Raleigh Transit Authority
Monthly Meeting
May 14, 2020
3:30 PM
Transportation
Transit Division
-
I. Preliminary Matters
A. Call to Order
B. Introductions
C. Revisions or Additions to the Agenda
D. Public Comment (emailed comments will be acknowledged)
Staff Action Items
a. ADA Functional Testing – Recommended Award of Contract
Staff Resource: David Walker
Attachment A (p.10)
b. Request Public Hearing at June 11th RTA meeting for Service
Improvements - Route 20 Garner and Route 21 Caraleigh scheduled to
begin September 2020
Staff Resource: David Walker
Attachment B (p.12)
c. HNTB – System Standards and New Bern Avenue BRT Final Design
Staff Resource: Mila Vega
d. Annual GoRaleigh and GoRaleigh Access Budget
Staff Resource: Shavon Tucker
Attachment C (p.14)
III. Staff Information Items
a. Wake Transit Plan FY21 Update
Staff Resource: David Walker
Attachment D (p.16)
b. Covid-19 Update
Staff Resource: David Eatman
Performance Reports
Income Statement (March 2020)
Operating Statistics (March 2020)
Evaluation by Route (March 2020)
Ridership by Time of Day (March 2020)
On-Time Performance Report (March 2020)
Variance Analysis (January 2020)
Variance Analysis Fiscal Year Breakdown (January 2020)
Concluding Remarks
Authority Members
Staff
Chairperson
Adjournment
-
• An RFP was posted for ADA Functional Testing (March)
• 2 Proposals Received/Reviewed/Scored April
• City staff and Town of Cary staff on selection committee
• Unanimous decision on award based on evaluation criteria
provided in RFP
• 5 year contract, total anticipated cost $1.2 Million
Recommended Action: Approve contract Award to MTM, Inc.
Current contract ends August 2020
ADA Functional Assessments
-
I. Preliminary Matters
A. Call to Order
B. Introductions
C. Revisions or Additions to the Agenda
D. Public Comment (emailed comments will be acknowledged)
Staff Action Items
a. ADA Functional Testing – Recommended Award of Contract
Staff Resource: David Walker
Attachment A (p.10)
b. Request Public Hearing at June 11th RTA meeting for Service
Improvements - Route 20 Garner and Route 21 Caraleigh scheduled to
begin September 2020
Staff Resource: David Walker
Attachment B (p.12)
c. HNTB – System Standards and New Bern Avenue BRT Final Design
Staff Resource: Mila Vega
d. Annual GoRaleigh and GoRaleigh Access Budget
Staff Resource: Shavon Tucker
Attachment C (p.14)
III. Staff Information Items
a. Wake Transit Plan FY21 Update
Staff Resource: David Walker
Attachment D (p.16)
b. Covid-19 Update
Staff Resource: David Eatman
Performance Reports
Income Statement (March 2020)
Operating Statistics (March 2020)
Evaluation by Route (March 2020)
Ridership by Time of Day (March 2020)
On-Time Performance Report (March 2020)
Variance Analysis (January 2020)
Variance Analysis Fiscal Year Breakdown (January 2020)
Concluding Remarks
Authority Members
Staff
Chairperson
Adjournment
-
Route 20 Garner
• Current service operates hourly
• Proposed service to operate every 30 minutes
• Funding provided in FY20 Work Plan
• Public hearing previously scheduled for April meeting, postponed
Route 21 Caraleigh
• Improving service frequencies to every 30 minutes 6 AM – 7 PM (7 days)
• Funding provided via the FY21 Recommended Work Plan
Service Improvements to Garner and Caraleigh
