The Basic Structure
Extract
Source Data
Extract
Storage: flat files (fastest);RDBMS;other
Processing:clean;prune;combine;remove duplicationstandardizeconform dimensionsstore awaiting replicationexport to data marts
No user query services
Data Staging Area
Data Mart #1OLAP (ROLAP,MOLAP,HOLAP)
dimensional accesssubject orienteduser group drivenrefresh frequencyconforms to the Bus
Data Mart #2
Data Mart #3
Populate,replicate,recover
DW Bus
DW Bus
Corporate View
![Page 2: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/2.jpg)
The Basic Structure
Data Mart #1OLAP (ROLAP,MOLAP,HOLAP)
dimensional accesssubject orienteduser group drivenrefresh frequencyconforms to the Bus
Data Mart #2
Data Mart #3
DW Bus
DW Bus
Corporate Staging Area User Access
Ad Hoc Query Tools
Reporting Tools and Writers
Customized Applications
Models:forecasting;scoring;allocating;data mining;scenario analysis;etc.
Data Feed
Data Feed
Data Feed
![Page 3: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/3.jpg)
The Business Dimensional Lifecycle
• Project Planning Early Critical Tasks– definition– scope– readiness assessment– business justification
• Remaining Tasks– Resource requirements and identification– Schedule construction and integrations
![Page 4: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/4.jpg)
The Business Dimensional Lifecycle
• Business Requirements Definition– Critical to success– Designers must understand the business needs– A plan to extract users needs and to understand
them must be developed.
![Page 5: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/5.jpg)
The Business Dimensional Lifecycle
• Three project tracks follow the business requirements definition process:– Data track– Technology track– Application track
![Page 6: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/6.jpg)
The Business Dimensional Lifecycle
• Data Track– Dimensional modeling– Physical design– Data staging design and development
![Page 7: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/7.jpg)
The Business Dimensional Lifecycle
• Technology Track– Technical architecture design– Things to consider:
• business requirements
• current technical environment
• planned strategic technical directions
![Page 8: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/8.jpg)
The Business Dimensional Lifecycle
• Application Track– Product identification, selection, and
installation– End user application development
• Configuring the metadata repository access
• Building specialized applications
![Page 9: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/9.jpg)
The Business Dimensional Lifecycle
• Deployment– The integration of all the pieces of the puzzle.– The best warehouse will fail if deployment is
not properly planned– Plan required prior to deployment are:
• education• user support• feedback• enhancement/maintenance
![Page 10: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/10.jpg)
The Business Dimensional Lifecycle
• Maintenance and Growth– Work never stops!!!– Critical to support and stay connected to the
users to ensure the warehouse meets their needs.
– Watch performance and plan ahead (the backroom)
– Collect and analyze metrics regarding use and operation
![Page 11: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/11.jpg)
The Business Dimensional Lifecycle
• Maintenance and Growth (cont)– If you are successful, change is inevitable. Plan
and prioritize future initiatives with user buy-in.– Always plan for expansion and growth with
each new increment or change.
![Page 12: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/12.jpg)
The Business Dimensional Lifecycle
• Project Management– Monitor project status– Track issues– Control change– Project communication– Project marketing– Project politician– Project visionary
![Page 13: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/13.jpg)
The Business Dimensional Lifecycle
TechnicalArchitecture
Design
TechnicalArchitecture
Design
ProductSelection &Installation
ProductSelection &Installation
End-UserApplication
Specification
End-UserApplication
Specification
End-UserApplication
Development
End-UserApplication
Development
ProjectPlanningProject
Planning
Business
Requirement
Definition
Business
Requirement
Definition
DeploymentDeploymentMaintenance
andGrowth
Maintenanceand
Growth
Project ManagementProject Management
DimensionalModeling
DimensionalModeling
PhysicalDesign
PhysicalDesign
Data StagingDesign &
Development
Data StagingDesign &
Development
![Page 14: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/14.jpg)
Project Planning & Management
• Who Wants the Warehouse?– A single visionary user
• desirable because the focus remains manageable
• requires political leverage to make it work
• the need must have broad and definable impacts to show worth
– Multiple demands• Many organizations want a data mart or warehouse
• Focus is spread, therefore politics and planning play a vital role
![Page 15: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/15.jpg)
Project Planning & Management
• Who Wants the Warehouse? (cont)– No identified need
• Organization wanting to get in the “warehouse” game
• More effort on the warehouse team to identify the need
• It is highly likely there will be one.
