LOW CARBON CITIES FRAMEWORK &
ASSESSMENT SYSTEM
Target: To guide stakeholders to lead by
example & implement low carbon cities effort.
Obj1: To encourage & promote
the concept of low carbon cities
townships in Malaysia.
Obj2: To increase the
compatibility of cities/townships
with their local natural system.
Obj3: To guide cities in making
choice/decisions towards
greener solutions.
WHAT IS LOW CARBON CITIES
Source: Greentech Malaysia
Low carbon cities is ‘a city that
comprises of societies that consume
green technology, green practices
and emit relatively low carbon or
GHG as compared with present day
practice to avoid the adverse impacts on
climate change’
PELAN TINDAKAN PERBANDARAN
RENDAH KARBON BANDAR BARU
BANGI
UEUrban
Environment
UTUrban
Transport
UIUrban
Infrastructure
BBuilding
Baseline
Target
Action
Strategy
CO2
emissions
CO2
sequestration
VISI:
BANDAR BARU BANGI RENDAH
KARBON DAN SELESA DIDIAMI
PRINSIP ASAS PERBANDARAN
RENDAH KARBON BANDAR BARU
BANGI
3 Prinsip Asas
Perbandaran
Rendah Karbon
Bandar Baru
Bangi
Prinsip 2:
Masyarakat
Rendah
Karbon
Prinsip 1:
Perbandaran
Rendah
Karbon yang
Selesa
Didiami
Prinsip 3:
Perbandaran
Pintar
Visi:
Membangunkan
Bandar Baru Bangi
sebagai Bandar
Rendah Karbon
yang Selesa
Didiami
PTPRKBBBangiserves as a guide to
use on pertinent area
(elements) that
contributes to the
reduction of carbon
emission.
UEUrban
Environment
UTUrban
Transport
UIUrban
Infrastructure
BBuilding
Baseline
Target
Action
Strategy
CO2
emissions
CO2
sequestration
PELAN TINDAKAN PERBANDARAN RENDAH
KARBON BANDAR BARU BANGI
LAPORAN PENUH
PELAN TINDAKAN PERBANDARAN RENDAH
KARBON BANDAR BARU BANGI
• LCCF Standard• Carbon
Calculation
LCCFTrack
UEUrban
Environment
UTUrban
Transport
UIUrban
Infrastructure
BBuilding
Baseline
CO2
emissions
CO2
sequestration
LAPORAN INTERIM
SOURCES OF CARBON
Total Area :
Sub-total Landuse (Buildings &
Infrastructure) :
Open space (not developed/open
space) :
Landscape :
Embodied/Building Footprint :
Waste :
Energy :
Water :
Transport :
1881.79 ha
1328.64 ha (70%)
553.15 ha (30%)
513.59 ha (including 1816 trees)
4,563,495.18 m2
10,198.010 tonnes
Pending
Pending
Need TIA/ Transport Survey
Baseline