Upgrading of OMIFCO Integrated Control System (ICS) Abdullah Ali Salim Al Araimi (Instrument Manager , OMIFCO) Gaurav Attri (Senior Instrument Engineer , OMIFCO)

Upload: others

Post on 13-May-2020

19 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Upgrading of OMIFCO Integrated Control System (ICS)...DCS: Process Control and Monitoring through Yokogawa Centum CS3000 Distributed Control System. ESD: Emergency Shut Down System

Upgrading of OMIFCO Integrated Control System (ICS)

Abdullah Ali Salim Al Araimi (Instrument Manager , OMIFCO)

Gaurav Attri (Senior Instrument Engineer , OMIFCO)

Page 2: Upgrading of OMIFCO Integrated Control System (ICS)...DCS: Process Control and Monitoring through Yokogawa Centum CS3000 Distributed Control System. ESD: Emergency Shut Down System

Contents

• Introduction

• Integrated Control System

• ICS: Need to Upgrade

• Upgrade Strategy

• DCS Upgrade Status

• ESD Upgrade

• Project Activities

• DCS Upgrade Execution Schedule/ Status

• Project Highlights

• Project Findings and challenges

• Conclusion

Page 3: Upgrading of OMIFCO Integrated Control System (ICS)...DCS: Process Control and Monitoring through Yokogawa Centum CS3000 Distributed Control System. ESD: Emergency Shut Down System

Introduction: OMIFCO

Page 4: Upgrading of OMIFCO Integrated Control System (ICS)...DCS: Process Control and Monitoring through Yokogawa Centum CS3000 Distributed Control System. ESD: Emergency Shut Down System

Introduction: OMIFCO

• Oman India Fertiliser Company SAOC (OMIFCO) has been

established, as the result of an initiative by the Governments of

Oman & India, in order to operate a modern world scale two-

train ammonia-urea fertiliser manufacturing plant.

• OMIFCO is a joint venture between Oman Oil Company

(50%), IFFCO (25%) and KRIBHCO (25%).

• Capacity to produce 2x1,750 MT/Day of Anhydrous Ammonia

from 2 Ammonia Plants and 2 x2,530 T/D of granular urea

from 2 Urea Plants with captive power and steam generation,

other plant utilities and off sites facilities.

• OMIFCO plant is located near Sur city in Sultanate of Oman.

Page 5: Upgrading of OMIFCO Integrated Control System (ICS)...DCS: Process Control and Monitoring through Yokogawa Centum CS3000 Distributed Control System. ESD: Emergency Shut Down System

45FIREFIGHTING

SYSTEM

N2

USERS

37AIR COMPR.

N2 PROD.

36INSTRUMENT

AIR

N2

USERS

POWER

USERS

42EM.POWER

GENERATORS

PW

USERS

44POTABLE

WATER

53

FLARES

ELECTRICAL

S/S

41POWER/STEAM

GENERATOR PCK

33DESALINATION

35

F.C.WSYSTEM

F.C.W

USERS

34POLISHING

31B.F.W.

PREPARATION

22

AMMONIA

TRAIN#2

12

AMMONIA

TRAIN#1

51

AMMONIA

STORAGE

21

MELT UREA

TRAIN#2

11

MELT UREA

TRAIN#1

52

UREA

STORAGE

28

GRAN.UNIT

TRAIN#2

18

GRAN.UNIT

TRAIN#1

43EFFLUENT

TREATMENT

46IRRIGATION

SYSTEM

39

AMMONIA

LOADING

40

UREA

LOADING

47

S.W.I. &CLORINATION

<SCW>

<SW>

<BRINE>

<DSW>

HP/LP

STEAM

DSW

USERS

FCW COND

<COND>

<DW>LP STEAM

USERS

32STEAM GEN.

AUX.BOILERS

<BFW>

<BFW>

<HS>

38N.G.

PREPARATION

<FG>

<NH3>

<VAP>

<CO2>

<CO2>

<UREA M.>

<UREA S.>

<UREA M.>

<UREA S.>

<DSW>

F.END

T1 & T2

F.END

T1 & T2

COND

<NH3>

<NH3>

Introduction: OMIFCO Process Diagram

Page 6: Upgrading of OMIFCO Integrated Control System (ICS)...DCS: Process Control and Monitoring through Yokogawa Centum CS3000 Distributed Control System. ESD: Emergency Shut Down System

Integrated Control System (ICS)

• Two separate systems:

DCS: Process Control and Monitoring through

Yokogawa Centum CS3000 Distributed Control System.