![Page 16: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/16.jpg)
Project Planning & Management• Determine Warehouse Readiness
– Do you have a strong business sponsor?• Vision
• Politically savvy
• Connected
• Influential
• History of success
• Respected
• Realistic
• Understands the need and the process and can communicate it
![Page 17: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/17.jpg)
Project Planning & Management
• Determine Warehouse Readiness (cont)– Without this person you will fail– Try to recruit multiple sponsors.– Is there a real and identifiable business need?– Does a strong partnership exist between IT and
the business groups?– What is the current analytical environment?
• How are things done now?• What culture shock will be created?
![Page 18: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/18.jpg)
Project Planning & Management
• Determine Warehouse Readiness (cont)– What is the feasibility?
• Is the data “dirty” beyond recovery?
• Is the target sources to dispersed and dynamic to achieve early and significant results?
![Page 19: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/19.jpg)
Project Planning & Management• Take the Readiness “Litmus Test”
– The test looks at:• Sponsor• Business Needs• IT/Business Partnership• Current Analytical Environment• Feasibility
– A strong sponsor is the most important to get a high rating from the test
– Business needs and IT/Business Partnerships are secondary in importance
![Page 20: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/20.jpg)
Project Planning & Management
• Addressing Readiness Issues– High-level business requirements analysis
• Identify the strategic initiatives
• Identify the business metrics
• Identify the high impact and ROI areas
– Business Requirements Prioritization• Look for high impact, ROI, and feasibility
– Proof of Concept
![Page 21: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/21.jpg)
Project Planning & Management
• Develop the Initial Scope– Keep the scope narrow and short to retain clarity– The bigger the scope the more difficult it
becomes to retain focus– Always define the scope based on business
requirements. Try to avoid deadlines or budget cycles from driving the scope.
![Page 22: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/22.jpg)
Project Planning & Management
• Develop the Initial Scope (cont)– Scope definition involves both IT and business
representatives– Make the scope have significance but ensure it is
achievable and timely– Start with a single or few data sources and a single
business process– Limit your initial user base (typically 25 - 35 people).– Determine what management expects so success can be
identified
![Page 23: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/23.jpg)
Project Planning & Management
• Develop the Initial Scope (cont)– Document the scope definition and success
indicators– Acknowledge that the scope will likely change– Develop a plan to manage the change
![Page 24: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/24.jpg)
Project Planning & Management
• Build the Business Justification– Determine the costs
• Identify hardware and software costs (start-up and ongoing)
• Identify maintenance costs
• Internal staff needs
• External resources (consultants, etc.)
• Operational support
• Support of growth pains
![Page 25: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/25.jpg)
Project Planning & Management
• Build the Business Justification (cont)– Determine the benefits (financial and other)
• Increased revenue
• Increased profit
• Increased customer satisfaction
• Expansion of a market or capability
• Increased employee productivity
• Reduction of capital investments (storage requirements, etc.)
• Protection against fraud and attack
![Page 26: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/26.jpg)
Project Planning & Management
• Build the Business Justification (cont)– It is important to monitor and track the business
to identify and market impacts the warehouse has made
– Look for the tangibles and intangibles
![Page 27: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/27.jpg)
Project Planning & Management
• Plan the Project– Establish project identity
• Create a name
• Create documentation describing your project
• Make T-shirts, mugs, etc
• Market, market, market!!!
