REQUEST FOR PROPOSAL FOR CONSULTING SERVICES RFP # RSC/ Namsaling Community Development Centre (NCDC), Ilam- 2071/72-003 Title of Consulting Services Detailed Feasibility Study of Indrawati Khola Micro Hydropower Project (MHP), Dovane, Bhojpur Project Name: National Rural and Renewable Energy Programme Office Name: Namsaling Community Development Centre (NCDC) Office Address: Dhobidhara-7, Ilam Standard Procurement Documents, RFP Consultant Services for Small Assignment

Upload: voque

Post on 22-May-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

REQUEST FOR PROPOSAL FOR CONSULTING SERVICES

RFP # RSC/ Namsaling Community Development Centre (NCDC), Ilam-2071/72-003

Title of Consulting Services

Detailed Feasibility Study of Indrawati Khola Micro Hydropower Project (MHP), Dovane, Bhojpur

Project Name: National Rural and Renewable Energy Programme Office Name: Namsaling Community Development Centre (NCDC) Office Address: Dhobidhara-7, Ilam

Financing Agency: NRREP

7 May 2015

Standard Procurement Documents, RFP Consultant Services for Small Assignment

Table of Contents

Section 1. Letter of Invitation...................................................................................................1

Section 2. Information to Consultants.....................................................................................2

Section 3. Format of Curriculum Vitae....................................................................................4

Section 4. Financial Proposal Submission Form.....................................................................5

Section 5. Terms of Reference................................................................................................7

Section 6. Required Documents list......................................................................................14

Section 7. Standard Form of Contract...................................................................................15

Standard Procurement Documents, RFP Consultant Services for Small Assignment

Section 1. Letter of Invitation

Dhobidhara-7, Ilam, Nepal

Date: 7th May,2015Name of Project: NRREPName of Contract: Detailed Feasibility Study of Indrawati Khola Micro Hydropower Project

1. The Namsaling Community Development Centre (NCDC) invites proposals to provide the following consulting services: Detailed Feasibility Study of Indrawati khola Micro Hydropower Project-35 kW, Dovane, Bhojpur. More details on the services is provided in the attached Terms of Reference (TOR).

2. The consultant shall be selected and engaged on the basis of required experience and qualifications specified in the TOR and the consultants Financial Proposal.

3. The Request for Proposal (RFP) has been addressed to all Pre-Qualified Survey Consulting Firms by AEPC

4. You are invited to submit a Proposal for the services under the TOR to :Address: Regional Service CentreNamsaling Community Development Centre (NCDC) Ilam Ilam Municipality-7, Dhobidhara, Ilam, NepalTel: 977- 027 - 520411, 520792 Fax : 027 520792

5. Your Proposal should be submitted in 1 (One) copy and the deadline for submission is: 14 May 2015 on or before 5.00 P.M.

6. Clarification on the RFP may be obtained from: Name: Guna Raj KhanalAddress: RSC/NCDCTel: 027 - 520411, 520792Email: [email protected]

7. Your Proposal must remain valid 30 days after the submission date, i.e., until: 15 June 2015

8. The assignment is expected to commence on 19 May 2015 at RSC/NCDC Ilam

9. The RFP includes the following documents:

Section 1 - Letter of Invitation

Section 2 - Information to the Consultant

Section 3 - Format of Curriculum Vitae (CV) for Proposed Professional Staff

Section 4 - Financial Proposal - Standard Forms

Section 5 - Terms of Reference

Section 6 - Required Document List

Section 7 - Standard Form of Contract

Yours sincerely,

Hira Bahadur GhaleTeam LeaderNCDC Ilam

Standard Procurement Documents, RFP Consultant Services for Small Assignment 1

Section 2. Information to Consultants

SN Subject Details1 The name of the Client Namsaling Community Development Centre (NCDC) Ilam

2 The method of selection Least Cost Selection (LCS) Method

3 Name of the Task Name : Detailed Feasibility Study of Indrawati Khola MHP

Objectives: The board objective of this assignment is to conduct Detailed Feasibility Study and prepare Detailed Feasibility Study Report (DFSR) of Indrawati Khola MHP-35 kW, Dovane, Bhojpur.

Description: More specifically the following objectives need to be addressed by the study.

Field Work - Prequalified human resources of concerning Consulting Firms shall carryout detail field survey of the project area of the MHP.

Office Work, Report Preparation - With the help of the field survey the consulting firm shall prepare a detail design of the MHP.

Project Design - The Consulting firm shall be responsible for all detail study and design of the project based “Guidelines for Detailed Feasibility Studies of Micro-Hydro Projects, 2014” published by AEPC.

Final Report - The Consulting firm shall provide a hard copies and an electronic copy of DFSR. The electronic copy of the final report will be uploaded by the Consulting firm on webpage – cedfs.org of AEPC / CESC, while the hard copy shall be submitted to concerning RSC.

More details on the services are provided in the attached Terms of Reference.