ESD: Emergency Shut Down System for Process

Safety through Yokogawa Prosafe-PLC.

• DCS and ESD communicating over plant wide control

network through communication gateway (MULCOM).

• Operation and monitoring of both systems via common

operator workstations.

Page 7: Upgrading of OMIFCO Integrated Control System (ICS)...DCS: Process Control and Monitoring through Yokogawa Centum CS3000 Distributed Control System. ESD: Emergency Shut Down System

HIS

HIS

CCR

OPC

OPERATION HIS

UREA11 UREA21

UTILITIES & OFFSITES

ECS-LSS

DOMAIN-2

DOMAIN-3

DOMAIN-1

DOMAIN-4

SR6 (DOMAIN-1)

UNIT -32/ 33/ 34/ 35/ 38/45

SR1 (DOMAIN-1)

UNIT -32/ 36/ 37/ 38/ 41/42/51

SR5 (DOMAIN-1)

UNIT -43/47

SR3 (DOMAIN-3)

UREA11 UREA11

LCR4UNIT-39/51

SR2 (DOMAIN-2) AMMONIA12/25 AMMONIA22

AMMONIA12/25 AMMONIA22

EWSSUPERVISORY STATIONS

:Field Control Station (FCS)

:Prosafe-PLC Controller :Media Converter Panel

: V Net Bus Converter :Human Interface Station (HIS)

:Prosafe-PLC Remote IO (RIO)

:FCS Remote IO (RIO)

:FO Cable Multi Mode (Redundant) :Centum V-net Coaxial Network (Redundant)

:V-net Bus End Terminator)

:Redundant Communication Gateway(MULCOM)

SR1

SR1

SR6

ICS: Network Diagram

AMM-EEWS

OPERATION HIS

OPERATION HIS

UREA-EEWS

SR1SR5-EEWS

SR6-EEWS

Page 8: Upgrading of OMIFCO Integrated Control System (ICS)...DCS: Process Control and Monitoring through Yokogawa Centum CS3000 Distributed Control System. ESD: Emergency Shut Down System

HIS

CCR

OPC

ECS-LSS

DOMAIN-1

DOMAIN-4

SR6 (DOMAIN-1)

UNIT -32/ 33/ 34/ 35/ 38/45

SR1 (DOMAIN-1)

UNIT -32/ 36/ 37/ 38/ 41/42/51

SR5 (DOMAIN-1)

UNIT -43/47

SR3 (DOMAIN-3)

UREA11 UREA11

LCR4UNIT-39/51

SR2 (DOMAIN-2) AMMONIA12/25 AMMONIA22

:Field Control Station (FCS)

:SLS SOE Module

:Human Interface Station (HIS):FCS Remote IO (RIO)

: ECS-LSS SOE Network :Centum V-net Coaxial Network (Redundant)

:V-net Bus End Terminator)

:Redundant Communication Gateway(MULCOM)

SR1

ICS: Network Diagram ECS-LSS

SR1SR1

SR1SR1

Page 9: Upgrading of OMIFCO Integrated Control System (ICS)...DCS: Process Control and Monitoring through Yokogawa Centum CS3000 Distributed Control System. ESD: Emergency Shut Down System

ICS: Need to Upgrade

• DCS:• End of support for Windows2000 and Workstations Hardware.

• DCS Centum CS3000 Software, Workstations Hardware and Software compatibility issues.

• ESD:• End of spares support for Prosafe-PLC hardware since 2009.

• End of service support for Prosafe-PLC expected by 2018-2019.

• Communication network issues:• Control Network (V-net): Bus topology (Bus Network)

• ESD-DCS Communication issues: MULCOM

Page 10: Upgrading of OMIFCO Integrated Control System (ICS)...DCS: Process Control and Monitoring through Yokogawa Centum CS3000 Distributed Control System. ESD: Emergency Shut Down System

Upgrade Strategy

• Upgrade Part-1 (DCS Upgrade):• DCS Software Upgrade from Centum CS3000 to Centum VP

• Engineering Station, Operator Workstations hardware upgrade and software upgrade from Windows 2000 to Windows 2008 server/ Windows7.