![Page 28: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/28.jpg)
Project Planning & Management
• Plan the Project (cont)– Staff up
•Project Manager•Business Lead•Business Analyst•Data Modeler•DW DBA•Data Staging System Designer•End User Application Developer
•DW Educator•Technical/Security Architect•Technical Support Specialists•Data Staging Programmers•Data Steward•DW QA Analyst
![Page 29: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/29.jpg)
Project Planning & Management
• Develop the Project Plan– Key (frequently update your plan)– The nature of a DW project in cyclic and
resembles a spiral approach– Identify key milestones– Develop a high-level and detailed plan
![Page 30: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/30.jpg)
Project Planning & Management
• Manage the Project– Matrix management is often used because of
the numerous interlaced roles– Data issues may lay waste to the best devised
plans (plan for the unexpected)– The project will likely increase in visibility
(manage expectations)– Iterative/sliding window development requires
multiple teams work in sync (communication)
![Page 31: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/31.jpg)
Project Planning & Management
• Manage the Project (cont)– Conduct a project kickoff meeting
• Identify the team, roles, and responsibilities
• Identify the scope
• Identify goals
• Identify the schedule
• Review the preliminary PMP
• Conduct preliminary education
![Page 32: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/32.jpg)
Project Planning & Management
• Monitor the Project Status– Frequent communication– Project status meetings– Team meetings– Project status reports– Customer reporting
![Page 33: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/33.jpg)
Collecting the Requirements
• The old theory was not to include the users in the early stages.
• Build it and they will come.• This proved to be the demise of many early
warehouse initiatives.• A formal requirement (but flexible) is
needed to document the users needs of the warehouse.
![Page 34: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/34.jpg)
Collecting the Requirements
• This is a difficult process for many reasons.– Key people may feel threatened and are not
willing to cooperate.– The informal decision process is typically not
well documented and is dispersed.– People have a difficult time thinking “out of the
box”– Terminology associated to warehousing often
creates confusion and/or misinformation
![Page 35: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/35.jpg)
Collecting the Requirements
• Talk with the business users first – Strive to understand how they do business– Identify how decisions are made today– Determine how they would like to make
decisions today and tomorrow– Do not just ask “what data do you need?”
![Page 36: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/36.jpg)
Collecting the Requirements
• Talk with the IT community second– Wait until some common sources and themes
are identified by the business users before approaching IT
– Look for feasibility issues– Start identifying technical issues such as
platforms, formats, access, and politics– Talk DBAs, DAs, application developers, an
designers
![Page 37: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/37.jpg)
Collecting the Requirements
• Getting the requirements (Interview VS Facilitation)– Interviews tend to stay focused and work well
with small groups– Facilitated sessions work with larger groups
and encourage “brainstorming” and cross pollination of ideas.
![Page 38: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/38.jpg)
Collecting the Requirements
• Roles of the requirements team– Lead interviewer– Secondary interviewers– Scribe– Observers– Facilitator
![Page 39: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/39.jpg)
Collecting the Requirements
• Preparation for the interview– Look at strategic plans that relate to the
company or group you will talk with– Look at the annual report. Important goals and
initiatives will be identified and taken seriously by the company.
– Review marketing material– Search the Internet for information– Identify past attempts at similar projects
![Page 40: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/40.jpg)
Collecting the Requirements
• Identify who will be interviewed– Business
• Look horizontally across the organization to see the big picture
• Get as much detail as possible in the current area of focus (vertical)
• Request that your sponsor identify who should be interviewed.
![Page 41: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/41.jpg)
Collecting the Requirements
• Identify who will be interviewed– Technology
• The data gurus (these people have been around a long time and know the details)
• Application programmers
• Pseudo technical people within a business area
• DBAs
• Data modelers
• System administrators
• IT management to identify the future
![Page 42: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/42.jpg)
Collecting the Requirements• Develop an interview questionnaire• Build an agenda for the interview sessions• Prepare the interviewees
– Hold a single meeting with all interviewees to discuss the project, intentions, etc
– Set the tone for all interviews
– Encourage questions
– Enables you to identify good and bad candidates early (now you can plan for each person)
![Page 43: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/43.jpg)
Collecting the Requirements• Conduct the interview
– Remain within the roles established for the interview team
– Validate what you have collected with the user as soon as possible
– Define terms with the users (profit, revenue, sales)
– Try to talk on their level and avoid using confusing technology terms (use their business lingo when possible)
![Page 44: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/44.jpg)
Collecting the Requirements• Conduct the interview
– Try to remain flexible during the interview process• Meet with unexpected people
• Run past the allotted time
• Discuss topics somewhat out of the focus of the interview.