Set Public Hearing for June 11, 2020
-
• WTP Public Engagement held early in 2020
• Additional Public Meeting/Comment opportunities to be provided
in May 2020
• New legislation: Public Hearing comments to be received a
minimum of 24 hours after the Public Hearing date
• Vote will be held at the next scheduled RTA Meeting (July/August)
Recommend Action: Setting Public Hearing for June 11, 2020 and
receive comments from May 20 through June 17
Service Improvements to Garner and Caraleigh
Set Public Hearing for June 11, 2020
-
I. Preliminary Matters
A. Call to Order
B. Introductions
C. Revisions or Additions to the Agenda
D. Public Comment (emailed comments will be acknowledged)
Staff Action Items
a. ADA Functional Testing – Recommended Award of Contract
Staff Resource: David Walker
Attachment A (p.10)
b. Request Public Hearing at June 11th RTA meeting for Service
Improvements - Route 20 Garner and Route 21 Caraleigh scheduled to
begin September 2020
Staff Resource: David Walker
Attachment B (p.12)
c. HNTB – System Standards and New Bern Avenue BRT Final Design
Staff Resource: Mila Vega
d. Annual GoRaleigh and GoRaleigh Access Budget
Staff Resource: Shavon Tucker
Attachment C (p.14)
III. Staff Information Items
a. Wake Transit Plan FY21 Update
Staff Resource: David Walker
Attachment D (p.16)
b. Covid-19 Update
Staff Resource: David Eatman
Performance Reports
Income Statement (March 2020)
Operating Statistics (March 2020)
Evaluation by Route (March 2020)
Ridership by Time of Day (March 2020)
On-Time Performance Report (March 2020)
Variance Analysis (January 2020)
Variance Analysis Fiscal Year Breakdown (January 2020)
Concluding Remarks
Authority Members
Staff
Chairperson
Adjournment
-
Wake BRT Program
Wake BRT: New Bern Avenue
STATUS: 30% Design Complete (WSP) NEXT STEP: 30-100% Design and System Standards (HNTB)
Wake BRT: Southern CorridorWake BRT: Western Corridor
Wake BRT: Northern Corridor
STATUS: Route Selection kicked off in February 2020 (WSP)
STATUS: Route Selection Kicked off in November 2019 (WSP/Western Corridor Blvd Study)
STATUS: Pre-Planning Complete
Project Status
-
Wake BRT: New Bern Avenue
SUMMERSPRING FALL WINTER SUMMERSPRING FALL WINTER SUMMERSPRING FALL WINTER
2019 2020 2021 2023 2024
Project Development
30% Design Complete(WSP)
Final Design Complete
ConstructionBRT Service late 2023Small Starts
Ratings Application
Final Design Team Selected/HNTB
WE ARE HERE
HNTB Contract Recommendation
30% -100% Design and System Standards Begins/HNTB
WSP team HNTB team
Project Status
-
This recommendation was developed by multi-departmental and multi-organizational Selection
Committee representing various stakeholders of the Wake Transit Plan: CAMPO, GoTriangle,
NCDOT, Town of Cary, Town of Garner, Wake County and various City of Raleigh departments.
Procurement steps:
1. Independent review and scoring of submittals by each member of Selection Committee:
• Submittals received: AECOM, HNTB, HDR, Kimley-Horn and STV
2. Selection Committee meeting to discuss scores and shortlist for interviews
3. Interviews for the shortlisted top 3 consultant teams: HDR, HNTB and Kimley-Horn
• Post interview debrief and recommendation for the top 2 teams (HNTB and Kimley-Horn)
