Modes 816.4.1 Workstations 816.4.2 PLC 816.4.3 Process I/O Modules 816.4.4 SCADA System Monitoring 816.4.5 Equipment Re-start 81
6.5 Control Descriptions 826.5.1 Raw Water Pump Station 826.5.1.1 RWPS Operation 846.5.1.2 Station Power Loss 856.5.2 Screen Air Scour 856.5.3 Sampler Control 86
-
8/10/2019 Wasit_Detailed Design Report_updated.pdf
6/180
C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universi ty and Engicon
6.5.13.2 Local Mode of Operation: 1016.5.13.3 Remote Manual Mode of Operation: 102
6.5.13.4 Monitoring Requirements: 1036.5.13.5 Chlorine Motive Water Pumps 1046.5.13.6 Chlorine Scrubber System 1066.5.14 Alum System 1086.5.14.1 Alum Mixing System 1096.5.15 Treated Water Pump Station 1106.5.16 Service Water System 1126.5.17 Overflow Holding Tank/Pump Station 114
7. Architecural and General Layout7.1 Introduction 1167.2 Scope of Work 1167.3 Methodology 1167.3.1 General criteria 1167.3.2 Support Buildings 1167.3.3 Process Buildings 117
7.4 Basis of Design 1177.4.1 Codes And Standards 117
7.4.2 Primary Elements 117
7.4.2.1 External walls 117
7.4.2.2 Internal walls 117
7.4.2.3 In-situ R.C. floor and roof slabs 117
7.4.3 Finishing 118
7.4.3.1 Wall finishing 118
7.4.3.2 Floor Finishings 1187.4.3.3 Base 118
7.4.3.4 Ceilings 118
7.4.3.5 Metal works 118
7.4.3.6 Carpentry 118
7.4.3.7 Roofing system 118
7.4.3.8 Flashing 118
7.4.3.9 Water proofing 1187.4.3.10 Sealants 119
7.4.3.11 Doors and Hardware 119
7.4.3.12 Windows 119
7.4.3.13 Glass and glazing 119
7.4.3.14 Fencing 119
-
8/10/2019 Wasit_Detailed Design Report_updated.pdf
7/180
C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universi ty and Engicon
8.2.1 Design Codes 122
8.2.2 Design Software 124
8.2.3 Structural Materials 1248.2.4 Foundations 124
8.2.5 Reinforced Concrete Structures : Design Basis General 125
8.2.5.1 General 125
8.2.5.2 Design Loads 125
8.2.5.3 Material Requirements 126
8.2.6 Structural Steel: Design Basis 126
8.2.6.1 General 126
8.2.6.2 Design loads 126
8.2.7 Concrete Block Work 127
8.2.8 Site Investigation 127
8.3 Sample of Calculations 127
8.4 Structural and Civil Drawings 143
8.5 General description of civil works 144
8.5.1 Non-Process Buildings 144
8.5.2 Process Buildings 1449. Ancillary Works9.1 Geotechnical Report 1489.1.1 Introduction 1489.1.2 Laboratory Works 1489.1.3 Stratigraphy 1509.1.4 Groundwater 1519.1.5 Soil Classification and Identification 152
9.1.6 Shear Strength Parameters 1559.1.7 Soil Compressibility 156
9.1.8 Chemical Tests for Soil and Groundwater 157
9.1.9 Geotechnical Design 158
9.1.9.1 Allowable bearing pressure 158
9.1.9.2 Shallow Foundations 159
9.1.9.3 Pile Foundations 159
9.1.9.4 De-watering 1609.1.10 Suitability of Materials for Re-use 160
9.1.11 Smmary of Design Parameters 160
9.1.12 Conclusions 161
9.2 Road Report 163
9.2.1 Introduction 163
-
8/10/2019 Wasit_Detailed Design Report_updated.pdf
8/180
C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universi ty and Engicon
1. INTRODUCTION
1.1 Background
Wasit subdistrict center is located in the south eastern part of the Wasit Governorate. It is
about 28 km to the south east of Al Kut city. The topography of Wasit subdistrict is flat. The
total population of Wasit subdistrict is about 38,293 inhabitants, about 10,500 of them are
urban and the rest are rural.
The climate in Wasit is dry and cold in the winter season and very hot in the summer. The
average annual precipitation ranges from 120 to 130mm, most of this occurs in the winter
months. The average daily temperatures range between 9-13 C in winter and 40-50 C in
summer. The main occupation in the subdistrict is agriculture and animal husbandry. Ingeneral, Wasit is considered a poor subdistrict. The rural areas in Wasit subdistrict appear to
be very populated; more than 72 percent of the population is living in the rural areas.
The main source of water in Wasit city is the Al-Dujaila irrigation canal which is a branch of
the Tigris River. Al-Dujaila canal passes through the urban area of Wasit city with continuous
water flow throughout the year. The canal is under the jurisdiction of the Ministry of Water
Resources.
Only about 40% of the total population of Wasit city is served by a piped system, the
remaining population is served by tankers or take water directly from the canal. Wasitsubdistrict center is served through an old water distribution network.
The distribution system in the city is very old and is mostly of asbestos, cast iron, plastic and
cement pipes. It has been reported that about 10% the maximum water head in the network is
about 3.0 m and may go down to 0.5 m. Only 25% of the total area is covered by existing
water facilities. The main transmission pipe is 250 mm in diameter, while the distribution
pipes diameters range from 110 mm to 200 mm.
The present project includes construction of a new 1,000 m3per hour WTP, river intake withraw water pumping station and transmission line, treated water ground storage tank, and
elevated water storage tank. The site of the new water treatment plant is on the main street but
drainage of the site might make access difficult during the rainy seasons.
It is anticipated that no negative impacts on the environments will take place due to the
sewage produced since most of water produced by the plant is utilized to improve the quality
of water consumed by the inhabitants which are presently using poor quality water.
1. 2 Summary and Scope of Work
This report has been prepared to show the detailed design of Water Treatment Plant utilizing
standard process units, structures and buildings developed by MWH for MMPW. The designs
are based on plant capacity (works throughput) of 1000 m3
/h. It is intended that standard
designs are incorporated into the site specific design with the necessary alterations. Several
-
8/10/2019 Wasit_Detailed Design Report_updated.pdf
9/180
C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universi ty and Engicon
The report consists of ten chapters. The chapters describe the procedure for the design of Wasit
Water Treatment Plant utilizing both Standard Designs and design specific to a particular
capacity of works and location.
2. DESIGN OF PROCESS UNITS
A water treatment process is an assemblage of unit processes that effectively produces a
supply of safe drinking water. The treatment system generally consists of four or more
interrelated components. These components include coagulation, flocculation, clarification,
filtration and disinfection with the necessary process control and instrumentation. Since the
unit processes must be interrelated, the operation of each component affects the performanceof others, and then the entire system.
2.1 Scope of Work
The design of Wasit water treatment plant is based on the standard design of WTP for a
capacity of 1000 m3/h of treated water. The standard design was incorporated into the specific
site and conditions of Wasit City with necessary alterations. Several alterations will be
explained in this chapter. The chapter also highlights the procedures which were undertaken
for raw water quality testing, followed by descriptions for developing the process design
utilizing calculation spreadsheets, Process Flow Diagram with Mass Balance, Hydraulic
Profile Diagrams, and Process and Instrumentation Diagrams, The process design will
determine the amendments which are required to the standard process units.
2.2 Approach and Methodology
The basic approach is that the water treatment plant should be designed to produce a
continuous supply of safe drinking water according to raw water characteristics and theenvironmental conditions. The specific approaches of the design process are:
1. Evaluation of local conditions carefully.
2. Creation of a reasonably conservative design and cost-effective to construct.
3. Creation of a simple, reliable, effective, and proven system by applying the bestknowledge and skill to the design.
4. Designing a plant that is easy and safe to construct as well as simple and safe tooperate.
5. Allowing for maximam and minimum operational flexibility.
The Standard Designs are based on river sources. However, the raw water quality varies
depending on location. The following parameters are those for which treatment is provided.
-
8/10/2019 Wasit_Detailed Design Report_updated.pdf
10/180
C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universi ty and Engicon
The stated capacity of Wasit WTP is 1000 m3of treated water output. In order to achieve the
necessary treated water output, the quantity of raw water will have to account for the amount
of water lost through the process.
The main factor that affects the water losses and hence the raw water flow is the raw water
quality. Raw water with high suspended solids content will produce a large amount of sludge
and hence the amount of water lost throughout the treatment will increase.
Allowance has also be required for filter backwash water and filter rinse to waste during start
up following a backwash. These quantities was calculated and shown in the material balance
sheet. The Process Flow Diagram (PFD) and Mass Balance Diagram (MBD) were developed
to assist in the design of hydraulics, process pipe work and wastewater disposal.
2.2.2 Raw Water Quality
The turbidity of the raw water influences the amount of sludge produced and the coagulant
dose. The amount of coagulant required will also influence the amount of wastewater. Typical
analysis of raw water quality includes
Total dissolved solids (TDS) Total suspended solids (TSS) pH Turbidity (Tur) Electrical conductivity (EC) Total hardness (TH) Alkalinity (Alk) Magnesium (Mg) Calcium (Ca)
Chloride (Cl)
Analysis of a set of raw water samples taken over a suitable period from Al-Dujaila- River
was carried out to evaluate the coagulant dose and waste streams. The full raw water quality
data is shown in Table 1. The analysis is done by the Local Municipal laboratory located at
Wasit City. The sample dates and temperatures were included.
