utlr-0020np acronym and reference part rev. 1, licensing
TRANSCRIPT
TOSHIBALeading Innovation )->
Toshiba Corporation
1-1,SHIBAURA 1-CHOME, MINATO-KU TOKYO 105-8001,JAPANPHONE:(03)3457-3734FACSIMILE:(03)5444-9195
No. TOS-CR-FPG-2013-0001March 13, 2013
NRC Project Number: PROJ0729
ENCLOSURE 4
UTLR-OO2ONP Acronym and Reference Part Rev. 1,
Licensing Topical Report for Toshiba NRW-FPGA-based
Instrumentation and Control System for Safety-Related Application
(Non-Proprietary)
TOSHIBALeading Innovation >>>
UTLR-0020NP Acronym and Reference (A&R) Part Rev.1
March 2013
Topical Report
Licensing Topical Report for Toshiba NRW-FPGA-based Instrumentation andControl System for Safety-Related Application
Acronym and Reference Part
Approved by
Instrumentation & Control Systems
Design and Engineering Dept.
Toshiba CorporationNuclear Energy Systems & Services Division
©2013 Toshiba Corporation All Rights Reserved
Licensing Topical Report for Toshiba NRW-FPGA-based Instrumentation and Control System for Safety-Related Application UTLR-0020NP A&R Part Rev.1
Acronym and Reference Part
The use *of the information contained in this document b)anyone for any purpose other than that for which it is intended ihnot authorized. In the event the information is used withoulauthorization from TOSHIBA CORPORATION, TOSHIBACORPORATION makes no representation or warranty andassumes no liability as to the completeness, accuracy, orusefulness of the information contained in this document.
TOSHIBA CORPORATIONNUCLEAR ENERGY SYSTEMS & SERVICES DIV.
TOSHIBA CORPORATION
Nuclear Systems & Services Division
Licensing Topical Report for Toshiba NRW-FPGA-based Instrumentation and Control System for Safety-Related Application UTLR-0020NP A&R Part Rev.1
Acronym and Reference Part
Table of Contents
Table of Contents ...............................................................................................................................
Acronyms
1
2
8
............................................................................................................................................
References ...........................................................................................................................................
TOEH-IBA CORPORATION INuclear Systems & Services Division
I
Licensing Topical Report for Toshiba NRW-FPGA-based Instrumentation and Control System for Safety-Related Application UTLR-0020NP A&R Part Rev.1
Acronym and Reference Part
Acronyms
The Acronym List below includes all acronyms used in all Parts except Part V of this Licensing
Topical Report (LTR). Part V has its own acronym list because it is existing PRM V&V Report.
ABWR Advanced Boiling Water Reactor
ACRS Advisory Committee for Reactor Safeguards
APRM Average Power Range Monitor
AS Toshiba Nuclear Energy Systems and Services Division Work Standard
ASME American Society of Mechanical Engineers
ATWS Anticipated Transient without Scram
BOP Balance of Plant
BRR Baseline Review Report
BWR Boiling Water Reactor
C of C Certificate of Conformance
C-cells Combinatorial cells
CAR Corrective Action Request
CCA Critical Characteristics for Acceptance
CCD Critical Characteristics for Design
CCF Common Cause Failure
CDI Commercial Dedication Instruction
CDR Critical Digital Review
CFR Code of Federal Regulations
CG Commercial Grade
CGD Commercial Grade Dedication
CGI Commercial Grade Item
CGS Commercial Grade Service
CI Configuration Item
CM Configuration Management
CMOS Complementary Metal Oxide Semiconductor
COL Combined Construction and Operating License
COTS Commercial-off-the-Shelf