4 Input from AEPC/NRREP/RSC

- Relevant information- Others as per ToR

5 Estimated man days 25 man days (4 persons as per Category A,B,C and D) 6 The clauses on fraud

and corruption in the Contract

As per government and donor’s rules and regulation

7 Clarifications may be requested

2 days before the submission date:Name: Guna Raj Khanal Mini-grid EngineerNCDC IlamIlam Municipality-7, Dhobidhara, Ilam

Standard Procurement Documents, RFP Consultant Services for Small Assignment 2

Telephone No. : 027-520411/520792 9 Language of Proposal English

10 The proposal submission address

Regional Service CentreNamsaling Community Development Centre (NCDC) Ilam Ilam Municipality-7, Dhobidhara, Ilam, NepalTel: 977- 027 - 520411, 520792 Fax : 027 520792

11 Information on the outer envelope

Proposal for “Detailed Feasibility Study of Indrawati khola Micro Hydropower Project (MHP)”

12 Award Immediate after evaluation of submitted proposal13 Address for Negotiation Regional Service Centre

Namsaling Community Development Centre (NCDC) Ilam Ilam Municipality-7, Dhobidhara, Ilam, NepalTel: 977- 027 - 520411, 520792 Fax : 027 520792

14 Other Provision As per Prevalent Law of Nepal including PPA/PPR

Standard Procurement Documents, RFP Consultant Services for Small Assignment 3

Section 3. Format of Curriculum Vitae

Key Qualifications:

[Give an outline of your /staff member’s experience and training most pertinent to tasks on assignment. Describe degree of responsibility held by you / staff member on relevant previous assignments and give dates and locations. Use about half a printed page.]

Education:

[Summarize college/university and other specialized education of your / staff member, giving names of schools, dates attended, and degrees obtained. Use about one quarter of a printed page.]

Employment Record:

[Starting with present position, list in reverse order every employment held. List all positions held by staff member since graduation, giving dates, names and address of employing organizations, titles of positions held, and locations of assignments. For experience in last ten years, also give types of activities performed and client references, where appropriate. Use about two pages.]

Languages:

[For each language indicate proficiency: excellent, good, fair, or poor in speaking, reading, and writing.]

Certification:

I, the undersigned, certify that to the best of my knowledge and belief, these data correctly describe me, my qualifications, and my experience.

Date: [Signature of staff member and authorized representative of the consultant] Day/Month/Year

Full name of staff member: ______________________________________

Full name of authorized representative: ___________________________

Seal / Stamp of the Consultant/Firm:

Standard Procurement Documents, RFP Consultant Services for Small Assignment 4

Section 4. Financial Proposal Submission Form

[Letterhead of Consultant in case of a Firm ]

To: [Name and address of Client]

We, the undersigned, offer to provide the consulting services for [Title of consulting services] in accordance with your Request for Proposal dated [Date] and our Proposal. Our attached Financial Proposal is for the sum of [Amount in words and figures]. This amount is inclusive of all the applicable local taxes( excluding Value Added Tax).

Our Financial Proposal shall be binding upon us subject to the modifications resulting from Contract negotiations, up to expiration of the validity period of the Proposal, i.e., [Date].

We understand you are not bound to accept any Proposal you receive.

We remain,

Yours sincerely,

Authorized Signature:Name and Title of Signatory:Name of Consultant:Address:

Note: This financial cover sheet must be submitted in separate envelope in Financial proposal.

Standard Procurement Documents, RFP Consultant Services for Small Assignment 5

4A. SUMMARY OF COSTS

Name of project: Indrawati Khola Micro Hydro project

Cost Estimation for conducting detail Feasibility Study of 35 kW 152 HHs Dovane VDC Bhojpur District

 A. Remuneration         

SN Particulars Quantity Unit Rate Amount Rs.1 Technical Expert (Surveyor)        a Surveyor, Category (A)   MDb Survey Assistant   MD2 Technical Expert (Designer)   MDa Designer (Civil), Category (B) MDb Designer (Mechanical),Category (C)   MDc Designer ( Electrical), Category (D )   MDd Management/Business Expert   MD

Sub Total    Overhead 10%Total Fee (A)

B. Other Cost    

a Transportation Cost and DSA for conducting survey   LS

b Preparation of Inception, Draft and Final Report   LS

Other Cost (B)C. Grand Total (A+B)    

D. VAT (13% of C)    E. Grand Total with VAT (C+D)    Amounts in words:

Note: This Summary of Costs sheet must be submitted in separate envelope in Financial proposal.

Standard Procurement Documents, RFP Consultant Services for Small Assignment 6

Section 5. Terms of Referencefor

Detailed Feasibility Study of Indrawati Khola MHP

1. Introduction Alternative Energy Promotion Center (AEPC) is the nodal agency for the development and promotion of the renewable energy technologies (RET) in Nepal. Since its establishment in 1996, AEPC has steered the RET promotion through the policy and implementation support. At present AEPC is executing five year National Rural and Renewable Energy Program (NRREP) with funding from the Government of Nepal and the external development partners. Before NRREP, RET promotion programs executed by AEPC largely focused on the rural areas and the focus was given to the technologies to cater the households with the services related to electrical, thermal and/or mechanical energy. Advent of NRREP has widened scope of RET promotion and RET promotion in urban areas is one of its focuses. Apart from that NRREP has kept emphasis on scaling up of the renewable energy technologies at community, institutional, commercial and municipal levels.

2. BackgroundAEPC has been providing technical and financial support to the user's of micro hydropower project for carrying out detailed feasibility study (DFS) and report preparation. RSC facilitates the process through competitive bidding process among AEPC pre qualified consulting companies. Every year AEPC updates the pre qualification list of consulting companies for carrying out survey and design of MHPs.