4. Additional analysis of key team members expertise, background, availability, references.
Wake BRT: New Bern Avenue
Final Design Team Selection Process
-
1. Wake BRT: New Bern Avenue Final Design – Focus Areas:• Survey
• Final Design
• Public Engagement
• Utility Coordination
• Right-of-way (ROW) and Construction Easements
2. Wake BRT System Standards & User Experience – Focus Areas:
• FTA Coordination
• System Standards and User Experience
• Branding
• Public Engagement
HNTB Scope Highlights
Final Design and System Standards
-
Total Fee: Approximately $2 million
• FTA Coordination
• System Standards and User Experience
• Branding
• Public Engagement
• System-Wide Policies
Wake BRT: New Bern Avenue
System Standards Focus Area –
HNTB & Subconsultants
-
Total Fee: Approximately $3 million
• FTA Coordination
• Planning
• Signals
• Roadway Design
• ITS
• Post Design
Wake BRT: New Bern Avenue
Final Design Focus Areas - HNTB
-
Total Fee: Approximately $2.5 million
• FTA Coordination
• Survey, Right-of-Way and Utility
• Geotech
• Landscape Architecture & Architecture
• Environmental Documentation
• Post Design
Wake BRT: New Bern Avenue
Final Design Focus Areas - Subconsultants
-
HNTB – Subconsultants
FTA DBE Goal: 13% | HNTB Team DBE Participation: Approx. 30%
Name Focus DBE Designation Location
SRF Consulting Group System Design/FTA None Minneapolis, MN
Neighboring Concepts Architecture DBE, MBE, HUB, SPSF Charlotte, NC
PR Pros Branding DBE, MBE, HUB, SPSF Raleigh, NC
Public Participation Partners Public Engagement DBE, MBE, SBE, HUB, SPSF Raleigh, NC
CH Engineering Survey, ROW, Utility DBE, WBE, HUB, SPSF Raleigh, NC
Susan Hatchell Landscape Architecture DBE, WBE, SBE, HUB, SPSF Raleigh, NC
Falcon Engineering Geotech DBE, WBE, SBE, HUB, ACDBE, SPSF Cary, NC
-
HNTB Project Manager
HNTB
Mark will lead the project team including leading the System Standards work effort• National leader in the BRT industry.
• He has developed multiple BRT projects and has worked as both an owner/operator and consultant
for BRT design.
• Current chair of the American Public Transportation Association (APTA) BRT Standards Committee,
he brings best practices and emerging trends from around the country.
-
New Bern Avenue BRT Final Design
HNTB
John will lead the
New Bern Avenue
Final Design including
roadway design work
effort
HNTB
Brian will lead the
Roadway Project
Engineering/
Design Review
-
HNTB – System Standards Team
SRF
Mona will lead the
Transit Design task
including FTA
Coordination and user
experience work effort
HNTB
Cherie will lead the
Public Engagement
task including the
branding work effort
-
HNTB – Public Engagement Team
HNTB
Cherie will lead the
Public Engagement
task including the
branding work effort
Public Participation
Partners (P3)
Simone will support the
Community Engagement
task within Public
Engagement work efforts
PR Pros
Valerie will support
the Branding task
within Public
Engagement work
efforts
-
• Recommend approval of HNTB contract
Wake BRT: New Bern Avenue
Recommended Action
-
I. Preliminary Matters
A. Call to Order
B. Introductions
C. Revisions or Additions to the Agenda
D. Public Comment (emailed comments will be acknowledged)
Staff Action Items
a. ADA Functional Testing – Recommended Award of Contract
Staff Resource: David Walker
Attachment A (p.10)
b. Request Public Hearing at June 11th RTA meeting for Service
Improvements - Route 20 Garner and Route 21 Caraleigh scheduled to
begin September 2020
Staff Resource: David Walker
Attachment B (p.12)
c. HNTB – System Standards and New Bern Avenue BRT Final Design
Staff Resource: Mila Vega
d. Annual GoRaleigh and GoRaleigh Access Budget
Staff Resource: Shavon Tucker
Attachment C (p.14)
III. Staff Information Items
a. Wake Transit Plan FY21 Update
Staff Resource: David Walker
Attachment D (p.16)
b. Covid-19 Update
Staff Resource: David Eatman
Performance Reports
Income Statement (March 2020)
Operating Statistics (March 2020)
Evaluation by Route (March 2020)
Ridership by Time of Day (March 2020)
On-Time Performance Report (March 2020)
Variance Analysis (January 2020)
Variance Analysis Fiscal Year Breakdown (January 2020)
Concluding Remarks
Authority Members
Staff
Chairperson
Adjournment
-
• May 19: City Manager’s Proposed FY21 Operating and CIP budget
presentation to City Council
• June 2: Budget Public Hearing
• June: Series of City Council Budget Work Sessions
• June 30: FY21 Operating and CIP budget adoption before Fiscal Year End
City of Raleigh FY21 Budget
Process / Timeline
-
Transit – COR FY21 Budget
• COVID-19 impacts introduce uncertainty
• Revisited revenue assumptions
• No significant change from prior year in annual federal grant
