  • 8/10/2019 Wasit_Detailed Design Report_updated.pdf

    1/180

    NNEX 5

    etailed Design Report

    anuary 2008

    SECOND EMERGENCY WATER SUPPLY AND

    SANITATION PROJECTDETAILED DESIGN FOR WATERWORKS AND

    TREATMENT PLANT AT WASIT

    REPUBLIC OF IRAQ

    MINISTRY OF MUNICIPALITIES AND PUBLIC WORKS

    C LOTTI & ASSOCIATI

  • 8/10/2019 Wasit_Detailed Design Report_updated.pdf

    2/180

    SEWSSP

    WASIT WATER TREATMENT PLANT

    1,000 m3/h CAPACITY

    DETAILED DESIGN REPORT

    November, 2007

  • 8/10/2019 Wasit_Detailed Design Report_updated.pdf

    3/180

    C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universi ty and Engicon

    CONTENTS

    Page

    1. INTRODUCTION1.1 Background 7

    1.2 Summary and Scope of Work 7

    2. Design of Process Units

    2.1 Scope of Work 8

    2.2 Approach and Methodology 8

    2.2.1 WTP Capacity 9

    2.2.2 Raw Water Quality 92.2.3 Design Criteria 9

    2.2.4 Process Unit Sizing 10

    2.2.5 Process Flow / Mass Balance Diagrams 10

    2.2.6 Process and Instrumentation Diagrams 10

    2.3 Basis of Design 10

    2.3.1 Process Design Overview 10

    2.3.2 Process Functions 11

    2.3.3 Process Flow 112.3.4 Water Quality 12

    2.3.4.1 Raw Water Quality 12

    2.3.4.2 Treated Water Quality 12

    2.3.4.3 Determination of the Chemical Dose with Jar Tests 12

    2.3.4.4 In-Line Chemical Dispenser 12

    2.3.5 Design Parameters 13

    2.3.5.1 Sludge Mass Balance 13

    2.3.5.2 Filters 13

    2.3.5.2.1 Filter backwash 13

    2.3.5.2.2 Filter dump volume 14

    2.3.5.3 Clean wash water tank 14

    2.3.5.4 Wastewater holding tank 14

    2.3.5.5 Elevated Storage Tank 14

    2.3.5.6 Chlorination System 14

    2.3.5.6 Chemical dose rates and storage 142.3.5.6.1 Alum 15

    2.3.5.6.2 Chlorine 15

    2.3.5.7 Service water 15

    2.4 Process Calculations 15

    2.4.1 Basis of Design for all Plant Flows 16

  • 8/10/2019 Wasit_Detailed Design Report_updated.pdf

    4/180

    C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universi ty and Engicon

    2.4.13 Service Water Requirment 32

    2.4.14 Mass Balance 33

    3. Hydraulics and Hydrology3.1 Hydraulics Study 34

    3.2 Hydrological Study in Al-Dujaila- River 34

    4. Mechanical Design

    4.1 Mechanical Equipment- General 35

    4.1.1 Introduction 35

    4.1.2 Scope of the Work 35

    4.1.3 Design Criteria 36

    4.1.4 Calculations 36

    4.1.5 References 37

    4.1.6 Sample of Calculations 37

    4.1.6.1 Head losses calculation for raw water pumps 38

    4.1.6.2 Head losses calculation for treated water pumps 39

    4.1.6.3 Head losses calculation for waste water pumps 40

    4.1.6.4 Head losses calculation for over flow pumps 41

    4.1.6.5 Head losses calculation for backwash water pumps 424.1.6.6 Head losses calculation for service water pumps 43

    4.2 Pump Station and Pipeline Hydraulic Transient Analysis 45

    4.2.1 Purpose 45

    4.2.2 Transient Mathematical Model 45

    4.2.3 Criteria and Analysis 46

    4.2.3.1 Raw Water Pump Station 46

    4.2.3.2 Treated Water Pump Station 47

    4.2.4 Analysis Summary and Recommendation 48

    4.2.5 References 48

    4.3 Mechanical Equipment-HVAC 53

    4.3.1 Introduction 53

    4.3.2 Design Criteria 53

    4.3.2.1 Cooling 53

    4.3.2.2 Heating 53

    4.3.2.3 Ventilation 534.3.3 Systems 54

    4.3.3.1 Cooling system 54

    4.3.3.2 Heating system 54

    4.3.3.3 Ventilation systems 54

    4.3.4 Sample of calculations 55

  • 8/10/2019 Wasit_Detailed Design Report_updated.pdf

    5/180

    C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universi ty and Engicon

    4.4.4 Emergency Showers 68

    5. Electrical Equipment

    5.1 Introduction 695.2 Scope of Work 69

    5.3 Design Criteria and Parameters 69

    5.3.1 Compliance with Regulations and Standards 69

    5.3.2 The Incoming Supply 69

    5.3.3 Transformers 69

    5.4 Methodology 69

    5.5 Sample of Calculations 70

    5.5.1 Load Estimation 70

    5.5.2 Voltage Drop Calculations 71

    5.5.3 Indoor Lighting Calculations 73

    5.6 Drawings 74

    5.7 Bills of Quantity 74

    5.8 Specifications 74

    6. Instrumentation Control and Automation

    6.1 Instrumentation and Controls System 756.1.1 Introduction 756.1.2 Main Process Control Center 756.1.3 Control Network 756.1.4 Local Control Panels 766.1.5 Distributed PLCs 76

    6.2 Local/Remote control 77

    6.3 General Guidelines for Control Logic 776.3.1 General Control Loop Functions 786.4 SCADA Failure Modes 816.4.1 Workstations 816.4.2 PLC 816.4.3 Process I/O Modules 816.4.4 SCADA System Monitoring 816.4.5 Equipment Re-start 81

    6.5 Control Descriptions 826.5.1 Raw Water Pump Station 826.5.1.1 RWPS Operation 846.5.1.2 Station Power Loss 856.5.2 Screen Air Scour 856.5.3 Sampler Control 86

  • 8/10/2019 Wasit_Detailed Design Report_updated.pdf

    6/180

    C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universi ty and Engicon

    6.5.13.2 Local Mode of Operation: 1016.5.13.3 Remote Manual Mode of Operation: 102

    6.5.13.4 Monitoring Requirements: 1036.5.13.5 Chlorine Motive Water Pumps 1046.5.13.6 Chlorine Scrubber System 1066.5.14 Alum System 1086.5.14.1 Alum Mixing System 1096.5.15 Treated Water Pump Station 1106.5.16 Service Water System 1126.5.17 Overflow Holding Tank/Pump Station 114

    7. Architecural and General Layout7.1 Introduction 1167.2 Scope of Work 1167.3 Methodology 1167.3.1 General criteria 1167.3.2 Support Buildings 1167.3.3 Process Buildings 117

    7.4 Basis of Design 1177.4.1 Codes And Standards 117

    7.4.2 Primary Elements 117

    7.4.2.1 External walls 117

    7.4.2.2 Internal walls 117

    7.4.2.3 In-situ R.C. floor and roof slabs 117

    7.4.3 Finishing 118

    7.4.3.1 Wall finishing 118

    7.4.3.2 Floor Finishings 1187.4.3.3 Base 118

    7.4.3.4 Ceilings 118

    7.4.3.5 Metal works 118

    7.4.3.6 Carpentry 118

    7.4.3.7 Roofing system 118

    7.4.3.8 Flashing 118

    7.4.3.9 Water proofing 1187.4.3.10 Sealants 119

    7.4.3.11 Doors and Hardware 119

    7.4.3.12 Windows 119

    7.4.3.13 Glass and glazing 119

    7.4.3.14 Fencing 119

  • 8/10/2019 Wasit_Detailed Design Report_updated.pdf

    7/180

    C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universi ty and Engicon

    8.2.1 Design Codes 122

    8.2.2 Design Software 124

    8.2.3 Structural Materials 1248.2.4 Foundations 124

    8.2.5 Reinforced Concrete Structures : Design Basis General 125

    8.2.5.1 General 125

    8.2.5.2 Design Loads 125

    8.2.5.3 Material Requirements 126

    8.2.6 Structural Steel: Design Basis 126

    8.2.6.1 General 126

    8.2.6.2 Design loads 126

    8.2.7 Concrete Block Work 127

    8.2.8 Site Investigation 127

    8.3 Sample of Calculations 127

    8.4 Structural and Civil Drawings 143

    8.5 General description of civil works 144

    8.5.1 Non-Process Buildings 144

    8.5.2 Process Buildings 1449. Ancillary Works9.1 Geotechnical Report 1489.1.1 Introduction 1489.1.2 Laboratory Works 1489.1.3 Stratigraphy 1509.1.4 Groundwater 1519.1.5 Soil Classification and Identification 152

    9.1.6 Shear Strength Parameters 1559.1.7 Soil Compressibility 156

    9.1.8 Chemical Tests for Soil and Groundwater 157

    9.1.9 Geotechnical Design 158

    9.1.9.1 Allowable bearing pressure 158

    9.1.9.2 Shallow Foundations 159

    9.1.9.3 Pile Foundations 159

    9.1.9.4 De-watering 1609.1.10 Suitability of Materials for Re-use 160

    9.1.11 Smmary of Design Parameters 160

    9.1.12 Conclusions 161

    9.2 Road Report 163

    9.2.1 Introduction 163

  • 8/10/2019 Wasit_Detailed Design Report_updated.pdf

    8/180

    C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universi ty and Engicon

    1. INTRODUCTION

    1.1 Background

    Wasit subdistrict center is located in the south eastern part of the Wasit Governorate. It is

    about 28 km to the south east of Al Kut city. The topography of Wasit subdistrict is flat. The

    total population of Wasit subdistrict is about 38,293 inhabitants, about 10,500 of them are

    urban and the rest are rural.

    The climate in Wasit is dry and cold in the winter season and very hot in the summer. The

    average annual precipitation ranges from 120 to 130mm, most of this occurs in the winter

    months. The average daily temperatures range between 9-13 C in winter and 40-50 C in

    summer. The main occupation in the subdistrict is agriculture and animal husbandry. Ingeneral, Wasit is considered a poor subdistrict. The rural areas in Wasit subdistrict appear to

    be very populated; more than 72 percent of the population is living in the rural areas.

    The main source of water in Wasit city is the Al-Dujaila irrigation canal which is a branch of

    the Tigris River. Al-Dujaila canal passes through the urban area of Wasit city with continuous

    water flow throughout the year. The canal is under the jurisdiction of the Ministry of Water

    Resources.

    Only about 40% of the total population of Wasit city is served by a piped system, the

    remaining population is served by tankers or take water directly from the canal. Wasitsubdistrict center is served through an old water distribution network.

    The distribution system in the city is very old and is mostly of asbestos, cast iron, plastic and

    cement pipes. It has been reported that about 10% the maximum water head in the network is

    about 3.0 m and may go down to 0.5 m. Only 25% of the total area is covered by existing

    water facilities. The main transmission pipe is 250 mm in diameter, while the distribution

    pipes diameters range from 110 mm to 200 mm.