RSCs create demand of MHPs and conduct pre feasibility study. Maintaining sufficient projects in pipeline is necessary for AEPC to meet committed targets. Despite of sufficient demand, studies are being hampered every year due to different reason. CESC intends to intensify to conduct detail feasibility studies from this year aiming to meet the set target. Therefore, CESC recommends following provision for conducting detail feasibility study of MHPs and DFS payment.

3. ObjectivesThe board objective of this assignment is to conduct Detailed Feasibility Study and prepare Detailed Feasibility Study Report (DFSR) of Indrawati khola MHP-35 kW, Dovane, Bhojpur.

4. Scope of Work The scope of the work is to prepare Detailed Feasibility Study Report (DFSR) of Micro Hydro Project following the “Guidelines for Detailed Feasibility Studies of Micro-Hydro Projects, 2014” published by AEPC. The purpose of this task is, to carry out detailed technical, financial and social and environmental information to proceed with procurement of detail design of engineering works, construction works, supply of electro mechanical equipment, installation works, testing, commissioning and putting into service of the MHP. The detailed scope of the services shall be as described in the following sections.

A complete DFSR will include preparation of a DFSR that shall contain all relevant information. Along with the narrative reports, the Consultant shall submit the required drawings, data, to the Client in the standard formats as per the guideline and requirement of the AEPC. The responsibility and scope of the work of Consultant shall be as follows:

4.1 Field WorkPrequalified human resources of concerning Pre-qualified Consulting Firms shall carryout detail field survey of the project area of the MHP. The feasibility study shall include, but not be limited to, the following:

Review of prefeasibility study report of MHPs prepared by RSC Comprehensive reconnaissance survey around the village and along the existing canal

and stream bank with the villagers. Consult with the VDC Chairperson, local teachers, social workers and senior citizens of

the locality, who were present in the village during the time. Measure the discharge.

Standard Procurement Documents, RFP Consultant Services for Small Assignment 7

Topographic surveys and locate the intake and canal alignment to obtain required discharge.

Take relevant information for designing appropriate structures required to operate the system.

Explore the possibility of land /soil stabilization measures. Identify potential load and collect information required for forecasting present and future

demand. Identify environmental impacts (adverse) and find out issues related to water right and

land use. Identify any other suitable measures for the futures sustainability. Discuss about the technical and socio-economic aspects of the proposed scheme. Identify the groups of vulnerable people and collect related information to prepare

vulnerable community's plans. Collect GESI related information. Identify the present socio-economic condition of the people and collect related

information in this regards

4.2 Office Work, Report Preparation

With the help of the field survey the consulting firm shall prepare a detail design of the MHP. The detail design of the scheme comprises of the following

Analyze data and information carried out in the field. Project layout and civil design Mechanical and electrical design Bill of Quantities (BOQ) Cost Estimates, Financial Analysis Construction planning Feasibility reporting Potential sources of investment plan Complete specification of materials and components to be used for the construction of

civil, mechanical and electrical parts of the project Detail drawings of all component

4.3 Information and Data Analysis

a) Socio Economic StudyThis part is concerned with information pertaining to more general description of the potential beneficiary population. This part is also intended for use as the baseline information, so that the indicators can be compared after the implementation of the hydropower system.

b) IdentificationIdentification of the location of the Scheme and the beneficiary areas, specifically the load center where the DFS is being conducted.

c) Site InformationInformation regarding the distance from the nearest road head and an airport to the load centre.

d) Income LevelThe income level of the households of the load centers has been categorized into High, Medium and Low levels as perceived by the participants of the FGD in the respective load center. This should be taken as the baseline information for comparison in subsequent periodic FGDs

e) Economic ActivitiesActivities related to agriculture, livestock, cottage industry, remittance, agriculture production, industry and craft, business entities etc. should be recorded.

Standard Procurement Documents, RFP Consultant Services for Small Assignment 8

f) InfrastructureThe infrastructure available at the time of the FGD should be recorded under the Public Services heading.

g) Local Level CapacityLocal level capacity implies to the available trained manpower within the beneficiary communities.

h) EducationAccess to education and the annual dropout of students should be filled in.

i) Consumption of EnergyConsumption of different kinds of energy should be filled in.

j) Development activitiesThe development activities expected in the immediate future.

k) Willingness to PayThe willingness to pay for electricity use as reported by the potential beneficiary during the FGD.

l) Local administration including VDC, DDC and other organizationsAn inventory of existing institutions and organizations in the load centers will be made based the responses of VDCs, DDCs and the Focus Group.

m) Commercial establishments (small scale industries, workshops and handicrafts)An inventory of existing commercial units will be prepared based on the responses of the VDCs, DDCs and Focus Group.

4.4 Project DesignThe Consultant shall be responsible for all detail study and design of the project based “Guidelines for Detailed Feasibility Studies of Micro-Hydro Projects, 2014” published by AEPC. The optimization studies shall include the project layout, hydraulic structures (diversion works, intake structures, de-sanding facilities, water conveyance system, powerhouse, etc.) and installed capacity. A complete Feasibility Detailed Feasibility Study Report (DFSR) with necessary conclusions, recommendations, annexes and drawings shall be prepared by the Consultant.

a) Civil worksThe design of civil works shall include the following: Construction facilities (temporary access, camps etc.); Diversion during construction; Intake, diversion weir / spillway and appurtenances; Gravel trap; De-sanding facilities; Waterway system; Fore-bay and its location; Powerhouse and machine foundation; Tailrace and outlet facilities; Permanent access (roads, bridges, culverts etc.); Anchor blocks and support piers;

b) Hydro-Mechanical EquipmentBased on the field study of specific measured head and measured flow design hydro mechanical equipment.