allocation or City contribution
• Closely monitoring expenditures and cash flow
-
• May 15: CAMPO release FY21 Work Plan for 30-Day Public
Comment Period
• June 17 / June 24: CAMPO and GoTriangle Hold Public Hearings
and Consider FY21 Budget Adoption
• June 30: FY21 Operating and CIP budget adoption before Fiscal
Year End
Wake Transit Plan FY21 Budget
Process / Timeline
-
Transit – WTP FY21 Budget
• COVID-19 impacts introduce uncertainty
• Revisited revenue assumptions
• Prioritization exercise for operating and capital requests
• Closely monitoring expenditures and cash flow
-
I. Preliminary Matters
A. Call to Order
B. Introductions
C. Revisions or Additions to the Agenda
D. Public Comment (emailed comments will be acknowledged)
Staff Action Items
a. ADA Functional Testing – Recommended Award of Contract
Staff Resource: David Walker
Attachment A (p.10)
b. Request Public Hearing at June 11th RTA meeting for Service
Improvements - Route 20 Garner and Route 21 Caraleigh scheduled to
begin September 2020
Staff Resource: David Walker
Attachment B (p.12)
c. HNTB – System Standards and New Bern Avenue BRT Final Design
Staff Resource: Mila Vega
d. Annual GoRaleigh and GoRaleigh Access Budget
Staff Resource: Shavon Tucker
Attachment C (p.14)
III. Staff Information Items
a. Wake Transit Plan FY21 Update
Staff Resource: David Walker
Attachment D (p.16)
b. Covid-19 Update
Staff Resource: David Eatman
Performance Reports
Income Statement (March 2020)
Operating Statistics (March 2020)
Evaluation by Route (March 2020)
Ridership by Time of Day (March 2020)
On-Time Performance Report (March 2020)
Variance Analysis (January 2020)
Variance Analysis Fiscal Year Breakdown (January 2020)
Concluding Remarks
Authority Members
Staff
Chairperson
Adjournment
-
TPAC Budget and Finance sub-committee recommended
a strict criteria on project eligibility to move forward
Considerations Included:
• A project’s time sensitivity to overall WTP implementation
• Transit riders’ most pressing needs
• Public comments received in January
Many changes from the DRAFT Work Plan and the
Recommended Work Plan due to COVID Conditions
WTP FY21 Recommended Work Plan
-
• 21 Caraleigh 30 minute Frequencies ($250k)
• BRT Matching funds for New Bern Ave project ($28 million) (This value reflects WTP match to anticipated FTA CIG Application)
• Transit Division office space funding ($157k)
• All other projects placed in unbudgeted reserve status (on
hold) pending sales tax receipts this fall for further review
Raleigh Funded projects
WTP FY21 Recommended Work Plan
-
FY 2021 Wake Transit Work Plan FY21 WTP Work Plan Requests FY21 Approved with Recommended Work Plan FY21 Reserve
Operating - New
T0005 – AL Improvements to Route 21 – Caraleigh $396,631
T0005 – AM Glenwood Route Package $471,164
T0002 – AS Transit Office Space Lease $156,550
$13,220,127 $471,164
Capital - Continuing
Bus Stop Improvements $1,131,200
East Raleigh Transit Center $3,157,530
Enhanced Transfer Points $1,441,263
Midtown Transit Center $2,486,000
ADA Facility – Operations $2,000,000
Replacement Vehicles (12 buses CNG) $5,083,413
Paratransit Replacement Vehicles $380,000
TC005 – A1 BRT $28,220,000
Capital - New
GoRaleigh Support Vehicles $156,000
Transit Origin – Destination Survey Capital Planning $75,000
$28,220,000 $15,835,406
-
I. Preliminary Matters
A. Call to Order
B. Introductions
C. Revisions or Additions to the Agenda
D. Public Comment (emailed comments will be acknowledged)
Staff Action Items
a. ADA Functional Testing – Recommended Award of Contract
Staff Resource: David Walker
Attachment A (p.10)
b. Request Public Hearing at June 11th RTA meeting for Service
Improvements - Route 20 Garner and Route 21 Caraleigh scheduled to
begin September 2020
Staff Resource: David Walker
Attachment B (p.12)
c. HNTB – System Standards and New Bern Avenue BRT Final Design
Staff Resource: Mila Vega
d. Annual GoRaleigh and GoRaleigh Access Budget
Staff Resource: Shavon Tucker
Attachment C (p.14)
III. Staff Information Items
a. Wake Transit Plan FY21 Update
Staff Resource: David Walker
Attachment D (p.16)
b. Covid-19 Update
Staff Resource: David Eatman
Performance Reports
Income Statement (March 2020)
Operating Statistics (March 2020)
Evaluation by Route (March 2020)
Ridership by Time of Day (March 2020)
On-Time Performance Report (March 2020)
Variance Analysis (January 2020)
Variance Analysis Fiscal Year Breakdown (January 2020)
Concluding Remarks
Authority Members
Staff
Chairperson
Adjournment
-
COVID-19 Update
GoRaleigh Staff
All GoRaleigh staff members are receiving daily wellness checks at the beginning
of their shifts.
