Raleigh Transit Authority Monthly Meeting May 14, 2020 3:30 PM Transportation Transit Division

Upload: others

Post on 31-Jan-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

  • Raleigh Transit Authority

    Monthly Meeting

    May 14, 2020

    3:30 PM

    Transportation

    Transit Division

  • I. Preliminary Matters

    A. Call to Order

    B. Introductions

    C. Revisions or Additions to the Agenda

    D. Public Comment (emailed comments will be acknowledged)

    Staff Action Items

    a. ADA Functional Testing – Recommended Award of Contract

    Staff Resource: David Walker

    Attachment A (p.10)

    b. Request Public Hearing at June 11th RTA meeting for Service

    Improvements - Route 20 Garner and Route 21 Caraleigh scheduled to

    begin September 2020

    Staff Resource: David Walker

    Attachment B (p.12)

    c. HNTB – System Standards and New Bern Avenue BRT Final Design

    Staff Resource: Mila Vega

    d. Annual GoRaleigh and GoRaleigh Access Budget

    Staff Resource: Shavon Tucker

    Attachment C (p.14)

    III. Staff Information Items

    a. Wake Transit Plan FY21 Update

    Staff Resource: David Walker

    Attachment D (p.16)

    b. Covid-19 Update

    Staff Resource: David Eatman

    Performance Reports

    Income Statement (March 2020)

    Operating Statistics (March 2020)

    Evaluation by Route (March 2020)

    Ridership by Time of Day (March 2020)

    On-Time Performance Report (March 2020)

    Variance Analysis (January 2020)

    Variance Analysis Fiscal Year Breakdown (January 2020)

    Concluding Remarks

    Authority Members

    Staff

    Chairperson

    Adjournment

  • • An RFP was posted for ADA Functional Testing (March)

    • 2 Proposals Received/Reviewed/Scored April

    • City staff and Town of Cary staff on selection committee

    • Unanimous decision on award based on evaluation criteria

    provided in RFP

    • 5 year contract, total anticipated cost $1.2 Million

    Recommended Action: Approve contract Award to MTM, Inc.

    Current contract ends August 2020

    ADA Functional Assessments

  • I. Preliminary Matters

    A. Call to Order

    B. Introductions

    C. Revisions or Additions to the Agenda

    D. Public Comment (emailed comments will be acknowledged)

    Staff Action Items

    a. ADA Functional Testing – Recommended Award of Contract

    Staff Resource: David Walker

    Attachment A (p.10)

    b. Request Public Hearing at June 11th RTA meeting for Service

    Improvements - Route 20 Garner and Route 21 Caraleigh scheduled to

    begin September 2020

    Staff Resource: David Walker

    Attachment B (p.12)

    c. HNTB – System Standards and New Bern Avenue BRT Final Design

    Staff Resource: Mila Vega

    d. Annual GoRaleigh and GoRaleigh Access Budget

    Staff Resource: Shavon Tucker

    Attachment C (p.14)

    III. Staff Information Items

    a. Wake Transit Plan FY21 Update

    Staff Resource: David Walker

    Attachment D (p.16)

    b. Covid-19 Update

    Staff Resource: David Eatman

    Performance Reports

    Income Statement (March 2020)

    Operating Statistics (March 2020)

    Evaluation by Route (March 2020)

    Ridership by Time of Day (March 2020)

    On-Time Performance Report (March 2020)

    Variance Analysis (January 2020)

    Variance Analysis Fiscal Year Breakdown (January 2020)

    Concluding Remarks

    Authority Members

    Staff

    Chairperson

    Adjournment

  • Route 20 Garner

    • Current service operates hourly

    • Proposed service to operate every 30 minutes

    • Funding provided in FY20 Work Plan

    • Public hearing previously scheduled for April meeting, postponed

    Route 21 Caraleigh

    • Improving service frequencies to every 30 minutes 6 AM – 7 PM (7 days)

    • Funding provided via the FY21 Recommended Work Plan

    Service Improvements to Garner and Caraleigh

    Set Public Hearing for June 11, 2020

  • • WTP Public Engagement held early in 2020

    • Additional Public Meeting/Comment opportunities to be provided

    in May 2020

    • New legislation: Public Hearing comments to be received a

    minimum of 24 hours after the Public Hearing date

    • Vote will be held at the next scheduled RTA Meeting (July/August)