    The present project includes construction of a new 1,000 m3per hour WTP, river intake withraw water pumping station and transmission line, treated water ground storage tank, and

    elevated water storage tank. The site of the new water treatment plant is on the main street but

    drainage of the site might make access difficult during the rainy seasons.

    It is anticipated that no negative impacts on the environments will take place due to the

    sewage produced since most of water produced by the plant is utilized to improve the quality

    of water consumed by the inhabitants which are presently using poor quality water.

    1. 2 Summary and Scope of Work

    This report has been prepared to show the detailed design of Water Treatment Plant utilizing

    standard process units, structures and buildings developed by MWH for MMPW. The designs

    are based on plant capacity (works throughput) of 1000 m3

    /h. It is intended that standard

    designs are incorporated into the site specific design with the necessary alterations. Several

  • 8/10/2019 Wasit_Detailed Design Report_updated.pdf

    9/180

    C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universi ty and Engicon

    The report consists of ten chapters. The chapters describe the procedure for the design of Wasit

    Water Treatment Plant utilizing both Standard Designs and design specific to a particular

    capacity of works and location.

    2. DESIGN OF PROCESS UNITS

    A water treatment process is an assemblage of unit processes that effectively produces a

    supply of safe drinking water. The treatment system generally consists of four or more

    interrelated components. These components include coagulation, flocculation, clarification,

    filtration and disinfection with the necessary process control and instrumentation. Since the

    unit processes must be interrelated, the operation of each component affects the performanceof others, and then the entire system.

    2.1 Scope of Work

    The design of Wasit water treatment plant is based on the standard design of WTP for a

    capacity of 1000 m3/h of treated water. The standard design was incorporated into the specific

    site and conditions of Wasit City with necessary alterations. Several alterations will be

    explained in this chapter. The chapter also highlights the procedures which were undertaken

    for raw water quality testing, followed by descriptions for developing the process design

    utilizing calculation spreadsheets, Process Flow Diagram with Mass Balance, Hydraulic

    Profile Diagrams, and Process and Instrumentation Diagrams, The process design will

    determine the amendments which are required to the standard process units.

    2.2 Approach and Methodology

    The basic approach is that the water treatment plant should be designed to produce a

    continuous supply of safe drinking water according to raw water characteristics and theenvironmental conditions. The specific approaches of the design process are:

    1. Evaluation of local conditions carefully.

    2. Creation of a reasonably conservative design and cost-effective to construct.

    3. Creation of a simple, reliable, effective, and proven system by applying the bestknowledge and skill to the design.

    4. Designing a plant that is easy and safe to construct as well as simple and safe tooperate.

    5. Allowing for maximam and minimum operational flexibility.

    The Standard Designs are based on river sources. However, the raw water quality varies

    depending on location. The following parameters are those for which treatment is provided.

  • 8/10/2019 Wasit_Detailed Design Report_updated.pdf

    10/180

    C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universi ty and Engicon

    The stated capacity of Wasit WTP is 1000 m3of treated water output. In order to achieve the

    necessary treated water output, the quantity of raw water will have to account for the amount

    of water lost through the process.

    The main factor that affects the water losses and hence the raw water flow is the raw water

    quality. Raw water with high suspended solids content will produce a large amount of sludge

    and hence the amount of water lost throughout the treatment will increase.

    Allowance has also be required for filter backwash water and filter rinse to waste during start

    up following a backwash. These quantities was calculated and shown in the material balance

    sheet. The Process Flow Diagram (PFD) and Mass Balance Diagram (MBD) were developed

    to assist in the design of hydraulics, process pipe work and wastewater disposal.

    2.2.2 Raw Water Quality

    The turbidity of the raw water influences the amount of sludge produced and the coagulant

    dose. The amount of coagulant required will also influence the amount of wastewater. Typical

    analysis of raw water quality includes

    Total dissolved solids (TDS) Total suspended solids (TSS) pH Turbidity (Tur) Electrical conductivity (EC) Total hardness (TH) Alkalinity (Alk) Magnesium (Mg) Calcium (Ca)

    Chloride (Cl)

    Analysis of a set of raw water samples taken over a suitable period from Al-Dujaila- River

    was carried out to evaluate the coagulant dose and waste streams. The full raw water quality

    data is shown in Table 1. The analysis is done by the Local Municipal laboratory located at

    Wasit City. The sample dates and temperatures were included.

    Table 1 Wasit Raw Water Quality Data (Source : Al-Dujaila- River)Date Temp Turb. pH E.C. Chlor. Alk. T.H. Ca Mg TDS TSS

    25-01-2006 17 25 7.70 1393 81.7 160.0 500.0 97.2 61.8 928 5219-02-2006 25 115 8.10 1404 163.4 160 473.5 117.5 43.1 936 125

    29-01-2007 20 30 7.50 1395 85.0 165 495 100.0 65.0 930 65

    22-03-2007 22 60 7.84 1211 132 114 620 144 63.7 774 52

    11-05-2007 26 53 7.95 1283 90 120 480 112 49 593 55

    M 22 56 6 7 818 1337 2 110 42 143 8 513 7 114 1 56 52 832 2 69 8

  • 8/10/2019 Wasit_Detailed Design Report_updated.pdf

    11/180

    C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universi ty and Engicon

    2.2.4 Process Unit Sizing

    The size of most of the process units is the standard unit size of 1000 m3/h plant. Standard

    Designs were reviewed and modified according to the raw water quality and consequent

    losses through the treatment process. The amount of raw water required depends on the water

    losses through the treatment processes. The flows were checked on the mass balance to ensure

    the raw water intake and pumps are sized correctly.

    The wastewater holding tank size depends on the quantity of sludge produced. The size of the

    tank as well as the diameters of the pipes carrying clarifier sludge were recalculated and

    checked.

    For the Chemical Building storage capacity and mixing tank volumes, the coagulant dosing

    requirements was rechecked and determined by the jar tests carried out on the raw water.

    The capacity of the treated water pumps was reviewed and checked according to the

    requirement of the distribution network.

    The calculation of these quantities and the unit sizing are shown in the calculation sheets

    located at the end of this chapter.

    2.2.5 Process Flow / Mass Balance Diagrams

    The flows across the treatment processes vary according to the site. The main factors that will

    influence these flows are the amount of sludge and wastewater produced and the amount of

    service water required. These amounts were calculated. A Process Flow Diagram (PFD) and

    Mass Balance Diagram (MBD) were prepared for Wasit Site and shown in the calculation

    sheets located at the end of this chapter. The process flow diagram with the mass balance

    table are also included in the set of the P&ID sheets (Drawing Sheet No. 13-202-7021).

    2.2.6 Process and Instrumentation Diagrams

    The Process and Instrumentation Diagrams (P&ID) are checked for standard WTP of 1000

    m3/h and modified according to the changes in the particular site of Wasit. The diameters of

    all interconnecting pipe work, wastewater pipe work and pipe work within process units were

    checked recalculated and modified for each Process Unit accordingly.

    The destination of the overflow outlets and waste water outlets were modified according to

    the new site. The Tag Numbering for the equipment, valves, etc, was checked and therequired alterations were made on the streams and instrumentations in the P&IDs.

    2.3 Basis of Design

    The basis of design describes the technical basis of the design process. The following

    references were used in order to establish the Basis of Design:

  • 8/10/2019 Wasit_Detailed Design Report_updated.pdf

    12/180

    C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universi ty and Engicon

    streams generated from the treatment process will be disposed to Nagara River located near

    the WTP site without any treatment. The process is designed to be operated continuously

    without frequent start-up and shut down.

    2.3.2 Process Functions

    The main process functions include:

    Extraction and transmission of raw water from the intake area to the treatment plantarea.

    Makeup, storage, injection, and in-line mechanical mixing of flocculation anddisinfection chemicals and raw water.

    In-line dispersion of coagulant (Alum) in the raw water main.

    Rapid gravity filtration of the settled water.

    Storage and injection of disinfection chemical (Chlorine Gas) into the filtered waterstream.

    Prechlorination Facilities for raw water entering the plant. Collection and storage of treated water, including establishment of disinfection contact

    time.

    Transmission of treated water from the treatment plant site to the DistributionNetwork

    Extraction and storage of dirty backwash water from the filters and sludge from theflocculator/clarifiers.

    Collection and storage of miscellaneous process wastes.

    Transmission of wastewater and sludge and miscellaneous process wastes from thetreatment plant site to the near river outfall.

    Collection and storage of emergency overflow water.

    Transmission of overflow water to the near river outfall.

    Provision for future incorporation of advanced chemical treatment (polyelectrolyte)processes

    2.3.3 Process Flow

    Raw water is pumped from Al-Dujaila- River to the water treatment plant via the raw water

    i li O i id th t t t l t th t fl i t d P hl i ti

  • 8/10/2019 Wasit_Detailed Design Report_updated.pdf

    13/180

    C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universi ty and Engicon

    Filtered water is treated with chlorine and flows through the chlorine contact tank to the

    treated water storage tank. The treated water pumps transfer treated water to the Distribution

    Network via treated water pipeline.From the splitter box onwards, the flow gravitates through the treatment works, ending up in

    the treated water storage tank. A portion of the treated water flow is extracted for use as

    service water and also domestic water on the treatment plant site. Emergency overflow water

    is directed to a dedicated overflow tank containing a pump to transmit the water to the river.

    2.3.4 Water Quality

    2.3.4.1 Raw Water QualityRaw water quality is dependent upon the river source, local conditions and in some cases time

    of year. Samples taken over a one year period were analyzed to understand the variability of

    the water quality, particularly with regard to pH and turbidity.

    The basic parameters analyzed are: pH, temperature, turbidity, conductivity, alkalinity, total

    hardness, calcium, magnesium, chloride, TDS, TSS, TOC, and aluminum. Table 1 shows a

    typical water quality data for Al-Dujaila- River.

    2.3.4.2 Treated Water Quality

    The plant was designed to treat the above raw water, and to produce the following quality of

    water, to the following standards:

    Target Turbidity 0.5 NTU average, 1 NTU maximum E coli or thermo tolerant coliform bacteria 0 in 100 ml sampleIt is anticipated that the target residual metals will be as follows, subject to confirmation

    of concentrations in the inlet raw water,

    Aluminium Less than 0.2 mg/l Iron Less than 0.2 mg/l

    2.3.4.3 Determination of the Chemical Dose with Jar Tests

    Jar Tests was carried out to establish the average alum dose rate for the WTP. The dose rate

    was used in the calculations for dosing pumps and chemical storage.

    In Jar Tests, a range of alum doses (0 to 60 mg/l) should be applied to the raw water under

    standard Jar Test conditions of rapid mixing, slow stirring and settlement. The settled watershould be analyzed for pH, turbidity and total and dissolved aluminum. The optimum alum

    dose is the dose after which increasing the alum dose does not significantly reduce the

    turbidity of the settled water (see figure). The dissolved aluminum should be less than 0.2

    mg/l. If higher or lower alum doses are required to achieve the optimum alum doses then the

    Jar Test should be repeated

  • 8/10/2019 Wasit_Detailed Design Report_updated.pdf

    14/180

    C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universi ty and Engicon

    Most of the design parameters are standard for the plant designs. However some factors affect

    the process calculations, which are detailed in this section.