Table 1 Wasit Raw Water Quality Data (Source : Al-Dujaila- River)Date Temp Turb. pH E.C. Chlor. Alk. T.H. Ca Mg TDS TSS
25-01-2006 17 25 7.70 1393 81.7 160.0 500.0 97.2 61.8 928 5219-02-2006 25 115 8.10 1404 163.4 160 473.5 117.5 43.1 936 125
29-01-2007 20 30 7.50 1395 85.0 165 495 100.0 65.0 930 65
22-03-2007 22 60 7.84 1211 132 114 620 144 63.7 774 52
11-05-2007 26 53 7.95 1283 90 120 480 112 49 593 55
M 22 56 6 7 818 1337 2 110 42 143 8 513 7 114 1 56 52 832 2 69 8
-
8/10/2019 Wasit_Detailed Design Report_updated.pdf
11/180
C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universi ty and Engicon
2.2.4 Process Unit Sizing
The size of most of the process units is the standard unit size of 1000 m3/h plant. Standard
Designs were reviewed and modified according to the raw water quality and consequent
losses through the treatment process. The amount of raw water required depends on the water
losses through the treatment processes. The flows were checked on the mass balance to ensure
the raw water intake and pumps are sized correctly.
The wastewater holding tank size depends on the quantity of sludge produced. The size of the
tank as well as the diameters of the pipes carrying clarifier sludge were recalculated and
checked.
For the Chemical Building storage capacity and mixing tank volumes, the coagulant dosing
requirements was rechecked and determined by the jar tests carried out on the raw water.
The capacity of the treated water pumps was reviewed and checked according to the
requirement of the distribution network.
The calculation of these quantities and the unit sizing are shown in the calculation sheets
located at the end of this chapter.
2.2.5 Process Flow / Mass Balance Diagrams
The flows across the treatment processes vary according to the site. The main factors that will
influence these flows are the amount of sludge and wastewater produced and the amount of
service water required. These amounts were calculated. A Process Flow Diagram (PFD) and
Mass Balance Diagram (MBD) were prepared for Wasit Site and shown in the calculation
sheets located at the end of this chapter. The process flow diagram with the mass balance
table are also included in the set of the P&ID sheets (Drawing Sheet No. 13-202-7021).
2.2.6 Process and Instrumentation Diagrams
The Process and Instrumentation Diagrams (P&ID) are checked for standard WTP of 1000
m3/h and modified according to the changes in the particular site of Wasit. The diameters of
all interconnecting pipe work, wastewater pipe work and pipe work within process units were
checked recalculated and modified for each Process Unit accordingly.
The destination of the overflow outlets and waste water outlets were modified according to
the new site. The Tag Numbering for the equipment, valves, etc, was checked and therequired alterations were made on the streams and instrumentations in the P&IDs.
2.3 Basis of Design
The basis of design describes the technical basis of the design process. The following
references were used in order to establish the Basis of Design:
-
8/10/2019 Wasit_Detailed Design Report_updated.pdf
12/180
C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universi ty and Engicon
streams generated from the treatment process will be disposed to Nagara River located near
the WTP site without any treatment. The process is designed to be operated continuously
without frequent start-up and shut down.
2.3.2 Process Functions
The main process functions include:
Extraction and transmission of raw water from the intake area to the treatment plantarea.
Makeup, storage, injection, and in-line mechanical mixing of flocculation anddisinfection chemicals and raw water.
In-line dispersion of coagulant (Alum) in the raw water main.
Rapid gravity filtration of the settled water.
Storage and injection of disinfection chemical (Chlorine Gas) into the filtered waterstream.
Prechlorination Facilities for raw water entering the plant. Collection and storage of treated water, including establishment of disinfection contact
time.
Transmission of treated water from the treatment plant site to the DistributionNetwork
Extraction and storage of dirty backwash water from the filters and sludge from theflocculator/clarifiers.
Collection and storage of miscellaneous process wastes.
Transmission of wastewater and sludge and miscellaneous process wastes from thetreatment plant site to the near river outfall.
Collection and storage of emergency overflow water.
Transmission of overflow water to the near river outfall.
Provision for future incorporation of advanced chemical treatment (polyelectrolyte)processes
2.3.3 Process Flow
Raw water is pumped from Al-Dujaila- River to the water treatment plant via the raw water
i li O i id th t t t l t th t fl i t d P hl i ti
-
8/10/2019 Wasit_Detailed Design Report_updated.pdf
13/180
C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universi ty and Engicon
Filtered water is treated with chlorine and flows through the chlorine contact tank to the
treated water storage tank. The treated water pumps transfer treated water to the Distribution
Network via treated water pipeline.From the splitter box onwards, the flow gravitates through the treatment works, ending up in
the treated water storage tank. A portion of the treated water flow is extracted for use as
service water and also domestic water on the treatment plant site. Emergency overflow water
is directed to a dedicated overflow tank containing a pump to transmit the water to the river.
2.3.4 Water Quality
2.3.4.1 Raw Water QualityRaw water quality is dependent upon the river source, local conditions and in some cases time
of year. Samples taken over a one year period were analyzed to understand the variability of
the water quality, particularly with regard to pH and turbidity.
The basic parameters analyzed are: pH, temperature, turbidity, conductivity, alkalinity, total
hardness, calcium, magnesium, chloride, TDS, TSS, TOC, and aluminum. Table 1 shows a
typical water quality data for Al-Dujaila- River.
2.3.4.2 Treated Water Quality
The plant was designed to treat the above raw water, and to produce the following quality of
water, to the following standards:
Target Turbidity 0.5 NTU average, 1 NTU maximum E coli or thermo tolerant coliform bacteria 0 in 100 ml sampleIt is anticipated that the target residual metals will be as follows, subject to confirmation
of concentrations in the inlet raw water,
Aluminium Less than 0.2 mg/l Iron Less than 0.2 mg/l
2.3.4.3 Determination of the Chemical Dose with Jar Tests
Jar Tests was carried out to establish the average alum dose rate for the WTP. The dose rate
was used in the calculations for dosing pumps and chemical storage.
In Jar Tests, a range of alum doses (0 to 60 mg/l) should be applied to the raw water under
standard Jar Test conditions of rapid mixing, slow stirring and settlement. The settled watershould be analyzed for pH, turbidity and total and dissolved aluminum. The optimum alum
dose is the dose after which increasing the alum dose does not significantly reduce the
turbidity of the settled water (see figure). The dissolved aluminum should be less than 0.2
mg/l. If higher or lower alum doses are required to achieve the optimum alum doses then the
Jar Test should be repeated
-
8/10/2019 Wasit_Detailed Design Report_updated.pdf
14/180
C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universi ty and Engicon
Most of the design parameters are standard for the plant designs. However some factors affect
the process calculations, which are detailed in this section.
2.3.5.1 Sludge Mass Balance
To achieve the desired plant flow at the outlet, the inlet flow has to be greater to account for
the losses through the process. The losses through the processes are as follows:
Clarifiers Intermittent desludging. Wash Water Tank filling: the wash water tank is filled from the filter outlet flow. Filter dump volume: the mass balance assumes there is 2 dump volumes lost per day
from the filters, during the backwash cycle.
Treated Water Tank: the service water is taken from the treated water storage tanks
The volume of clarifier sludge depends on the raw water quality and the coagulant dose. The
instantaneous maximum flow can be calculated assuming that all the clarifiers desludge at the
same time. Using the raw water turbidity, the amount of clarifier sludge produced can be
predicted, using the following equation:
= 1
A234.0T4S1000
T2S1000CS
ic
oc
Where:
S: Sludge flow (MLD)
Sc: Sludge solids concentration - 8kg/m3 or 0.8% (used for medium values of turbidity)
To: Clarifier outlet turbidity taken as - Min 1 NTU
-Max 2 NTU
A: Alum dose (50mg/l)
Ti: Clarifier inlet turbidity (NTU)
C: Clarifier outlet flow (MLD)
2.3.5.2FiltersThe filters are designed on the following parameters:
Media type/depth: - Dual media-Anthracite No 2 750 mm depth
- Sand 0.65mm NES 500 mm depth
-Gravel 4 9 mm 50 mm depth
Clogging head: 3 m
-
8/10/2019 Wasit_Detailed Design Report_updated.pdf
15/180
C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universi ty and Engicon
Filter outlet to wastewater tank pipe diameter- Assume a velocity of 1 m/s.
2.3.5.2.2 Filter dump volume
The mass balance assumes there are 2 filter dumps per day, to the wastewater holding tank.
This volume is calculated as follows:
Filter dump volume = volume above weir + volume of wash water troughs + volume below
weir to the base of the siphons.
2.3.5.3Clean wash water tank
The clean water tank is filled by part of the filtered water overflowing a weir, such that the
flow going forward to the Chlorine contact tank is not starved. This is approximately 10% of
the max plant flow. The tank is sized using the following parameters:
Sized for 2 filter backwashes Each backwash uses 4.5 Bed Volumes of wash water.The flow rate to fill the wash water tank is calculated from the mass balance assuming:
Wash rate for each filter: Min - once a dayMax - twice a day
2.3.5.4 Wastewater holding tank
The wastewater holding tank was designed as follows:
Sized to hold one filter wash, plus 1 hour of average clarifier flow and 30 minutesrinse to waste
The TWL of this tank should be below the invert level of the filter wash waterchannel.
The return pumps are sized on the following details:
To evacuate the tank in 2 hours. 2 duty pumps. A pipe velocity of 1.5 m/s suction and 2.5 m/s discharge.
2.3.5.5 Elevated Storage Tank
An elevated storage tank should be designed, constructed and installed in raw water intake area to
supply treated water to Wasit City. The EST should be made of galvanized pressed steel with total netcapacity of 1200 m
3. The height of steel structure should be 30 m. The design of EST is to be the
responsibility of the contractor who will be awarded the construction of the project. The design should
include structural design (foundations and steel design), geotechnical and topographic field survey, all
pipe connections, local control instruments, and all other necessary requirements.
2 3 5 6 Chlorination System
-
8/10/2019 Wasit_Detailed Design Report_updated.pdf
16/180
C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universi ty and Engicon
2.3.5.7.1 Alum
Chemical - Aluminium sulphate Al2(SO4)3.14.3H20.