– Schedule breaks and limit the number of interview session per day to about five
– Continue to manage expectations
![Page 45: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/45.jpg)
Collecting the Requirements• Potential interview questions for an executive:
– What are the objectives of your organization? What are you trying to accomplish?
– How do you measure success? How do you know you are doing well? How often do you measure yourself?
– What are the key business issues you face today? What could prevent you from meeting these objectives? What would be the impact?
![Page 46: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/46.jpg)
Collecting the Requirements
• Potential interview questions for an analyst:– What are your groups objectives? How do you
accomplish them? How do you achieve it?– What are your success metrics? How do you
know you are doing well? How often do you measure?
– What issues do you currently face?– Describe your products, vendors, etc? Is there a
natural hierarchy?
![Page 47: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/47.jpg)
Collecting the Requirements• Potential interview questions for an analyst:
– What type of analysis do you perform? What data is used? How do you get it? What do you do with it?
– What analysis would you like to perform?
– What dynamic analysis needs do you have? Who drives these needs? How long does it take to perform? Are you able to conduct deeper levels of analysis?
– What analytical capabilities would you like?
![Page 48: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/48.jpg)
Collecting the Requirements• Potential interview questions for an analyst:
– Where are the bottlenecks in obtaining information?
– How much historical information is needed?
– How will improved information access impact you and your organization? What is the financial impact?
– What reports do you currently use? Which data elements on the reports are important? How is this information used? Is it combined with anything else?
![Page 49: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/49.jpg)
Collecting the Requirements
• What to discuss with IT:– Request an overview of the operational systems
– What are the current tools and technologies used to share information?
– What types of analyses are performed?
– How are detailed analyses supported and conducted?
– What are the data quality issues?
– Where do bottlenecks exist?
![Page 50: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/50.jpg)
Collecting the Requirements
• What to discuss with IT:– What concerns do you have about data
warehousing in the organization? What roadblocks do you see?
– What expectations do you have of the warehouse?
– How do you expect the warehouse to impact you?
![Page 51: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/51.jpg)
Collecting the Requirements
• Types of users you will interview– Abused User
• Involved in earlier attempts• Unwilling to cooperate
– Overbooked User (To busy to meet)– Comatose User– Overzealous User– Nonexistent User (Use technology to drive the
needs)
![Page 52: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/52.jpg)
Collecting the Requirements
• Wrap Up
• Review the interview results with the team
• Prepare and publish the results
• Establish what will be done next
![Page 53: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/53.jpg)
Dimensional Modeling
Jeffrey T. Edgell
![Page 54: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/54.jpg)
The Dimensional Model
• More intuitive structure for presentation and reporting
• Likely predates the E/R approach– General Mills & Dartmouth University
developed a fact and dimension structure– Nielsen Marketing Research used this on
grocery and drug store auditing and scanner data in the 70s and 80s.