Material, size (diameter), thickness, required length, flange, gasket etc. if headrace pipe is used.

Material, size (diameter), thickness, required length, flange, gasket etc. of penstock pipe.

Expansion joint and accessories

Standard Procurement Documents, RFP Consultant Services for Small Assignment 9

Bell mouth, Air vent Sluice gates, Valves, Stop logs. Trash racks (Coarse and fine). Other required necessary items.

c) Electro-mechanical EquipmentBased on the anticipated operating condition of the hydropower plant and prevailing guidelines the Consultant shall analyze and recommend most suitable type of turbine and other components in the generating system, sub-station, transmission system and interconnection system. The electromechanical works shall include the following:

Turbine and base frame Coupling System Generators: Control systems, AVR, Excitation System etc. Power house, area lighting and services Belt Belt guard Ballest Monitoring, control and protection of generator, transformer and feeder

d) Transmission / Distribution Systems:Transformer, Grounding, Lightning System, High Tension, Low Tension and Composite Lines etc;

e) DrawingsThe design works shall result in the preparation of drawing of the project layout and all project components required at the feasibility level. Drawings shall be produced by the Consultant in AutoCAD in the type and numbers that reflect the scope of the feasibility design. The detail drawings submitted with the draft and final feasibility reports shall be such that all design information is clearly indicated, and they lead to a fair cost estimation of the project. Typical drawing details will include:

General Layout: Showing all the components of the project in plan. Plans and necessary section of Headwork, Intake, Gravel Trap cum Desilting Basin,

Headrace canal / pipe, transition structures, forebay, penstock alignment, anchor block, powerhouse, machine foundation and tailrace canal.

General layout plan of electrical generation, transmission and distribution system networks.

f) Bill of Quantities (BOQ)The Consultant shall calculate a detailed bill of quantity as per the design drawing of each component of the project that is fair enough to calculate actual quantity of the project. The BOQ shall be done on the optimized layout, structure sizes and the construction methodology conceived for the project.

g) Cost EstimatesThe Consultant shall follow Government of Nepal (GoN) norms and district rates published by DDC for detail cost estimation and analysis of the proposed MHP.

Calculate a detailed cost estimate of the project that is fair enough to help in decision making for investment. The estimate shall be done on the optimized layout, structure sizes and the construction methodology conceived for the project. The cost of construction management and engineering shall be included in the estimate as separate items. Appropriate contingencies will be applied to take account of factors that cannot be adequately defined at the feasibility study stage.

For the estimating and the economic analysis of the project, following methodology shall follow-

Standard Procurement Documents, RFP Consultant Services for Small Assignment 10

Collect quotation / current market price of electro- mechanical equipments and the line materials needed for the project from various manufacturers and suppliers for their costing.

Prepare detail estimates of the MHP construction costs and annual operation and management cost based on approved design and updated norms.

Calculate tariff rate for the electricity for uses, including all recommended end uses, so that the tariff comes under affordable range for all the users and the fund generated from the tariff becomes sufficient for the annual O/M costs.

Prepare economic analysis showing economic parameters like IRR, NPV and Payback Period on the basis of cash flows of the MHP.

h) Financial AnalysisFinancial analysis shall be prepared by the Consultant, and an analysis shall be carried out to determine the financial viability of the project taking into account the requirements of the integrated power system. The analysis shall be presented from the perspective of the project being developed by a private investor

4.5 Detail Feasibility Study Report (DFSR) RequirementsThe technical requirements of works / items in the DFSR must be as per the following: “Guidelines for Detailed Feasibility Studies of Micro-Hydro Projects, 2014” published

by AEPC “Reference Micro Hydro Standard”, published by AEPC

a) Draft Report:The contents of reports / drawings / BoQ shall be as per Detailed Feasibility Study Format of AEPC. Incomplete detailed study format shall be rejected. The design parameters shall be according to “Guidelines for Detailed Feasibility Studies of Micro-Hydro Projects, 2014” published by AEPC. These format / guidelines have already been provided to the prequalified consulting companies during their contract agreement with AEPC.

The draft report will be subjected to checks and verification by concerning Regional Service Centers (RSCs). In order for RSCs to make checks and comments, the concerned Consulting Companies should upload the soft copy of the report on the webpage – cedfs.org of AEPC / CESC. This website will be a platform for interaction with DFSR Consulting Companies, RSCs and Community Electrification Sub-Component (CESC).

b) Final Report:After inclusion of comments and suggestion of concerning RSCs and on acceptance of the draft report by CESC, final report shall be prepared.

The Consulting Companies shall provide a hard copies and an electronic copy of DFSR. The electronic copy of the final report will be uploaded by Consulting Companies on webpage – cedfs.org of AEPC / CESC, while the hard copy shall be submitted to concerning RSCs.

5. Inputs from AEPC/NRREP/RSC NRREP budget and relevant documents/materials and information Input from relevant AEPC/NRREP Officers and RSC Mini-grid Engineer

6. Time and BudgetThe consultant is expected to complete all tasks within Three months from the date of contract agreement.

