VDOT Culpeper District Alison DeTuncq Commonwealth Transportation Board John Lynch, P.E. District Administrator Wendy Thomas Assistant District Administrator February 6, 2014

Upload: maggie-humble

Post on 11-Dec-2015

216 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: VDOT Culpeper District Alison DeTuncq Commonwealth Transportation Board John Lynch, P.E. District Administrator Wendy Thomas Assistant District Administrator

VDOT Culpeper District

Alison DeTuncqCommonwealth Transportation Board

John Lynch, P.E.District Administrator

Wendy ThomasAssistant District Administrator

February 6, 2014

Page 2: VDOT Culpeper District Alison DeTuncq Commonwealth Transportation Board John Lynch, P.E. District Administrator Wendy Thomas Assistant District Administrator

2

Discussion Items

• Six-Year Improvement Program (SYIP) Overview

• Revenue Forecast and Outlook

• Impact of Revenue Forecast on FY 2015-2020 SYIP

• Culpeper District Overview

• FY 2015-2020 SYIP Development Process

• Project Outlook

Page 3: VDOT Culpeper District Alison DeTuncq Commonwealth Transportation Board John Lynch, P.E. District Administrator Wendy Thomas Assistant District Administrator

3

Six-Year Improvement Program (SYIP)

Legal Basis

• §33.1-12(7)(b) of the Code of Virginia requires the CTB to adopt a Six-Year Improvement Program (SYIP) of anticipated projects and programs by July 1 each year• Based on the most recent revenue forecast and the Commonwealth’s

debt policy

Purpose

• Documents how available transportation funding is allocated among capital and maintenance projects by mode, program, project type, system, district or local government, and phase

• Guides the Commonwealth’s spending for transportation improvements over the following six-year period

Page 4: VDOT Culpeper District Alison DeTuncq Commonwealth Transportation Board John Lynch, P.E. District Administrator Wendy Thomas Assistant District Administrator

Culpeper District SYIP Analysis(000s)

System FY10-15 FY10-15 Revised FY11-16 FY12-17 FY13-18 FY14-19

Interstate $1,812 $0 $8,130 $9,110 $7,397 $12,013

Primary $37,970 $40,273 $42,009 $297,4141 $258,828 $234,828

Secondary $40,086 $24,753 $21,475 $41,211 $32,609 $47,674

Urban $9,248 $5,984 $2,075 $23,348 $30,298 $30,104

Other2 $1,091 $5,891 $0 $1,572 $2,057 $6,405

Total $90,208 $76,900 $73,689 $372,655 $331,189 $331,025

1 Includes $230 million allocated to Route 29 Bypass project after adoption of Final FY 2012-2017 SYIP in June 20112 Includes safety, enhancements, rail, earmarks, etc.

Page 5: VDOT Culpeper District Alison DeTuncq Commonwealth Transportation Board John Lynch, P.E. District Administrator Wendy Thomas Assistant District Administrator

Revenue Outlook

• FY 2014-2019 financial outlook has been updated as part of the

annual development of the Governor’s Budget Bill and

Transportation’s Six-Year Financial Plan

• State and federal revenue forecasts for FY 2014-2019 are down by total

of $907.5 million

• Preliminary outlook for FY 2015-2020 represents a six-year net

reduction of $491.4 million from FY 2014-2019

5

Page 6: VDOT Culpeper District Alison DeTuncq Commonwealth Transportation Board John Lynch, P.E. District Administrator Wendy Thomas Assistant District Administrator

Impact of Revenue Reduction on FY 2015-2020 SYIP

• Continue to work with existing priorities for SYIP development

• Continue to program remaining new state funding through the CTB Formula; allocations will no longer be sufficient to flow through the original State Construction Formula in FY 2017-2020

• Based on revised revenue estimates, propose to delay project schedules versus eliminating projects in the existing SYIP

• Balance the SYIP update with FY 2020 revenues to reduce impact of revenue reductions for FY 2014-2019

• CMAQ and RSTP funding is estimated to be reduced 2.1% in RSTP or $9.4 million and 2.3% in CMAQ or $6.8 million

• Recommend increasing Revenue Sharing allocation for each year of the SYIP to $184 million per year to meet increasing need

6

Page 7: VDOT Culpeper District Alison DeTuncq Commonwealth Transportation Board John Lynch, P.E. District Administrator Wendy Thomas Assistant District Administrator