• Upgrade Part-2 (ESD Upgrade):• ESD system upgrade from Prosafe-PLC to Prosafe-RS.

• DCS controller (FCS) upgrade from AFS30D to AFV30D.

• Upgrade of plant control network from V-net bus network to VP star network.

Page 11: Upgrading of OMIFCO Integrated Control System (ICS)...DCS: Process Control and Monitoring through Yokogawa Centum CS3000 Distributed Control System. ESD: Emergency Shut Down System

Upgrade Part-1 (DCS Upgrade)

• Implemented in 2015-2016

• Online Implementation

• Installed GPS master clock for time

synchronization.

• Prerequisite for ESD Upgrade

• Resolved compatibility issues related to DCS

and workstation software and hardware.

Page 12: Upgrading of OMIFCO Integrated Control System (ICS)...DCS: Process Control and Monitoring through Yokogawa Centum CS3000 Distributed Control System. ESD: Emergency Shut Down System

ICS: Network Diagram (Post DCS Upgrade)

Page 13: Upgrading of OMIFCO Integrated Control System (ICS)...DCS: Process Control and Monitoring through Yokogawa Centum CS3000 Distributed Control System. ESD: Emergency Shut Down System

Upgrade Part-2 (ESD Upgrade): Project Plan and Scope

• Phase-1: Ammonia22 and Urea21 stream • Upgrade of ESD system: 2300 I/O points• DCS Controller (FCS: 05 nos.) upgrade• Network Upgrade to Centum VP

• Phase-2: Utilities & Off sites, Ammonia25 • Upgrade of ESD system and HRSG BMS: 3400 I/O points• DCS, LSS-ECS Controller (FCS: 10 nos.) upgrade• ECS-LSS IO Network and SOE Upgrade• Network Upgrade to Centum VP

• Phase-3: Ammonia12 and Urea11 stream • Upgrade of ESD System: 2300 I/O points• DCS Controller (FCS: 04 nos.) upgrade• Network Upgrade to Centum VP

Page 14: Upgrading of OMIFCO Integrated Control System (ICS)...DCS: Process Control and Monitoring through Yokogawa Centum CS3000 Distributed Control System. ESD: Emergency Shut Down System

ESD Upgrade: Project Objective

• Phase-1: Commissioning of Ammonia22 and

Urea21 ESD System within available

shutdown period of 14 days in TA-2018.

• Phase-2 and 3: Commissioning of Utilities &

Off sites, Ammonia12 and Urea11 ESD

System within available shutdown period of

21 days in TA-2019.

Page 15: Upgrading of OMIFCO Integrated Control System (ICS)...DCS: Process Control and Monitoring through Yokogawa Centum CS3000 Distributed Control System. ESD: Emergency Shut Down System

ESD Upgrade: Project Philosophy

• Removal of following components:

• Prosafe-PLC System Cabinets

• Prosafe-PLC Field Termination Assemblies (FTAs)

• Retaining of Field Marshalling Cabinets

• Minimum disruption to field cables routing

• Reduce shutdown time.

• Installation of following Prosafe-RS components

• Prosafe-RS System Cabinets

• Prosafe-RS Field Termination Assemblies (FTA) Cabinets

• Interconnection between new FTAs and field Marshalling

Cabinets

• Cabinet installation in spare locations wherever possible, to

minimise shutdown scope of activities.

Page 16: Upgrading of OMIFCO Integrated Control System (ICS)...DCS: Process Control and Monitoring through Yokogawa Centum CS3000 Distributed Control System. ESD: Emergency Shut Down System

Field JB Field Marshalling Cabinet Field Terminal Assembly FTA System Cabinet Prosafe-PLC

ESD Upgrade: Project Philosophy: IS Loop

Prefab Cable

Multi Pair CableSafety Barriers

Page 17: Upgrading of OMIFCO Integrated Control System (ICS)...DCS: Process Control and Monitoring through Yokogawa Centum CS3000 Distributed Control System. ESD: Emergency Shut Down System

Field JB Field Marshalling Cabinet Field Terminal Assembly FTA System Cabinet Prosafe-PLC