Budget (Payment Modality for DFS):

Payment modality for DFS will be as per Subsidy Delivery Mechanism 2070 and specified in attached "Condition of contract”. The payments shall be done on installment basis and submission of the respective documents to CESC/AEPC as given below.

Standard Procurement Documents, RFP Consultant Services for Small Assignment 11

A. For First 40% Instalment Payment:

Payment request from the survey company Recommendation letter from RSC                Letter from user's committee to RSC                                                              Front copy of DFS report                                                                              Quality Confirmation Sheet signed by engineers from pre-qualified by AEPC "Format for DFS of prospective MHPs" filled by hand writing and signed by representative of

User’s committee and survey team leader Photo taken at site while measuring site parameters with proper equipment

B. For Second 40% Instalment Payment:

Payment request from the survey company Recommendation letter from RSC                Front copy of TRC approved DFS report 

 C. For Third 20% Instalment Payment:

Payment request from the survey company Recommendation letter from RSC                Satisfaction letter from User Committee Monitoring report of MHP from company

7. Deliverables (output)The consultant will submit the following to the client in the timeline stipulated below:

DFS will be done : Within 1 month after signing the contract Draft report : Within 2 months after signing the contract Final report : Within 3 month after signing the contract

8. Qualification of the Consulting Companies and Requirement of Human Resources8.1 Qualification of the Consulting Companies AEPC has a pool of Pre Qualified (PQ) Consulting Companies related to Micro Hydro Project Detailed Feasibility Study. These Consulting Companies are eligible for carry out the DFS are categorized as below –

Greater than 10 kW and up to 50 kW Greater than 50 kW and up to 100 kW

Consulting Companies that are prequalified by AEPC are eligible. However, the job advertised (in kW) should fall in the category that they are prequalified for.

8.2 Requirement of Human Resources Detail feasibility study of micro hydro projects need to be done in the dry seasons and the flow measurement is need to be done between 1st November to end of May as per DFS guidelines and as current subsidy delivery mechanism final report should be submitted within three months time from the date of contract signing, therefore one set qualified technician can only carry few numbers of MHPS. The completion of DFS In many cases, because of this reason DFS is not received in time and project implementation is delayed. Hence, following provision is added with regard to the human resource:

The consulting company can sign contract for DFS with one human resource in maximum of three MHPs at a time.

If the consulting company submits the draft report of any one of three MHPs having same human resource then the human resource can be engaged in another MHP.

Human resource qualified by AEPC shall be considered in the bid evaluation:

-HR Category A, B, C and D equivalent to 50 kW for the project sized up to 50 kW capacity9. The Right to Audit

Standard Procurement Documents, RFP Consultant Services for Small Assignment 12

The National Rural & Renewable Energy Programme’s Compliance Unit shall have the right to audit and inspect all books, records and underlying documentation relating or pertaining to contracts or agreements under NRREP, for delivery of goods or services, kept by or under the control of the Contractor including, but not limited to those kept by the Contractor and its employees, agents, assigns, successors and subcontractors.

The Contractor shall maintain such books and records, together with such supporting or underlying documents and materials, for the duration of the contract or agreement and at least to the end of the following Government of Nepal Fiscal Year from the approved date of the completion of the assignment as per contract or agreement with NRREP.

A clause regarding this facility will be included in the contract document.

Standard Procurement Documents, RFP Consultant Services for Small Assignment 13

Section 6. Required Documents List 

Note: Consultants are suggested to provide the corresponding information in the format given in the RFP document.

Eligibility Criteria (Required Documents):

SN Documents

1 Copy of Company/Firm Registration Certificate with updated renewal

2 Copy of VAT Registration Certificate

3 Copy of Tax Clearance Certificate of F.Y. 2070/71

4 Copy of contract signed between AEPC and the respective qualified consulting company

5 JV Agreement (in case of JV Submission)

6 Separate Sealed Technical Proposal as per given Terms of Reference in Section 5

7 Separate Sealed Financial proposal including VAT (As per given format)

8 CV of proposed dedicated personnel and copy of other required supported documents

Standard Procurement Documents, RFP Consultant Services for Small Assignment 14

Section 7. Standard Form of ContractKf/fdz{ ;]jf ;Demf}tf

of] ;Demf}tf ldlt ========================== df ===============================================================-o;kl5 æk/fdz{ ;]jf u|fxLÆ

-n3' / ;fgf hnljB't ljsf; ug]{ sDkgL / ;+:yfsf] gfd / 7]ufgf_elgPsf]_ / ======================================================================== -o;kl5 æk/fdz{ bftfÆ elgPsf]_ aLr ePsf] xf] .

-cfof]hgfsf] lj:t[t ;j]{If0f sfo{sf] k/fdz{ ;]jf lng] sDkgL÷;+:yfsf] gfd / 7]ufgf_k/fdz{ ;]jf u|fxLn] =============================== n3' tyf ;fgf hnljB't\ cfof]hgfsf] lj:t[t ;j]{If0f sfo{sf] æk/fdz{ bftfÆaf6 sfof{Gjog u/fpg OR5's eO{ pQm sfo{x? ;Dk"0f{ ?kdf ;DkGg ug]{ tyf ;f] sfo{df s'g} q'6L kfOPdf To;nfO{ ;d]t k"/f ug]{ u/L sfo{ ug{sf] nflu k/fdz{ bftfn] k]z u/]sf] af]nkq÷k|:tfj :jLs[t u/]sf] / o; k/fdz{ ;]jf ;+emf}tfsf] clwgdf /xL cfof]hgfsf] lj:t[t ;j]{If0f, l8hfO{Gf, nfut cg'dfg tyf k|ltj]bg tof/ ug]{ sfd ;DkGg ug{ k/fdz{ bftf d+h'/ ePsf]n], k/fdz{ ;]jf u|fxL / k/fdz{ bftf b]xfosf s'/fx?df d~h'/ ePsf 5f} M–!= o; ;Demf}tfdf pNn]v ePsf zAb tyf jfSof+zx?sf]

cy{ ubf{ o; ;Demf}tf;+u ;DalGwt k/fdz{ ;]jfsf zt{x?df nufOP adf]lhdsf] g} cy{ nufOg] 5 .