CPU Central Processing Unit
CRD Control Rod Drive
CSA Channel Statistical Allowance
D3 Diversity and Defense-in-Depth
TOSHIBA CORPORATION 2Nuclear Systems & Services Division
Licensing Topical Report for Toshiba NRW-FPGA-based. Instrumentation and Control System for Safety-Related Application UTLR-0020NP A&R Part Rev.1
Acronym and Reference Part
DAC Design Acceptance Criteria
DCD Design Control Document
DCR Document Change Request
DCTR Design Change Technical Report
DDS Detailed Design Specification
DI&C Digital I&C
DIO Digital Input and Output
DIS Design Input Sheet
DRM Design Review Meeting
DTF Digital Trip Function
DVR Design Verification Report
ECCS Emergency Core Cooling System
ECS Engineering Communication Sheet
ECWD Elementary Control Wiring Diagram
EDS Equipment Design Specification
EFT/B Electrical Fast Transient / Burst
EIA Electronic Industries Alliance
ELCS Engineered Safety Features Logic and Control System
EMC Electromagnetic Compatibility
EMI/RFI Electromagnetic Interference/ Radio-Frequency Interference
EPRI Electric Power Research Institute
EQ Equipment Qualification
ES Engineering Schedule
ESD Electrostatic Discharge
ESF Engineered Safety Features
FE Functional Element
FIR Finite Impulse Response
FPGA Field Programmable Gate Array
FMEA Failure Modes and Effects Analysis
FTA Fault Tree Analysis
FTER Final Technical Evaluation Report
GPM Group Manager
HCU Hydraulic Control Unit
HMI Human Machine Interface
I&C Instrumentation and Control
IBD Interlock Block Diagram
TOSHIBA CORPORATION 3Nuclear Systems & Services Division
Licensing Topical Report for Toshiba NRW-FPGA-based Instrumentation and Control System for Safety-Related Application UTLR-0020NP A&R Part Rev.1
Acronym and Reference Part
ICDD Instrumentation & Control Systems Design and Engineering Department
lED Instrumentation Electrical Diagram
IEEE Institute of Electrical and Electronics Engineers
I/O Input/Output
IRM Intermediate Range Monitor
ISO International Organization for Standardization
IV&V Independent Verification and Validation
LD Load Driver
LDS Leak Detection and Isolation System
LED Light Emitting Diode
LPRM Local Power Range Monitor
LTR Licensing Topical Report
LVPS Low Voltage Power Supply
MCL Master Configuration List
MDS Module Design Specification
MSIV Main Steam Isolation Valve
MSV Mean Square Voltage
MTBF Mean Time between Failures
MTP Master Test Plan
MTTR Mean Time to Repair
NED Nuclear Energy Systems and Services Division
NEEMD Nuclear Energy Equipment Manufacturing Department
NICSD Nuclear Instrumentation and Control Systems Department
NICS-QA Quality Assurance Group in NISCD
NICS-QC Quality Control Group in NICSD
NMS Neutron Monitoring System
NNR Nonconformance Notice Report
NQ Nuclear Quality
NQA Nuclear Quality Assurance
NQAD Quality Assurance Department, Nuclear Energy Systems and Services Division
NRW Non Re-writable
NSSS Nuclear Steam Supply System
NUREG Nuclear Regulation
O&M Operations and Maintenance
OBE Operating Basis Earthquake
OLU Output Logic Unit
TOSHIBA CORPORATION 4Nuclear Systems & Services Division
Licensing Topical Report for Toshiba NRW-FPGA-based Instrumentation and Control System for Safety-Related Application UTLR-0020NP A&R Part Rev.1
Acronym and Reference Part
OPRM Oscillation Power Range Monitor
PCB Printed Circuit Board
PCDL Project Control Document List
PDS Previously Developed Software
PICS Plant Information and Control System
PM Project Manager
PPS Procurement Planning Sheet
PQAP Project Quality Assurance Plan
PRM Power Range Monitor
PRNM Power Range Neutron Monitor
PS Power Systems Company