7

CTB Priorities FY 2015-2020 SYIP

• Fund deficits on project phases already under way

• Fund project phases under way as well as project phases that start in the current federal fiscal year

• Maximize use of federal funds to meet federal strategy

• Fund deficient bridges and paving projects

• Fund ADHS planned projects with an average of 4% of total federal maintenance and construction funds over the six years

• Fund deficient bridges with an average of 13% of total federal maintenance and construction funds over the six years

• Increase funding for preliminary engineering

• Support development of PPTAs

• Allocate funds consistent with how they will be obligated and expended

• Redirect inactive balances on projects

Page 8: VDOT Culpeper District Alison DeTuncq Commonwealth Transportation Board John Lynch, P.E. District Administrator Wendy Thomas Assistant District Administrator

8

Culpeper District

Culpeper District Geography:• Albemarle • Louisa• Fluvanna• Greene• Madison• Orange• Culpeper• Fauquier• Rappahannock

Culpeper District Facilities:• District Office Complex

• 2 Residency Offices– Warrenton– Charlottesville

• 16 Area Headquarters

Page 9: VDOT Culpeper District Alison DeTuncq Commonwealth Transportation Board John Lynch, P.E. District Administrator Wendy Thomas Assistant District Administrator

9

John D. LynchDistrict Administrator

Brent Sprinkel, P.E.ADA – Project Development

Wendy Thomas

ADA – Programming and Investment

Management

Ken Connors

ADA – Construction

David Pearce

ADA – MaintenanceResidencies

Mark Nesbit

Warrenton Residency Administrator

Joel DeNunzio

Charlottesville Residency

Administrator

Karen S. Settle

Admin Staff Asst

Lou Hatter

Communications Mgr

Jan Pearce

Human Resource Mgr (Central Office)

Matt Shiley, P.E.

Regional Operations Director

Reggie Moseley, Sr. Civil Rights Mgr(Central Office)

Donna Backe

Procurement Mgr (Central Office)

Culpeper District

Page 10: VDOT Culpeper District Alison DeTuncq Commonwealth Transportation Board John Lynch, P.E. District Administrator Wendy Thomas Assistant District Administrator

10

Funding the SYIP

• SYIP is funded with state and federal funds

• Code of Virginia establishes policy for allocating funds for construction

• CTB Formula requires an amount not to exceed $500 million annually to be allocated:

• 25% to bridge reconstruction and rehabilitation;

• 25% to advancing high priority projects statewide;

• 25% to reconstructing deteriorated interstate and primary system pavements determined to have a Combined Condition Index (CCI) of less than 60;

• 15% to Public-Private Transportation Act (PPTA) projects

• 5% to unpaved roads carrying more than 200 vehicles per day; and

• 5% to smart roadway technology

• Amounts over $500 million go through the existing state construction formula

Page 11: VDOT Culpeper District Alison DeTuncq Commonwealth Transportation Board John Lynch, P.E. District Administrator Wendy Thomas Assistant District Administrator

11

SYIP Development Principles

• CTB priorities provide the overarching policy guidance to program the annual update of the SYIP

• Funding/budgeting priorities are used by VDOT to program projects

• Maximize federal funds

• Use project cash flow information

• Use current estimates and schedules

• Match allocations to project

• Fully fund PE by RW phase start

• Fully fund RW by CN phase start

• Fully fund CN phase in year of expected completion; state code requires projects be fully funded within 12 months of completion

Page 12: VDOT Culpeper District Alison DeTuncq Commonwealth Transportation Board John Lynch, P.E. District Administrator Wendy Thomas Assistant District Administrator

12

SYIP Development Principles

• Special fund categories (RSTP, CMAQ, HSIP, TAP, Revenue Sharing) are allocated based on priorities specific to that program and federal and state requirements

• RSTP/CMAQ are allocated by MPOs according to their established processes (CMAQ is reviewed with CTB member) – not applicable to Charlottesville-Albemarle MPO

• NHPP and STP funds used for bridge program allocated based on priorities defined by structural deficiency and other factors

• HSIP funds allocated based on eligibility criteria related to safety issues and cost/benefit analysis