Form/delivery - Granular Bulk storage - 30 days at average dose rate in 50 kg bags.Maximum dose rate - The dose can be predicted using jar tests. 50 mg/l has been used
for the designs.
Chemical makeup - 10% solution, with a S.G. of 1.06-Makeup tanks standard size - 18.9 m3
- Duty makeup tanks - 1 days dosing at max plant flow
- 1 duty makeup tanks- 1 additional tank standby
2.3.5.7.2 Chlorine
Prechlorination-Predicted dose 3mg/l
-1 duty drums
-No standby is required Disinfection-Predicted dose 2mg/l
-Number of drums - 1 duty/1 standby
-Calculated using maximum draw off rates from a chlorine drum as follows:
30 oC = 15kg/hr
20 oC = 10kg/hr
15 oC = 5kg/hr
Storage- Maximum 30 days
- A 9 (1 tonne) chlorine drum store was adopted for the Standard Designs
2.3.5.8 Service water
The service water is taken off from the treated water tank
Assumed Service water consumption 8 m3/day Assumed wash down water 23 m3/day
2.4 Process Calculations
Process design was done utilizing calculation spreadsheets, by EXEL software considering
the main factors affecting the water treatment plant of Wasit. Mass balance was done to
calculate the amount of sludge, amount of water lost throughout the treatment process, filter
backwash water and filter rinse alum and chlorine doses required Unit sizing and
-
8/10/2019 Wasit_Detailed Design Report_updated.pdf
17/180
C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universit y and Engicon
2.4.1 Basis of Design for all Plant Flows
Flash mixing
Alum addition/energy input will be by inline mechanical mixer
Clarification
The Flocculation/Clarification plant will consist of a number of streams
Each stream will comprise the following:
Flocculation stage comprising 3 No chambers to give an overall nominal residence time of 30 mins.
Nom.length 4.45 m
Nom. width 4.45 m
Nom. depth 4.45 m
500 m3/h nett Clarification stage designed on a maximum velocity of 0.65m/h on the projected plate area.
Nom.length 9 m
Nom. width 9 m
Nom. depth 4.4 m
Flowrate 1000 m3/h
No of Streams 2 500 m3/h
Filtration
The filters will be of the single cell type with width 4.75m (nominally internal wall to wall)
Flowrate 1000 m3/h
No of filters n 5
Length 5.2 m
Width 4.75 m
Area 24.7 m2
n Velocity 8.1 m/h
n-1 Velocity 10.1 m/h
Based on nominal flows
Filter media ES mm Depth m
Sand 0.65 0.5
Anthracite No 2 1 3 0 75
-
8/10/2019 Wasit_Detailed Design Report_updated.pdf
18/180
C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universit y and Engicon
Flocculation stage comprising 3 No chambers to give an overall nominal residence time of 30 mins.
Nom.length 4.45 m
Nom. width 4.45 m
Nom. depth 4.45 m
Clarification stage
Nom.length 9.0 m
Nom. width 9.0 m
Nom. depth 4.4 m
Filtration
There will be 5 no filters of the single cell type
No of filters n 5
Length 5.2 m
Width 4.75 m
Area 24.7 m2n Velocity 8.1 m/h
n-1 Velocity 10.1 m/h
Filter inlet channel size
Max inlet flow to the block of filters 1030 m3/h
Flow down channel 0.3 m/s
Area of channel 0.95 m2Width/height 2
Water depth 0.69
Channel width 1.38
Adopted width 1.00 m
Max outlet flow from block of filters 1001 m3/h
Flow down channel 0.3 m/s
Area of channel 0.93 m2Width/height 2
Water depth 0.68 m
Channel width 1.36 m
Adopted width 1.50 m
-
8/10/2019 Wasit_Detailed Design Report_updated.pdf
19/180
C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universit y and Engicon
2.4.3 Flocculation
PROJECT TITLE Wasit
PROJECT NO
PROCESS UNIT FLOCCULATION TANKS
DESCRIPTION 2 STREAM
PREPARED BY DATE 28/10/2007
CHECKED BY DATE
VERIFIED BY DATE
VERSION NO DATE
INFLUENT CONDITIONS NOTES
AVG MIN MAX
INFLUENT FLOW Ml/d 8.37 25.48
INFLUENT TEMEPRATURE C 10 5 30
DESIGN CONDITIONSRESIDENCE TIME REQUIRED s 1800 30 MINS -(IN 3 CELLS)
TOTAL VOLUME REQUIRED m3 531 PROCESS VOLUME ONLY
TOTAL VOLUME INSTALLED m3 531 FROM ABOVE OR KNOWN
NO OF STREAMS - 2 INPUT
NO OF UNITS PER STREAM - 3 SEE BASIS OF DESIGN
DYNAMIC VISCOSITY kg/m s 0.001308 0.001519 0.000801 CALCULATED
VOLUME PER STREAM m3 265.4 CALCULATED
VOLUME PER UNIT m3 88.5 CALCULATED
LENGTH PER STREAM m 13.37 4.45 INPUT
WIDTH PER STREAM m 4.46 4.45 INPUT
DEPTH PER STREAM m 4.46 4.47 CALCULATED
LENGTH PER UNIT m 4.45 CALCULATED
ASSUMED EFFICIENCY % 100% SEE GUIDELINES
OPERATING CONDIITONS AVG MIN MAX
RESIDENCE TIME s #DIV/0! 1800 5481 CALCULATED
MIXING - PER UNIT AVG MIN MAX
REQUIRED G - 70 Choose gearbox to provide 10 - 70s-1
-
8/10/2019 Wasit_Detailed Design Report_updated.pdf
20/180
C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universit y and Engicon
LENGTH m 13.35
WIDTH m 4.45
DEPTH m 4.5
OPERATING CONDIITONS
RESIDENCE TIME s #DIV/0! 1800 5481
0 s 0 0 0
MIXING
SELECTED POWER kW 1.1
ACTUAL G s-1
74
2.4.4 Clarifier Plate Pack Design
Unit size
Q = 531 m/h
Rate 0.67 m/h
Proj.Area 792.4 mAny plate 1.5 m wide Avail. F. C -6 m
Area 2.41 m Width -1.5 m
No. requd 329 Flow per trough 0.036868 m/s
Rows 4
82.2 No
Horl. 63.5 mm
5220 mm
Offset 15556775 m long
Allowing for shaft
pack m pack m pack m No.plates Area m b1 Length
22 50.61 17 38.56 18 40.97 17 38.56 1080 2635
Area requd 792.4 m 18 40.97 1144 2699
15.7 packs 20.5 packs 19.3 packs 19 43.38 1207 2762
4 Rows 4 Rows 4 Rows 20 45.79 1271 2826
3.91 packs 5.14 packs 4.84 packs 21 48.2 1334 2889
7147 mm long 8035
mm
long 8416 mm long 22 50.61 1398 2953
Width 1.5 23 53.02 1462 3017
2 6 2 6 63.5 mm horzl. distance
2 4 2 4
t k 20 k 20
-
8/10/2019 Wasit_Detailed Design Report_updated.pdf
21/180
C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universit y and Engicon
2.4.5 Clarifier Hydraulics
Comprising 2 no 541 m3/h units
TWL in Filter inlet channel 4.505
Connecting channel between clarifiers 10 m TBC
and filter block
Velocity in channel 0.3 m/sArea of channel 0.98 m2
Width 1.40 m
Adopt width 1.40 m
Water depth 0.70 m
Channel losses assumed negligible
Exit loss into filter channel K 1 0.005 m
TWL in connecting channel 4.510
Entry loss into channel K 0.5 0.002TWL in clarifier outlet channel 4.512
TWL in clarifier launders 4.512
Assumed Freefall into lamella launders 0.2 m
Depth of launders
TWL in clarifier 4.712
Outlet to RGF Channel
Stop Log Frame
4.9644.844.745.504.7124.5124.5124.510
4.8104.962
0.272
Overflow
Raw Water Inlet
Lamella Splitter Box
-
8/10/2019 Wasit_Detailed Design Report_updated.pdf
22/180
C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universit y and Engicon
Losses through flocculator chambers
Loss under baffle
Length of bafffle 4.45 m
Entry slot depth 0.2 m
Velocity 0.17 m/s
Headloss under baffle 0.004 m
Headloss over submerged baffle assumed 0.000 m
Perforated baffle
No of holes 20
Dia of holes 0.120 m
Area of holes 0.226 m2
Headloss 0.022 m
TWL upstream of perf. Baffle 4.741
Splitter box
Free drop 0.100 m
Soffit of weir 4.841Head over weir (assume not submerged)
Weir length 2.000 m
Head over weir 0.120 m
TWL inlet compartment 4.961
Clarified water overflow weir
Rise in level to overflow weir 0.3 mSoffit of weir 4.810
Length of weir 2.8 m
Flow rate 1061.8 m3/h
Head over weir 0.152 m
TWL over weir 4.962
Freeboard to top of Walls 0.539
Top of Wall 5.501
-
8/10/2019 Wasit_Detailed Design Report_updated.pdf
23/180
C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universit y and Engicon
2.4.6 RGF Trough Location
Filter inflow 24972 m3/d from mass balance Levels Refer to True Datum
1041 m3/h
Comprising 5 No Filters 24.7 m2 area
TWL 20.013
16.420 Syphon level
16.655 Expanded media level
16.120 Normal media level
16.00 Natural ground level
14.870 Bottom of the media level
13.720
Head losses through filter Datum TWL Filter outlet channel
No of filters 5
Actual Level m
TWL in FW channel 16.000
Rise to inlet weir 0.2 m 16.200Soffit of weir 16.200
Weir length 1.2 m
Water depth 0.68
Invert of channel 15.319
Max flow per filter 260 m3/h with one filter out for washing
Head over weir 0.105 mTWL over weir 16.305
Weir height above media 0.08 m
Top of media 16.120
Pipe velocity 0.8 m/s
Pipe dia 0.34 m
-
8/10/2019 Wasit_Detailed Design Report_updated.pdf
24/180
C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universit y and Engicon
Exit loss 1 1 0.07 0.75 0.029 0.029
Butterfly valve 1 1.54 0.07 0.75 0.029 0.044
Tee (with rinse pipe) 1 0 0.07 0.75 0.029 0.000
Entry loss into pipe 1 0.5 0.07 0.75 0.029 0.014
Pipe length Length m Re
TBC but to allow for future 0.4 6 0.00015 0.072 0.751 197768 0.008
installation of flow meter Total 0.008
Apparent level in filter outlet 16.313
Filter max velocity 10.53 m/h (Turbidity target 0.5 NTU, 1 NTU max)