@= lgDg sfuhftx?nfO{ -lnvt_ o; ;Demf}tfsf] cleGg c+u dfgL ;f]xL adf]lhd kl9g] tyf JofVof ul/g]5 M–

-s_ ============================== ldltdf k/fdz{ bftfn] a'emfPsf] af]nkq÷k|:tfj sfuhft -Bid Form) ;d]t

-v_ k/fdz{ ;]jfsf zt{x? (Conditions of Contract)

-u_ k/fdz{ bftf / a}slNks pmhf{ k|j4{g s]Gb| aLr ePsf] ;+emf}tfdf pNn]lvt zt{x?

#= k/fdz{ ;]jf u|fxLn] o; ;Demf}tf adf]lhdsf] /sd k/fdz{ bftfnfO{ lbP jfkt k/fdz{ bftfn] k/fdz{ ;]jf zt{df ePsf Joj:yfx? cg'?ksf] sfd / To;df s'g} q'6L kfOPdf To:tf] q'6L ;RofO{ jf ;'wf/ u/L ;f] sfo{ ;Dk"0f{ ?kdf k"/f ug{'kg]{5 .

$= k/fdz{ bftfn] k/fdz{ ;]jf ;Demf}tf adf]lhdsf] sfd / To;df s'g} q'6L kfOPdf To:tf] q'6L ;RofO{ jf ;'wf/ u/L sfo{ ;DkGg u/] jfkt k/fdz{ ;]jf u|fxLn] k/fdz{ ;]jf zt{df tf]lsPsf] ;dodf / tl/sf cg';f/ k/fdz{ ;]jf /sd e'QmfgL lbg'kg]{5 .

%= o; k/fdz{ ;]jf ;Demf}tfdf pNn]v eP adf]lhdsf] sfd tyf ;]jf jfkt k/fdz{ ;]jf zt{x?sf] cg';"rL -!_ adf]lhd e'QmfgL tflnsfdf pNn]v eP cg';f/ k/fdz{ ;]jf u|fxLn] k/fdz{ bftfnfO{ hDdf ?

Standard Procurement Documents, RFP Consultant Services for Small Assignment 15

============================ -cIf/df ===================================================================================================dfq_ e'QmfgL lbg dGh'/ ub{5 .

o; ;Demf}tfsf kIfx?n] tn n]lvPsf ;fIfLx?sf /f]xj/df dfly z'?df n]lvPsf] ldltdf /Ltk"j{s ;xL5fk u/]sf 5f}+ .

k/fdz{ ;]jf u|fxLsf] tkm{af6 k/fdz{ bftfsf] tkm{af6b:tvt M =======================================

b:tvt M =================================gfd M ============================================ gfd M ======================================bhf{ M ============================================ bhf{ M =====================================5fk 5fk;fIfL ;fIfL -If]qLo ;]jf s]Gb|sf] tkm{af6_gfd M ========================================== gfd M ====================================7]ufgf M ========================================

7]ufgf M =================================ldlt M ========================================= ldlt M ===================================

cg';"rL -!_k/fdz{ ;]jf s/f/sf zt{x? (Conditions of Contract)

Standard Procurement Documents, RFP Consultant Services for Small Assignment 16

!= sG;N6]G;L sDkgLx?n] ;DalGwt cfof]hgfsf] lj:t[t ;j]{If0f, l8hfOg tyf Oli6d]6 ;fd'bflos ljB'lts/0f sfo{qmdsf] (1) Guidelines for Detailed Feasibility

Studies of Micro-hydro Projects, 2014 published by AEPC sf] 9fFrf cg'?k tof/ u/L l/kf]6{ tof/ ug'{kg]{ 5 .

@= sG;N6]G;L sDkgLn] cfof]hgfsf] ;j]{If0f tyf l8hfO{g a}slNks pmhf{ k|j4{g s]Gb|af6 dfGotf k|fKt hgzlQm4f/f u/fpg' kg]{ 5 . k|:tfjgfdf pNn]lvt hgzlQmx? Dffq sfddf nufpg' kg]{5 . h; cg';f/ b]xfP cg';f/sf hgzlQm kl/rfng ul/g] 5 Ms_ Category A (Surveyor): Mr/Ms……………………………………………………………………………..………,

v_ Category B (Designer Civil): Mr/Ms………………………………..…………………………………………….,

u_ Category C (Designer Electrical): Mr/Ms…………………………….………………………………………….,

3_ Category D (Designer Mechanical): Mr/Ms………………………………………………………………….,

#= sG;N6]G;L sDkgLn] g+= ! / @ adf]lhd sfo{ ;DkGg u/L d:of}bf k|ltj]bg -8«fˆ6 l/kf]6{_ o; If]qLo s]Gb|df a'emfO{ d:of}bf k|ltj]bgdf o; sfof{nosf] lgb]{zg cg';f/ yk36 u/L clGtd k|ltj]bg a'emfO ;f] k|ltj]bg k|fljlws d"Nof+sg ;ldltaf6 :jLs[t ePkl5 dfq pQm kmd{sf] sfo{ ;DkGg ePsf] dflgg]5 .