Field Terminal Assembly FTA System Cabinet Prosafe-RS

ESD Upgrade: Project Philosophy: IS Loop

Prefab Cable

Multi Pair CableSafety Barriers

Safety Barriers BoardsTermination Board

Page 18: Upgrading of OMIFCO Integrated Control System (ICS)...DCS: Process Control and Monitoring through Yokogawa Centum CS3000 Distributed Control System. ESD: Emergency Shut Down System

Field JB Field Marshalling Cabinet Field Terminal Assembly FTA System Cabinet Prosafe-PLC

Field Terminal Assembly FTA System Cabinet Prosafe-RS

Prefab CablePrefab Cable

ESD Upgrade: Project Philosophy: IS Loop

Prefab Cable

Multi Pair CableSafety Barriers

Safety Barriers BoardsTermination Board

Page 19: Upgrading of OMIFCO Integrated Control System (ICS)...DCS: Process Control and Monitoring through Yokogawa Centum CS3000 Distributed Control System. ESD: Emergency Shut Down System

Field JB Field Marshalling Cabinet Field Terminal Assembly FTA System Cabinet Prosafe-PLC

Field Terminal Assembly FTA System Cabinet Prosafe-RS

Prefab CablePrefab Cable

ESD Upgrade: Project Philosophy: IS Loop

Prefab Cable

Multi Pair CableTermination Board

Safety Barriers BoardsTermination Board

Page 20: Upgrading of OMIFCO Integrated Control System (ICS)...DCS: Process Control and Monitoring through Yokogawa Centum CS3000 Distributed Control System. ESD: Emergency Shut Down System

Field JB Field Marshalling Cabinet

Field Terminal Assembly FTA System Cabinet Prosafe-RS

Prefab CablePrefab Cable

ESD Upgrade: Project Philosophy: IS Loop

Termination Board

Termination Board Safety Barriers Boards

Page 21: Upgrading of OMIFCO Integrated Control System (ICS)...DCS: Process Control and Monitoring through Yokogawa Centum CS3000 Distributed Control System. ESD: Emergency Shut Down System

Field JB Field Marshalling Cabinet

Field Terminal Assembly FTA System Cabinet Prosafe-RS

Prefab CablePrefab Cable

ESD Upgrade: Project Philosophy: IS Loop

Termination Board

Safety Barriers Boards

Page 22: Upgrading of OMIFCO Integrated Control System (ICS)...DCS: Process Control and Monitoring through Yokogawa Centum CS3000 Distributed Control System. ESD: Emergency Shut Down System

Field JB/ Elect SS Field Marshalling Cabinet Field Terminal Assembly FTA System Cabinet Prosafe-PLC

Prefab Cable

Multi Pair Cable

ESD Upgrade: Project Philosophy: Non-IS Loop

Terminal Block

Page 23: Upgrading of OMIFCO Integrated Control System (ICS)...DCS: Process Control and Monitoring through Yokogawa Centum CS3000 Distributed Control System. ESD: Emergency Shut Down System

Field JB/ Elect SS Field Marshalling Cabinet Field Terminal Assembly FTA System Cabinet Prosafe-PLC

Field Terminal Assembly FTA System Cabinet Prosafe-RS

Prefab Cable

Multi Pair Cable

ESD Upgrade: Project Philosophy: Non-IS Loop

Terminal Block

Termination Board

Page 24: Upgrading of OMIFCO Integrated Control System (ICS)...DCS: Process Control and Monitoring through Yokogawa Centum CS3000 Distributed Control System. ESD: Emergency Shut Down System

Field JB/ Elect SS Field Marshalling Cabinet Field Terminal Assembly FTA System Cabinet Prosafe-PLC

Field Terminal Assembly FTA System Cabinet Prosafe-RS

Prefab Cable

Prefab Cable

Multi Pair Cable

Multi Pair Cable

ESD Upgrade: Project Philosophy: Non-IS Loop

Terminal Block

Termination Board

Page 25: Upgrading of OMIFCO Integrated Control System (ICS)...DCS: Process Control and Monitoring through Yokogawa Centum CS3000 Distributed Control System. ESD: Emergency Shut Down System

Field JB/ Elect SS Field Marshalling Cabinet Field Terminal Assembly FTA System Cabinet Prosafe-PLC