Head loss (1/ES)^1.85 x FR^1.21 x 10^(0.23429-0.0111T)x14.45415
Loss through 0.65mm media 0.84 m/m 0.42 m
Loss through No 2 anthracite 0.22 m/m 0.16 m
Clogging head adopted 3.00 m
Total media loss 3.58 m Loss inc nozzles say 3.700
TWL of filters 20.013
Top of media 16.120
Anthracite depth 0.750 m
Sand depth 0.500 m
Gravel depth 0.05 m
Slab thickness 0.200 m Underside of slab 14.620 m
Depth floor/ underside of slab 0.900 mFilter floor level 13.720
Anthracite expansion 48%
Sand expansion 35% assumed
Expanded media depth 0.535 m
Margin to underside of trough 0.178 m
Depth of trough 0.56 m
Top of washweir 17.393
Head of water above media 3.893 mHead over trough 0.047 m
Head loss through opening in wall 0.05 m sized to suit
TWL over trough 17.440 m
Expansion media level 16.655 m
Underside of trough level 16.833 m
-
8/10/2019 Wasit_Detailed Design Report_updated.pdf
25/180
C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universit y and Engicon
2.4.7 Filter
Filter inflow 24972 m3/d from mass balance
1041 m3/h
Comprising 5 No Filters 24.7 m2 area
4.505 4.455 4.350
4.197
TWL 4.100
Wash trough ( 2 No)
1.393
0.120
-2.280
Head losses through filter Datum TWL Filter outlet channel
No of filters 5
Actual Level m -1.13
TWL in FW channel 0.000
Rise to inlet weir 0.2 m 0.200
Soffit of weir 0.200 16.12
Weir length 1.2 m
Water depth 0.68
Invert of channel -0.681
Max flow per filter 260 m3/h with one filter out for washing
Head over weir 0.105 m
TWL over weir 0.305
Weir height above media 0.08 m
Top of media 0 120
Channel roof level
1.093
Filtered Water Channel
-0.681
FW Overflow
0.4940.200
0.350
0.305
0.000
-
8/10/2019 Wasit_Detailed Design Report_updated.pdf
26/180
C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universit y and Engicon
Fittings Size No K Flow VelocityVel.Head Headloss
mm m3/s m/s m m
Exit loss 1 1 0.07 0.75 0.029 0.029
Butterfly valve 1 1.54 0.07 0.75 0.029 0.044
Tee (with rinse pipe) 1 0 0.07 0.75 0.029 0.000
Entry loss into pipe 1 0.5 0.07 0.75 0.029 0.014
Pipe length
Length
m Re
TBC but to allow for future 0.4 6 0.00015 0.072 0.751 197768 0.008
installation of flow meter Total 0.095
Apparent level in filter outlet 0.400
Filter max velocity 10.53 m/h (Turbidity target 0.5 NTU, 1 NTU max)
Head loss (1/ES)^1.85 x FR^1.21 x 10^(0.23429-0.0111T)x14.45415Loss through 0.65mm media 0.84 m/m 0.42 m
Loss through No 2 anthracite 0.22 m/m 0.16 m
Clogging head adopted 3.00 m
Total media loss 3.58 m Loss inc nozzles say 3.700
TWL of fil ters 4.100
Top of media 0.120Anthracite depth 0.750 m
Sand depth 0.500 m
Gravel depth 0.05 m
Slab thickness 0.200 m Underside of slab -1.380 m
Depth floor/ underside of slab 0.900 m
Filter floor level -2.280
Anthracite expansion 48%
Sand expansion 35% assumed
Expanded media depth 0.535 m Expansion media level 0.655 m
Margin to underside of trough 0.178 m Underside of trough level 0.833 m
Depth of trough 0.56 m
Top of washweir 1.393
Head of water above media 3.980 m
H d t h 0 047 TWL t h 1 440
-
8/10/2019 Wasit_Detailed Design Report_updated.pdf
27/180
C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universit y and Engicon
TWL inlet channel 4.505
Filtered water Overflow weir
Length of weir 3.000 m into washwater tank (overflow from wash water tank)
Head over weir 0.144 m
Rise to overflow weir 0.350
Soffit of weir 0.350
TWL over weir 0.494
Soffit of channel roof 1.093
Overflow pipework
Flowrate 24726 m3/d
Dia 0.6 m
Velocity 1.01 m/s
Siphon
Adopt no of siphons per filter 3 1.393 Weir level
Dia of siphon 0.15 m
Height of siphon 0.3 m
0.420 Drain down point
2.4.8 Clean Wash Water Tank
Concept is that part of the filtered water overflows a weir into the tank, such that the flow going forward to the
Chlorine contact tank is not starved.Inlet flow to washwater tank about 10% of max plant flow.
Flow into tank 104.05 m3/h at max flow
69.4 m3/h at min flow
Volume of tank 278 m3 nett
Assume weir length 1 m
Max head over weir 0.064 m
-
8/10/2019 Wasit_Detailed Design Report_updated.pdf
28/180
C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universit y and Engicon
Adopted dia 0.45 m
Outlet penstock area 0.36 m2
Washwater velocity 1.05 m/s
Head loss 0.15 m
Ai r scour blowers (2 no)
Air scour velocity 45 Nm3/2.h
Flow 1111.5 Nm3/h
Velocity in pipe 20 m/s
Pipe dia 0.140 m/sAdopted dia 0.15 m
2.4.9 Chlorine Contact Tank
Twin compartment (to allow cleaning)
Inlet flow 24031 m3/d
Contact time 30 mins
Volume 500.6 m3
Assumed eff 100%
as this is taken into accountin the 30 mins
Temp C 5
Kinematic visc 1.52E-06
g 9.81DH DH = (0.25LV^2)/((2Dg((log((k/3.7D)) + 5.74 /(Re^0.9)))^2))
Fittings Size No K Flow VelocityVel.Head Headloss
mm m3/s m/s m mExit loss intoCCT 0.7 1 1 0.28 0.72 0.027 0.027Butterfly
valve 0.7 1 1.54 0.28 0.72 0.027 0.041
Tee 0.7 1 1.2 0.28 0.72 0.027 0.032Entry loss into
pipe 0.7 1 0.5 0.28 0.72 0.027 0.013
0.7 Length m RePipe lengthA d
-
8/10/2019 Wasit_Detailed Design Report_updated.pdf
29/180
C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universit y and Engicon
2.4.10 Sludge System
Based on Al-Dujaila raw water characteristics
CLARIFIER
Turbidity
F
Cf
C
Raw water 57 NTU mean Cw
25 NTU min F
115 NTU max
Clarified water 2 NTU maxClarified water 1 NTU min W
Cw
Chemical addition
Alum dose 50 mg/l as .14.3 H2O- to be confirmed
Assumed ratio SS/NTU 4 from rw quality data
Solids concentration 8.00 kg/m3 (0.8%)assumed for low and medium turbidities10.00 kg/m3 (1%)assumed for high turbidities
Solids production 236 mg/l mean
104 mg/l min
468 mg/l max
Max flow average turbidity
Clarified water flow C 24.73 MldFeed concentration Cf 240 mg/l
Clarified water conc. Cc 2 mg/l
Sludge blowdown conc Cw 8000 mg/l
Feed flowF 25.48 Mld
Sludge blowdown W 0.76 Mld
Max flow max turbidity
Clarified water flow C 24.73 Mld
Feed concentration Cf 472 mg/l
Clarified water conc. Cc 2 mg/l
Sludge blowdown conc Cw 10000 mg/l
Feed flowF 25.94 Mld
Sludge blowdown W 1.22 Mld
-
8/10/2019 Wasit_Detailed Design Report_updated.pdf
30/180
C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universit y and Engicon
Max flow max turbidity 12189 kg/day 11514.75
FILTERS
Inlet turbidity 2 NTU max
Outlet turbidity 0.1 NTU for design basis
Flowrate max 24726 m3/d
Flowrate ave 24726 m3/d (for solids calc basis)
Flowrate min 8369 m3/d 44.506238
Filter bed volume 30.875 m3
Washwater BV 4.5Wash water volume 139 m3
No of backwashes 5 per day
Dump area 30.6 m2 approx. assumes weir wall thickness 0.25m
Depth from TWL to weir 2.71 m
Depth from weir to siphon 0.97 0.3 above media for siphon
Dump volume 110m3 per filter comprising vol above weir + vol of 2 no washwater troughs+ volbelow troughs
Max wash volume per day 695 m3 excluding dumpMin wash volume per day 347 m3
Max wash volume per day 914 m3 assuming two dumps per day
Solids load 94 kg/d assumes SS/NTU ratio = 2
Solids concentration 0.1 kg/m3 max excluding dump
Min wash volume per day 347 m3
Solids load 32 kg/d assumes SS/NTU ratio = 2
Solids concentration 0.1 kg/m3
Outlet pipe to wastewater tank
Max flow 1360.5 m3/h
Velocity 1.0 m/s
Dia 0.7 m
2.4.11Wastewater Holding Tank
Sized to hold one filter wash plus 1 hour of average clarifier flow + 30 mins rinse to waste
The TWL of this tankshould be below the invert level of the filter
h t h l
-
8/10/2019 Wasit_Detailed Design Report_updated.pdf
31/180
C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universit y and Engicon
Absorbed power 4.29 kW
Return pumps ( 2 duty)
Evacuate tank in 2 hours
Flow rate required 215 m3/h
Flow per pump 107 m3/h per pump
Pipe length
Pipe velocity 1.5 m/s
Pipe dia 0.22 m
Adopted dia 0.25 m
discharge head mPump heat to be confirmed when pipe route finalised
Individual Pump
Flow 107 m3/h
Pipe dia 0.15 m
Velocity 1.69 m/s
Temp C 5
Kinematic visc
1.52E-06
g 9.81
DH DH = (0.25LV^2)/((2Dg((log((k/3.7D)) + 5.74 /(Re^0.9))) 2))
Fittings Size No K Flow VelocityVel.Head Headloss
m m3/s m/s m m
Exit loss 0.25 1 1 0.06 1.21 0.075 0.075
Butterfly valve 1 1.54 0.06 1.21 0.075 0.116
NRV 1 1.7 0.06 1.21 0.075 0.128
Tee 1 0 0.06 1.21 0.075 0.000
Bends 12 0.75 0.06 1.21 0.075 0.677
Pipe length Length m Re
0.25 3500 0.00015 0.060 1.21 199942 20.474
-
8/10/2019 Wasit_Detailed Design Report_updated.pdf
32/180
C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universit y and Engicon
2.4.12 Chemical Storage and DosingAlum
Max flow 25.48 Mld
Dose rate adopted 50 mg/l Al2(SO4)3.14 H2O
Solution strength 10%
Alum consumption 1258.00 kg/d
Solution flow 12580 kg/d
SG of 10% solution 1.06 approx.