$= sG;N6]G;L sDkgLn] ;DalGwt cfof]hgfsf] lj:t[t ;j]{If0f k|ltj]bgdf ;+efAo Joj;fo of]hgf, ;fd'bflos nfe of]hgf tyf jftfj/0fLo k|efj Go"lgs/0f of]hgf ;dfj]z ug{' kg{]5 .

%= sfo{ ;DkGg ePkl5 sG;N6]G;L sDkgLn] ! k|lt k|ltj]bg pBdL jf pkef]Qmf ;ldltnfO{ a'emfO{ pkef]Qmf ;ldltaf6 sfo{ ;DkGg eO{ k|ltj]bg k|fKt ePsf] l;kmf/L; ;fy csf]{ Ps k|lt k|ltj]bg o; If]qLo s]Gb|df a'emfpg' kg]{5 .

^= sG;N6]G;L sDkgLx?n] lj:t[t ;j]{If0f ug{' k"j{ o; If]qLo s]Gb|df ;Dks{ u/L lj:t[t ;j]{If0fsf] nflu cfjZos yk ljj/0fx? lng' kg]{ 5 .

&= of] cfof]hgfsf] clGtd k|ltj]bg of] kqsf] ldltn] () lbg leqdf o; sfof{nodf a'emfO;Sg' kg]{5 .&=! sG;N6]G;L sDkgLx?n] ;+emf}tf eP kZrft tn b]xfo adf]lhdsf]

sfo{ tflnsfsf] clwgdf /xL sfo{ ;DkGg ug'{kg]{5 M— lj:t[t ;a]{If0f sfo{ ;DkGg ug]{ ;do M ;+emf}tf ePsf] ldltn] !

dlxgf leq .— d;f}bf k|ltj]bg k]z ug'{kg]{ ;do M ;+emf}tf ePsf] ldltn] @

dlxgf leq .

Standard Procurement Documents, RFP Consultant Services for Small Assignment 17

— clGtd k|ltj]bg k]z ug'{ kg]{ ;do M ;+emf}tf ePsf] ldltn] # dlxgf leq .

&=@ s'g} laz]if sf/0fn] pNn]lvt ;doleq k|lta]bg a'emfpg g;Sg] ePdf plrt sf/0f ;lxt hfgsf/L o; sfof{nodf lbO{ ;do yksf] nflu lga]bg lbg'kg]{5 . sfa' eGbf aflx/sf] l:yltn] ubf{ ;f] cjlwdf sfo{ ;DkGg x'g g;s]df ;DalGwt sDkgL / pkef]Qmf ;ldltsf] ;xdltdf Ps k6s a9Ldf @ dlxg;Ddsf] nflu ;+alGwt lgsfosf] k"j{ :js[lt lnO{ ;do yKg ;lsg]5 .

&=# ;f] cjlw leq k]z gePdf k|lt xKtf cfly{s ;xof]u /sdsf] ! k|ltztsf b/n] a9Ldf !) k|ltzt;Dd h/Ljfgf x'g]5 . h/Ljfgf /sd !) k|ltzt eGbf a9L ePsf] v08df ;Demf}tf :jtM vf/]h x''g]5 .

*= pQm sfd ;DkGg ug]{ sG;N6]G;L sDkgLnfO{ lbOg] ;]jf z'Ns n3' hnljB't pkef]Qmf ;ldltn] l;naGbL af]nkq4f/f 5flgPsf] sDkgLn] saf]n u/]sf /sd cg';f/ ?==================== -cIf?kL ============_ x'g]5 . a}slNks pmhf{ k|j4{g s]Gb|÷;fd'bflos ljB'lts/0f sfo{qmdn] ;f] sfo{ ug{ ;xof]u :j?k sDkgLn] sfo{ ;DkGg ul/;s] kl5 ;f] n3' hnljB't cfof]hgfsf] nflu a9Ldf ?= ====================÷– -cIf?kL ============_ pknAw u/fpg] 5, . o;} u/L k/fdz{ ;]jf u|fxLn] afFsL /sd ?============== -cIf?kL ============_ sG;N6]G;L sDkgLnfO{ k|bfg ug]{ 5 . ;]jf z'Ns sf] e'QmfgL k|s[of b]xfo cg';f/ x'g]5 M

k/fdz{ ;]jf u|fxLn] k/fdz{ bftfnfO{ e'QmfgL lbg] tflnsf

-e'QmfgLsf nflu ;DkGg ug'{ kg]{ sfd / e'QmfgLsf] tl/sf_

e'QmfgLsf] ;do a}slNks pmhf{ k|j4{g s]Gb|

:jnufgL-

pkef]Qmf ;ldlt_

s}lkmot

klxnf] ls:tfM d:of}bf k|ltj]bg If]qLo ;]jf s]Gb|df k|fKt eP kl5 .