PSNE Power Systems Company, Nuclear Energy
PTER Preliminary Technical Evaluation Report
QA Quality Assurance
QAPD Quality Assurance Program Description
QC Quality Control
QVL Qualified Vendors List
R&P Regulations and Procedures
RBM Rod Block Monitor
R-cells Register cells
RCIS Rod Control and Information System
RD Rack Drift
RFC Recirculation Flow Control System
RFI Radio Frequency Interference
RG Regulatory Guide
RPS Reactor Protection System
RRA Rack Reference Accuracy
RTE Rack Temperature Effect
RTIS Reactor Trip and Isolation System
RTM Requirements Traceability Matrix
SCL Software Configuration Lead
SCMP Software Configuration Management Plan
SD Software Development
SDD System Design Description
SDL Software Development Lead
SDOE Secure Development and Operational Environment
TOSHIBA CORPORATION 5Nuclear Systems & Services Division
Licensing Topical Report for Toshiba NRW-FPGA-based Instrumentation and Control System for Safety-Related Application UTLR-0020NP A&R Part Rev.1
Acronym and Reference Part
SDP Software Development PlanSER Safety Evaluation Report
SES Sub-master Engineering Schedule
SIL Software Integrity LevelSlnstP Software Installation Plan
SIntP Software Integration Plan
SM Senior ManagerSMaintP Software Maintenance Plan
SMP Software Management Plan
SOP Software Operation Plan
SRM Source Range Monitor
SPTM Suppression Pool Temperature Monitor
SQA Software Quality Assurance
SQAL Software QA LeadSQAP Software Quality Assurance PlanSRNM Startup Range Neutron Monitor
SRP Standard Review Plan
SRS Software Requirements Specification
SSAR Software Safety Analysis Report
SSE Safe Shutdown Earthquake
SSL Software Safety Lead
SSLC Safety System Logic & Control
SSP Software Safety Plan
STP South Texas Project
STP Software Test PlanSTPNOC South Texas Project - Nuclear Operating Company
STrngP Software Training Plan
SVTP Software Validation Test Plan
SVTR Software Validation Test Report
SVVP Software Verification and Validation Plan
SWC Surge Withstand CapabilitySWE Software Engineering
TLF Trip Logic Function
TR Topical Report
TRS Test Response Spectrum
USNRC United States Nuclear Regulatory Commission
TOSHIBA CORPORATION 6Nuclear Systems & Services Division
Licensing Topical Report for Toshiba NRW-FPGA-based Instrumentation and Control System for Safety-Related Application UTLR-OO2ONP A&R Part Rev.1
Acronym and Reference Part
V&V
VHDL
VHSIC
VVP
VVR
Verification and Validation
Very High Speed Integrated Circuit Hardware Description Language
Very High Speed Integrated Circuit
V&V Plan
V&V Report
TOSHIBA CORPORATION
Nuclear Systems & Services Division7
Licensing Topical Report for Toshiba NRW-FPGA-based Instrumentation and Control System for Safety-Related Application UTLR-0020NP A&R Part Rev.1
Acronym and Reference Part
References
The References List below includes all references used in all Parts except Part V of this Licensing
Topical Report (LTR). Part V has its own reference list because it is existing PRM V&V Report
(al) 10 CFR21"Reporting of Defects and Noncompliance"
(a2) 10 CFR 50 Appendix B"Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants"
(a3) ASME NQA- 1-1994, and NQA- 1-2008 and the NQA- I a-2009 Addenda"Quality Assurance Program Requirements for Nuclear Facilities"
(a4) USNRC Standard Review Plan (SRP), NUREG-0800 Section 7, 2010
(a5) USNRC Standard Review Plan (SRP), NUREG-0800, Branch Technical Position 7-14,"Guidance on Software Reviews for Digital Computer-Based Instrumentation and ControlSystems," Rev.5, March 2007
(a6) USNRC Standard Review Plan (SRP), NUREG-0800, Branch Technical Position 7-17,"Guidance on Self-Test and Surveillance Test Provisions", Rev.5, March 2007