Field Terminal Assembly FTA System Cabinet Prosafe-RS

Prefab Cable

Prefab Cable

Multi Pair Cable

Multi Pair Cable

ESD Upgrade: Project Philosophy: Non-IS Loop

Terminal Block

Termination Board

Page 26: Upgrading of OMIFCO Integrated Control System (ICS)...DCS: Process Control and Monitoring through Yokogawa Centum CS3000 Distributed Control System. ESD: Emergency Shut Down System

Field JB/ Elect SS Field Marshalling Cabinet

Field Terminal Assembly FTA System Cabinet Prosafe-RS

Prefab Cable

Multi Pair Cable

ESD Upgrade: Project Philosophy: Non-IS Loop

Terminal Block

Termination Board

Page 27: Upgrading of OMIFCO Integrated Control System (ICS)...DCS: Process Control and Monitoring through Yokogawa Centum CS3000 Distributed Control System. ESD: Emergency Shut Down System

Field JB/ Elect SS Field Marshalling Cabinet

Field Terminal Assembly FTA System Cabinet Prosafe-RS

Prefab Cable

Multi Pair Cable

ESD Upgrade: Project Philosophy: Non-IS Loop

Terminal Block

Termination Board

Page 28: Upgrading of OMIFCO Integrated Control System (ICS)...DCS: Process Control and Monitoring through Yokogawa Centum CS3000 Distributed Control System. ESD: Emergency Shut Down System

Project Activities

• Activities broadly planned as follows:

• Engineering Activities

• Construction (Pre-shutdown) Activities

• Site Preparatory Activities

• Commissioning (Shutdown) Activities

Page 29: Upgrading of OMIFCO Integrated Control System (ICS)...DCS: Process Control and Monitoring through Yokogawa Centum CS3000 Distributed Control System. ESD: Emergency Shut Down System

Project Activities

Yokogawa’s implementation of realisation phase of safety lifecycle

Engineering Activities:

Page 30: Upgrading of OMIFCO Integrated Control System (ICS)...DCS: Process Control and Monitoring through Yokogawa Centum CS3000 Distributed Control System. ESD: Emergency Shut Down System

Engineering Activities

Collection of design inputs:

• Site Survey

• Existing rack room layout, cable tray/routing

• IO database,

• Application Backup

• Installation verification:

• Field Marshalling Cabinets termination details

• Verification of logic diagrams and narratives with application backup

Page 31: Upgrading of OMIFCO Integrated Control System (ICS)...DCS: Process Control and Monitoring through Yokogawa Centum CS3000 Distributed Control System. ESD: Emergency Shut Down System

Engineering Activities

Basic Design Engineering:

• System Integrity:• Certified for use up to SIL3

• High reliability and availability system

• System Redundancy:• Redundancy at all levels: Power Supply, Controller, IO

modules, Network components

• No single point of failure

• Documentation review:• Hardware Functional Design Specifications

• System Architecture and Network Drawing

• Cabinet layouts, cable tray layouts

Page 32: Upgrading of OMIFCO Integrated Control System (ICS)...DCS: Process Control and Monitoring through Yokogawa Centum CS3000 Distributed Control System. ESD: Emergency Shut Down System

Engineering Activities

Detailed Design Engineering:

Hardware Design:

• System Cabinet Design:• Process unit wise controller segregation in each plant

• Controller loading < 40% for specified scan time

• IO segregation: IS, Non-IS

• Marshalling Cabinet Design:• Segregation of IS, Non-IS cabinets

• Bought out items selection and design

Page 33: Upgrading of OMIFCO Integrated Control System (ICS)...DCS: Process Control and Monitoring through Yokogawa Centum CS3000 Distributed Control System. ESD: Emergency Shut Down System

Engineering Activities

Detailed Design Engineering:

Software Design:

• Instrument Logic diagrams and narratives verification with existing application

• Software Architecture and building blocks selection/design

Document review

• System Cabinets, Marshalling Cabinets GA drawings

• Software Functional Design Specification review and approval

• Bill Of Material (BOM)

• Safety Validation Plan

Page 34: Upgrading of OMIFCO Integrated Control System (ICS)...DCS: Process Control and Monitoring through Yokogawa Centum CS3000 Distributed Control System. ESD: Emergency Shut Down System

Engineering Activities

Implementation:

Cabinet Integration:

• System and Marshalling Cabinets Integration.

