tugas akhir perencanaan penjadwalan waktu dengan …
TRANSCRIPT
TUGAS AKHIR
PERENCANAAN PENJADWALAN WAKTU DENGAN METODE PDM
(PRECEDENCE DIAGRAM METHOD)
STUDI KASUS : PEMBANGUNAN JEMBATAN DESA RANTAU LIMAU
MANIS, KECAMATAN TABIR ILIR, KABUPATEN MERANGIN,
PROVINSI JAMBI
Diajukan Sebagai Salah Satu Syarat Memperoleh Gelar Sarjana Teknik Pada
Program Studi Teknik Sipil Fakultas Tenkik Sipil Dan Perencanaan
Universitas Bung Hatta
Oleh :
NAMA : MOHD IRVAN
NPM : 1610015211071
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK SIPIL DAN PERENCANAAN
UNIVERSITAS BUNG HATTA
PADANG
2021
UNIVERSITAS BUNG HATTA
PERENCANAAN PENJADWALAN WAKTU DENGAN METODE PDM (PREDENCE
DIAGRAM METHOD) STUDI KASUS : PEMBANGUNAN JEMBATAN DESA
RANTAU LIMAU MANIS, KECAMATAN TABIR ILIR, KABUPATEN MERANGIN,
PROVINSI JAMBI
MohdIrvan1), IndraKhaidir2), RobbyPermata3)
Prodi Teknik Sipil, Fakultas Teknik Sipil dan Perencanaan, Universitas Bung Hatta, Padang Email : [email protected], [email protected], [email protected]
Abstrak
Untuk mendukung pertumbuhan ekonomi Pemerintah Kabupaten Merangin melakukan pembangunan
Jembatan Rantau Limau Manis Kabupaten Merangin yang bertujuan dapat menggantikan jembatan yang
sebelumnya sudah ada, karena jembatan sebelumnya sudah terlihat rusak. Pembangunan Jembatan Rantau
Limau Manis Kabupaten Merangin direalisasikan dengan biaya dari APBD (Anggaran Pendapatan Belanja
Daerah) Tahun 2019 dibawah pengawasan dari Dinas Pekerjaan Umum Propinsi Jambi. Yang mana untuk
Kontraktok yaitu PT. Wijaya Kesuma Mandiri dan untuk Konsultan yaitu PT. Wandra Cipta Engineering
Consultant. Pembangunan jembatan ini memiliki masa pelaksanaan dari tanggal 02 Juni 2020-22 Desember
2020. Proyek inilah yang akan dijadikan studi kasus pada penulisan tugas akhir, karena pada pelaksanaan
proyek tersebut terjadi keterlambatan dan banyak terjadi penjadwalan ulang pada berapa item pekerjaan.
.Penulis mencoba menerapkan metode ini pada pembangunan proyek tersebut agar durasi dan item
pekerjaan bisa dilaksanakan dengan waktu yang efektif. Oleh karena itu penulis melakukan perencanaan
penjadwalan waktu dengan menggunakan metode PDM. Metode PDM ini mendefenisikan proyek sebagai
suatu rangkaian kegiatan yang hanya terjadi sekali, dimana pelaksanaannya sejak awal sampai akhir
dibatasi oleh kurun waktu tertentu. Hasil penelitian diperoleh bahwa dengan metode PDM penyelesaian
proyek memiliki waktu penyelesaian proyek Pembangunan Jembatan Desa Rantau Limau Manis,
Kecamatan Tabir Ilir, Kabupaten Merangin, Provinsi Jambi diperoleh 168 hari. Perhitungan PT. Wijaya
Kesuma Mandiri menjadwalkan proyek Pembangunan Jembatan Desa Rantau Limau Manis, Kecamatan
Tabir Ilir, Kabupaten Merangin, Provinsi Jambi selesai dalam waktu 22 Desember 2020 , sedangkan
dengan perhitungan menggunakan metode PDM diperoleh waktu akhir penyelesaian proyek 07 Desember
2020.
Kata Kunci: Jembatan, perencanaan, penjadwalan waktu, metode PDM.
Pembimbing I
Indra Khaidir, ST, M.Sc
Pembimbing II
Robby Permata ST, MT, Ph.D
KATA PENGANTAR
Puji syukur atas khadirat Allah subhanahu wa ta‟ala penulis ucapkan, yang telah
memberikan rahmat dan hidayah-Nya. Seiring dengan itu, penulis juga tidak lupa
mengirimkan shalawat dan salam kepada junjungan alam, yakni Rasulullah
Shalallahu ‘alaihi wassalam melalui perantaranya kita dapat merasakan dan
menikmati kehidupan yang penuh dengan perkembangan ilmu pengetahuan seperti
yang kita rasakan saat ini, Sehingga penulis dapat menyelsaiakan Tugas Akhir ini
dengan Judul “PERENCANAAN PENJADWALAN WAKTU DENGAN
METODE PDM (PRECEDENCE DIAGRAM METHOD) STUDI KASUS :
PEMBANGUNAN JEMBATAN DESA RANTAU LIMAU MANIS,
KECAMATAN TABIR ILIR, KABUPATEN MERANGIN, PROVINSI
JAMBI’’
Setelah mengalami serangkaian perbaiakan, baik kekurangan, kelengkapan data
maupun kesalahan-kesalahan dalam penulisan. Tugas Akhir ini merupakan salah
satu syarat mendapatkan gelas strata 1 (S-1) pada program Studi Teknik Sipil dan
Perencanaan Fakultas Teknik Sipil dan Perencanaan di Universitas Bung Hatta.