• TAP funds allocated based on the established CTB and MPOs processes

• Revenue Sharing funds allocated based on the established CTB process

Page 13: VDOT Culpeper District Alison DeTuncq Commonwealth Transportation Board John Lynch, P.E. District Administrator Wendy Thomas Assistant District Administrator

13

Programming Projects in the SYIP

• Funding in years two through six is estimated based on SYFP

• Amounts and types of funds available for SYIP development impact individual project funding

• Projects are funded based on their schedules/estimates

• Projects included in the SYIP come from a variety of sources: • General Assembly • Governor/Secretary• CTB priorities• MPO/PDC/Locality priorities• Deficient bridges (S&BD)• Deficient pavement (Maintenance)• Crash/safety data (TED)• Corridor studies (TMPD)• STARS (TMPD)• Plans (CLRP, VSTP, RLRPs)• Continuation of existing SYIP projects

Page 14: VDOT Culpeper District Alison DeTuncq Commonwealth Transportation Board John Lynch, P.E. District Administrator Wendy Thomas Assistant District Administrator

14

Tentative Schedule - FY 2015-2020 SYIP Update

January - March 2014• Priorities submitted – urban, bridge, paving, surface transportation plan,

regional• Financial information for SYIP available to begin programming • Coordinate with MPOs on RSTP and CMAQ programming

• Other special fund categories programmed by program managers

March – April 2014• RSTP and other special fund programming complete

April – May 2014• Present draft SYIP to CTB• Financial information for Final SYIP available• Complete public hearings• Adjust SYIP as necessary for final financial information and public hearing

comments

June 2014• CTB adopts FY 2015-2020 SYIP

Page 15: VDOT Culpeper District Alison DeTuncq Commonwealth Transportation Board John Lynch, P.E. District Administrator Wendy Thomas Assistant District Administrator

15

Project OutlookAlbemarle County

Locality Project Total Estimate Milestone

Albemarle Seminole Trail – Adaptive Signals $720,000 Engineering under way

Albemarle Route 616 Bridge Replacement over Buckingham Branch Railroad $3.7 million Advertisement

3/2014

Albemarle Route 677 Bridge Replacement over Buckingham Branch Railroad $4.7 million Advertisement

12/2014

Albemarle Route 637 Bridge Replacement over Ivy Creek $2.5 million Advertisement

12/2014

Albemarle Route 29 Widening – Ashwood Boulevard to Town Center Drive $32.6 million Advertisement

12/2016

Page 16: VDOT Culpeper District Alison DeTuncq Commonwealth Transportation Board John Lynch, P.E. District Administrator Wendy Thomas Assistant District Administrator

16

Project Outlook City of Charlottesville

• PLACEHOLDERLocality Project Total Estimate Milestone

Charlottesville Interchange at Route 29 and Route 250 Bypass $11.1 million Advertisement

11/2014

Charlottesville Hillsdale Drive Extended (City Administered) $13.7 million Advertisement

7/2015

CharlottesvilleRoute 20 Belmont Bridge Replacement (City Administered)

$14.5 million Advertisement TBD

Page 17: VDOT Culpeper District Alison DeTuncq Commonwealth Transportation Board John Lynch, P.E. District Administrator Wendy Thomas Assistant District Administrator

17

Completed or Underway Projects Albemarle County and City of Charlottesville

Locality Project Total Estimate Completion

Charlottesville McIntire Road Extended $10.0 million 6/2013

Albemarle Route 53 Spot Safety Improvements $1.0 million 10/2013

Albemarle Route 708 Bridge over Buckingham Branch Railroad $4.0 million Scheduled

9/2014

CharlottesvilleRoute 250/McIntire Road Extended Interchange (City Administered)

$34 million Scheduled 7/2015

Albemarle Route 29 Western Bypass $245 million Scheduled 9/2016

Page 18: VDOT Culpeper District Alison DeTuncq Commonwealth Transportation Board John Lynch, P.E. District Administrator Wendy Thomas Assistant District Administrator

18

Regional Projects

Locality Project Total Estimate Milestone

Louisa County I-64 Zion Crossroads DDI (Design-Build) $8.8 million Completion

4/2014

Culpeper County Route 3 Widening $43.5 million Awarded

10/2013

Various I-64 Active Traffic and Safety Management System $5.3 million Awarded

1/2014

Culpeper County

Interchange – Route 29 at Route 666 $31.7 million Advertisement