![Page 55: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/55.jpg)
The Dimensional Model
• Dimensions are descriptive
• Facts are likely numeric and are measurement based
• Additive facts are vital to allow aggregation of many records during a retrieval
• Page 145 (A typical dimensional model)
![Page 56: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/56.jpg)
The Argument for the Dimensional Model
• Tools can utilize a standardized framework
• Query tools can leverage against this for performance optimization
• High performance entry browsing is possible
• All queries can be initially constrained thus significantly increasing performance
![Page 57: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/57.jpg)
The Argument for the Dimensional Model
• Easily adapts to unpredictable queries
• Extends to allow the addition of new tables or data elements– will not require rebuilding the database from
scratch– data does not need to be reloaded– existing reports and query tools do not need to
be redesigned or implemented
![Page 58: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/58.jpg)
The Argument for the Dimensional Model
• The model can be altered as follows without interruption:– The addition of new facts (consistent with the
defined grain)– The addition of new dimensions– The widening of a dimension table– Changing the detail of a dimension to a lower
level
![Page 59: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/59.jpg)
The Argument for the Dimensional Model
• The dimensional model exhibits a predefined set of approaches used to deal with common issues.– Slowly changing dimensions– Heterogeneous products (track different lines of
business i.e. checking & savings)– Pay-in-advance data bases (look at individual
components as well as the total)– Event handling (no facts)
![Page 60: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/60.jpg)
The Argument for the Dimensional Model
• Aggregation in a warehouse allows for query performance normally delegated to hardware to solve (greatly increasing $)
• A standard set of schemas for different business types and applications exist
![Page 61: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/61.jpg)
The Bus
• Supports the incremental approach
• The data mart approach has often lead to development of warehouse absent of a corporate framework
• Stovepipe decision structures result
• Produces a uniform global structure eliminating the pocket or stovepipe data marts
![Page 62: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/62.jpg)
The Bus
• Look at the entire enterprise as you design and build the data marts
• A high level architecture must be defined that explains the entire structure
• A detailed architecture must be developed to support each data mart as they are confronted
![Page 63: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/63.jpg)
Conformed Dimensions
• Dimensions used to represent concepts across the enterprise must be standardized and agreed upon– customer– product– time– potentially not region (sales & management)
![Page 64: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/64.jpg)
Conformed Dimensions
• Conformed dimensions must be carefully managed, maintained, and published to ensure consistency
• The conformed dimension represents the central source description of which everyone agrees
• If the conformed dimension approach is not observed, the bus will not properly function
![Page 65: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/65.jpg)
Conformed Dimensions
• With conformed dimensions– One dimension table relates to multiple facts– Browsers are consistent with the dimension
providing a unified view– Rollups and meanings remain consistent across
facts
![Page 66: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/66.jpg)
Conformed Dimensions
• Design– Lowest level of granularity possible (based on
the lowest level defined)– Use the sequential numeric key (surrogate key)
![Page 67: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/67.jpg)
Conformed Facts
• Occurs during the definition of conformed dimensions
• Relates common measurements accurately– Cost – Profit– Unit price
• If facts are different use different names (marketing profit & sales profit)
• As much political as technical
![Page 68: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/68.jpg)
When the Bus is not Required
• The business you are dealing with is intentionally segmented– Components operated autonomously with no
unified corporate view required– Products or business areas are disjoint– For example a company sells music and repairs
train engines (no business or product synergy except at the very top)
![Page 69: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/69.jpg)
The Components of the Dimensional Model
• Facts
• Dimensions
• Attributes
• The Bus (optional but highly suggested)
![Page 70: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/70.jpg)
Operations
• Drill down and rollup – Example on page 168
![Page 71: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/71.jpg)
Snowflakes• What is it?
The removal of low cardinality fields from a dimension placed in a new table and linked back with keys
• Complicates design detail
• Decreases performance
• Saves some space but normally not a significant amount
• Bit map indexes can not be effectively utilized
![Page 72: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/72.jpg)
When a Snowflake is OK
• When used as a subdimesnion– The data in the subd is related to the dimension
are at different levels of granularity– The data load times for the data are different– Examples:
• County and state
• District and region
• Ship and battle group
![Page 73: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/73.jpg)
Good Descriptive Dimensions
• Large dimension tables
• Highly descriptive
• Without good descriptive dimensions, the warehouse is not useful
• Use:– full words, no missing values (null), QA,
metadata
![Page 74: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/74.jpg)
Common Dimension Techniques
• Time– example figure 5.7 page 176
• Address– example page 178
• Commercial address– example page 179
![Page 75: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/75.jpg)
Slowly Changing Dimensions
• What to do:– Type 0: Ignore the change– Type 1: Overwrite the changed attribute– Type 2: Add a new dimension record with new
value of the surrogate key– Type 3: Add an “old value” field
![Page 76: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/76.jpg)
Slowly Changing Dimensions
• Ignore the change– Not typically a good solution to the problem,
but is done.