(a7) USNRC Standard Review Plan (SRP), NUREG-0800, Branch Technical Position 7-18,"Guidance on the Use of Programmable Logic Controllers in Digital Computer-BasedInstrumentation and Control Systems," Rev.5, March 2007
(a8) USNRC, Regulatory Guide 1.28"Quality Assurance Program Requirements (Design and Construction)(Task RS 002-5)," Rev.3, August 1985
(a9) USNRC, Regulatory Guide 1.75"Physical Independence of Electric Systems," Rev.3, February 2005
(al0) USNRC Regulatory Guide 1.105"Setpoints for Safety-Related Instrumentation," Rev.3, December 1999
(al 1) USNRC Draft Regulatory Guide Regulatory Guide 1.152"Criteria for Use of Computers in Safety Systems of Nuclear," Rev.3 July 2011
(a12) USNRC Regulatory Guide 1.153"Criteria for Safety Systems, " Rev. 1, June 1996
(a13) USNRC Regulatory Guide 1.168"Verification, Validation, Reviews, and Audits for Digital Computer Software Used in SafetySystems of Nuclear Power Plants," Rev. 1, February 2004
(a14) USNRC Regulatory Guide 1.169"Configuration Management Plans for Digital Computer Software Used in Safety Systems ofNuclear Power Plants," September 1997
TOSHIBA CORPORATION 8Nuclear Systems & Services Division
Licensing Topical Report for Toshiba NRW-FPGA-based Instrumentation and Control System for Safety-Related Application UTLR-0020NP A&R Part Rev.1
Acronym and Reference Part
(a15) USNRC Regulatory Guide 1.170"Software Test Documentation for Digital Computer Software Used in Safety Systems ofNuclear Power Plants," September 1997
(a16) USNRC Regulatory Guide 1.171"Software Unit Testing for Digital Computer Software Used in Safety Systems of NuclearPower Plants," September 1997
(a17) USNRC Regulatory Guide 1.172"Software Requirements Specifications for Digital Computer Software Used in SafetySystems of Nuclear Power Plants," September 1997
(a] 8) USNRC Regulatory Guide 1.173"Developing Software Lifecycle Processes for Digital Computer Software Used in SafetySystems of Nuclear Power Plants," September 1997
(a19) USNRC Regulatory Guide 1.180"Guidelines for Evaluating Electromagnetic and Radio-Frequency Interference inSafety-Related Instrumentation and Control Systems," Rev. 1, October 2003
(a20) USNRC Regulatory Guide 1.209"Guidelines for Environmental Qualification of Safety-Related Computer-Based'Instrumentation and Control Systems in Nuclear Power Plants," March 2007
(a21) USNRC Regulatory Guide 5.71"Cyber Security Programs for Nuclear Facilities," January 2010
(a22) USNRC, Interim Staff Guidance, DI&C-ISG-04, Highly-Integrated ControlRooms---Communication Issues (HICRc)
(a23) USNRC, Interim Staff Guidance, DI&C-ISG-06, Licensing Process
(a24) MIL-HDBK-217F"Reliability Prediction of Electronic Equipment"
(a25) MIL-STD 461E"Requirements for the Control of Electromagnetic Interference Characteristics of Subsystemsand Equipment"
(a26) IEC 61000-4-2-1995"Electromagnetic compatibility (EMC) - Part 4-2: Testing and measurement techniques -Electrostatic discharge immunity test"
(a27) IEC 61000-4-4-1995"Electromagnetic compatibility (EMC) - Part 4-4: Testing and measurement techniques -Electrical fast transient/burst immunity test"
(a28) IEC 61000-4-5-1995"Electromagnetic compatibility (EMC) - Part 4-5: Testing and measurement techniques -Surge immunity test"
(a29) IEC 61000-4-12-1995"Electromagnetic compatibility (EMC) - Part 4-12: Testing and measurement techniques -Ring wave immunity test"
TOSHIBA CORPORATION 9Nuclear Systems & Services Division
Licensing Topical Report for Toshiba NRW-FPGA-based Instrumentation and Control System for Safety-Related Application UTLR-0020NP A&R Part Rev.1