    Recommend Action: Setting Public Hearing for June 11, 2020 and

    receive comments from May 20 through June 17

    Service Improvements to Garner and Caraleigh

    Set Public Hearing for June 11, 2020

  • I. Preliminary Matters

    A. Call to Order

    B. Introductions

    C. Revisions or Additions to the Agenda

    D. Public Comment (emailed comments will be acknowledged)

    Staff Action Items

    a. ADA Functional Testing – Recommended Award of Contract

    Staff Resource: David Walker

    Attachment A (p.10)

    b. Request Public Hearing at June 11th RTA meeting for Service

    Improvements - Route 20 Garner and Route 21 Caraleigh scheduled to

    begin September 2020

    Staff Resource: David Walker

    Attachment B (p.12)

    c. HNTB – System Standards and New Bern Avenue BRT Final Design

    Staff Resource: Mila Vega

    d. Annual GoRaleigh and GoRaleigh Access Budget

    Staff Resource: Shavon Tucker

    Attachment C (p.14)

    III. Staff Information Items

    a. Wake Transit Plan FY21 Update

    Staff Resource: David Walker

    Attachment D (p.16)

    b. Covid-19 Update

    Staff Resource: David Eatman

    Performance Reports

    Income Statement (March 2020)

    Operating Statistics (March 2020)

    Evaluation by Route (March 2020)

    Ridership by Time of Day (March 2020)

    On-Time Performance Report (March 2020)

    Variance Analysis (January 2020)

    Variance Analysis Fiscal Year Breakdown (January 2020)

    Concluding Remarks

    Authority Members

    Staff

    Chairperson

    Adjournment

  • Wake BRT Program

    Wake BRT: New Bern Avenue

    STATUS: 30% Design Complete (WSP) NEXT STEP: 30-100% Design and System Standards (HNTB)

    Wake BRT: Southern CorridorWake BRT: Western Corridor

    Wake BRT: Northern Corridor

    STATUS: Route Selection kicked off in February 2020 (WSP)

    STATUS: Route Selection Kicked off in November 2019 (WSP/Western Corridor Blvd Study)

    STATUS: Pre-Planning Complete

    Project Status

  • Wake BRT: New Bern Avenue

    SUMMERSPRING FALL WINTER SUMMERSPRING FALL WINTER SUMMERSPRING FALL WINTER

    2019 2020 2021 2023 2024

    Project Development

    30% Design Complete(WSP)

    Final Design Complete

    ConstructionBRT Service late 2023Small Starts

    Ratings Application

    Final Design Team Selected/HNTB

    WE ARE HERE

    HNTB Contract Recommendation

    30% -100% Design and System Standards Begins/HNTB

    WSP team HNTB team

    Project Status

  • This recommendation was developed by multi-departmental and multi-organizational Selection

    Committee representing various stakeholders of the Wake Transit Plan: CAMPO, GoTriangle,

    NCDOT, Town of Cary, Town of Garner, Wake County and various City of Raleigh departments.

    Procurement steps:

    1. Independent review and scoring of submittals by each member of Selection Committee:

    • Submittals received: AECOM, HNTB, HDR, Kimley-Horn and STV

    2. Selection Committee meeting to discuss scores and shortlist for interviews

    3. Interviews for the shortlisted top 3 consultant teams: HDR, HNTB and Kimley-Horn

    • Post interview debrief and recommendation for the top 2 teams (HNTB and Kimley-Horn)