• Overwrite the changed attribute– Valid when correcting a value from the source
• Add a new dimension record with a generalized key– Retains history of a changed product
![Page 77: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/77.jpg)
Slowly Changing Dimensions
• Add an “old value” field– Valid when on the previous change is needed
for decision making
![Page 78: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/78.jpg)
Slowly Changing Dimensions
• Type 2 example:
Change in product (bottle changes from platic to glass)
Key 001 002Type Plastic GlassSKU 1234 1234
![Page 79: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/79.jpg)
Slowly Changing Dimensions
• Type 3 example:
Regional divisions of a company changes (only one historical change is supported)
Region Gold Silver Platinum BronzeOld Region North South East West
![Page 80: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/80.jpg)
The Monster Dimension
• It is a compromise
• Avoids creating copies of dimension records in a significantly large dimension
• Done to manage space and changes efficiently
![Page 81: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/81.jpg)
The Monster Dimension
Customer_Keynameaddresscity, statebirth_datedate_first_purchaseincomenumber_childreneducationtotal_purchasescredit_score
Customer_Keynameaddresscity,statebirth_datedate_first_purchase
Demographics_Keyincome_bandnumber_childreneducation_leveltotal_purchases_bandcredit_group
Basically constant
May change with each purchase
Bands used tominimize possibilities
Example 1
![Page 82: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/82.jpg)
The Monster Dimension
• Case 1 (Rapid change)– Large dimensions can be dynamic because of
the amount of information contained– Certain aspects must be maintained in the
dimension, over time, to understand impacts• demographics
• customer data
• product lines (for companies in acquisition)
![Page 83: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/83.jpg)
The Monster Dimension
• The solution to very dynamic large dimensions– identify the dynamic areas of the dimension– segment the hot areas into there own
independent dimensions– The relative static information remains in the
original dimension
![Page 84: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/84.jpg)
The Monster Dimension
• The trade off (plus)– the warehouse can accurately retain significant
changes in a dimension over time– to slow the rate of change down extremely
dynamic attributes should be banded to slow the rate of change
– All possible combinations in the dimension become finite (discrete) and are thus manageable
![Page 85: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/85.jpg)
The Monster Dimension
• The trade off (minus)– Loss of detail in the bands (no longer exact)– Once bands are defined they must be enforced
from that point on– Slower browse performance required when
combining the segmented table with the original table
– Impossible to combine the data without a single instance of a fact (nothing to relate the dimensions)
![Page 86: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/86.jpg)
The Monster Dimension
Employee Tablename addressdate_of_birthsocial_security_num…titleyears_with_companyincomedivisionpurchase_level
Example 2
Employee Tablename addressdate_of_birthsocial_security_num
Corporate Demographicsposition_gradeincome_banddivisionservice_years_band
![Page 87: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/87.jpg)
Degenerate Dimensions/Key
Definition - Critical data provided in the legacy environment that normally remains independent. Typically the old key from the current fact information you are using with no supporting data
![Page 88: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/88.jpg)
Degenerate Dimensions/Key
• Likely found in the header of a file
• The other items have been absorbed in other dimensions– customer, date, vendor, item
• The remaining item has no supporting attributes but is important– CLIN, Requisition #, Order #
• Useful information and should be absorbed in the fact table
![Page 89: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/89.jpg)
Degenerate Dimensions/Key
• Useful information and should be absorbed in the fact table
• If there is other supporting attributes, it becomes a typical dimension
![Page 90: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/90.jpg)
Junk Dimensions
• Resident flags, status codes, and miscellaneous information persists after the dimensional design is near complete
• Alternatives:– Place the flags in the fact tables– Make each attribute a dimension– Remove the attributes completely
![Page 91: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/91.jpg)
Junk Dimensions
• Leave the flags in the fact tables– likely sparse data– no real browse entry capability– can significantly increase the size of the fact
table