    2.3.5.1 Sludge Mass Balance

    To achieve the desired plant flow at the outlet, the inlet flow has to be greater to account for

    the losses through the process. The losses through the processes are as follows:

    Clarifiers Intermittent desludging. Wash Water Tank filling: the wash water tank is filled from the filter outlet flow. Filter dump volume: the mass balance assumes there is 2 dump volumes lost per day

    from the filters, during the backwash cycle.

    Treated Water Tank: the service water is taken from the treated water storage tanks

    The volume of clarifier sludge depends on the raw water quality and the coagulant dose. The

    instantaneous maximum flow can be calculated assuming that all the clarifiers desludge at the

    same time. Using the raw water turbidity, the amount of clarifier sludge produced can be

    predicted, using the following equation:

    = 1

    A234.0T4S1000

    T2S1000CS

    ic

    oc

    Where:

    S: Sludge flow (MLD)

    Sc: Sludge solids concentration - 8kg/m3 or 0.8% (used for medium values of turbidity)

    To: Clarifier outlet turbidity taken as - Min 1 NTU

    -Max 2 NTU

    A: Alum dose (50mg/l)

    Ti: Clarifier inlet turbidity (NTU)

    C: Clarifier outlet flow (MLD)

    2.3.5.2FiltersThe filters are designed on the following parameters:

    Media type/depth: - Dual media-Anthracite No 2 750 mm depth

    - Sand 0.65mm NES 500 mm depth

    -Gravel 4 9 mm 50 mm depth

    Clogging head: 3 m

  • 8/10/2019 Wasit_Detailed Design Report_updated.pdf

    15/180

    C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universi ty and Engicon

    Filter outlet to wastewater tank pipe diameter- Assume a velocity of 1 m/s.

    2.3.5.2.2 Filter dump volume

    The mass balance assumes there are 2 filter dumps per day, to the wastewater holding tank.

    This volume is calculated as follows:

    Filter dump volume = volume above weir + volume of wash water troughs + volume below

    weir to the base of the siphons.

    2.3.5.3Clean wash water tank

    The clean water tank is filled by part of the filtered water overflowing a weir, such that the

    flow going forward to the Chlorine contact tank is not starved. This is approximately 10% of

    the max plant flow. The tank is sized using the following parameters:

    Sized for 2 filter backwashes Each backwash uses 4.5 Bed Volumes of wash water.The flow rate to fill the wash water tank is calculated from the mass balance assuming:

    Wash rate for each filter: Min - once a dayMax - twice a day

    2.3.5.4 Wastewater holding tank

    The wastewater holding tank was designed as follows:

    Sized to hold one filter wash, plus 1 hour of average clarifier flow and 30 minutesrinse to waste

    The TWL of this tank should be below the invert level of the filter wash waterchannel.

    The return pumps are sized on the following details:

    To evacuate the tank in 2 hours. 2 duty pumps. A pipe velocity of 1.5 m/s suction and 2.5 m/s discharge.

    2.3.5.5 Elevated Storage Tank

    An elevated storage tank should be designed, constructed and installed in raw water intake area to

    supply treated water to Wasit City. The EST should be made of galvanized pressed steel with total netcapacity of 1200 m

    3. The height of steel structure should be 30 m. The design of EST is to be the

    responsibility of the contractor who will be awarded the construction of the project. The design should

    include structural design (foundations and steel design), geotechnical and topographic field survey, all

    pipe connections, local control instruments, and all other necessary requirements.

    2 3 5 6 Chlorination System

  • 8/10/2019 Wasit_Detailed Design Report_updated.pdf

    16/180

    C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universi ty and Engicon

    2.3.5.7.1 Alum

    Chemical - Aluminium sulphate Al2(SO4)3.14.3H20.

    Form/delivery - Granular Bulk storage - 30 days at average dose rate in 50 kg bags.Maximum dose rate - The dose can be predicted using jar tests. 50 mg/l has been used

    for the designs.

    Chemical makeup - 10% solution, with a S.G. of 1.06-Makeup tanks standard size - 18.9 m3

    - Duty makeup tanks - 1 days dosing at max plant flow

    - 1 duty makeup tanks- 1 additional tank standby

    2.3.5.7.2 Chlorine

    Prechlorination-Predicted dose 3mg/l

    -1 duty drums

    -No standby is required Disinfection-Predicted dose 2mg/l

    -Number of drums - 1 duty/1 standby

    -Calculated using maximum draw off rates from a chlorine drum as follows:

    30 oC = 15kg/hr

    20 oC = 10kg/hr

    15 oC = 5kg/hr

    Storage- Maximum 30 days

    - A 9 (1 tonne) chlorine drum store was adopted for the Standard Designs

    2.3.5.8 Service water

    The service water is taken off from the treated water tank

    Assumed Service water consumption 8 m3/day Assumed wash down water 23 m3/day

    2.4 Process Calculations

    Process design was done utilizing calculation spreadsheets, by EXEL software considering

    the main factors affecting the water treatment plant of Wasit. Mass balance was done to

    calculate the amount of sludge, amount of water lost throughout the treatment process, filter

    backwash water and filter rinse alum and chlorine doses required Unit sizing and

  • 8/10/2019 Wasit_Detailed Design Report_updated.pdf

    17/180

    C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universit y and Engicon

    2.4.1 Basis of Design for all Plant Flows

    Flash mixing

    Alum addition/energy input will be by inline mechanical mixer

    Clarification

    The Flocculation/Clarification plant will consist of a number of streams

    Each stream will comprise the following:

    Flocculation stage comprising 3 No chambers to give an overall nominal residence time of 30 mins.

    Nom.length 4.45 m

    Nom. width 4.45 m

    Nom. depth 4.45 m

    500 m3/h nett Clarification stage designed on a maximum velocity of 0.65m/h on the projected plate area.

    Nom.length 9 m

    Nom. width 9 m

    Nom. depth 4.4 m

    Flowrate 1000 m3/h

    No of Streams 2 500 m3/h

    Filtration

    The filters will be of the single cell type with width 4.75m (nominally internal wall to wall)

    Flowrate 1000 m3/h

    No of filters n 5

    Length 5.2 m

    Width 4.75 m

    Area 24.7 m2

    n Velocity 8.1 m/h

    n-1 Velocity 10.1 m/h

    Based on nominal flows

    Filter media ES mm Depth m

    Sand 0.65 0.5

    Anthracite No 2 1 3 0 75

  • 8/10/2019 Wasit_Detailed Design Report_updated.pdf

    18/180

    C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universit y and Engicon

    Flocculation stage comprising 3 No chambers to give an overall nominal residence time of 30 mins.

    Nom.length 4.45 m

    Nom. width 4.45 m

    Nom. depth 4.45 m

    Clarification stage

    Nom.length 9.0 m

    Nom. width 9.0 m

    Nom. depth 4.4 m

    Filtration

    There will be 5 no filters of the single cell type

    No of filters n 5

    Length 5.2 m

    Width 4.75 m

    Area 24.7 m2n Velocity 8.1 m/h

    n-1 Velocity 10.1 m/h

    Filter inlet channel size

    Max inlet flow to the block of filters 1030 m3/h

    Flow down channel 0.3 m/s

    Area of channel 0.95 m2Width/height 2

    Water depth 0.69

    Channel width 1.38

    Adopted width 1.00 m

    Max outlet flow from block of filters 1001 m3/h

    Flow down channel 0.3 m/s

    Area of channel 0.93 m2Width/height 2

    Water depth 0.68 m

    Channel width 1.36 m

    Adopted width 1.50 m

  • 8/10/2019 Wasit_Detailed Design Report_updated.pdf

    19/180

    C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universit y and Engicon

    2.4.3 Flocculation

    PROJECT TITLE Wasit

    PROJECT NO

    PROCESS UNIT FLOCCULATION TANKS

    DESCRIPTION 2 STREAM

    PREPARED BY DATE 28/10/2007

    CHECKED BY DATE

    VERIFIED BY DATE

    VERSION NO DATE

    INFLUENT CONDITIONS NOTES

    AVG MIN MAX

    INFLUENT FLOW Ml/d 8.37 25.48

    INFLUENT TEMEPRATURE C 10 5 30

    DESIGN CONDITIONSRESIDENCE TIME REQUIRED s 1800 30 MINS -(IN 3 CELLS)