Software Implementation:

• Migration of existing logic to Prosafe-RS

• Migration tool used for software migration

Page 35: Upgrading of OMIFCO Integrated Control System (ICS)...DCS: Process Control and Monitoring through Yokogawa Centum CS3000 Distributed Control System. ESD: Emergency Shut Down System

Engineering Activities

Internal Testing:

• 100% hardware and software testing

• Punch points resolution and test records

Factory Acceptance Test

• 100% hardware and software testing

• Presence of OMIFCO

• Punch points resolution• Document review

• FAT reports

• AS shipped documentation

Page 36: Upgrading of OMIFCO Integrated Control System (ICS)...DCS: Process Control and Monitoring through Yokogawa Centum CS3000 Distributed Control System. ESD: Emergency Shut Down System

Preparatory Activities

• Single Mode Fiber Optic Network

• Required for Centum VP and Prosafe-RS

• Multicore SMFO cables required for each location

connectivity to CCR.

• Field overhead and underground cable laying.

• Phase-1,3: CCR- SR2, CCR-SR3 FO cables laying

• Phase-2: CCR-SR1, CCR-SR6, CCR-SR6, SR1-

LCR4 FO cables laying

Page 37: Upgrading of OMIFCO Integrated Control System (ICS)...DCS: Process Control and Monitoring through Yokogawa Centum CS3000 Distributed Control System. ESD: Emergency Shut Down System

Preparatory Activities

• Line Monitoring component replacement:

• End-of-Line (EOL) resistor online replacement.

• Replacement for all IS-DI loops.

• Line Fault Transparency (LFT) achieved,

enhancing the diagnostics of the IS-DI loops.

Page 38: Upgrading of OMIFCO Integrated Control System (ICS)...DCS: Process Control and Monitoring through Yokogawa Centum CS3000 Distributed Control System. ESD: Emergency Shut Down System

Construction Activities

• Installation of System and Marshalling Cabinets inspare control room locations.

• Power earthing cables laying and termination.

• System Multipair Cables termination at new FTAcabinet side and termination ready at field cabinet side.

• System Prefab Cables laying and termination at Systemcabinet side and new FTA cabinet side.

• Network cables laying and accessories installation.

• SMFO network setup and testing.

• New Cabinets power up and testing.

Page 39: Upgrading of OMIFCO Integrated Control System (ICS)...DCS: Process Control and Monitoring through Yokogawa Centum CS3000 Distributed Control System. ESD: Emergency Shut Down System

Commissioning Activities

• Removal of old system/marshalling cabinets.

• Installation of new system cabinets in old locations.

• Termination of system cables on field interface panels.

• Configuration and testing of all network components.

• Replacement of FCS controller nodes and configuration and download in database.

• ECS-LSS Remote IO Network and SOE Upgrade.

• Total system power ON.

• Hardware Loop checking.

• Functional testing and system commissioning.

• Demolition of old ESD cabinets.

Page 40: Upgrading of OMIFCO Integrated Control System (ICS)...DCS: Process Control and Monitoring through Yokogawa Centum CS3000 Distributed Control System. ESD: Emergency Shut Down System

HIS

HIS

CCR

EWS OPCSUPERVISORY HIS

OPERATION HIS

AMMONIA12 AMMONIA22

OPERATION HIS

UREA11 UREA21

UTILITIES & OFFSITES

ECS-LSS

DOMAIN-6

DOMAIN-7

DOMAIN 5

DOMAIN-16

OPERATION HIS

SR2 (DOMAIN-6) AMMONIA12/25 AMMONIA22

SR6 (DOMAIN-5)

UNIT -32/ 33/ 34/ 35/ 38/45

SR3 (DOMAIN-7)

UREA11 UREA11

SR1 (DOMAIN-5)

UNIT -32/ 36/ 37/ 38/ 41/42/51

SR5 (DOMAIN-5)

UNIT -43/47

LCR4UNIT-39/51

:Field Control Station (FCS)

:Safety Control Station (SCS) :Layer 2 Network Switch

:Layer 3 Network Switch :Human Interface Station (HIS)

:SCS Remote IO (RIO)

:FCS Remote IO (RIO)

:Fibre Optic Cable Single Mode (Redundant) :Centum VP Vnet/IP Network (Redundant)

:Fibre Optic Patch Panel (FOPP)