Flowrate 0.49 m3/h
Water addition 11.3 m3/d
Pump flow 0.50 m3/h
Alum granules delivered in 50 kg bags on a 1 tonne pallet.
Dimensions of pallet
Nett storage capacity 19.0 m3 Weight of Alum solution 20128 kg
Water depth 2.5 m Quantity of Alum 2012.8 kg
Area 7.60 Amount of water 18115.2 kgL = W 2.76 Volume of make up water 18.079042 m3
adopt L = W 2.5 m Capacity of tank 1.6
Liquid depth 3.04 m
Freeboard 0.5 m
Overall heightadopted 2.50 m
Adopt Duty and standby tanks
Chlorine Dosing
MaxFlow 25.48 Mld
Max dose 5 mg/l
Chlorine consumption 127.4 Kg/d
30 days storage 3.8 Tonne
Adopt 9 1 Tonne drum store for commonality
Future Polyelectrolte dosing
Raw Water
A d d 0 2 /l
C LOTTI & ASSOCIATI S A i ll b ti i th CEB B hd d U i it d E i
-
8/10/2019 Wasit_Detailed Design Report_updated.pdf
33/180
C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universit y and Engicon
Consumption max 79.5 Kg/d
Concentration 0.20%
Volume 39.73 m3/d
Tank dia 2.5 m NB Preferable to install an auto polyprep unit
depth 8.09
Adopt 3.0 m
Weight required
in 30 days 2384.1 say 32 No 25 kg bags
2.4.13 Service Water Requirements
Alum make up 18.1 m3/d
Polyelectrolyte 0 m3/d ( Future requirement and not taken into consideration)
Chlorine 22.8 m3/d assuming no prechlorination ( intermittent)
Potable to houses
Population equiv 20 assumed
Consumption p.e 400 l/p.e
Consumption per day 8 m3/d
Washdown 23 m3/d assumed
Treated water losses max. 31 m3 max /day
Treated water losses min. 22 m3 min /day assuming min flow
Service water tank
Sized for a nominal 6 hours
Volume 2.05 m3
Dia 2 m
Straight side 0.653 m
Adopt 2 m dia
C LOTTI & ASSOCIATI S p A in collaboration wi th CEB Baghdad Universit y and Engicon
-
8/10/2019 Wasit_Detailed Design Report_updated.pdf
34/180
C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universit y and Engicon
Ministry of Municipalities and Public Works Republic of Iraq 4/11/07
Second Emergency Water Supply and Sanitation Project Wasit Detailed Design Report/fdDetailed Design Report c.a.: F249A
33
2.4.14 Mass Balance
To River
Stream Description F1 F2 F3 F4 F5 F6 F7 F8 F9 F10 F11
Fluid Raw Water Conditioned RW Clarified Filtered Treated Sludge Sludge Sludge Filtered Filtered Treated
Flow Regime Continuous Continuous Continuous Continuous Continuous Intermittent Intermittent Continuous Intermittent Intermittent
Flow
Instantaneous max m3/h 371 1360 104 1360
Maximum/max solids m3/d 25945 25945 24726 24031 24000 1219 914 1914 695 695 31
Maximum /av solids 25483 25483 24726 757 695
Minimum m3/d 8369 8369 8369 8022 8000 0 347 347 347 347 22
Mass flowInstantaneous kg/h 3706
Maximum kg/d 12189 94
Average kg/d 6059
Minimum kg/d 0 32
Service water Tank
F11
Inlet PumpingStation
LamellaClarifiers
Rapid GravityFilters
Treated waterStorage Tank
Alum
F1 F2
Clean Wash watertank
F3 F4
F7
F6
ChlorineContact Tank
Waste WaterHolding Tank
F9
F10
F5
F8
ESTDistribution
-
8/10/2019 Wasit_Detailed Design Report_updated.pdf
35/180
-
8/10/2019 Wasit_Detailed Design Report_updated.pdf
36/180
C. LOTTI & ASSOCIATI S.p.A. in co llaboration with CEB Baghdad University and Engicon
4. MECHANICAL DESIGN
4.1 Mechanical Equipment General
4.1.1 Introduction
The raw water system transfers water from the Al-Dujaila- River to the flocculators/clarifier via the raw
water pipeline of 500 mm in diameter. The raw water pumping station is located on the Al-Dujaila-River bank and consists of an above-ground pump room and a below-ground wet well. The pump room
is located above wet well and consists of four vertical turbine pump (one standby) each with flow rate
of 350 m3/hr and 11.8 m head.
The treated water pumping station consists of a pump room and electrical room located above the
pumping station. The treated water storage tank chambers act as wet wells for the treated water pumps
and service water pumps. The treated water pumping station consists of four electric driven, two speed
vertical turbine pumps (one standby) each with capacity of 333.3 m3/hr and with head of 40.8 m. The
treated water is pumped from treated water storage tank to the elevated storage tank with 30 m head via
the treated water pipeline of 500 mm in diameter. The treated water pipeline also supplies the site
potable water system.
In backwash system, the two 100% capacity backwash pumps are provided. They are designed for 1350
m3/hr which is equivalent to a wash rate of 55 m
3/hr.This is sufficient to provide the necessary bed
expansion at a water temperature of 30oC. The backwash pumps will operate in alternating duty with
one serving as a standby.
Filter backwash water, clarifier sludge, and miscellaneous process wastes are routed from structures
and process units to the wastewater holding tank. All flow is by gravity with process unit sources
operating under the static heads in each chamber. Wastewater will be discharged by three pumps (one
standby) each with capacity of 410 m3/hr and a head of 12.2 m back to the Dujaila River downstreamof the plant intake via the wastewater pipeline of 250 mm diameter (see drawing no. 13-231-2212).
An emergency overflows from the process units are piped to an overflow tank sized to hold 30 minutes
full works flow. A single vertical spindle pump with capacity of 126 m3/hr and a head of 6.5 m is
located in the tank which pumps the overflow at a controlled rate through a pipe of 200 mm diameter to
outside treatment plant area.
The service water system provides treated water to miscellaneous plant service such as chemical make-
up, wash down and fire fighting. The system is primarily located in the treated water pumping stationand consists of duty assist and standby pumps.
4.1.2 Scope of the Work
For Wasit subproject the length of transmission pipelines, service pipelines and static heads for all
-
8/10/2019 Wasit_Detailed Design Report_updated.pdf
37/180
C. LOTTI & ASSOCIATI S.p.A. in co llaboration with CEB Baghdad University and Engicon
drawings are constructed to cope with new subproject in Wasit. Finally the bill of quantities and
technical specifications for each item is revised and changed accordingly.
4.1.3 Design Criteria
The mechanical system is designed to meet the criteria specified below:-
- Colebrook-White formula is used for head loss calculations for all piping systems.
- 1.25 mm roughness coefficient is used for Ductile Iron pipe (cement lined) up to 20 years old.
- Pump discharge velocity (2-3) m/s.
- Pump discharge header velocity (1.5-2) m/s.
- DI pipe will adopt for all process yard pipe work to carry water and wastewater.
- Treated water pipeline is designed for ultimate capacity.
- The slopes for interconnecting pipes in site are adopted to fit the required invert for each unit.
- A wastewater pumps are sized to evacuate the tank in 2 hours.
- NPSH definition is used to calculate and check the cavitations for pump suction side.
- Natural ground level of Wasit site is 16.00 m.
4.1.4 Calculations
A computer program is developed for calculations of head losses in transmission and service pipelines,Net Positive Suction Heads (NPSH) and power required for the pumps in order to check the previously
selected pumps in standard design technical specifications. The results of the calculations are shown in
computer outputs.Based on the scope of the work, design criteria and the results of the calculations, the major changes in
standard design can be summarized as follows:-
1- The slopes for interconnecting pipes in the yard piping are calculated and adopted to fit the required
invert for each unit within the new layout and new drawings (13-231-2200/13-231-2201/ 13-231-2202/
13-231-2203 and 13-231-2204) have been constructed.
2-New dimensions for longitudinal sections of yard piping layout for process, wastewater and overflow
are calculated and new drawings (13-231-2205/13-231-2206 and 13-231-2207) have been constructed.
3- Based on new layout, new tables for manholes specifications (13-231-2208) and piping length,
diameters and fittings (13-231-2210) are formed.