    TOTAL VOLUME REQUIRED m3 531 PROCESS VOLUME ONLY

    TOTAL VOLUME INSTALLED m3 531 FROM ABOVE OR KNOWN

    NO OF STREAMS - 2 INPUT

    NO OF UNITS PER STREAM - 3 SEE BASIS OF DESIGN

    DYNAMIC VISCOSITY kg/m s 0.001308 0.001519 0.000801 CALCULATED

    VOLUME PER STREAM m3 265.4 CALCULATED

    VOLUME PER UNIT m3 88.5 CALCULATED

    LENGTH PER STREAM m 13.37 4.45 INPUT

    WIDTH PER STREAM m 4.46 4.45 INPUT

    DEPTH PER STREAM m 4.46 4.47 CALCULATED

    LENGTH PER UNIT m 4.45 CALCULATED

    ASSUMED EFFICIENCY % 100% SEE GUIDELINES

    OPERATING CONDIITONS AVG MIN MAX

    RESIDENCE TIME s #DIV/0! 1800 5481 CALCULATED

    MIXING - PER UNIT AVG MIN MAX

    REQUIRED G - 70 Choose gearbox to provide 10 - 70s-1

  • 8/10/2019 Wasit_Detailed Design Report_updated.pdf

    20/180

    C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universit y and Engicon

    LENGTH m 13.35

    WIDTH m 4.45

    DEPTH m 4.5

    OPERATING CONDIITONS

    RESIDENCE TIME s #DIV/0! 1800 5481

    0 s 0 0 0

    MIXING

    SELECTED POWER kW 1.1

    ACTUAL G s-1

    74

    2.4.4 Clarifier Plate Pack Design

    Unit size

    Q = 531 m/h

    Rate 0.67 m/h

    Proj.Area 792.4 mAny plate 1.5 m wide Avail. F. C -6 m

    Area 2.41 m Width -1.5 m

    No. requd 329 Flow per trough 0.036868 m/s

    Rows 4

    82.2 No

    Horl. 63.5 mm

    5220 mm

    Offset 15556775 m long

    Allowing for shaft

    pack m pack m pack m No.plates Area m b1 Length

    22 50.61 17 38.56 18 40.97 17 38.56 1080 2635

    Area requd 792.4 m 18 40.97 1144 2699

    15.7 packs 20.5 packs 19.3 packs 19 43.38 1207 2762

    4 Rows 4 Rows 4 Rows 20 45.79 1271 2826

    3.91 packs 5.14 packs 4.84 packs 21 48.2 1334 2889

    7147 mm long 8035

    mm

    long 8416 mm long 22 50.61 1398 2953

    Width 1.5 23 53.02 1462 3017

    2 6 2 6 63.5 mm horzl. distance

    2 4 2 4

    t k 20 k 20

  • 8/10/2019 Wasit_Detailed Design Report_updated.pdf

    21/180

    C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universit y and Engicon

    2.4.5 Clarifier Hydraulics

    Comprising 2 no 541 m3/h units

    TWL in Filter inlet channel 4.505

    Connecting channel between clarifiers 10 m TBC

    and filter block

    Velocity in channel 0.3 m/sArea of channel 0.98 m2

    Width 1.40 m

    Adopt width 1.40 m

    Water depth 0.70 m

    Channel losses assumed negligible

    Exit loss into filter channel K 1 0.005 m

    TWL in connecting channel 4.510

    Entry loss into channel K 0.5 0.002TWL in clarifier outlet channel 4.512

    TWL in clarifier launders 4.512

    Assumed Freefall into lamella launders 0.2 m

    Depth of launders

    TWL in clarifier 4.712

    Outlet to RGF Channel

    Stop Log Frame

    4.9644.844.745.504.7124.5124.5124.510

    4.8104.962

    0.272

    Overflow

    Raw Water Inlet

    Lamella Splitter Box

  • 8/10/2019 Wasit_Detailed Design Report_updated.pdf

    22/180

    C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universit y and Engicon

    Losses through flocculator chambers

    Loss under baffle

    Length of bafffle 4.45 m

    Entry slot depth 0.2 m

    Velocity 0.17 m/s

    Headloss under baffle 0.004 m

    Headloss over submerged baffle assumed 0.000 m

    Perforated baffle

    No of holes 20

    Dia of holes 0.120 m

    Area of holes 0.226 m2

    Headloss 0.022 m

    TWL upstream of perf. Baffle 4.741

    Splitter box

    Free drop 0.100 m

    Soffit of weir 4.841Head over weir (assume not submerged)

    Weir length 2.000 m

    Head over weir 0.120 m

    TWL inlet compartment 4.961

    Clarified water overflow weir

    Rise in level to overflow weir 0.3 mSoffit of weir 4.810

    Length of weir 2.8 m

    Flow rate 1061.8 m3/h

    Head over weir 0.152 m

    TWL over weir 4.962

    Freeboard to top of Walls 0.539

    Top of Wall 5.501

  • 8/10/2019 Wasit_Detailed Design Report_updated.pdf

    23/180

    C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universit y and Engicon

    2.4.6 RGF Trough Location

    Filter inflow 24972 m3/d from mass balance Levels Refer to True Datum

    1041 m3/h

    Comprising 5 No Filters 24.7 m2 area

    TWL 20.013

    16.420 Syphon level

    16.655 Expanded media level

    16.120 Normal media level

    16.00 Natural ground level

    14.870 Bottom of the media level

    13.720

    Head losses through filter Datum TWL Filter outlet channel

    No of filters 5

    Actual Level m

    TWL in FW channel 16.000

    Rise to inlet weir 0.2 m 16.200Soffit of weir 16.200

    Weir length 1.2 m

    Water depth 0.68

    Invert of channel 15.319

    Max flow per filter 260 m3/h with one filter out for washing

    Head over weir 0.105 mTWL over weir 16.305

    Weir height above media 0.08 m

    Top of media 16.120

    Pipe velocity 0.8 m/s

    Pipe dia 0.34 m

  • 8/10/2019 Wasit_Detailed Design Report_updated.pdf

    24/180

    C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universit y and Engicon

    Exit loss 1 1 0.07 0.75 0.029 0.029

    Butterfly valve 1 1.54 0.07 0.75 0.029 0.044

    Tee (with rinse pipe) 1 0 0.07 0.75 0.029 0.000

    Entry loss into pipe 1 0.5 0.07 0.75 0.029 0.014

    Pipe length Length m Re

    TBC but to allow for future 0.4 6 0.00015 0.072 0.751 197768 0.008

    installation of flow meter Total 0.008

    Apparent level in filter outlet 16.313

    Filter max velocity 10.53 m/h (Turbidity target 0.5 NTU, 1 NTU max)

    Head loss (1/ES)^1.85 x FR^1.21 x 10^(0.23429-0.0111T)x14.45415

    Loss through 0.65mm media 0.84 m/m 0.42 m

    Loss through No 2 anthracite 0.22 m/m 0.16 m

    Clogging head adopted 3.00 m

    Total media loss 3.58 m Loss inc nozzles say 3.700

    TWL of filters 20.013

    Top of media 16.120

    Anthracite depth 0.750 m

    Sand depth 0.500 m

    Gravel depth 0.05 m

    Slab thickness 0.200 m Underside of slab 14.620 m

    Depth floor/ underside of slab 0.900 mFilter floor level 13.720

    Anthracite expansion 48%

    Sand expansion 35% assumed

    Expanded media depth 0.535 m

    Margin to underside of trough 0.178 m

    Depth of trough 0.56 m

    Top of washweir 17.393

    Head of water above media 3.893 mHead over trough 0.047 m

    Head loss through opening in wall 0.05 m sized to suit

    TWL over trough 17.440 m

    Expansion media level 16.655 m

    Underside of trough level 16.833 m

  • 8/10/2019 Wasit_Detailed Design Report_updated.pdf

    25/180

    C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universit y and Engicon

    2.4.7 Filter

    Filter inflow 24972 m3/d from mass balance

    1041 m3/h

    Comprising 5 No Filters 24.7 m2 area

    4.505 4.455 4.350

    4.197

    TWL 4.100

    Wash trough ( 2 No)

    1.393

    0.120

    -2.280

    Head losses through filter Datum TWL Filter outlet channel

    No of filters 5

    Actual Level m -1.13

    TWL in FW channel 0.000

    Rise to inlet weir 0.2 m 0.200

    Soffit of weir 0.200 16.12

    Weir length 1.2 m

    Water depth 0.68

    Invert of channel -0.681

    Max flow per filter 260 m3/h with one filter out for washing

    Head over weir 0.105 m

    TWL over weir 0.305

    Weir height above media 0.08 m

    Top of media 0 120

    Channel roof level

    1.093

    Filtered Water Channel

    -0.681

    FW Overflow

    0.4940.200

    0.350

    0.305

    0.000

  • 8/10/2019 Wasit_Detailed Design Report_updated.pdf

    26/180

    C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universit y and Engicon

    Fittings Size No K Flow VelocityVel.Head Headloss

    mm m3/s m/s m m

    Exit loss 1 1 0.07 0.75 0.029 0.029

    Butterfly valve 1 1.54 0.07 0.75 0.029 0.044

    Tee (with rinse pipe) 1 0 0.07 0.75 0.029 0.000

    Entry loss into pipe 1 0.5 0.07 0.75 0.029 0.014

    Pipe length

    Length

    m Re

    TBC but to allow for future 0.4 6 0.00015 0.072 0.751 197768 0.008

    installation of flow meter Total 0.095

    Apparent level in filter outlet 0.400

    Filter max velocity 10.53 m/h (Turbidity target 0.5 NTU, 1 NTU max)

    Head loss (1/ES)^1.85 x FR^1.21 x 10^(0.23429-0.0111T)x14.45415Loss through 0.65mm media 0.84 m/m 0.42 m

    Loss through No 2 anthracite 0.22 m/m 0.16 m

    Clogging head adopted 3.00 m

    Total media loss 3.58 m Loss inc nozzles say 3.700

    TWL of fil ters 4.100

    Top of media 0.120Anthracite depth 0.750 m

    Sand depth 0.500 m

    Gravel depth 0.05 m

    Slab thickness 0.200 m Underside of slab -1.380 m

    Depth floor/ underside of slab 0.900 m

    Filter floor level -2.280

    Anthracite expansion 48%

    Sand expansion 35% assumed

    Expanded media depth 0.535 m Expansion media level 0.655 m

    Margin to underside of trough 0.178 m Underside of trough level 0.833 m

    Depth of trough 0.56 m

    Top of washweir 1.393

    Head of water above media 3.980 m

    H d t h 0 047 TWL t h 1 440

  • 8/10/2019 Wasit_Detailed Design Report_updated.pdf

    27/180

    C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universit y and Engicon

    TWL inlet channel 4.505

    Filtered water Overflow weir

    Length of weir 3.000 m into washwater tank (overflow from wash water tank)

    Head over weir 0.144 m

    Rise to overflow weir 0.350

    Soffit of weir 0.350

    TWL over weir 0.494

    Soffit of channel roof 1.093

    Overflow pipework

    Flowrate 24726 m3/d

    Dia 0.6 m

    Velocity 1.01 m/s

    Siphon

    Adopt no of siphons per filter 3 1.393 Weir level

    Dia of siphon 0.15 m

    Height of siphon 0.3 m

    0.420 Drain down point

    2.4.8 Clean Wash Water Tank

    Concept is that part of the filtered water overflows a weir into the tank, such that the flow going forward to the

    Chlorine contact tank is not starved.Inlet flow to washwater tank about 10% of max plant flow.

    Flow into tank 104.05 m3/h at max flow

    69.4 m3/h at min flow

    Volume of tank 278 m3 nett

    Assume weir length 1 m

    Max head over weir 0.064 m

  • 8/10/2019 Wasit_Detailed Design Report_updated.pdf

    28/180

    C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universit y and Engicon

    Adopted dia 0.45 m

    Outlet penstock area 0.36 m2

    Washwater velocity 1.05 m/s

    Head loss 0.15 m

    Ai r scour blowers (2 no)

    Air scour velocity 45 Nm3/2.h

    Flow 1111.5 Nm3/h

    Velocity in pipe 20 m/s

    Pipe dia 0.140 m/sAdopted dia 0.15 m

    2.4.9 Chlorine Contact Tank

    Twin compartment (to allow cleaning)

    Inlet flow 24031 m3/d

    Contact time 30 mins

    Volume 500.6 m3

    Assumed eff 100%

    as this is taken into accountin the 30 mins

    Temp C 5

    Kinematic visc 1.52E-06

    g 9.81DH DH = (0.25LV^2)/((2Dg((log((k/3.7D)) + 5.74 /(Re^0.9)))^2))

    Fittings Size No K Flow VelocityVel.Head Headloss

    mm m3/s m/s m mExit loss intoCCT 0.7 1 1 0.28 0.72 0.027 0.027Butterfly

    valve 0.7 1 1.54 0.28 0.72 0.027 0.041

    Tee 0.7 1 1.2 0.28 0.72 0.027 0.032Entry loss into

    pipe 0.7 1 0.5 0.28 0.72 0.027 0.013

    0.7 Length m RePipe lengthA d

  • 8/10/2019 Wasit_Detailed Design Report_updated.pdf

    29/180

    C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universit y and Engicon

    2.4.10 Sludge System

    Based on Al-Dujaila raw water characteristics

    CLARIFIER

    Turbidity

    F

    Cf

    C

    Raw water 57 NTU mean Cw

    25 NTU min F

    115 NTU max

    Clarified water 2 NTU maxClarified water 1 NTU min W

    Cw

    Chemical addition

    Alum dose 50 mg/l as .14.3 H2O- to be confirmed

    Assumed ratio SS/NTU 4 from rw quality data

    Solids concentration 8.00 kg/m3 (0.8%)assumed for low and medium turbidities10.00 kg/m3 (1%)assumed for high turbidities