SR1

SR1

SR6

AMM-EEWS

UREA-EEWS

UTILnOFF-EEWS

ICS: Network Diagram : Post ICS Upgrade

Page 41: Upgrading of OMIFCO Integrated Control System (ICS)...DCS: Process Control and Monitoring through Yokogawa Centum CS3000 Distributed Control System. ESD: Emergency Shut Down System

HIS

CCR

OPC

ECS-LSS

DOMAIN-16

DOMAIN-16

SR6 (DOMAIN-5)

UNIT -32/ 33/ 34/ 35/ 38/45

SR1 (DOMAIN-5)

UNIT -32/ 36/ 37/ 38/ 41/42/51

SR5 (DOMAIN-5)

UNIT -43/47

SR3 (DOMAIN-7)

UREA11 UREA11

LCR4UNIT-39/51

SR2 (DOMAIN-6) AMMONIA12/25 AMMONIA22

SR1

ICS: Network Diagram ECS-LSS

SR1SR1

SR1SR1

Ethernet Network

:Field Control Station (FCS)

:Layer 2 Network Switch

:Human Interface Station (HIS):FCS Remote IO (RIO)

:Centum VP Vnet/IP Network (Redundant): ECS-LSS SOE Network :SLS SOE Module

Page 42: Upgrading of OMIFCO Integrated Control System (ICS)...DCS: Process Control and Monitoring through Yokogawa Centum CS3000 Distributed Control System. ESD: Emergency Shut Down System

ESD Upgrade: Project Execution Schedule

Page 43: Upgrading of OMIFCO Integrated Control System (ICS)...DCS: Process Control and Monitoring through Yokogawa Centum CS3000 Distributed Control System. ESD: Emergency Shut Down System

Project Highlights

SNo

Activity Phase-1 Phase-2 Phase-3 Total

1 SMFO cable laying 4km 12km - 16 km

2 EOL online replacement 350 300 350 1000

3 Cabinets Installation 20 38 17 75 nos

4 Power Earthing Cables laying and termination 60 114 51 225 lengths

5 Multipair Cables laying and termination 300 400 300 1000 lengths

6 Prefab Cables laying and termination 350 500 350 1200 lengths

7 Network Cables laying and termination 100 150 100 350 lengths

8 Fiber Optic Patch cord laying - 120 - 120 lengths

9 Signal Wiring terminations in cabinets and fieldjunction boxes, verification and testing

9000 12000 9000 30000

10 ILDs and narratives verification, Site Functionaltesting

130 240 130 500 interlocks

11 Old Cabinets demolition 15 25 15 55 nos.

Page 44: Upgrading of OMIFCO Integrated Control System (ICS)...DCS: Process Control and Monitoring through Yokogawa Centum CS3000 Distributed Control System. ESD: Emergency Shut Down System

Project Challenges and Findings

• Preparation of sequence and phase wise plan andscope for the upgrade

• Execution of the complete upgrade project withminimum team at OMIFCO.

• Single Mode Fiber Optic Cable laying duringrunning plant.

• System design and engineering of HRSG- A,BBMS

• Co-ordination with all internal and externalstakeholders of the project including third partyconstruction contractor.

Page 45: Upgrading of OMIFCO Integrated Control System (ICS)...DCS: Process Control and Monitoring through Yokogawa Centum CS3000 Distributed Control System. ESD: Emergency Shut Down System

Project Challenges and Findings

• ILDs, narratives verification proved very helpfulfor system inspection and commissioning

• Execution of Phase-1 of the project before Phase-2 and3: Lessons learnt in Phase-1 were implemented inPhase-2&3.

• FAT: 100% hardware and logic checking andverification. Resulted in minimum loop troubleshootingduring commissioning.

• Preparatory and Pre-shutdown activities minimisedshutdown scope of activities.

• Functional testing of all safety interlocks before plantstart up ensured commissioning of the system ahead ofthe schedule.

Page 46: Upgrading of OMIFCO Integrated Control System (ICS)...DCS: Process Control and Monitoring through Yokogawa Centum CS3000 Distributed Control System. ESD: Emergency Shut Down System

Conclusion

• Detailed planning of all activities in order to

reduce duration of shutdown activities.

• Active engagement with all stakeholders

during the whole course of the project.

• Adequate and timely allocation of resources

and logistics.