updates: annual programme monitoring (apm) 4 feb 2013

20
Updates: Annual Programme Monitoring (APM) 4 Feb 2013

Upload: david-randall

Post on 27-Dec-2015

224 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Updates: Annual Programme Monitoring (APM) 4 Feb 2013

Updates: Annual Programme Monitoring (APM)

4 Feb 2013

Page 2: Updates: Annual Programme Monitoring (APM) 4 Feb 2013

Academic QA Processes Timelines

Sem 1 EMR Report Submission AQR Roundtable

Sep/Oct

Aug AQR / APM Report

AprSem 2 EMR Report Submission New AY, Sem 1

Sem 2 BOEMar

Recommended APM Report SubmissionSch/CEC to manage internal timelines

May/Jun

School may include development/ achievements AFTER semester 2 during the AQR Roundtable presentation

Oct Sem 2 starts

Corporate Planning

Page 3: Updates: Annual Programme Monitoring (APM) 4 Feb 2013

APM for Dip in XXXXAPM for Dip in XXXX

APM & AQR Report Integration

APM for Dip in XXXX•Review of Programme Indicators

AQR – Section 1: Where We AreReview of •School’s focus areas, •Major developments & achievements * In alignment with RP’s Strategies / Thrusts

AQR – Section 1: Where We AreReview of •School’s focus areas, •Major developments & achievements * In alignment with RP’s Strategies / Thrusts

Annex A (by OPN)1.1 School Info1.2 Major Performance Indicator

Endorsed by PAC a.APM Report to integrate with AQR Report, as proposed

b.No change to APM report format

c.As a guide, APM main report to be kept within 5 pages per diploma.

Page 4: Updates: Annual Programme Monitoring (APM) 4 Feb 2013

Annual Programme Monitoring Report

Good Practices

Page 5: Updates: Annual Programme Monitoring (APM) 4 Feb 2013

Major Developments and Achievements

Significant Developments Changes and/or actions implemented by the

programme over the period of review. i.e. change of curriculum (new track, new modules,

new T&L and assessment methods), new facilities for student learning, research activities, industry projects and collaboration, etc.

Major Achievements Achievement relating to programme, staff and/or

students. i.e. competition, research and development projects,

patents, articulation, accreditation, etc.

Page 6: Updates: Annual Programme Monitoring (APM) 4 Feb 2013

EXAMPLES:

Major Developments and Achievements

Significant Developments

Major Achievements

Revision of Curriculum

Advancement Pathway

Page 7: Updates: Annual Programme Monitoring (APM) 4 Feb 2013

Internal Assessment

Identify strengths and weaknesses that are significant for the success and/or survival of the programme. Prioritise and focus on the significant areas.

Page 8: Updates: Annual Programme Monitoring (APM) 4 Feb 2013

EXTERNALEVIDENCE-BASED

Internal Assessment

EXAMPLE:

Page 9: Updates: Annual Programme Monitoring (APM) 4 Feb 2013

External Assessment

Identify the opportunities that your programme could seize and the threats to its competitiveness, arising from developments in the environment and anticipated changes in the future.

Page 10: Updates: Annual Programme Monitoring (APM) 4 Feb 2013

EVIDENCE-BASED SPECIFIC

External Assessment

EXAMPLE:

Page 11: Updates: Annual Programme Monitoring (APM) 4 Feb 2013

Improvement/Action Plan• Short term (within a year)• Actionable • Aligned with programme priorities/objectives

Refer to Section 1 – Programme Priorities

Actionable items against relevant programme priorities

Within 1 AY (e.g. 6 months)

Specific team member(s) in-charge

Complete/Review status of the strategies/actions at the end of the AY

Page 12: Updates: Annual Programme Monitoring (APM) 4 Feb 2013

Report status of the strategies/actions at the end of the AY

Programme Priorities established in section

1.2

Strategy/Action plans for the established priorities

Improvement/Action PlanEXAMPLE:

Page 13: Updates: Annual Programme Monitoring (APM) 4 Feb 2013

Use of Baseline EvidencesAnalyse & Interpret Programme Indicators

FCA

COP

EXAMPLE 1:

Page 14: Updates: Annual Programme Monitoring (APM) 4 Feb 2013

Use of Baseline Evidences

Make reference to evidences in EMR document

EXAMPLE 2:

Page 15: Updates: Annual Programme Monitoring (APM) 4 Feb 2013

Use of Baseline Evidences

Analyse & Interpret Student Survey & Fedback

EXAMPLE 3:

Page 16: Updates: Annual Programme Monitoring (APM) 4 Feb 2013

Reporting and presentation

• Evidence-based

• Use sub-headers & bullets

Page 17: Updates: Annual Programme Monitoring (APM) 4 Feb 2013

Reporting and presentation• Use a variety of evidences (1/2)

Page 18: Updates: Annual Programme Monitoring (APM) 4 Feb 2013

Reporting and presentation• Use a variety of evidences (2/2)

Page 19: Updates: Annual Programme Monitoring (APM) 4 Feb 2013

Reporting and presentation• Use illustration (e.g. graphical and table format)

Page 20: Updates: Annual Programme Monitoring (APM) 4 Feb 2013

Points to note

APM is an annual review exercise Plans should be short-term Plans should be specific and actionable Review and report status of action plans at the

end of the academic year Must be evidence-based Report should be concise