    Solids production 236 mg/l mean

    104 mg/l min

    468 mg/l max

    Max flow average turbidity

    Clarified water flow C 24.73 MldFeed concentration Cf 240 mg/l

    Clarified water conc. Cc 2 mg/l

    Sludge blowdown conc Cw 8000 mg/l

    Feed flowF 25.48 Mld

    Sludge blowdown W 0.76 Mld

    Max flow max turbidity

    Clarified water flow C 24.73 Mld

    Feed concentration Cf 472 mg/l

    Clarified water conc. Cc 2 mg/l

    Sludge blowdown conc Cw 10000 mg/l

    Feed flowF 25.94 Mld

    Sludge blowdown W 1.22 Mld

  • 8/10/2019 Wasit_Detailed Design Report_updated.pdf

    30/180

    C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universit y and Engicon

    Max flow max turbidity 12189 kg/day 11514.75

    FILTERS

    Inlet turbidity 2 NTU max

    Outlet turbidity 0.1 NTU for design basis

    Flowrate max 24726 m3/d

    Flowrate ave 24726 m3/d (for solids calc basis)

    Flowrate min 8369 m3/d 44.506238

    Filter bed volume 30.875 m3

    Washwater BV 4.5Wash water volume 139 m3

    No of backwashes 5 per day

    Dump area 30.6 m2 approx. assumes weir wall thickness 0.25m

    Depth from TWL to weir 2.71 m

    Depth from weir to siphon 0.97 0.3 above media for siphon

    Dump volume 110m3 per filter comprising vol above weir + vol of 2 no washwater troughs+ volbelow troughs

    Max wash volume per day 695 m3 excluding dumpMin wash volume per day 347 m3

    Max wash volume per day 914 m3 assuming two dumps per day

    Solids load 94 kg/d assumes SS/NTU ratio = 2

    Solids concentration 0.1 kg/m3 max excluding dump

    Min wash volume per day 347 m3

    Solids load 32 kg/d assumes SS/NTU ratio = 2

    Solids concentration 0.1 kg/m3

    Outlet pipe to wastewater tank

    Max flow 1360.5 m3/h

    Velocity 1.0 m/s

    Dia 0.7 m

    2.4.11Wastewater Holding Tank

    Sized to hold one filter wash plus 1 hour of average clarifier flow + 30 mins rinse to waste

    The TWL of this tankshould be below the invert level of the filter

    h t h l

  • 8/10/2019 Wasit_Detailed Design Report_updated.pdf

    31/180

    C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universit y and Engicon

    Absorbed power 4.29 kW

    Return pumps ( 2 duty)

    Evacuate tank in 2 hours

    Flow rate required 215 m3/h

    Flow per pump 107 m3/h per pump

    Pipe length

    Pipe velocity 1.5 m/s

    Pipe dia 0.22 m

    Adopted dia 0.25 m

    discharge head mPump heat to be confirmed when pipe route finalised

    Individual Pump

    Flow 107 m3/h

    Pipe dia 0.15 m

    Velocity 1.69 m/s

    Temp C 5

    Kinematic visc

    1.52E-06

    g 9.81

    DH DH = (0.25LV^2)/((2Dg((log((k/3.7D)) + 5.74 /(Re^0.9))) 2))

    Fittings Size No K Flow VelocityVel.Head Headloss

    m m3/s m/s m m

    Exit loss 0.25 1 1 0.06 1.21 0.075 0.075

    Butterfly valve 1 1.54 0.06 1.21 0.075 0.116

    NRV 1 1.7 0.06 1.21 0.075 0.128

    Tee 1 0 0.06 1.21 0.075 0.000

    Bends 12 0.75 0.06 1.21 0.075 0.677

    Pipe length Length m Re

    0.25 3500 0.00015 0.060 1.21 199942 20.474

  • 8/10/2019 Wasit_Detailed Design Report_updated.pdf

    32/180

    C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universit y and Engicon

    2.4.12 Chemical Storage and DosingAlum

    Max flow 25.48 Mld

    Dose rate adopted 50 mg/l Al2(SO4)3.14 H2O

    Solution strength 10%

    Alum consumption 1258.00 kg/d

    Solution flow 12580 kg/d

    SG of 10% solution 1.06 approx.

    Flowrate 0.49 m3/h

    Water addition 11.3 m3/d

    Pump flow 0.50 m3/h

    Alum granules delivered in 50 kg bags on a 1 tonne pallet.

    Dimensions of pallet

    Nett storage capacity 19.0 m3 Weight of Alum solution 20128 kg

    Water depth 2.5 m Quantity of Alum 2012.8 kg

    Area 7.60 Amount of water 18115.2 kgL = W 2.76 Volume of make up water 18.079042 m3

    adopt L = W 2.5 m Capacity of tank 1.6

    Liquid depth 3.04 m

    Freeboard 0.5 m

    Overall heightadopted 2.50 m

    Adopt Duty and standby tanks

    Chlorine Dosing

    MaxFlow 25.48 Mld

    Max dose 5 mg/l

    Chlorine consumption 127.4 Kg/d

    30 days storage 3.8 Tonne

    Adopt 9 1 Tonne drum store for commonality

    Future Polyelectrolte dosing

    Raw Water

    A d d 0 2 /l

    C LOTTI & ASSOCIATI S A i ll b ti i th CEB B hd d U i it d E i

  • 8/10/2019 Wasit_Detailed Design Report_updated.pdf

    33/180

    C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universit y and Engicon

    Consumption max 79.5 Kg/d

    Concentration 0.20%

    Volume 39.73 m3/d

    Tank dia 2.5 m NB Preferable to install an auto polyprep unit

    depth 8.09

    Adopt 3.0 m

    Weight required

    in 30 days 2384.1 say 32 No 25 kg bags

    2.4.13 Service Water Requirements

    Alum make up 18.1 m3/d

    Polyelectrolyte 0 m3/d ( Future requirement and not taken into consideration)

    Chlorine 22.8 m3/d assuming no prechlorination ( intermittent)

    Potable to houses

    Population equiv 20 assumed

    Consumption p.e 400 l/p.e

    Consumption per day 8 m3/d

    Washdown 23 m3/d assumed

    Treated water losses max. 31 m3 max /day

    Treated water losses min. 22 m3 min /day assuming min flow

    Service water tank

    Sized for a nominal 6 hours

    Volume 2.05 m3

    Dia 2 m

    Straight side 0.653 m

    Adopt 2 m dia

    C LOTTI & ASSOCIATI S p A in collaboration wi th CEB Baghdad Universit y and Engicon

  • 8/10/2019 Wasit_Detailed Design Report_updated.pdf

    34/180

    C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universit y and Engicon

    Ministry of Municipalities and Public Works Republic of Iraq 4/11/07

    Second Emergency Water Supply and Sanitation Project Wasit Detailed Design Report/fdDetailed Design Report c.a.: F249A

    33

    2.4.14 Mass Balance

    To River

    Stream Description F1 F2 F3 F4 F5 F6 F7 F8 F9 F10 F11

    Fluid Raw Water Conditioned RW Clarified Filtered Treated Sludge Sludge Sludge Filtered Filtered Treated

    Flow Regime Continuous Continuous Continuous Continuous Continuous Intermittent Intermittent Continuous Intermittent Intermittent

    Flow

    Instantaneous max m3/h 371 1360 104 1360

    Maximum/max solids m3/d 25945 25945 24726 24031 24000 1219 914 1914 695 695 31

    Maximum /av solids 25483 25483 24726 757 695

    Minimum m3/d 8369 8369 8369 8022 8000 0 347 347 347 347 22

    Mass flowInstantaneous kg/h 3706

    Maximum kg/d 12189 94

    Average kg/d 6059

    Minimum kg/d 0 32

    Service water Tank

    F11

    Inlet PumpingStation

    LamellaClarifiers

    Rapid GravityFilters

    Treated waterStorage Tank

    Alum

    F1 F2

    Clean Wash watertank

    F3 F4

    F7

    F6

    ChlorineContact Tank

    Waste WaterHolding Tank

    F9

    F10

    F5

    F8

    ESTDistribution

  • 8/10/2019 Wasit_Detailed Design Report_updated.pdf

    35/180

  • 8/10/2019 Wasit_Detailed Design Report_updated.pdf

    36/180

    C. LOTTI & ASSOCIATI S.p.A. in co llaboration with CEB Baghdad University and Engicon

    4. MECHANICAL DESIGN

    4.1 Mechanical Equipment General

    4.1.1 Introduction

    The raw water system transfers water from the Al-Dujaila- River to the flocculators/clarifier via the raw

    water pipeline of 500 mm in diameter. The raw water pumping station is located on the Al-Dujaila-River bank and consists of an above-ground pump room and a below-ground wet well. The pump room

    is located above wet well and consists of four vertical turbine pump (one standby) each with flow rate

    of 350 m3/hr and 11.8 m head.

    The treated water pumping station consists of a pump room and electrical room located above the

    pumping station. The treated water storage tank chambers act as wet wells for the treated water pumps

    and service water pumps. The treated water pumping station consists of four electric driven, two speed

    vertical turbine pumps (one standby) each with capacity of 333.3 m3/hr and with head of 40.8 m. The

    treated water is pumped from treated water storage tank to the elevated storage tank with 30 m head via

    the treated water pipeline of 500 mm in diameter. The treated water pipeline also supplies the site

    potable water system.

    In backwash system, the two 100% capacity backwash pumps are provided. They are designed for 1350

    m3/hr which is equivalent to a wash rate of 55 m

    3/hr.This is sufficient to provide the necessary bed

    expansion at a water temperature of 30oC. The backwash pumps will operate in alternating duty with

    one serving as a standby.

    Filter backwash water, clarifier sludge, and miscellaneous process wastes are routed from structures

    and process units to the wastewater holding tank. All flow is by gravity with process unit sources

    operating under the static heads in each chamber. Wastewater will be discharged by three pumps (one

    standby) each with capacity of 410 m3/hr and a head of 12.2 m back to the Dujaila River downstreamof the plant intake via the wastewater pipeline of 250 mm diameter (see drawing no. 13-231-2212).

    An emergency overflows from the process units are piped to an overflow tank sized to hold 30 minutes

    full works flow. A single vertical spindle pump with capacity of 126 m3/hr and a head of 6.5 m is

    located in the tank which pumps the overflow at a controlled rate through a pipe of 200 mm diameter to

    outside treatment plant area.

    The service water system provides treated water to miscellaneous plant service such as chemical make-

    up, wash down and fire fighting. The system is primarily located in the treated water pumping stationand consists of duty assist and standby pumps.

    4.1.2 Scope of the Work

    For Wasit subproject the length of transmission pipelines, service pipelines and static heads for all

  • 8/10/2019 Wasit_Detailed Design Report_updated.pdf

    37/180

    C. LOTTI & ASSOCIATI S.p.A. in co llaboration with CEB Baghdad University and Engicon

    drawings are constructed to cope with new subproject in Wasit. Finally the bill of quantities and

    technical specifications for each item is revised and changed accordingly.