    4. Additional analysis of key team members expertise, background, availability, references.

    Wake BRT: New Bern Avenue

    Final Design Team Selection Process

  • 1. Wake BRT: New Bern Avenue Final Design – Focus Areas:• Survey

    • Final Design

    • Public Engagement

    • Utility Coordination

    • Right-of-way (ROW) and Construction Easements

    2. Wake BRT System Standards & User Experience – Focus Areas:

    • FTA Coordination

    • System Standards and User Experience

    • Branding

    • Public Engagement

    HNTB Scope Highlights

    Final Design and System Standards

  • Total Fee: Approximately $2 million

    • FTA Coordination

    • System Standards and User Experience

    • Branding

    • Public Engagement

    • System-Wide Policies

    Wake BRT: New Bern Avenue

    System Standards Focus Area –

    HNTB & Subconsultants

  • Total Fee: Approximately $3 million

    • FTA Coordination

    • Planning

    • Signals

    • Roadway Design

    • ITS

    • Post Design

    Wake BRT: New Bern Avenue

    Final Design Focus Areas - HNTB

  • Total Fee: Approximately $2.5 million

    • FTA Coordination

    • Survey, Right-of-Way and Utility

    • Geotech

    • Landscape Architecture & Architecture

    • Environmental Documentation

    • Post Design

    Wake BRT: New Bern Avenue

    Final Design Focus Areas - Subconsultants

  • HNTB – Subconsultants

    FTA DBE Goal: 13% | HNTB Team DBE Participation: Approx. 30%

    Name Focus DBE Designation Location

    SRF Consulting Group System Design/FTA None Minneapolis, MN

    Neighboring Concepts Architecture DBE, MBE, HUB, SPSF Charlotte, NC

    PR Pros Branding DBE, MBE, HUB, SPSF Raleigh, NC

    Public Participation Partners Public Engagement DBE, MBE, SBE, HUB, SPSF Raleigh, NC

    CH Engineering Survey, ROW, Utility DBE, WBE, HUB, SPSF Raleigh, NC

    Susan Hatchell Landscape Architecture DBE, WBE, SBE, HUB, SPSF Raleigh, NC

    Falcon Engineering Geotech DBE, WBE, SBE, HUB, ACDBE, SPSF Cary, NC

  • HNTB Project Manager

    HNTB

    Mark will lead the project team including leading the System Standards work effort• National leader in the BRT industry.

    • He has developed multiple BRT projects and has worked as both an owner/operator and consultant

    for BRT design.

    • Current chair of the American Public Transportation Association (APTA) BRT Standards Committee,

    he brings best practices and emerging trends from around the country.

  • New Bern Avenue BRT Final Design

    HNTB

    John will lead the

    New Bern Avenue

    Final Design including

    roadway design work

    effort

    HNTB

    Brian will lead the

    Roadway Project

    Engineering/

    Design Review

  • HNTB – System Standards Team

    SRF

    Mona will lead the

    Transit Design task

    including FTA

    Coordination and user

    experience work effort

    HNTB

    Cherie will lead the

    Public Engagement

    task including the

    branding work effort

  • HNTB – Public Engagement Team

    HNTB

    Cherie will lead the

    Public Engagement

    task including the

    branding work effort

    Public Participation

    Partners (P3)

    Simone will support the

    Community Engagement

    task within Public

    Engagement work efforts

    PR Pros

    Valerie will support

    the Branding task

    within Public

    Engagement work

    efforts

  • • Recommend approval of HNTB contract

    Wake BRT: New Bern Avenue

    Recommended Action

  • I. Preliminary Matters

    A. Call to Order

    B. Introductions

    C. Revisions or Additions to the Agenda

    D. Public Comment (emailed comments will be acknowledged)

    Staff Action Items

    a. ADA Functional Testing – Recommended Award of Contract

    Staff Resource: David Walker

    Attachment A (p.10)

    b. Request Public Hearing at June 11th RTA meeting for Service

    Improvements - Route 20 Garner and Route 21 Caraleigh scheduled to

    begin September 2020

    Staff Resource: David Walker

    Attachment B (p.12)

    c. HNTB – System Standards and New Bern Avenue BRT Final Design

    Staff Resource: Mila Vega

    d. Annual GoRaleigh and GoRaleigh Access Budget

    Staff Resource: Shavon Tucker

    Attachment C (p.14)

    III. Staff Information Items

    a. Wake Transit Plan FY21 Update

    Staff Resource: David Walker

    Attachment D (p.16)

    b. Covid-19 Update

    Staff Resource: David Eatman

    Performance Reports

    Income Statement (March 2020)

    Operating Statistics (March 2020)

    Evaluation by Route (March 2020)

    Ridership by Time of Day (March 2020)

    On-Time Performance Report (March 2020)

    Variance Analysis (January 2020)

    Variance Analysis Fiscal Year Breakdown (January 2020)