4- Based on Wasit site layout a new drawing for yard service and potable water piping systems (13-
-
8/10/2019 Wasit_Detailed Design Report_updated.pdf
38/180
C. LOTTI & ASSOCIATI S.p.A. in co llaboration with CEB Baghdad University and Engicon
pumps heads selected in standard design. Therefore, the selected pumps for standard design will be
recommended and used for service and backwash pumping stations. The results of the calculation areshown in attached computer outputs.
7- The net positive suction heads for all pumping stations are calculated as shown in computer output,
checked and compared with the values of NPSH in technical specification of standard design. All the
values are within the selected range.
4.1.5 References
- All general arrangements
- Hydraulic design guide
- Drawing No. 13-231-2200 Wasit landscape pipelines
- Drawing No. 13-231-2201 Piping layout 1 0f 4
- Drawing No. 13-231-2202 Piping layout 2 0f 4
- Drawing No. 13-231-2203 Piping layout 3 0f 4
- Drawing No. 13-231-2204 Piping layout 4 0f 4
- Drawing No. 13-231-2205 Yard piping process pipelines
- Drawing No. 13-231-2206 Yard piping wastewater pipelines
- Drawing No. 13-231-2207 Yard piping overflow piplines
- Drawing No. 13-231-2208 Manhole schedule
- Drawing No. 13-231-2209 Thrust block schedule- Drawing No. 13-231-2210 Pipe schedule
- Drawing No. 13-231-2211 Service and potable water piping system
- Drawing No. 13-231-2212 Draniage system for wastewater and overflow water
- Treatment plant process output
- Fluid Mechanics, F. White, Second Edition
4.1.6 Sample of the Calculations
The results of all the calculations for yard piping, transmission pipelines head losses, net positive
suction heads for pumps and pumps power are represented and attached as a computer outputs for:-
- Head losses calculation for raw water pumps
-
8/10/2019 Wasit_Detailed Design Report_updated.pdf
39/180
C. LOTTI & ASSOCIATI S.p.A. in co llaboration with CEB Baghdad University and Engicon
4.1.6.1 Head losses calculation for raw water pumps
-
8/10/2019 Wasit_Detailed Design Report_updated.pdf
40/180
C. LOTTI & ASSOCIATI S.p.A. in co llaboration with CEB Baghdad University and Engicon
4.1.6.2 Head losses calculation for treated water pumps
-
8/10/2019 Wasit_Detailed Design Report_updated.pdf
41/180
C. LOTTI & ASSOCIATI S.p.A. in co llaboration with CEB Baghdad University and Engicon
4.1.6.3 Head losses calculation for wastewater pumps
-
8/10/2019 Wasit_Detailed Design Report_updated.pdf
42/180
C. LOTTI & ASSOCIATI S.p.A. in co llaboration with CEB Baghdad University and Engicon
4.1.6.4 Head losses calculation for overflow pumps
-
8/10/2019 Wasit_Detailed Design Report_updated.pdf
43/180
C. LOTTI & ASSOCIATI S.p.A. in co llaboration with CEB Baghdad University and Engicon
4.1.6.5 Head losses calculation for backwash water pumps
-
8/10/2019 Wasit_Detailed Design Report_updated.pdf
44/180
C. LOTTI & ASSOCIATI S.p.A. in co llaboration with CEB Baghdad University and Engicon
4.1.6.6 Head losses calculation for service water pumps
-
8/10/2019 Wasit_Detailed Design Report_updated.pdf
45/180
-
8/10/2019 Wasit_Detailed Design Report_updated.pdf
46/180
C. LOTTI & ASSOCIATI S.p.A. in co llaboration with CEB Baghdad University and Engicon
4.2 Pump Station and Pipeline Hydraulic Transient Analysis
4.2.1 Purpose
Surges or transient pressure in a pressurized system are generally caused by a change of flow conditions
in the pipeline system. These changes cause waves to travel upstream and downstream from the pointwhere the change take place. The waves, in turn, cause increases or decreases in pressure as they travel
along the pipeline. Transient pressure is independent of the internal working pressure created by the
fluid in the pipeline; however transient pressure is proportional to the rate of change of flow conditionsand the pressure wave speed. Transient pressures must be considered during the pipeline and pump
station design to adequately protect the hydraulic system and ensure safety.Changes in flow conditions can result from either normal or abnormal hydraulic transient conditions in
a pumped system. Normal flow conditions changes may be caused by a change in pump operation suchas a normal pump startup or shut down, or by the normal opening and closing of valves in the system.
Abnormal flow conditions changes typically result from unplanned events such as power failure at the
pump station or a sudden/unexpected valve closure.
A sudden starting or stopping due to power failure are the most severe surge condition in a pumped
pipeline system. A rapid change in the flow conditions will take place at the pump station andimmediately propagate downstream of the pump. In a pumped system the pressures developed
following the pump start or failure within the system may exceed the limits that the system canwithstand casing damage to the system. A pressure control devices must therefore be provided in order
to control transients in the pipeline.
As part of this analysis, for both the raw water pump station and finished water pump station, a surge
control strategy has been recommended and sized to eliminate potential formation of high and vacuum
pressure conditions and resultant transient pressure conditions during a maximum flow uncontrolledpump station shutdown and pumps startup.
4.2.2 Transient Mathematical Model
In general two primary equations are used in predicting transient flow conditions for surge events, These
are based on Newton's second law of motion and on the continuity equation. The assumptions involved
and the derivation of the equations are found in the literature on fluid transients (Chaudhry, Wylie andStreeter, and Parmakian). When these equations are coupled, they form a pair of quasi-linear hyperbolic
partial differential equations in terms of two dependent variables, velocity and HGL elevation, and twoindependent variables, distance along the pipeline and time. The model uses the numerical approach
known as the Method of Characteristics to transform these equations into four ordinary differentialequations. In order to solve for the flow conditions at the end of time step at the two boundaries,
auxiliary equations are needed so that there are as many equations as there are unknowns. In other
d th ti f th b d diti t b d i th ti l f th t b
-
8/10/2019 Wasit_Detailed Design Report_updated.pdf
47/180
C. LOTTI & ASSOCIATI S.p.A. in co llaboration with CEB Baghdad University and Engicon
water pipeline systems.
4.2.3 Criteria and Analysis
The analysis performed included both the raw water and finished water pump stations. The assumptions
used to hydraulically represent the system and assess and size the surge control facilities are detailedbelow.
4.2.3.1 Raw Water Pump Station
The raw water pump station and pipeline system was modeled with the following assumptions:
Surge Events:The causes of the surge events are simultaneous power failure to pumps and simultaneouspump start up.
Pipelines: All pipelines are assumed to be ductile iron pipeline with a rated water working pressure of105m and an allowable downsurge and upsurge pressure allowances as follows:
Downsurge: To eliminate problems resulting from air admission to the system, no negative or sub-
atmospheric pressure is allowed along the pipeline.
Upsurge: Ductile iron pipeline has a surge pressure allowance of 70m for a total working plus surgepressure allowance of 175m.
Roughness Coefficient:The pipeline was assumed to have a relative roughness, , of 1.5 mm for a
Darcy Weisbach friction factor,f, of 0.026.
Source/Delivery Points:The model assumes the raw water pump station wet well as the supply point.
The wet well is modeled with water level of 16.77m and 13.75m. The delivery point is assumed to be theflocculation basin with a maximum and minimum water surface elevation of 20.837m and 20.775m,
respectively.Pump Station: Each pump is modeled with a rotational moment of inertia equal to the pump/motor
combination. Each pump rotational moment of inertia is derived from an empirical equation developedby A.R.D Thorley and published in Fluid Transients in Pipeline Systems
2
. The equation uses
horsepower and rotating speed to estimate moment of inertia. The raw water pump analysis assumes
three pumps running. Each pump produces 350m3/h for a total flow rate of 1000 m
3/h. The total moment
of inertia has been modeled as 4.0 kg-m2.
Pump Characteristics: Power failure at the pump station and pumps start are modeled to assess theworst-case surge condition. Pumps manufacturers usually supply the characteristics curve of normal
operation zone and very few of them supply the complete characteristics curve. If these curves are notavailable for a pump, then the curves for a pump of the same type with approximately the same specific
speed may be used (Chaudhry, Wylie and Streeter)
-
8/10/2019 Wasit_Detailed Design Report_updated.pdf
48/180
-
8/10/2019 Wasit_Detailed Design Report_updated.pdf
49/180
C. LOTTI & ASSOCIATI S.p.A. in coll aboration w ith CEB Baghdad University and Engicon
Pressure Wave Speed: A wave speed of approximately 1,160 m/s was utilized in the model. The
program performs minor adjustments to the wave speed to accommodate pipeline segments of differentlengths.
The head variation at the pump station due to pumps start and failure are shown in Figure (3). The
maximum pressure developed within the system reached a level of 66. No vacuum pressure occurred. A
minimum pressure level of 31.12m occurred at the station.
It is recommended that the system be equipped with a surge control system. Several mathematical modelruns were made with different air vessels sizes, the recommended surge control system is a 10 m
3hydro
pneumatic tank with 70% of the total volume initially charged with water and 30% charged withcompressed air. The results for the protected system are shown in Figure (4). The pressures are keptwithin acceptable limits at the station and along the pipeline.
It should be noted that both raw water and treated water analyses and control strategies that are
recommended should be verified once refinements to system control logic and equipment selection has
been made. Field tests are required to verify the variation of the pressures due to pump failure and pumpstart just when the raw and treated water stations are completed
4.2.4 Analysis Summary and Recomendations
Surge control facilities are required for both of the raw water and finished water systems. A surge tank of
a cross sectional area of 1.4m with a maximum top level of 25.5m is recommended to control the
transient pressures within the raw water system. .