Acronym and Reference Part
(a30) IEEE Std 7-4.3.2-2003"IEEE Standard Criteria for Digital Computers in Safety Systems of Nuclear PowerGeneration Stations"
(a31) IEEE Std 323-1983"IEEE Standard for Qualifying Class I E Equipment for Nuclear Power Generating Stations"
(a32) IEEE Std 344-1987"IEEE Recommended Practice for Seismic Qualification of Class 1E Equipment for NuclearPower Generating Stations"
(a33) IEEE Std 352-1987"IEEE Guide for General Principles of Reliability Analysis of Nuclear Power GeneratingStation Safety Systems"
(a34) IEEE Std 384-1992"IEEE Standard Criteria for Independence of Class 1 E Equipment and Circuits"
(a35) IEEE Std 730-2002"IEEE Standard for Software Quality Assurance Plans"
(a36) IEEE Std 603-1991"IEEE Standard for Safety Systems for Nuclear Power Generating Stations"
(a37) IEEE Std 828-1990"IEEE Standard for Software Configuration Management Plans"
(a38) IEEE Std 1012-1998"IEEE Standard for Software Verification and Validation"
(a39) IEEE Std 1028-1997"IEEE Standard for Software Reviews"
(a40) IEEE Std 1076-2000"IEEE Standard VHDL Language Reference Manual"
(a41) IEEE Std 1164-1993"IEEE Standard Multivalue Logic System for VHDL Model Interoperability"
(a42) EPRI NP-5652"Utilization of Commercial Grade Items in Nuclear Safety Related Applications," March 1988
(a43) EPRI TR- 102260"Supplement Guidance for the Application of EPRI Report NP-5652 on the Utilization ofCommercial Grade Items," March 1994
(a44) EPRI TR-102323"Guidelines for Electromagnetic Interference Testing of Power Plant Equipment," November2000, Rev. 2
(a45) EPRI TR-106439"Guideline on Evaluation and Acceptance of Commercial Grade Digital Equipment forNuclear Safety Applications," October 1996
TOS-HIBA CORPORATION 10Nuclear Systems & Services Division
Licensing Topical Report for Toshiba NRW-FPGA-based Instrumentation and Control System for Safety-Related Application UTLR-0020NP A&R Part Rev.1
Acronym and Reference Part
(a46) EPRI TR-107330,"Generic Requirements Specification for Qualifying a Commercially Available PLC forSafety-Related Applications in Nuclear Power Plants," December 1996
(a47) EPRI TR-107339"Evaluating Commercial Digital Equipment for High Integrity Applications," December 1997
(a48) Electric Power Research Institute (EPRI) Technical Report 1011710"Handbook for Evaluating Critical Digital Equipment and Systems," November 2005
(a49) Toshiba RS-5146900
"Design Control Document (DCD) for ABWR DCDR" Rev.0
(b 1) Toshiba Corporation, Power Systems Company 4401-4"Nuclear Energy QA Program Description"
(b2) Toshiba Corporation, Power Systems Company Regulations and Procedures 4810"Reporting Procedure for Defects and Noncompliance under USNRC 10 CFR 21"
(ci) Toshiba Nuclear Energy Systems and Services Division FA10-0501-0024"Software Program Plan" Rev. I
(c2) Nuclear Energy Systems and Services Division FA32-3702-0005"Nuclear Energy Systems and Services Division FPGA-based Safety-Related SystemsSoftware Management Plan" Rev.2
(c3) Nuclear Instrumentation & Control Systems Department FA32-3702-1000"Nuclear Instrumentation & Control Systems Department Software Management Plan forFPGA-based Safety-Related Systems" Rev. 2
(c4) Nuclear Instrumentation & Control Systems Department FA32-702 1-1000"Commercial Grade Dedication Plan for FPGA-based Safety-Related Systems" Rev. 1
(c5) Toshiba Nuclear Energy Systems and Services Division FA 10-0301-0001"Project Specific Document Control Procedure" Rev.0