    4.1.3 Design Criteria

    The mechanical system is designed to meet the criteria specified below:-

    - Colebrook-White formula is used for head loss calculations for all piping systems.

    - 1.25 mm roughness coefficient is used for Ductile Iron pipe (cement lined) up to 20 years old.

    - Pump discharge velocity (2-3) m/s.

    - Pump discharge header velocity (1.5-2) m/s.

    - DI pipe will adopt for all process yard pipe work to carry water and wastewater.

    - Treated water pipeline is designed for ultimate capacity.

    - The slopes for interconnecting pipes in site are adopted to fit the required invert for each unit.

    - A wastewater pumps are sized to evacuate the tank in 2 hours.

    - NPSH definition is used to calculate and check the cavitations for pump suction side.

    - Natural ground level of Wasit site is 16.00 m.

    4.1.4 Calculations

    A computer program is developed for calculations of head losses in transmission and service pipelines,Net Positive Suction Heads (NPSH) and power required for the pumps in order to check the previously

    selected pumps in standard design technical specifications. The results of the calculations are shown in

    computer outputs.Based on the scope of the work, design criteria and the results of the calculations, the major changes in

    standard design can be summarized as follows:-

    1- The slopes for interconnecting pipes in the yard piping are calculated and adopted to fit the required

    invert for each unit within the new layout and new drawings (13-231-2200/13-231-2201/ 13-231-2202/

    13-231-2203 and 13-231-2204) have been constructed.

    2-New dimensions for longitudinal sections of yard piping layout for process, wastewater and overflow

    are calculated and new drawings (13-231-2205/13-231-2206 and 13-231-2207) have been constructed.

    3- Based on new layout, new tables for manholes specifications (13-231-2208) and piping length,

    diameters and fittings (13-231-2210) are formed.

    4- Based on Wasit site layout a new drawing for yard service and potable water piping systems (13-

  • 8/10/2019 Wasit_Detailed Design Report_updated.pdf

    38/180

    C. LOTTI & ASSOCIATI S.p.A. in co llaboration with CEB Baghdad University and Engicon

    pumps heads selected in standard design. Therefore, the selected pumps for standard design will be

    recommended and used for service and backwash pumping stations. The results of the calculation areshown in attached computer outputs.

    7- The net positive suction heads for all pumping stations are calculated as shown in computer output,

    checked and compared with the values of NPSH in technical specification of standard design. All the

    values are within the selected range.

    4.1.5 References

    - All general arrangements

    - Hydraulic design guide

    - Drawing No. 13-231-2200 Wasit landscape pipelines

    - Drawing No. 13-231-2201 Piping layout 1 0f 4

    - Drawing No. 13-231-2202 Piping layout 2 0f 4

    - Drawing No. 13-231-2203 Piping layout 3 0f 4

    - Drawing No. 13-231-2204 Piping layout 4 0f 4

    - Drawing No. 13-231-2205 Yard piping process pipelines

    - Drawing No. 13-231-2206 Yard piping wastewater pipelines

    - Drawing No. 13-231-2207 Yard piping overflow piplines

    - Drawing No. 13-231-2208 Manhole schedule

    - Drawing No. 13-231-2209 Thrust block schedule- Drawing No. 13-231-2210 Pipe schedule

    - Drawing No. 13-231-2211 Service and potable water piping system

    - Drawing No. 13-231-2212 Draniage system for wastewater and overflow water

    - Treatment plant process output

    - Fluid Mechanics, F. White, Second Edition

    4.1.6 Sample of the Calculations

    The results of all the calculations for yard piping, transmission pipelines head losses, net positive

    suction heads for pumps and pumps power are represented and attached as a computer outputs for:-

    - Head losses calculation for raw water pumps

  • 8/10/2019 Wasit_Detailed Design Report_updated.pdf

    39/180

    C. LOTTI & ASSOCIATI S.p.A. in co llaboration with CEB Baghdad University and Engicon

    4.1.6.1 Head losses calculation for raw water pumps

  • 8/10/2019 Wasit_Detailed Design Report_updated.pdf

    40/180

    C. LOTTI & ASSOCIATI S.p.A. in co llaboration with CEB Baghdad University and Engicon

    4.1.6.2 Head losses calculation for treated water pumps

  • 8/10/2019 Wasit_Detailed Design Report_updated.pdf

    41/180

    C. LOTTI & ASSOCIATI S.p.A. in co llaboration with CEB Baghdad University and Engicon

    4.1.6.3 Head losses calculation for wastewater pumps

  • 8/10/2019 Wasit_Detailed Design Report_updated.pdf

    42/180

    C. LOTTI & ASSOCIATI S.p.A. in co llaboration with CEB Baghdad University and Engicon

    4.1.6.4 Head losses calculation for overflow pumps

  • 8/10/2019 Wasit_Detailed Design Report_updated.pdf

    43/180

    C. LOTTI & ASSOCIATI S.p.A. in co llaboration with CEB Baghdad University and Engicon

    4.1.6.5 Head losses calculation for backwash water pumps

  • 8/10/2019 Wasit_Detailed Design Report_updated.pdf

    44/180

    C. LOTTI & ASSOCIATI S.p.A. in co llaboration with CEB Baghdad University and Engicon

    4.1.6.6 Head losses calculation for service water pumps

  • 8/10/2019 Wasit_Detailed Design Report_updated.pdf

    45/180

  • 8/10/2019 Wasit_Detailed Design Report_updated.pdf

    46/180

    C. LOTTI & ASSOCIATI S.p.A. in co llaboration with CEB Baghdad University and Engicon

    4.2 Pump Station and Pipeline Hydraulic Transient Analysis

    4.2.1 Purpose

    Surges or transient pressure in a pressurized system are generally caused by a change of flow conditions

    in the pipeline system. These changes cause waves to travel upstream and downstream from the pointwhere the change take place. The waves, in turn, cause increases or decreases in pressure as they travel

    along the pipeline. Transient pressure is independent of the internal working pressure created by the

    fluid in the pipeline; however transient pressure is proportional to the rate of change of flow conditionsand the pressure wave speed. Transient pressures must be considered during the pipeline and pump

    station design to adequately protect the hydraulic system and ensure safety.Changes in flow conditions can result from either normal or abnormal hydraulic transient conditions in

    a pumped system. Normal flow conditions changes may be caused by a change in pump operation suchas a normal pump startup or shut down, or by the normal opening and closing of valves in the system.

    Abnormal flow conditions changes typically result from unplanned events such as power failure at the

    pump station or a sudden/unexpected valve closure.

    A sudden starting or stopping due to power failure are the most severe surge condition in a pumped

    pipeline system. A rapid change in the flow conditions will take place at the pump station andimmediately propagate downstream of the pump. In a pumped system the pressures developed

    following the pump start or failure within the system may exceed the limits that the system canwithstand casing damage to the system. A pressure control devices must therefore be provided in order

    to control transients in the pipeline.

    As part of this analysis, for both the raw water pump station and finished water pump station, a surge

    control strategy has been recommended and sized to eliminate potential formation of high and vacuum

    pressure conditions and resultant transient pressure conditions during a maximum flow uncontrolledpump station shutdown and pumps startup.

    4.2.2 Transient Mathematical Model

    In general two primary equations are used in predicting transient flow conditions for surge events, These

    are based on Newton's second law of motion and on the continuity equation. The assumptions involved

    and the derivation of the equations are found in the literature on fluid transients (Chaudhry, Wylie andStreeter, and Parmakian). When these equations are coupled, they form a pair of quasi-linear hyperbolic

    partial differential equations in terms of two dependent variables, velocity and HGL elevation, and twoindependent variables, distance along the pipeline and time. The model uses the numerical approach

    known as the Method of Characteristics to transform these equations into four ordinary differentialequations. In order to solve for the flow conditions at the end of time step at the two boundaries,

    auxiliary equations are needed so that there are as many equations as there are unknowns. In other

    d th ti f th b d diti t b d i th ti l f th t b

  • 8/10/2019 Wasit_Detailed Design Report_updated.pdf

    47/180

    C. LOTTI & ASSOCIATI S.p.A. in co llaboration with CEB Baghdad University and Engicon

    water pipeline systems.

    4.2.3 Criteria and Analysis

    The analysis performed included both the raw water and finished water pump stations. The assumptions

    used to hydraulically represent the system and assess and size the surge control facilities are detailedbelow.

    4.2.3.1 Raw Water Pump Station

    The raw water pump station and pipeline system was modeled with the following assumptions:

    Surge Events:The causes of the surge events are simultaneous power failure to pumps and simultaneouspump start up.

    Pipelines: All pipelines are assumed to be ductile iron pipeline with a rated water working pressure of105m and an allowable downsurge and upsurge pressure allowances as follows:

    Downsurge: To eliminate problems resulting from air admission to the system, no negative or sub-

    atmospheric pressure is allowed along the pipeline.

    Upsurge: Ductile iron pipeline has a surge pressure allowance of 70m for a total working plus surgepressure allowance of 175m.

    Roughness Coefficient:The pipeline was assumed to have a relative roughness, , of 1.5 mm for a

    Darcy Weisbach friction factor,f, of 0.026.

    Source/Delivery Points:The model assumes the raw water pump station wet well as the supply point.

    The wet well is modeled with water level of 16.77m and 13.75m. The delivery point is assumed to be theflocculation basin with a maximum and minimum water surface elevation of 20.837m and 20.775m,

    respectively.Pump Station: Each pump is modeled with a rotational moment of inertia equal to the pump/motor

    combination. Each pump rotational moment of inertia is derived from an empirical equation developedby A.R.D Thorley and published in Fluid Transients in Pipeline Systems

    2

    . The equation uses

    horsepower and rotating speed to estimate moment of inertia. The raw water pump analysis assumes

    three pumps running. Each pump produces 350m3/h for a total flow rate of 1000 m

    3/h. The total moment

    of inertia has been modeled as 4.0 kg-m2.

    Pump Characteristics: Power failure at the pump station and pumps start are modeled to assess theworst-case surge condition. Pumps manufacturers usually supply the characteristics curve of normal

    operation zone and very few of them supply the complete characteristics curve. If these curves are notavailable for a pump, then the curves for a pump of the same type with approximately the same specific

    speed may be used (Chaudhry, Wylie and Streeter)

  • 8/10/2019 Wasit_Detailed Design Report_updated.pdf

    48/180

  • 8/10/2019 Wasit_Detailed Design Report_updated.pdf

    49/180

    C. LOTTI & ASSOCIATI S.p.A. in coll aboration w ith CEB Baghdad University and Engicon

    Pressure Wave Speed: A wave speed of approximately 1,160 m/s was utilized in the model. The

    program performs minor adjustments to the wave speed to accommodate pipeline segments of differentlengths.

    The head variation at the pump station due to pumps start and failure are shown in Figure (3). The

    maximum pressure developed within the system reached a level of 66. No vacuum pressure occurred. A

    minimum pressure level of 31.12m occurred at the station.