Dalam penyelesaian tugas akhir ini penulis banyak mendapatkan bimbingan dan
bantuan serta dorongan dan motivasi dari berbagai pihak, sehingga penulis dapat
menyelesaikan tugas akhir ini. Untuk itu dalam kesempatan ini dengan kerendahan
hati penulis ingin mengucapkan terima kasih yang sebanyak-banyaknya kepada :
1. Bapak Prof. Dr. Ir. Nasfryzal Carlo, M.Sc. selaku Dekan Fakultas Teknik Sipil
dan Perencanaan Unversitas Bung Hatta.
2. Ibu Dr. Rini Mulyani, S.T., M.Sc (Eng) selaku Ketua Prodi Teknik Sipil,
Fakultas Teknik Sipil dan Perencanaan Unversitas Bung Hatta
Bapak Indra khaidir, ST, M.Sc selaku Pembimbing I dan Bapak Robby
Permata, ST,.MT,.Ph.D selaku pembimbing II yang telah memberikan
bimbingan, arahan, masukan dan pengalaman beliau dalam penulisan Laporan
Tugas Akhir ini kepada penulis
3. Kedua orang tua dan keluarga penulis yang terhebat, sumber semangat penulis,
Berkat doa, motivasi dan dukungan yang tak terkira telah menjadikan penulis
semangat sehingga dapat menyelesaikan Laporan Tugas Akhir ini.
4. Kekasih tercinta Feby Cinthya Cantika, S.ST yang telah banyak memberikan
semangat, motivasi, dan doanya bagi penulis untuk bisa menyelesaikan laporan
Tugas Akhir Ini.
5. Kawan-kawan Teknik Sipil Angkatan 2016 yang telah banyak memberikan
banyak memberikan semangat, motivasi, dan doanya bagi penulis untuk bisa
menyelesaikan laporan Tugas Akhir ini. Tetap semangat untuk 16.
Semoga bantuan yang telah diberikan menjadi amal ibadah dan diberikan balasan
setimpal dari Allah subhanahu wa ta‟ala. Aamiin. Penulis juga menyadari masih
banyak kelemahan baik dari segi isi maupun tata bahasa, untuk itu penulis berharap
kritik dan saran yang bersifat membangun dari pembaca demi kesempurnaan Tugas
Akhir ini. Akhir kata penulis mohon maaf bila ada kata-kata yang salah dalam
tulisan ini.
Wassalamu’alaikum Warrahmatullahi Wabarakatuh.
Padang, 24 Juni 2021
Mohd Irvan
ii
DAFTAR ISI
TUGAS AKHIR ....................................................................................................... i
DAFTAR ISI ........................................................................................................... ii
DAFTAR GAMBAR ............................................................................................. iv
DAFTAR TABEL ................................................................................................... v
LAMPIRAN ........................................................................................................... vi
BAB I ...................................................................................................................... 1
PENDAHULUAN ................................................................................................... 1
1.1 Latar Belakang Masalah ................................................................................ 1
1.2 Rumusan Masalah ......................................................................................... 4
1.3 Tujuan Penulisan .......................................................................................... 4
1.4 Batasan Masalah............................................................................................ 4
1.5 Manfaat Penulisan ......................................................................................... 5
1.6 Sistematika Penulisan ................................................................................... 5
BAB II ..................................................................................................................... 6
TINJUAUAN PUSTAKA ....................................................................................... 6
2.1 Proyek ........................................................................................................... 6
2.2 Jenis-jenis Proyek ......................................................................................... 7
2.3 Ciri-ciri Proyek.............................................................................................. 8
2.4 Tahapan Siklus Proyek .................................................................................. 9
2.5 Jembatan ....................................................................................................... 9
2.5.1 Metode Pelaksanaan Pekerjaan ............................................................ 10
LINGKUP PEKERJAAN ................................................................................. 10
Divisi 1. Umum ................................................................................................. 10
Divisi 2. Drainase .............................................................................................. 10
Divisi 3. Pekerjaan Tanah dan Geosintetik ....................................................... 10
Divisi 5. Perkerasan Berbutir ............................................................................ 10
Divisi 7. Struktur ............................................................................................... 11
- Divisi 9. Pekerjaan Harian & Pekerjaan Lain-lain ..................................... 11
2.6 Manajemen Proyek...................................................................................... 12
2.6.1 Tujuan Manajemen Proyek .................................................................. 13
2.6.2 Tahapan Manajemen Proyek ................................................................ 13
2.7 Pengendalian Proyek Konstruksi ................................................................ 17
2.8 Kurva S ....................................................................................................... 19
2.9 Microsoft Project ........................................................................................ 19
iii
2.10 Macam-macam metode analisis diagram jaringan kerja ........................... 19
2.11 Metode PDM (Precedence Diagram Method)........................................... 23
2.11.1Pengertian PDM .................................................................................. 23
