PERENCANAAN BANGUNAN HALL DENGAN KONSEP PRACETAK
Disusun Oleh:
Kelompok IV
Syamsul Bahri ( 10 0404 020 ) Yusriawan ( 10 0404 026 ) Ebeneser Simanjuntak ( 10 0404 028 ) Rizki Pratama (10 0404 038 ) Alfian Simbolon ( 10 0404 040 ) Andi Sitanggang ( 10 0404 043 ) Andri Syahputra M ( 10 0404 045 ) Muhammad Jefrizal ( 10 0404 047 ) Fander W Simanjuntak ( 10 0404 053 ) Rid Grandson Tumorang ( 10 0404 058 )
![Page 2: TUGAS BETON PRECAST(KEL.4).docx](https://reader030.vdocuments.mx/reader030/viewer/2022020714/54860a1ab4795984178b4bc3/html5/thumbnails/2.jpg)
1. PERENCANAAN DENAH PORTAL
![Page 3: TUGAS BETON PRECAST(KEL.4).docx](https://reader030.vdocuments.mx/reader030/viewer/2022020714/54860a1ab4795984178b4bc3/html5/thumbnails/3.jpg)
2. PERENCANAAN BALOK
A. BALOK BIASA
H1 = 112l =
112x1600 = 130 cm
B1 = 12h =
12x130 = 65 cm
H2 = 112l =
112x600 = 50 cm
B2 = 12h = 12x50 = 25 cm
B. PRACETAK
H1 = 130 X 0,75 = 100 cmB1 = 65 X 0,75 = 50 cm
H2 = 50 x 0,75 = 40 cmB2 = 25 x 0,75 = 20 cm
3. PERENCANAAN KOLOM
K balok = K kolom
1,2 I
L3 =
I
H 3
1,2112x 50 x1003
16003 = 112h4
7003
h = 50
maka; b = 50
sehingga digunakan kolom : K 50 x 50
![Page 4: TUGAS BETON PRECAST(KEL.4).docx](https://reader030.vdocuments.mx/reader030/viewer/2022020714/54860a1ab4795984178b4bc3/html5/thumbnails/4.jpg)
![Page 5: TUGAS BETON PRECAST(KEL.4).docx](https://reader030.vdocuments.mx/reader030/viewer/2022020714/54860a1ab4795984178b4bc3/html5/thumbnails/5.jpg)
4. DINDING
Pada perencanaan ini digunakan panel type Non Load Bearing Panels (Slading), dan 1 jarak portal digunakan 2 dinding, seperti tergambar dibawah
![Page 6: TUGAS BETON PRECAST(KEL.4).docx](https://reader030.vdocuments.mx/reader030/viewer/2022020714/54860a1ab4795984178b4bc3/html5/thumbnails/6.jpg)
5. Perencanaan PondasiPondasi yang digunakan pada perencanaan ini ialah pondasi setapak dengan dimensi seperti gambar dibawah ini.
![Page 7: TUGAS BETON PRECAST(KEL.4).docx](https://reader030.vdocuments.mx/reader030/viewer/2022020714/54860a1ab4795984178b4bc3/html5/thumbnails/7.jpg)
1. KOLOM DAN BALOK
![Page 8: TUGAS BETON PRECAST(KEL.4).docx](https://reader030.vdocuments.mx/reader030/viewer/2022020714/54860a1ab4795984178b4bc3/html5/thumbnails/8.jpg)
Gambar Desain 3d sambungan kolom dan Balok memanjang (konsol)
![Page 9: TUGAS BETON PRECAST(KEL.4).docx](https://reader030.vdocuments.mx/reader030/viewer/2022020714/54860a1ab4795984178b4bc3/html5/thumbnails/9.jpg)
![Page 10: TUGAS BETON PRECAST(KEL.4).docx](https://reader030.vdocuments.mx/reader030/viewer/2022020714/54860a1ab4795984178b4bc3/html5/thumbnails/10.jpg)
PERTEMUAN BALOK MEMANJANG DAN MELINTANG PADA KOLOM
![Page 11: TUGAS BETON PRECAST(KEL.4).docx](https://reader030.vdocuments.mx/reader030/viewer/2022020714/54860a1ab4795984178b4bc3/html5/thumbnails/11.jpg)
![Page 12: TUGAS BETON PRECAST(KEL.4).docx](https://reader030.vdocuments.mx/reader030/viewer/2022020714/54860a1ab4795984178b4bc3/html5/thumbnails/12.jpg)
REKAITULASI TEIL PERENCANAAN HALL DENGAN
BETON PRACETAK