GoRaleigh Cleaning Procedures
•spraying and wiping all bus areas with Clorox commercial disinfecting spray;
•spraying and wiping door handles, common areas and surfaces throughout
GoRaleigh facilities multiple times a day with Clorox commercial disinfecting
spray;
•providing sanitizing wipes for all GoRaleigh staff including bus operators;
•installing sanitizing pumps throughout GoRaleigh facilities;
•providing sanitizing pumps for bus operators and public use on all buses;
•social distancing signage for seating;
•weekly fogging of buses with Zep Triton disinfectant;
•nightly fogging with Zep Triton disinfectant for GoRaleigh Station public
restrooms;
•rear door boarding (front door access will be available for persons with
disabilities);
•N95 mask distribution to all front-line employees;
•glove distribution to all operators;
•spot sanitizing on buses throughout the day;
•chain installed to promote additional social distancing behind bus operator at rear
of wheel well; and
•deep cleaning of entire fleet.
GoRaleigh Service Reductions
GoRaleigh routes are operating on a weekend schedule. Routes serving
hospitals and other essential facilities (2 Falls of Neuse, 4 Rex, 15
WakeMed, 19 Apollo Heights) are operating with the same frequencies.
•The 20 Garner route will provide peak period service only
•The 40X Wake Tech Express will remain on its Modified Service schedule
•The R-Line will operate between the hours of 1 p.m. – 6 p.m.
•The Wake Forest Loop will only operate the A route
GoRaleigh Begins Implementing Rear Door Boarding
Customers are boarding GoRaleigh buses using the rear doors in an effort
to promote greater social distancing. GoRaleigh cannot collect fares at the
rear doors, therefore we are also suspending fare collection during this
time. Front door access is available for persons with disabilities.
GoRaleigh Passengers
GoRaleigh standard sized buses allow up to 16 passengers to comply with
social distancing practices. If a bus reaches full capacity and resources
are available at the time, a tripper bus will be sent to pick up any remaining
passengers.
-
I. Preliminary Matters
A. Call to Order
B. Introductions
C. Revisions or Additions to the Agenda
D. Public Comment (emailed comments will be acknowledged)
Staff Action Items
a. ADA Functional Testing – Recommended Award of Contract
Staff Resource: David Walker
Attachment A (p.10)
b. Request Public Hearing at June 11th RTA meeting for Service
Improvements - Route 20 Garner and Route 21 Caraleigh scheduled to
begin September 2020
Staff Resource: David Walker
Attachment B (p.12)
c. HNTB – System Standards and New Bern Avenue BRT Final Design
Staff Resource: Mila Vega
d. Annual GoRaleigh and GoRaleigh Access Budget
Staff Resource: Shavon Tucker
Attachment C (p.14)
III. Staff Information Items
a. Wake Transit Plan FY21 Update
Staff Resource: David Walker
Attachment D (p.16)
b. Covid-19 Update
Staff Resource: David Eatman
Performance Reports
Income Statement (March 2020)
Operating Statistics (March 2020)
Evaluation by Route (March 2020)
Ridership by Time of Day (March 2020)
On-Time Performance Report (March 2020)
Variance Analysis (January 2020)
Variance Analysis Fiscal Year Breakdown (January 2020)
Concluding Remarks
Authority Members
Staff
Chairperson
Adjournment
-
Adjournment