A 10 cubic meter hydro-pneumatic tank is recommended to control the transient pressures within the
finished water system. Generally, hydro-pneumatic tanks of this size have a free water surface to
compressed air interface. The water surface level in the tank will fluctuate with system pressure and
therefore is continuously adjusted by a compressor and receiving tank. This type of system allowssignificant flexibility and will protect the system over a wide range of operating conditions. However,
general maintenance on the compressor is required to ensure operation. If the compressor is not
operational, the hydro-pneumatic tank will not protect the system during a transient event. An alternativeto the compressor system is an air bladder. The bladder is positioned within the tank during the
manufacturing process and after installation the bladder is inflated to a set pressure. This set pressure is
generally the higher end of the systems normal operating bandwidth. A bladder system does not provide
as much flexibility as a compressor designed system, but the inflated bladder system will maintain the set
pressure for an extended period of time without the need for constant adjustments. For a hydro-pneumatic tank this size periodic adjustments may be required depending on temperature and bladder
elasticity. Also, there are limited manufacturers of bladder hydro-pneumatic tank systems. If available
and cost feasible, a bladder tank is recommended.
-
8/10/2019 Wasit_Detailed Design Report_updated.pdf
50/180
-
8/10/2019 Wasit_Detailed Design Report_updated.pdf
51/180
C. LOTTI & ASSOCIATI S.p.A. in co llaboration with CEB Baghdad University and Engicon
70
-
8/10/2019 Wasit_Detailed Design Report_updated.pdf
52/180
Ministry of Municipalities and Public Works Republic of Iraq 4/11/07
Second Emergency Water Supply and Sanitation Project Wasit Detailed Design Report/fdDetailed Design Report c.a.: F249A51
0 25 50 75
Time (Sec.)
30
35
40
45
50
55
60
65
70
Head(m)
Head Variation due to pumps start
Head Variation due to pumps failure
Figure (3). Head variation at the finished water pump station without pressure control device.
C. LOTTI & ASSOCIATI S.p.A. in co llaboration with CEB Baghdad University and Engicon
60
-
8/10/2019 Wasit_Detailed Design Report_updated.pdf
53/180
Ministry of Municipalities and Public Works Republic of Iraq 4/11/07
Second Emergency Water Supply and Sanitation Project Wasit Detailed Design Report/fdDetailed Design Report c.a.: F249A52
0 25 50 75 100 125 150 175 200
Time (Sec.)
40
45
50
55
60
Head(m)
Head Variation due to pumps start
Head Variation due to pumps failure
Figure (4). Head variation at the finished water pump s tation with pressure cont rol device.
C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universi ty and Engicon
-
8/10/2019 Wasit_Detailed Design Report_updated.pdf
54/180
4.3 Mechanical Equipment-HAVAC
4.3.1 Introduction
The standard design drawings for processing and non-processing buildings are reviewed and
selected to cope with the new subproject in Wasit. Also, all relevant HVAC system drawings
have been checked for cross references and changed to fit the new set of the drawings for
subproject in Wasit WTP.
Computer programs for calculations of cooling/heating loads and ventilation rates are
developed to check the standard design loads calculations. The cooling and heating loads
calculations for all spaces are performed. In addition, the required ventilation rates for pumps,
chlorination, chemical, rapid gravity filter and other halls are revised. Furthermore, the sizeand specifications of a scrubber unit for chlorinating hall is calculated and checked.
The work includes the design criteria and installation systems for air conditioning, heating
and ventilation for various spaces and will be as follows:
The air conditioning, heating and ventilation systems will be designed to meet the criteria
specified below:-
4.3.2 Design Criteria
4.3.2.1 Cooling
The air conditioned areas comprise the following spaces:-
- Non-process building
- Selected rooms in processing building
Inside design conditions will be:-- 23 oC Dry bulb temperature
- 50 % Relative humidity
- 20 % Fresh air make- up
4.3.2.2Heating
Heating areas comprise the conditioned spaces listed above and drum stores in the
chlorination stations.
- Conditioned spaces will be heated to maintain a
temperature of 21 oC.
D t ill b h t d t i t i
C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universi ty and Engicon
- Pipe galleries system
-
8/10/2019 Wasit_Detailed Design Report_updated.pdf
55/180
Pipe galleries system
6- Air changes/ hour
- Battery room extracts system
13- Air changes/ hour
While mechanical ventilation areas comprise the following
- Generating hall
15 - Air changes/ hour
- Chlorinating building8- Air changes/ hour
- Pump halls
7- Air changes/ hour
- Workshop system
6- Air changes/ hour
Installation will be designed to operate continuously under limiting conditions for full range
likely meteorological conditions.
4.3.3 Systems
Different systems are used for cooling, heating and ventilation of various spaces in processing
and non-processing buildings of the Wasit water treatment plant. The systems for building
are as follows:-
4.3.3.1 Cooling system
An individual through the- wall split air conditioning units ( cooling/ heating ) will be
provided for individual rooms that are adequate for simplicity of air-conditioning smaller
spaces.
4.3.3.2 Heating system
Heating system will be provided to air conditioned areas by electric heater batteries within the
split air conditioning unit. In addition, duct inserted electric heaters will be provided in drumstore in the vicinity of the on-line drums and chemical building to maintain a temperature of
13 oC. Also, a local electric heater will be provided for workshop building.
4.3.3.3 Ventilation systems
C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universi ty and Engicon
In addition to the air ventilation specified for chlorinating station, a complete air cleaning
-
8/10/2019 Wasit_Detailed Design Report_updated.pdf
56/180
In addition to the air ventilation specified for chlorinating station, a complete air cleaning
system (scrubber unit) will be provided for removable of chlorine from contaminated exhaust
air following a chlorine leak in the drum store.
4.3.4 Sample of Calculations
4.3.4.1Non-processing building
A computer program is developed for the calculations of cooling and heating loads for all
spaces in the non-processing building . All the coefficients used in the calculations are based
on ASHRE standards with correction to our ambient conditions (latitude, month,
temperature,..etc.) and with the following conditions.
- Outside Summer: 46C Dry bulb and 23C Wet bulb.
- Outside Winter: 0C
- Daily temperature range = 19.2C
-Heat transfer coefficients
- Wall : 1.56 W/m2. C
- Roof : 0.65 W/m2. C- Glass : 5.7 W/m2. C
- Barrier: 3 W/m2. C
- Film coefficients
- Inside wall : 6.23 W/m2. C
- Outside wall: 22.7 W/m2. C
- An air change per hour is chosen as (20) for approved Air Cooler.
- All split units are manufactured for outside temp. = 35 C. Therefore, a correction is made to
estimate the actual load for ambient temperature of 50 oC.
- Load calculations for mechanical maintenance room
a- Heating load
- Heating load calculations showed a load of 11220 watt.
- Heat source from machines = 1800 w
- Net heat required = 9420 w
Therefore the heating load = 10000w
C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universi ty and Engicon
= 847 x 20
-
8/10/2019 Wasit_Detailed Design Report_updated.pdf
57/180
= 16940 m3/hr
= 9960 CFM
- (2) Nos. Evaporator Air Coolers with 5000 CFM each are selected.
- Load calculation for conditioned zones
A computer program is developed for calculation of cooling load for various zones in non-
processing building. The calculations are based on the design criteria and the correction
procedure to fit the ambient temperature of 50 oC. The computer output shows the details of
the calculations and cooling loads for other zones are shown in the attached table.4.3.4.2 Process buildings
The process buildings comprise pumps halls, rapid gravity filter, chemical, chlorine buildings
and other associated buildings. These buildings are provided with ventilation system thought
fan extraction units and sand trap filters. A computer program is developed for calculation of
ventilation loads for various spaces. The result of sample calculation is shown in computer
output. Loads for others zones are calculated and checked.
4.3.5 The Changed Drawings:
The drawing No. (13-299-5600) shows the technical information about the HAVC
equipment used in the WTP. The following units are not found in above drawing.
1- EUW-90-1003 & CU-90-1021
2- EUW-90-1002 & CU-90-1022
3- EUW-90-1003 & CU-90-1023
Electrical Building MCC
4- EUW-80-1001 & CU-80-1021 Chemical Building
5- EXF-80-1001
6- EXF-80-1002
So, these units are added in the table with their technical information ( split unit type,
capacity, power, voltage, phase .etc)
4.3.6 Bill of Quantities:
The bill of quantities is revised, checked and changed accordingly to fit the supplied
drawings.
C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universi ty and Engicon
-
8/10/2019 Wasit_Detailed Design Report_updated.pdf
58/180
Summary of Cooling Load Calculations for non-processing building
Building ZoneTotal Heat
(Watt)
Total Heat
(Btu/hr)
GTH
(Btu/hr)
Selected
Capacity
(Btu/hr)
Admini. 02 19628 66931 83664 3x30000
08 12568 42731 53413 2x30000
11 12009 40050 51186 2x3000012,13 12673 43088 53860 2x30000
14 11170 38092 47615 1x48000
17 22155 75548 94436 2x48000
Mainten. 07 8592 29298 36623 2x22300
09 7016 23924 29905 2x22300
10 3169 10815 13518 1x22300
3-BR 03 6533 22277 27846 1x3000006 4822 16464 20580 1x22300
07 5512 18812 23515 1x30000
08 4499 15355 19193 1x22300
10 5422 18505 23131 1x30000
11 4485 15307 19133 1x22300
2-BR B07 3918 13372 16715 1x22300
B03 5429 18529 23161 1x30000B06 3255 11101 13876 1x22300
B08 5248 17911 22388 1x30000
B11 5797 19709 24636 1x30000
2-BR A03 5762 19648 24560 1x30000
A06 5101 17409 21761 1x30000
A07 3918 13372 16715 1x22300
A08 3255 11101 13876 1x22300A10 5429 18529 23161 1x30000
Guard 02 3028 10334 12917 1x18000
05 2562 8744 10930 1x22300
C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universit y and Engicon
-
8/10/2019 Wasit_Detailed Design Report_updated.pdf
59/180
Ministry of Municipalities and Public Works Republic of Iraq 4/11/07Second Emergency Water Supply and Sanitation Project Wasit Detailed Design Report/fdDetailed Design Report c.a.: F249A
58
SUBJECT HVAC Sample of Calculations
Admin. Bui lding
Wasit WTP
ZONE NAME: off ice
COMPUTED DATE 30/6/2007
CHECKED DATE 06/01/2007
REFERENCES (3). Modern Air Conditioning Practice, 2nd Edition.