• Remove the attributes from the design– potentially critical information will be lost– if they provide no relevance, remove them
![Page 92: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/92.jpg)
Junk Dimensions
• Make a flag into it’s own dimension– may greatly increase the number of
dimensions, increasing the size of the fact table– can clutter and confuse the design
Combine all relevant flags, etc. into a single dimension– the number of possibilities remain finite– information is retained
![Page 93: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/93.jpg)
Keys, Keys, Keys
• Surrogate keys (always use) – 4 byte integer (232 or two billion + integers)
• Date keys should use surrogates as well– dates are typically 8 bytes -- saves 4 bytes per
fact
• Do not use smart keys with embedded meanings
• Do not use legacy or production keys
![Page 94: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/94.jpg)
Just the Facts• Attempt to make all facts additive
– simplifies calculations across dimensions
– all numbers are not additive facts
• Semi-additive facts can be used but understand they are there– averages, max, min
• Non-additive facts often are avoided but may have value– weather conditions (non-discrete), non-discrete discriptions
![Page 95: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/95.jpg)
Steps to Designing a Fact Table
• Time to choose:– data mart (functional business area)– grain of the fact table (what level of detail)– dimensions associated to the data mart– the facts relative to the data mart
![Page 96: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/96.jpg)
Data Mart• Single operational source data marts provide the
least amount of risk
• Multiple operational source data marts typical provide more cross functional value
• Examples: (remember, processes you measure)– Marketing– Sales– Inventory– Productivity
![Page 97: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/97.jpg)
Fact Table Grain
• Without this, dimensions can not be accurately defined
• Select as low of a grain as possible– handles unexpected queries– adapts readily to additional facts and dimensions– delivers the most comprehensive solution– Consumes more space– Performance can be an issue
![Page 98: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/98.jpg)
Fact Loads
• By record– account for every transaction or activity recorded
(ATM)
• Snapshot– A picture of the related facts at a specific point in
time (monthly reporting)
• Line item– track and reflect the status of line item activity (PO)
![Page 99: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/99.jpg)
Dimensions
• Once the grain is defined, basic dimensions will be evident from the grain (customer, time, etc.)
• Addition of other dimensions and junk dimensions
• All dimensions can not be at a lower level of granularity than the lowest fact table grain
![Page 100: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/100.jpg)
Identifying Facts
• The grain of the fact table dictates the facts• All facts must be at the same level• Individual transaction tables typically have 1
fact (the numeric value of the transaction)• Snap shot and line item fact tables will likely
contain multiple facts in that multiple additive facts are captured
• Keep all three types separated
![Page 101: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/101.jpg)
Fact Table Families
• Process chain (supply chain, linear)– fact table represents each step in the process– RFI-RFP-RFQ-Contact-Delivery– supply chain process example: page 200– each fact is connected on the bus
• Value Circle (parallel measurement)– health care (example page 202)– retail
![Page 102: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/102.jpg)
Fact Table Families
• Heterogeneous Product Schemas– Service offered by the business are distinct and
separate– banking (checking, savings, loans, etc.)– Insurance (life, home, auto, etc.)
• Transaction an Snapshot Schemas– Snapshot (periodic picture) example page 210– Transaction (activity detail) example page 207
![Page 103: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/103.jpg)
Aggregate Families
• Used to improve query performance
• Typically roll ups of facts along a dimension for anticipated reporting and querying
• Aggregate tables can also be used to combine details from two fact tables of varying granularity
![Page 104: Warehouse components](https://reader033.vdocuments.mx/reader033/viewer/2022061206/548339fbb47959140d8b4988/html5/thumbnails/104.jpg)
Factless Fact Tables
• Used for two reasons:– record an activity (student attendance page 213)
• answers what the most popular classes were• what days are frequently missed
– Coverage (account for activity that may not have happened) (example page 215)
• An entry is placed in the fact table for all item of interest• answers questions regarding what did and did not have
activity