Page 1: Update results after the interventions performed on ... · Interventions on EE01 corner chimney 4 Slide# : 3 l On September 23rd – 24th the following interventions have been performed

Update results after the interventions performed on

September 23rd -26th on the EE01 and EW01 corner chimneys

C. Farnese for the ICARUS TPC WG

WA104/ICARUS Technical Working Group Meeting

October 2nd 2019

Page 2: Update results after the interventions performed on ... · Interventions on EE01 corner chimney 4 Slide# : 3 l On September 23rd – 24th the following interventions have been performed

EE01M EE01T

RMS

(#A

DC)

channel

RMS

(#A

DC)

channel

Reference measurements

RMS

(#A

DC)

channel

RMS

(#A

DC)

channel

EW01M EW01T

Page 3: Update results after the interventions performed on ... · Interventions on EE01 corner chimney 4 Slide# : 3 l On September 23rd – 24th the following interventions have been performed

4Interventions on EE01 corner chimney

Slide# : 3

l On September 23rd – 24th the following interventions have been performed on the EE01 corner chimneys: ü  The mini-crates on EE01T and EE01M have been removed ü  The flanges on EE01M and EE01T have been opened, together with the

flange on the top of the tower chimney to allow the movement/positioning of the internal cables

ü  The cables on EE01M have been shortened while in EE01T the cables have not been disconnected from the DBB

ü  Connectivity and vertical slice tests (including TP measurements) have been performed before the final closure of the flanges

ü  The screw holes on the supports of the mini-crates have been also enlarged in order to allow a better mechanical installation of the mini-crate and a better insertion of the boards

Page 4: Update results after the interventions performed on ... · Interventions on EE01 corner chimney 4 Slide# : 3 l On September 23rd – 24th the following interventions have been performed

EE01M: starting situation

RMS (#ADC)

RMS

(#A

DC)

channel

Comparison of the results after the intervention EE01M

RMS

(#A

DC)

channel

RMS (#ADC)

EE01M: final situation

EE01M: starting situation

EE01M: final situation

Slightly RMS variation 5.8 -> 5.45 despite the better cabling inside

Page 5: Update results after the interventions performed on ... · Interventions on EE01 corner chimney 4 Slide# : 3 l On September 23rd – 24th the following interventions have been performed

EE01T: starting situation

RMS (#ADC)

RMS

(#A

DC)

channel

No variation after the intervention on EE01T

RMS

(#A

DC)

channel

RMS (#ADC)

EE01T: final situation

EE01T: starting situation

EE01T: final situation

Board to be checked

Page 6: Update results after the interventions performed on ... · Interventions on EE01 corner chimney 4 Slide# : 3 l On September 23rd – 24th the following interventions have been performed

4Interventions on EW01 corner chimney - 1

Slide# : 6

l On September 24th – 25th the following interventions have been performed on the EW01 corner chimneys: ü  The mini-crates on EW01T and EW01M have been removed to enlarge the

screw holes on the supports and then reinstalled ü  The flanges have not been opened, so at the end of the intervention only

the vertical slice tests have been performed to evaluate the noise conditions

l At the end of the intervention we notice a big increase of the noise on the EW01T, originated by the cryo box installed on the rack nearest to the EW01 chimney

Raw data Fit shape Fit hit

Raw

data [

AD

C c

]

-10

0

10

20

30

40

50

Time Samples [x 400 ns]0 1,000 2,000 3,000 4,000

FFT

FFT [

AD

C c

]

0

1,000

2,000

3,000

4,000

5,000

6,000

7,000

Frequency [KHz]0 200 400 600 800 1,000 1,200

Page 7: Update results after the interventions performed on ... · Interventions on EE01 corner chimney 4 Slide# : 3 l On September 23rd – 24th the following interventions have been performed

RMS

(#A

DC)

channel RM

S (#

AD

C)

channel

4

RMS

(#A

DC)

channel

Results on EW01T

RMS (#ADC) RMS (#ADC) RMS (#ADC)

starting situation

starting situation

final situation

final situation

with the cryo box on

with the cryo box on

Page 8: Update results after the interventions performed on ... · Interventions on EE01 corner chimney 4 Slide# : 3 l On September 23rd – 24th the following interventions have been performed

Intervention on EW01M

RMS

(#A

DC)

channel

EW01M: after the intervention on the mini-crate

l At the end of the intervention on the EW01M mini-crate we also notice an increase of the noise level on the channels corresponding to the boards on the slot 0 and 3: even restoring the starting situation in the mini-crate the level of the noise did not change ü  The slot 3 has been fixed replacing the board ü  The noise in slot 0 (master board) has been improved connecting the

additional ground from the power supply to the mini-crate

Page 9: Update results after the interventions performed on ... · Interventions on EE01 corner chimney 4 Slide# : 3 l On September 23rd – 24th the following interventions have been performed

RMS

(#A

DC)

channel

4

RMS

(#A

DC)

channel

Results on EW01M

RMS (#ADC) RMS (#ADC)

starting situation

starting situation

final situation

final situation

Slightly RMS variation 5.4 -> 5.3 on average but the high noise tail has been fixed

Page 10: Update results after the interventions performed on ... · Interventions on EE01 corner chimney 4 Slide# : 3 l On September 23rd – 24th the following interventions have been performed

TTLink Signal

Ø  The TTLink (Timing and Trigger Link) is used to distribute the sampling clock and a set of real time commands to all the TPC readout electronics boards (A2795).

Ø  The TTLink is a 1 wire serial bus which sends a 10 MHz clock with a modulated duty cycle

Ø  TT-Link input on the board (A2795) : LEMO connector, TTL standard, Zin=50Ω.

Page 11: Update results after the interventions performed on ... · Interventions on EE01 corner chimney 4 Slide# : 3 l On September 23rd – 24th the following interventions have been performed

TTLink Fan out Board Schematic

Ø  24 outputs, plus some spares. LEMO connectors PCB style. Ø  Power supply requirement: 3V, >3A Ø  Recommend using: RSP-150-3.3 or equivalent

Page 12: Update results after the interventions performed on ... · Interventions on EE01 corner chimney 4 Slide# : 3 l On September 23rd – 24th the following interventions have been performed

TTLink Connections

Page 13: Update results after the interventions performed on ... · Interventions on EE01 corner chimney 4 Slide# : 3 l On September 23rd – 24th the following interventions have been performed

4TTLink fan out array

Ø  Six units of 1 to 26 fan out has been built and delivered by Colorado group.

Ø  They passed tests on bench and approved. Ø  They are deployed on top of the two T300 according to the previous

scheme. Ø  Two inputs to the two groups, for each T300, will be provided by two

SPEXI outputs.

Ø  During the next intervention on the DAQ electronics the fan out will be carefully tested in the final arrangement in order to provide correct distribution of the TTLink signals to each mini-crate avoiding any possible ground loop.

Ø  Even if SPEXI signals will not available yet, tests will be performed using TTLink generated by Master board in each mini-crate.