2.11.2 Durasi Kegiatan .................................................................................. 27
2.11.3 Jalur Kritis .......................................................................................... 27
2.11.4 Jadwal Aktivitas ................................................................................. 28
2.12 Penelitian Terdahulu ................................................................................. 30
BAB III ................................................................................................................. 33
METODE PERENCANAAN ............................................................................... 33
3.1 ...................................................................................................................... 33
Metode Perencanaan ......................................................................................... 33
3.2 Sumber Data ................................................................................................ 33
3.3 Pengumpulan Data ................................................................................. 33
3.4 Analisa Pengolahan Data ............................................................................ 33
3.5 Perencanaan Metode PDM .......................................................................... 34
3.6 Langkah – langkah Penulisan Tugas Akhir ................................................ 35
BAB IV HASIL DAN PEMBAHASAN ............................................................. 36
4.1 Umum .......................................................................................................... 36
4.1.1 Analisis Data ........................................................................................ 36
4.1.2 Data Proyek .......................................................................................... 37
4.1.3 Jadwal Proyek ...................................................................................... 38
4.2 Pengolahan Data ..................................................................................... 39
4.2.1 Penyusunan Urutan Pekerjaan............................................................ 39
4.2.3 Menyusun Jaringan Kerja .................................................................... 41
4.3 Perhitungan ES, EF, LS dan LF .................................................................. 43
4.3.1 Perhitungan Earlies Start (ES) dan Earliest Finist (EF) ....................... 43
4.3.2 Perhitungan Latest Stars (LS) dan Latest Finist (LF) .......................... 48
4.4 Menghitung Float Time atau Slack ........................................................ 56
4.4.1 Perhitungan Total Float (TF)/ Slack .................................................... 56
4.4.2 Menentukan Lintasan Kritis ................................................................. 61
4.5 Hasil dan Pembahasan................................................................................. 62
BAB V ................................................................................................................... 67
PENUTUP ............................................................................................................. 67
5.1 Kesimpulan ................................................................................................. 67
5.2 Saran ............................................................................................................ 68
DAFTAR PUSTAKA ........................................................................................... 69
iv
DAFTAR GAMBAR
Gambar 2. 1 Jembatan Tampak Samping dan Jembatan Tampak Atas ................ 11
Gambar 2. 2 Alternatif 1, lambang kegiatan ......................................................... 24
Gambar 2. 3 Alternatif 2, lambang kegiatan ......................................................... 24
Gambar 2. 4 Hubungan Finish to Start(FS) .......................................................... 25
Gambar 2. 5 Hubungan Start to Start (SS) ........................................................... 26
Gambar 2. 6 Hubungan Finish to Finish (FF) ...................................................... 26
Gambar 2. 7 Hubungan Start to Finish (SF) ......................................................... 27
Gambar 2. 8 Jadwal Aktifitas ................................................................................ 28
Gambar 3. 1 Langkah – Langkah Penulisan Tugas Akhir .................................... 35
Gambar 4. 1 Jaringan Kerja .................................................................................. 42
Gambar 4. 2 Jaringan Kerja dengan metode PDM ............................................... 55
v
DAFTAR TABEL
Tabel 2. 1 Posisi Penelitian ................................................................................... 32
Tabel 4. 1 Data Teknis Proyek .............................................................................. 37
Tabel 4. 2 Durasi item perkejaan .......................................................................... 38
Tabel 4. 3 Urutan Aktivitas Pekerjaan .................................................................. 40
Tabel 4. 4 Perhitungan ES dan EF ........................................................................ 44
Tabel 4. 6 Perhitungan LS dan LF: ....................................................................... 49
Tabel 4. 7 Rekapitulasi Total Float....................................................................... 59
Tabel 4. 8 Pekerjaan yang bersifat kritis ............................................................... 61
vi
LAMPIRAN
Lampiran 1. 1Diagram Jaringan PDM .................................................................. 70
Lampiran 1. 2 Diagram Jaringan PDM ................................................................. 71
Lampiran 1. 3 Jadwal Rencana Pelaksanaan Pekerjaan ........................................ 72
Lampiran 1. 4 Metode Pelaksanaan Pekerjaan Jembatan Rantau Limau Manis... 73
Lampiran 1.5 Gambar Rencana…………………………………………………119