(1). ASHRAE FUNDAMENTALS 2001. (4). ASHRAE STANDARD 62-1989
(2). ASHRAE FUNDAMENTALS 1997.
DESIGN DATA (Ref. 1, Ref. 4)
Outside Design Air Temperatures
Maximum DB Maximum WB Minimum DB Daily DB Range
C F C F C F C F
50 122 23 73.4 24 75.2 19 66.2
Inside Design ConditionAir Conditioned Spaces Ventilated Spaces
Min. Temperature Max. TemperatureRelativeHumidity Min. Temperature Max. Temperature
C F C F % C F C F
23 73.4 30 86 50 8 46.4 40 104
BUILDING DATA
Surface Conductances and Resistances (Ref. 1, Table 1 on pg. 25.2)
Inside Surface
Surface TypeSurfacePosition hi (W/m
2.oC) Ri (
oC.m
2/W)
Horizontal 9.26 0.108Inside SurfaceVertical 8.29 0.121
C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universit y and Engicon
O t id S f
-
8/10/2019 Wasit_Detailed Design Report_updated.pdf
60/180
Ministry of Municipalities and Public Works Republic of Iraq 4/11/07Second Emergency Water Supply and Sanitation Project Wasit Detailed Design Report/fd
Detailed Design Report c.a.: F249A59
Outside Surface
Surface TypeSurfacePosition h
i(W/m
2.oC) R
i(oC.m
2/W)
Outside Surface summer Any 22.70 0.04
Thermal Properties
Thickness Conductivity Resistance Total Resistance Ud
x ka R
b R
c(
oC.m
2/W) W/m
2.oC
Item mm m. W.m/m2.oC
oC.m
2/W Rsummer Usummer
Gypsum Plaster 20 0.020 0.81 0.025Concrete 200 0.200 1.37 0.146
Cement Morter 20 0.020 0.72 0.028
Asphalet 1.000 97.5 0.010
Insulation Styrafoam 0.500 0.517 0.967
Sand 100 0.100 1.83 0.055
Roof
Concrete Tile 40 0.040 0.76 0.053
1.44 0.697
Gypsum Plaster 20 0.020 0.81 1.000Brick 25 0.025 0.72 0.035
Cement Morter 20 0.020 0.72 0.450Exposed Walls 1.65 0.606
ZONE DIMENSIONS
Length Width Height Volume
Room m ft m ft m ft m3 ft
3
Zone 8.50 27.9 4.50 14.8 3.50 ### 134 4727
COOLING LOAD CALCULATION BY CLTD/SCL/CLF METHOD FOR AIR CONDITIONED SPACES
Construction Data
Uwindow= 6.42W/m
2.oC (Ref. 1,
Table 4 on pg. 30.8)
C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universit y and Engicon
Cooling Load from Heat Gain through Exposed Roof, Walls, Doors and Conduction through Galss
E ti UA(CLTD )
-
8/10/2019 Wasit_Detailed Design Report_updated.pdf
61/180
Ministry of Municipalities and Public Works Republic of Iraq 4/11/07Second Emergency Water Supply and Sanitation Project Wasit Detailed Design Report/fd
Detailed Design Report c.a.: F249A60
Equation: q = UA(CLTDCORR.)
Section
Net A m2 U-Factor (W/m
2.oC)
CLTDoC LM K
Corr.CLTD
oC Ref. for CLTD (Ref.2,Chap.28)
Roof 1 28 0.697 16 0.50 1.00 40 Table 30, Roof 1
NE wall 0 21 0.606 10 -0.50 0.85 35 Table 32, Wall 5
NW wall 0 40 0.606 8 0.00 0.85 24 Table 32, Wall 5
SE wall 1 29.75 0.606 12 0 0.85 39.4
SW wall 0 0 0.606 8 0 0.85 33 Table 32, Wall 1Where: Corr. CLTD = ((CLTD + LM) K + (25.5 - ti) + (tm - 29.4)) C
F=ventilation correction throughfalsh ciling
LM = alitute correction K = darkness correctiontm= mean outdoortemperature
Heat Load Through Glass
Conduction Cooling Load Through Glass
q = A U CLTDcorr
Section
Net A m2 U W/m
2.oC
Corr.CLTD
oC
Cooling LoadW
CoolingLoadBtu/h
Windows 6 6.42 27 1040 3547
Solar Cooling Load Through Glass
Equation: q = A(SC)(SCL)(SHGmax)
where SC= shading factor,SCL=solar cooling load factor SHGmax = soler heat gain
Windows Net A m2 SC SCL SHGmax
Ref. for SCL,SC and SHGmax (Ref. 2, Chapter
28)
CoolingLoad W Cooling Load Btu/h
NE window 0 0.64 0.81 445Table 36,
on pg. 28.50 0
C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universit y and Engicon
NW window 0 0.64 0.81 445 0
SE i d 0 0 64 0 81 571 0
-
8/10/2019 Wasit_Detailed Design Report_updated.pdf
62/180
Ministry of Municipalities and Public Works Republic of Iraq 4/11/07Second Emergency Water Supply and Sanitation Project Wasit Detailed Design Report/fd
Detailed Design Report c.a.: F249A61
SE window 0 0.64 0.81 571 0
SW window 6 0.64 0.81 571 1776
Cooling Load From People 1776
Equation:
qsensible= N(Sensible heat gain)CLF
Where qlatent = N(Latent heat gain)
N = number of people in space
Sensible and latent heat gain from occupancy - Ref. 1, Table 1 on pg. 29.4
CLF = Cooling load factor, by hour of occupancy - Ref. 2, Table 29 on pg.28.40
N Sensible Heat W latent Heat W CLF qsensible Wqlatent
WCooling
Load W
12 90 95 1.0 1080 1140 2220
Cooling Load from Heat Gain through Lights
Equation: q = WFulFsa(CLF)
W Factor Ful Fsa CLF q(W) q(Btu/h)
720 3.41 1 1.2 1 864 2946
Cooling Load from Infiltration Air
Infiltration through wall surface is neglected as insignificant.
To calculate the infiltration through doors, estimate 100 ft3per person per door passage (Ref. 2 on pg. 28.34).
Further estimate each door use is at 2 persons hour. 74.40 L/s
Qinfiltration= 2 x 100 /( 60 *2.118 =
qsensible= 1.22Q(to- ti)
qlatent= 2940Q(Wo-Wi)
Q L/s Factor t OcW kg(water)/kg(dry
air)qW
qBtu/h
74.40 1.22 27 2451 8357
74.40 2940 0.0010 219 746
C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universit y and Engicon
Cooling load from equipment
-
8/10/2019 Wasit_Detailed Design Report_updated.pdf
63/180
Ministry of Municipalities and Public Works Republic of Iraq 4/11/07Second Emergency Water Supply and Sanitation Project Wasit Detailed Design Report/fd
Detailed Design Report c.a.: F249A62
Equipment
Cooling Load W Cooling Load Btu/h1 1000 3410
Summary of Cooling Load Calculations
itemSensible Cooling
Load W Latent Cooling Load W Sensible Cooling Load Btu/hLatent Cooling Load
Btu/h
Roof 780 2661
Exposed surfaces 1161 3958
Glass 3996 13626Equipment 1000 3410
People 1080 1140 3683 3887
Lights 864 2946
Infiltration 2451 219 8357 746
Subtotal 2451 1359 8357 4633
Grand Total Load 11332 1359 38641 9267
Summary of Cooling Load Calculations
RoomTotal CoolingLoad W Total Cooling Load 1.1 W
Total CoolingLoad Btu/h
Total Cooling LoadTon
Zone 12690 13960 47602 3.97
EQUPIMENT SELECTION
The load calculation is based on 46C temperaure outside condtion.
Equipment design is based on 35 C ambinent temperatureTotal Load will
be=4.96 Tons
Meter/Ton= 0.130
59503 Btu/h
Select Unit with 21950 Btu/h
C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universit y and Engicon
Nos. of Units= 3
-
8/10/2019 Wasit_Detailed Design Report_updated.pdf
64/180
Ministry of Municipalities and Public Works Republic of Iraq 4/11/07Second Emergency Water Supply and Sanitation Project Wasit Detailed Design Report/fd
Detailed Design Report c.a.: F249A63
AIR REQUIREMENTS FOR AIR CONDITIONED SPACES
Sensible-Heat Factor (SHF):SHF = (Sensible Heat)/(Total Heat) = 0.89
Room Apparatus Dew Point (ADP):
Using the Psychrometric Chart with the room design condition of 32oC DB, 50% RH,
ADP = 11.5oC
Bypass Factor (BPF):
Assuming cooling coil bypass factor
BPF
=
0.1
Required Airflow (Qsupply): (Ref. 4)
Where RSH = room sensible heat
tr= room air temperature,oC
Qsupply = 0.897 m3
/s
Qsupply = 1900 Cfm 701CFM EachUnit
CFM/Ton= 383
Fresh Air= 190 CFM
( ) ( ) 1000ADPtBPF1822.1RSH
Qr
=
C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universi ty and Engicon
SUBJECT Sample of Calculations PROJECT NAME:
-
8/10/2019 Wasit_Detailed Design Report_updated.pdf
65/180
SUBJECT Sample of Calculations PROJECT NAME:
COMPUTED DATE 24/5/2007 Chlorinating B.
CHECKED DATE 28/5/2007 Drum StoreVentilation System Wasit WTP
REFERENCES
(1). ASHRAE FUNDAMENTALS 2001. (5). ASHRAE STANDARD 62-1989
(2). ASHRAE FUNDAMENTALS 1997.