(c6) Toshiba Nuclear Energy Systems and Services Division FA32-3709-0001"Nuclear Energy Systems and Services Division FPGA-based Safety-Related SystemsVerification and Validation Plan" Rev.2
(c7) Toshiba Nuclear Instrumentation & Control Systems Department FA32-3701 -1001"Nuclear Instrumentation & Control Systems Department Software Quality Assurance Planfor FPGA-based Safety-Related Systems" Rev. 1
(c8) Toshiba Nuclear Instrumentation & Control Systems Department FA32-3708-1000"Nuclear Instrumentation & Control Systems Department Software ConfigurationManagement Plan for FPGA-based Safety-Related Systems" Rev. 1
(c9) Toshiba Nuclear Instrumentation & Control Systems Department FA32-3709-1000"Nuclear Instrumentation & Control Systems Department Verification and Validation Plan forFPGA-based Safety-Related Systems" Rev.5
TOSHIBA CORPORATION 11Nuclear Systems & Services Division
Licensing Topical Report for Toshiba NRW-FPGA-based Instrumentation and Control System for Safety-Related Application UTLR-0020NP A&R Part Rev.1
Acronym and Reference Part
(dl) "CG Survey Report," (E05SR-001-R1)
(d2) "CG Survey Report," (E05SR-003-RI)
(d3) "Survey/Audit Report," (SE09SR-001 RO)
(d4) "Survey/Audit Report," (SE09SR-002 RO)
(d5) "Survey/Audit Report," (SE09SR-004 RO)
(d6) "Survey/Audit Report," (SE1OSR-001 RO)
(d7) "Evaluation Report," (SAER10-002 RO)
(d8) "Evaluation Report," (SAERI 1-002 RO)
(d9) "Evaluation Report," (SAERIO-004 RO)
(d 10) Toshiba FPG-DRT-C51-0002"Preliminary Hazard Analysis Report" Rev.2
(d 11) Toshiba FPG-DRT-C51-0018"Requirements Definition Phase Hazard Analysis Report" Rev.0
(d12) Toshiba FPG-DRT-C51-0019"Design Phase Preliminary Hazard Analysis Report" Rev. 1
(d 13) Toshiba FPG-DRT-C51-0020"Implementation and Integration Phase Preliminary Hazard Analysis Report" Rev. 1
(d14) Toshiba FPG-DRT-C51-0021"Unit/Module Validation Testing Phase Preliminary Hazard Analysis Report" Rev.1
(d 15) Toshiba FPG-DRT-C51-0022"System Validation Testing Phase Hazard Analysis Report" Rev. 1
(d16) Toshiba FPG-TRT-C51-0101"Qualification Test Summary Report" Rev.0
(d 17) Toshiba FPG-PLN-C51-0012"System Validation Test Plan" Rev.2
(d1 8) Toshiba FPG-TPRC-C51-0001"System Validation Test Procedure" Rev.2
(d 19) Toshiba FPG-PLN-C51-0005"Master Test Plan" Rev.3
(d20) Toshiba FPG-TPRC-C51-1001"System Set-Up and Check-out Test Procedure" Rev.6
(d21) Toshiba FPG-TPRC-C51-1002"Environmental Test Procedure" Rev.3
(d22) Toshiba FPG-TPRC-C51-1003"Seismic Test Procedure" Rev.3
TOSHIBA CORPORATION 12Nuclear Systems & Services Division
Licensing Topical Report for Toshiba NRW-FPGA-based Instrumentation and Control System for Safety-Related Application UTLR-0020NP A&R Part Rev.1
Acronym and Reference Part
(d23) Toshiba FPG-TPRC-C51-1004"EMI/RFI Test Procedure" Rev.7
(d24) Toshiba FPG-TPRC-C51-1005"Surge Withstand Capability Test Procedure" Rev.4
(d25) Toshiba FPG-TPRC-C51-1006"EFT/B Test Procedure" Rev.4
(d26) Toshiba FPG-TPRC-C51-1007"ESD Test Procedure" Rev.5
(d27) Toshiba FPG-TPRC-C51-1008"Class 1E to Non- 1E Isolation Test Procedure" Rev.5
(d28) Toshiba FPG-TPRC-C51-1009"Operability Test Procedure" Rev.5
(d29) Toshiba FPG-TPRC-C51-1010"Prudency Test Procedure" Rev.5
(d30) Toshiba FPG-TRT-C51-0002"Availability/Reliability Analysis Report" Rev.0
(d31) Toshiba FPG-TRT-C51-0003"Setpoint Support Analysis Report" Rev.0
(d32) Toshiba FPG-DRT-C51-0005"NICSD's CDR Report" Rev..1
(d33) Toshiba FPG-DRT-C51-0006"Actel's CDR Report" Rev. 0
(d34) Toshiba FA32-3613-0001"Updated Critical Digital Review of Actel FPGA Software Tools" Rev. 0
(d35) "Commercial Grade Survey Report" (SE 1OSR-001 a RO)
TOSHIBA CORPORATION 13Nuclear Systems & Services Division