    It is recommended that the system be equipped with a surge control system. Several mathematical modelruns were made with different air vessels sizes, the recommended surge control system is a 10 m

    3hydro

    pneumatic tank with 70% of the total volume initially charged with water and 30% charged withcompressed air. The results for the protected system are shown in Figure (4). The pressures are keptwithin acceptable limits at the station and along the pipeline.

    It should be noted that both raw water and treated water analyses and control strategies that are

    recommended should be verified once refinements to system control logic and equipment selection has

    been made. Field tests are required to verify the variation of the pressures due to pump failure and pumpstart just when the raw and treated water stations are completed

    4.2.4 Analysis Summary and Recomendations

    Surge control facilities are required for both of the raw water and finished water systems. A surge tank of

    a cross sectional area of 1.4m with a maximum top level of 25.5m is recommended to control the

    transient pressures within the raw water system. .

    A 10 cubic meter hydro-pneumatic tank is recommended to control the transient pressures within the

    finished water system. Generally, hydro-pneumatic tanks of this size have a free water surface to

    compressed air interface. The water surface level in the tank will fluctuate with system pressure and

    therefore is continuously adjusted by a compressor and receiving tank. This type of system allowssignificant flexibility and will protect the system over a wide range of operating conditions. However,

    general maintenance on the compressor is required to ensure operation. If the compressor is not

    operational, the hydro-pneumatic tank will not protect the system during a transient event. An alternativeto the compressor system is an air bladder. The bladder is positioned within the tank during the

    manufacturing process and after installation the bladder is inflated to a set pressure. This set pressure is

    generally the higher end of the systems normal operating bandwidth. A bladder system does not provide

    as much flexibility as a compressor designed system, but the inflated bladder system will maintain the set

    pressure for an extended period of time without the need for constant adjustments. For a hydro-pneumatic tank this size periodic adjustments may be required depending on temperature and bladder

    elasticity. Also, there are limited manufacturers of bladder hydro-pneumatic tank systems. If available

    and cost feasible, a bladder tank is recommended.

  • 8/10/2019 Wasit_Detailed Design Report_updated.pdf

    50/180

  • 8/10/2019 Wasit_Detailed Design Report_updated.pdf

    51/180

    C. LOTTI & ASSOCIATI S.p.A. in co llaboration with CEB Baghdad University and Engicon

    70

  • 8/10/2019 Wasit_Detailed Design Report_updated.pdf

    52/180

    Ministry of Municipalities and Public Works Republic of Iraq 4/11/07

    Second Emergency Water Supply and Sanitation Project Wasit Detailed Design Report/fdDetailed Design Report c.a.: F249A51

    0 25 50 75

    Time (Sec.)

    30

    35

    40

    45

    50

    55

    60

    65

    70

    Head(m)

    Head Variation due to pumps start

    Head Variation due to pumps failure

    Figure (3). Head variation at the finished water pump station without pressure control device.

    C. LOTTI & ASSOCIATI S.p.A. in co llaboration with CEB Baghdad University and Engicon

    60

  • 8/10/2019 Wasit_Detailed Design Report_updated.pdf

    53/180

    Ministry of Municipalities and Public Works Republic of Iraq 4/11/07

    Second Emergency Water Supply and Sanitation Project Wasit Detailed Design Report/fdDetailed Design Report c.a.: F249A52

    0 25 50 75 100 125 150 175 200

    Time (Sec.)

    40

    45

    50

    55

    60

    Head(m)

    Head Variation due to pumps start

    Head Variation due to pumps failure

    Figure (4). Head variation at the finished water pump s tation with pressure cont rol device.

    C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universi ty and Engicon

  • 8/10/2019 Wasit_Detailed Design Report_updated.pdf

    54/180

    4.3 Mechanical Equipment-HAVAC

    4.3.1 Introduction

    The standard design drawings for processing and non-processing buildings are reviewed and

    selected to cope with the new subproject in Wasit. Also, all relevant HVAC system drawings

    have been checked for cross references and changed to fit the new set of the drawings for

    subproject in Wasit WTP.

    Computer programs for calculations of cooling/heating loads and ventilation rates are

    developed to check the standard design loads calculations. The cooling and heating loads

    calculations for all spaces are performed. In addition, the required ventilation rates for pumps,

    chlorination, chemical, rapid gravity filter and other halls are revised. Furthermore, the sizeand specifications of a scrubber unit for chlorinating hall is calculated and checked.

    The work includes the design criteria and installation systems for air conditioning, heating

    and ventilation for various spaces and will be as follows:

    The air conditioning, heating and ventilation systems will be designed to meet the criteria

    specified below:-

    4.3.2 Design Criteria

    4.3.2.1 Cooling

    The air conditioned areas comprise the following spaces:-

    - Non-process building

    - Selected rooms in processing building

    Inside design conditions will be:-- 23 oC Dry bulb temperature

    - 50 % Relative humidity

    - 20 % Fresh air make- up

    4.3.2.2Heating

    Heating areas comprise the conditioned spaces listed above and drum stores in the

    chlorination stations.

    - Conditioned spaces will be heated to maintain a

    temperature of 21 oC.

    D t ill b h t d t i t i

    C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universi ty and Engicon

    - Pipe galleries system

  • 8/10/2019 Wasit_Detailed Design Report_updated.pdf

    55/180

    Pipe galleries system

    6- Air changes/ hour

    - Battery room extracts system

    13- Air changes/ hour

    While mechanical ventilation areas comprise the following

    - Generating hall

    15 - Air changes/ hour

    - Chlorinating building8- Air changes/ hour

    - Pump halls

    7- Air changes/ hour

    - Workshop system

    6- Air changes/ hour

    Installation will be designed to operate continuously under limiting conditions for full range

    likely meteorological conditions.

    4.3.3 Systems

    Different systems are used for cooling, heating and ventilation of various spaces in processing

    and non-processing buildings of the Wasit water treatment plant. The systems for building

    are as follows:-

    4.3.3.1 Cooling system

    An individual through the- wall split air conditioning units ( cooling/ heating ) will be

    provided for individual rooms that are adequate for simplicity of air-conditioning smaller

    spaces.

    4.3.3.2 Heating system

    Heating system will be provided to air conditioned areas by electric heater batteries within the

    split air conditioning unit. In addition, duct inserted electric heaters will be provided in drumstore in the vicinity of the on-line drums and chemical building to maintain a temperature of

    13 oC. Also, a local electric heater will be provided for workshop building.

    4.3.3.3 Ventilation systems

    C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universi ty and Engicon

    In addition to the air ventilation specified for chlorinating station, a complete air cleaning

  • 8/10/2019 Wasit_Detailed Design Report_updated.pdf

    56/180

    In addition to the air ventilation specified for chlorinating station, a complete air cleaning

    system (scrubber unit) will be provided for removable of chlorine from contaminated exhaust

    air following a chlorine leak in the drum store.

    4.3.4 Sample of Calculations

    4.3.4.1Non-processing building

    A computer program is developed for the calculations of cooling and heating loads for all

    spaces in the non-processing building . All the coefficients used in the calculations are based

    on ASHRE standards with correction to our ambient conditions (latitude, month,

    temperature,..etc.) and with the following conditions.

    - Outside Summer: 46C Dry bulb and 23C Wet bulb.

    - Outside Winter: 0C

    - Daily temperature range = 19.2C

    -Heat transfer coefficients

    - Wall : 1.56 W/m2. C

    - Roof : 0.65 W/m2. C- Glass : 5.7 W/m2. C

    - Barrier: 3 W/m2. C

    - Film coefficients

    - Inside wall : 6.23 W/m2. C

    - Outside wall: 22.7 W/m2. C

    - An air change per hour is chosen as (20) for approved Air Cooler.

    - All split units are manufactured for outside temp. = 35 C. Therefore, a correction is made to

    estimate the actual load for ambient temperature of 50 oC.

    - Load calculations for mechanical maintenance room

    a- Heating load

    - Heating load calculations showed a load of 11220 watt.

    - Heat source from machines = 1800 w

    - Net heat required = 9420 w

    Therefore the heating load = 10000w

    C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universi ty and Engicon

    = 847 x 20

  • 8/10/2019 Wasit_Detailed Design Report_updated.pdf

    57/180

    = 16940 m3/hr

    = 9960 CFM

    - (2) Nos. Evaporator Air Coolers with 5000 CFM each are selected.

    - Load calculation for conditioned zones

    A computer program is developed for calculation of cooling load for various zones in non-

    processing building. The calculations are based on the design criteria and the correction

    procedure to fit the ambient temperature of 50 oC. The computer output shows the details of

    the calculations and cooling loads for other zones are shown in the attached table.4.3.4.2 Process buildings

    The process buildings comprise pumps halls, rapid gravity filter, chemical, chlorine buildings

    and other associated buildings. These buildings are provided with ventilation system thought

    fan extraction units and sand trap filters. A computer program is developed for calculation of

    ventilation loads for various spaces. The result of sample calculation is shown in computer

    output. Loads for others zones are calculated and checked.

    4.3.5 The Changed Drawings:

    The drawing No. (13-299-5600) shows the technical information about the HAVC

    equipment used in the WTP. The following units are not found in above drawing.

    1- EUW-90-1003 & CU-90-1021

    2- EUW-90-1002 & CU-90-1022

    3- EUW-90-1003 & CU-90-1023

    Electrical Building MCC

    4- EUW-80-1001 & CU-80-1021 Chemical Building

    5- EXF-80-1001

    6- EXF-80-1002

    So, these units are added in the table with their technical information ( split unit type,

    capacity, power, voltage, phase .etc)

    4.3.6 Bill of Quantities:

    The bill of quantities is revised, checked and changed accordingly to fit the supplied

    drawings.

    C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universi ty and Engicon

  • 8/10/2019 Wasit_Detailed Design Report_updated.pdf

    58/180

    Summary of Cooling Load Calculations for non-processing building

    Building ZoneTotal Heat

    (Watt)

    Total Heat

    (Btu/hr)

    GTH

    (Btu/hr)

    Selected

    Capacity

    (Btu/hr)

    Admini. 02 19628 66931 83664 3x30000

    08 12568 42731 53413 2x30000

    11 12009 40050 51186 2x3000012,13 12673 43088 53860 2x30000

    14 11170 38092 47615 1x48000

    17 22155 75548 94436 2x48000

    Mainten. 07 8592 29298 36623 2x22300

    09 7016 23924 29905 2x22300

    10 3169 10815 13518 1x22300

    3-BR 03 6533 22277 27846 1x3000006 4822 16464 20580 1x22300

    07 5512 18812 23515 1x30000

    08 4499 15355 19193 1x22300

    10 5422 18505 23131 1x30000

    11 4485 15307 19133 1x22300

    2-BR B07 3918 13372 16715 1x22300

    B03 5429 18529 23161 1x30000B06 3255 11101 13876 1x22300

    B08 5248 17911 22388 1x30000

    B11 5797 19709 24636 1x30000

    2-BR A03 5762 19648 24560 1x30000

    A06 5101 17409 21761 1x30000

    A07 3918 13372 16715 1x22300

    A08 3255 11101 13876 1x22300A10 5429 18529 23161 1x30000

    Guard 02 3028 10334 12917 1x18000

    05 2562 8744 10930 1x22300

    C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universit y and Engicon

  • 8/10/2019 Wasit_Detailed Design Report_updated.pdf

    59/180

    Ministry of Municipalities and Public Works Republic of Iraq 4/11/07Second Emergency Water Supply and Sanitation Project Wasit Detailed Design Report/fdDetailed Design Report c.a.: F249A

    58

    SUBJECT HVAC Sample of Calculations

    Admin. Bui lding

    Wasit WTP

    ZONE NAME: off ice

    COMPUTED DATE 30/6/2007

    CHECKED DATE 06/01/2007

    REFERENCES (3). Modern Air Conditioning Practice, 2nd Edition.