klxnf] ls:tf jfktsf] cf+lzs cfly{s ;xof]u /sd sf] $)Ü a/fj/ x'g] /sd ?= ====================

? =====================a9Ldf %)Ü

Standard Procurement Documents, RFP Consultant Services for Small Assignment 18

e'QmfgLsf] ;do a}slNks pmhf{ k|j4{g s]Gb|

:jnufgL-

pkef]Qmf ;ldlt_

s}lkmot

======== bf]>f] ls:tfM k|ltj]bg k|fljlws d"Nof+sg ;ldltaf6 :jLs[t eP kl5 .

bf]>f] ls:tf jfktsf] cf+lzs cfly{s ;xof]u /sd sf] $)Ü a/fj/ x'g] /sd ?= ============================

? ======================afFsL %)Ü

t]>f] ls:tfM lgdf{0fflwg cfof]hgfsf] :ynut lg/LIf0f k|ltj]bg a}=pm=k|=s]= af6 :jLs[t eP kl5 .

clGtd ls:tf jfktsf] cf+lzs cfly{s ;xof]u /sd sf] @)Ü a/fj/ x'g] /sd ?= ============================

(= sG;N6]G;L sDkgLn] ;]jf z'Nssf] e'QmfgLsf] nfuL tklznsf sfuhftx? Kf]; ug'{kg]{5 .

-s_ klxnf] ls:tf -$)%_ e'QmfgLsf] nfuL_ M— sG;N6]G;L sDkgLn] e'QmfgLsf] nfuL cg'/f]w u/]sf] kq .— If]qLo ;]jf s]Gb|sf] l;kmfl/z kq .— lj:t[t ;j]{If0f ug{ k/fdz{ bftf sDkgL 5gf}6 ug]{ af/]

k/fdz{ ;]jfu|fxLn] If]qLo ;]jf s]Gb|nfO{ n]v]sf] kq .— lj:t[t ;j]{If0f k|ltj]bgsf] afxL/L kfgf -Cover page_ / Salient Features .— a}slNks pmhf{ k|j4{g s]Gb4f/f dfGotf k|fKt hgzlQmx?n]

x:tfIf/ u/]sf] "Quality Confirmation Sheet" .— xftn] e/LPsf] tyf pmkef]Qmf ;ldlt / ;e]{ l6d ln8/x?n] x:tfIf/

u/]sf] "Format for Detailed Feasibility Studies of prospective Micro Hydro Projects" .

— pmko'Qm cf}hf/ -Survey equipment_ k|of]u u/L ;e]{If0f u/L/x]sf] Survey Team / ldlt ;d]t b]lvg] kmf]6f]x? .

-v_ bf];|f] ls:tf -$)%_ e'QmfgLsf] nfuL_ M— sG;N6]G;L sDkgLn] e'QmfgLsf] nfuL cg'/f]w u/]sf] kq .— If]qLo ;]jf s]Gb|sf] l;kmfl/z kq .

Standard Procurement Documents, RFP Consultant Services for Small Assignment 19

— k|fljlws d"Nof+sg ;ldltaf6 :jLs[t lj:t[t ;j]{If0f k|ltj]bgsf] afxL/L kfgf -Cover page_.

-u_ t];|f] -clFtd_ ls:tf -@)%_ e'QmfgLsf] nfuL_ M— sG;N6]G;L sDkgLn] e'QmfgLsf] nfuL cg'/f]w u/]sf] kq .— If]qLo ;]jf s]Gb|sf] l;kmfl/z kq .— ;]jfu|fxL ;Gt'i6 /x]sf] kq .— cfof]hgfsf] lg/LIf0f k|ltj]bg

!)= x/]s ls:tf /sd e'QmfgL dfu ubf{ ;Ssn s/ ljhsx? clgjfo{ k]z ug{'kg]{5 .

!!= cfof]hgfsf] lj:t[t ;j]{If0f ug]{ k/fdz{bftfn] lj:t[t ;j]{If0f cg'';f/ cfof]hgfsf] lgdf{0f sfo{ eP gePsf] lgSof]{n ug{ cfof]hgfsf] lgdf{0f cjlwdf sDtLdf b'O{ k6s cfof]hgfsf] lg/LIf0f (Supervision) ug'{ kg]{5 . ;fy} cfof]hgfsf] gSzf+sg ;lxt u'0f:t/ lg/LIf0f k|ltj]bg k]z ug'{kb{{5.

!@= h8fgstf{ sDkgLn] :ynut k|dfl0fs/0f (Site Verification)

ubf{ cfof]hgfsf] Ifdtf -lsnf]jf6_ / cfof]hgfsf] k|zf/0f / ljt/0f (BOQ)

sf] kl/df0f kl/jt{g eP/ s'n nfutsf] !) k|ltzt eGbf a9L km/s kg{ uPdf pQm cfof]hgfsf] k'gM lj:t[t ;j]{If0f ug'{ kg]{5 . pQm gofF ;j]{If0fsf] ;Dk"0f{ vr{ klxn] ;j]{If0f ug]{ k/fdz{bftf sDkgLn] Joxf]g'{ kg]{5 . olb ;f] sDkgLn] k'gM lj:t[t ;j]{If0f ug]{ ;Dk"0f{ vr{ gJoxf]/]df s]Gb|n] ;f] sDkgLsf] k"j{ dfGotf vf/]h ug]{5 .

Standard Procurement Documents, RFP Consultant Services for Small Assignment 20