    (1). ASHRAE FUNDAMENTALS 2001. (4). ASHRAE STANDARD 62-1989

    (2). ASHRAE FUNDAMENTALS 1997.

    DESIGN DATA (Ref. 1, Ref. 4)

    Outside Design Air Temperatures

    Maximum DB Maximum WB Minimum DB Daily DB Range

    C F C F C F C F

    50 122 23 73.4 24 75.2 19 66.2

    Inside Design ConditionAir Conditioned Spaces Ventilated Spaces

    Min. Temperature Max. TemperatureRelativeHumidity Min. Temperature Max. Temperature

    C F C F % C F C F

    23 73.4 30 86 50 8 46.4 40 104

    BUILDING DATA

    Surface Conductances and Resistances (Ref. 1, Table 1 on pg. 25.2)

    Inside Surface

    Surface TypeSurfacePosition hi (W/m

    2.oC) Ri (

    oC.m

    2/W)

    Horizontal 9.26 0.108Inside SurfaceVertical 8.29 0.121

    C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universit y and Engicon

    O t id S f

  • 8/10/2019 Wasit_Detailed Design Report_updated.pdf

    60/180

    Ministry of Municipalities and Public Works Republic of Iraq 4/11/07Second Emergency Water Supply and Sanitation Project Wasit Detailed Design Report/fd

    Detailed Design Report c.a.: F249A59

    Outside Surface

    Surface TypeSurfacePosition h

    i(W/m

    2.oC) R

    i(oC.m

    2/W)

    Outside Surface summer Any 22.70 0.04

    Thermal Properties

    Thickness Conductivity Resistance Total Resistance Ud

    x ka R

    b R

    c(

    oC.m

    2/W) W/m

    2.oC

    Item mm m. W.m/m2.oC

    oC.m

    2/W Rsummer Usummer

    Gypsum Plaster 20 0.020 0.81 0.025Concrete 200 0.200 1.37 0.146

    Cement Morter 20 0.020 0.72 0.028

    Asphalet 1.000 97.5 0.010

    Insulation Styrafoam 0.500 0.517 0.967

    Sand 100 0.100 1.83 0.055

    Roof

    Concrete Tile 40 0.040 0.76 0.053

    1.44 0.697

    Gypsum Plaster 20 0.020 0.81 1.000Brick 25 0.025 0.72 0.035

    Cement Morter 20 0.020 0.72 0.450Exposed Walls 1.65 0.606

    ZONE DIMENSIONS

    Length Width Height Volume

    Room m ft m ft m ft m3 ft

    3

    Zone 8.50 27.9 4.50 14.8 3.50 ### 134 4727

    COOLING LOAD CALCULATION BY CLTD/SCL/CLF METHOD FOR AIR CONDITIONED SPACES

    Construction Data

    Uwindow= 6.42W/m

    2.oC (Ref. 1,

    Table 4 on pg. 30.8)

    C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universit y and Engicon

    Cooling Load from Heat Gain through Exposed Roof, Walls, Doors and Conduction through Galss

    E ti UA(CLTD )

  • 8/10/2019 Wasit_Detailed Design Report_updated.pdf

    61/180

    Ministry of Municipalities and Public Works Republic of Iraq 4/11/07Second Emergency Water Supply and Sanitation Project Wasit Detailed Design Report/fd

    Detailed Design Report c.a.: F249A60

    Equation: q = UA(CLTDCORR.)

    Section

    Net A m2 U-Factor (W/m

    2.oC)

    CLTDoC LM K

    Corr.CLTD

    oC Ref. for CLTD (Ref.2,Chap.28)

    Roof 1 28 0.697 16 0.50 1.00 40 Table 30, Roof 1

    NE wall 0 21 0.606 10 -0.50 0.85 35 Table 32, Wall 5

    NW wall 0 40 0.606 8 0.00 0.85 24 Table 32, Wall 5

    SE wall 1 29.75 0.606 12 0 0.85 39.4

    SW wall 0 0 0.606 8 0 0.85 33 Table 32, Wall 1Where: Corr. CLTD = ((CLTD + LM) K + (25.5 - ti) + (tm - 29.4)) C

    F=ventilation correction throughfalsh ciling

    LM = alitute correction K = darkness correctiontm= mean outdoortemperature

    Heat Load Through Glass

    Conduction Cooling Load Through Glass

    q = A U CLTDcorr

    Section

    Net A m2 U W/m

    2.oC

    Corr.CLTD

    oC

    Cooling LoadW

    CoolingLoadBtu/h

    Windows 6 6.42 27 1040 3547

    Solar Cooling Load Through Glass

    Equation: q = A(SC)(SCL)(SHGmax)

    where SC= shading factor,SCL=solar cooling load factor SHGmax = soler heat gain

    Windows Net A m2 SC SCL SHGmax

    Ref. for SCL,SC and SHGmax (Ref. 2, Chapter

    28)

    CoolingLoad W Cooling Load Btu/h

    NE window 0 0.64 0.81 445Table 36,

    on pg. 28.50 0

    C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universit y and Engicon

    NW window 0 0.64 0.81 445 0

    SE i d 0 0 64 0 81 571 0

  • 8/10/2019 Wasit_Detailed Design Report_updated.pdf

    62/180

    Ministry of Municipalities and Public Works Republic of Iraq 4/11/07Second Emergency Water Supply and Sanitation Project Wasit Detailed Design Report/fd

    Detailed Design Report c.a.: F249A61

    SE window 0 0.64 0.81 571 0

    SW window 6 0.64 0.81 571 1776

    Cooling Load From People 1776

    Equation:

    qsensible= N(Sensible heat gain)CLF

    Where qlatent = N(Latent heat gain)

    N = number of people in space

    Sensible and latent heat gain from occupancy - Ref. 1, Table 1 on pg. 29.4

    CLF = Cooling load factor, by hour of occupancy - Ref. 2, Table 29 on pg.28.40

    N Sensible Heat W latent Heat W CLF qsensible Wqlatent

    WCooling

    Load W

    12 90 95 1.0 1080 1140 2220

    Cooling Load from Heat Gain through Lights

    Equation: q = WFulFsa(CLF)

    W Factor Ful Fsa CLF q(W) q(Btu/h)

    720 3.41 1 1.2 1 864 2946

    Cooling Load from Infiltration Air

    Infiltration through wall surface is neglected as insignificant.

    To calculate the infiltration through doors, estimate 100 ft3per person per door passage (Ref. 2 on pg. 28.34).

    Further estimate each door use is at 2 persons hour. 74.40 L/s

    Qinfiltration= 2 x 100 /( 60 *2.118 =

    qsensible= 1.22Q(to- ti)

    qlatent= 2940Q(Wo-Wi)

    Q L/s Factor t OcW kg(water)/kg(dry

    air)qW

    qBtu/h

    74.40 1.22 27 2451 8357

    74.40 2940 0.0010 219 746

    C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universit y and Engicon

    Cooling load from equipment

  • 8/10/2019 Wasit_Detailed Design Report_updated.pdf

    63/180

    Ministry of Municipalities and Public Works Republic of Iraq 4/11/07Second Emergency Water Supply and Sanitation Project Wasit Detailed Design Report/fd

    Detailed Design Report c.a.: F249A62

    Equipment

    Cooling Load W Cooling Load Btu/h1 1000 3410

    Summary of Cooling Load Calculations

    itemSensible Cooling

    Load W Latent Cooling Load W Sensible Cooling Load Btu/hLatent Cooling Load

    Btu/h

    Roof 780 2661

    Exposed surfaces 1161 3958

    Glass 3996 13626Equipment 1000 3410

    People 1080 1140 3683 3887

    Lights 864 2946

    Infiltration 2451 219 8357 746

    Subtotal 2451 1359 8357 4633

    Grand Total Load 11332 1359 38641 9267

    Summary of Cooling Load Calculations

    RoomTotal CoolingLoad W Total Cooling Load 1.1 W

    Total CoolingLoad Btu/h

    Total Cooling LoadTon

    Zone 12690 13960 47602 3.97

    EQUPIMENT SELECTION

    The load calculation is based on 46C temperaure outside condtion.

    Equipment design is based on 35 C ambinent temperatureTotal Load will

    be=4.96 Tons

    Meter/Ton= 0.130

    59503 Btu/h

    Select Unit with 21950 Btu/h

    C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universit y and Engicon

    Nos. of Units= 3

  • 8/10/2019 Wasit_Detailed Design Report_updated.pdf

    64/180

    Ministry of Municipalities and Public Works Republic of Iraq 4/11/07Second Emergency Water Supply and Sanitation Project Wasit Detailed Design Report/fd

    Detailed Design Report c.a.: F249A63

    AIR REQUIREMENTS FOR AIR CONDITIONED SPACES

    Sensible-Heat Factor (SHF):SHF = (Sensible Heat)/(Total Heat) = 0.89

    Room Apparatus Dew Point (ADP):

    Using the Psychrometric Chart with the room design condition of 32oC DB, 50% RH,

    ADP = 11.5oC

    Bypass Factor (BPF):

    Assuming cooling coil bypass factor

    BPF

    =

    0.1

    Required Airflow (Qsupply): (Ref. 4)

    Where RSH = room sensible heat

    tr= room air temperature,oC

    Qsupply = 0.897 m3

    /s

    Qsupply = 1900 Cfm 701CFM EachUnit

    CFM/Ton= 383

    Fresh Air= 190 CFM

    ( ) ( ) 1000ADPtBPF1822.1RSH

    Qr

    =

    C. LOTTI & ASSOCIATI S.p.A. in collaboration wi th CEB Baghdad Universi ty and Engicon

    SUBJECT Sample of Calculations PROJECT NAME:

  • 8/10/2019 Wasit_Detailed Design Report_updated.pdf

    65/180

    SUBJECT Sample of Calculations PROJECT NAME:

    COMPUTED DATE 24/5/2007 Chlorinating B.

    CHECKED DATE 28/5/2007 Drum StoreVentilation System Wasit WTP

    REFERENCES

    (1). ASHRAE FUNDAMENTALS 2001. (5). ASHRAE STANDARD 62-1989

    (2). ASHRAE FUNDAMENTALS 1997.