    Concluding Remarks

    Authority Members

    Staff

    Chairperson

    Adjournment

  • • May 19: City Manager’s Proposed FY21 Operating and CIP budget

    presentation to City Council

    • June 2: Budget Public Hearing

    • June: Series of City Council Budget Work Sessions

    • June 30: FY21 Operating and CIP budget adoption before Fiscal Year End

    City of Raleigh FY21 Budget

    Process / Timeline

  • Transit – COR FY21 Budget

    • COVID-19 impacts introduce uncertainty

    • Revisited revenue assumptions

    • No significant change from prior year in annual federal grant

    allocation or City contribution

    • Closely monitoring expenditures and cash flow

  • • May 15: CAMPO release FY21 Work Plan for 30-Day Public

    Comment Period

    • June 17 / June 24: CAMPO and GoTriangle Hold Public Hearings

    and Consider FY21 Budget Adoption

    • June 30: FY21 Operating and CIP budget adoption before Fiscal

    Year End

    Wake Transit Plan FY21 Budget

    Process / Timeline

  • Transit – WTP FY21 Budget

    • COVID-19 impacts introduce uncertainty

    • Revisited revenue assumptions

    • Prioritization exercise for operating and capital requests

    • Closely monitoring expenditures and cash flow

  • I. Preliminary Matters

    A. Call to Order

    B. Introductions

    C. Revisions or Additions to the Agenda

    D. Public Comment (emailed comments will be acknowledged)

    Staff Action Items

    a. ADA Functional Testing – Recommended Award of Contract

    Staff Resource: David Walker

    Attachment A (p.10)

    b. Request Public Hearing at June 11th RTA meeting for Service

    Improvements - Route 20 Garner and Route 21 Caraleigh scheduled to

    begin September 2020

    Staff Resource: David Walker

    Attachment B (p.12)

    c. HNTB – System Standards and New Bern Avenue BRT Final Design

    Staff Resource: Mila Vega

    d. Annual GoRaleigh and GoRaleigh Access Budget

    Staff Resource: Shavon Tucker

    Attachment C (p.14)

    III. Staff Information Items

    a. Wake Transit Plan FY21 Update

    Staff Resource: David Walker

    Attachment D (p.16)

    b. Covid-19 Update

    Staff Resource: David Eatman

    Performance Reports

    Income Statement (March 2020)

    Operating Statistics (March 2020)

    Evaluation by Route (March 2020)

    Ridership by Time of Day (March 2020)

    On-Time Performance Report (March 2020)

    Variance Analysis (January 2020)

    Variance Analysis Fiscal Year Breakdown (January 2020)

    Concluding Remarks

    Authority Members

    Staff

    Chairperson

    Adjournment

  • TPAC Budget and Finance sub-committee recommended

    a strict criteria on project eligibility to move forward

    Considerations Included:

    • A project’s time sensitivity to overall WTP implementation

    • Transit riders’ most pressing needs

    • Public comments received in January

    Many changes from the DRAFT Work Plan and the

    Recommended Work Plan due to COVID Conditions

    WTP FY21 Recommended Work Plan

  • • 21 Caraleigh 30 minute Frequencies ($250k)

    • BRT Matching funds for New Bern Ave project ($28 million) (This value reflects WTP match to anticipated FTA CIG Application)

    • Transit Division office space funding ($157k)

    • All other projects placed in unbudgeted reserve status (on

    hold) pending sales tax receipts this fall for further review

    Raleigh Funded projects

    WTP FY21 Recommended Work Plan

  • FY 2021 Wake Transit Work Plan FY21 WTP Work Plan Requests FY21 Approved with Recommended Work Plan FY21 Reserve

    Operating - New

    T0005 – AL Improvements to Route 21 – Caraleigh $396,631

    T0005 – AM Glenwood Route Package $471,164

    T0002 – AS Transit Office Space Lease $156,550

    $13,220,127 $471,164

    Capital - Continuing

    Bus Stop Improvements $1,131,200

    East Raleigh Transit Center $3,157,530

    Enhanced Transfer Points $1,441,263

    Midtown Transit Center $2,486,000

    ADA Facility – Operations $2,000,000

    Replacement Vehicles (12 buses CNG) $5,083,413

    Paratransit Replacement Vehicles $380,000

    TC005 – A1 BRT $28,220,000

    Capital - New

    GoRaleigh Support Vehicles $156,000

    Transit Origin – Destination Survey Capital Planning $75,000

    $28,220,000 $15,835,406

  • I. Preliminary Matters

    A. Call to Order

    B. Introductions

    C. Revisions or Additions to the Agenda

    D. Public Comment (emailed comments will be acknowledged)

    Staff Action Items

    a. ADA Functional Testing – Recommended Award of Contract

    Staff Resource: David Walker

    Attachment A (p.10)

    b. Request Public Hearing at June 11th RTA meeting for Service

    Improvements - Route 20 Garner and Route 21 Caraleigh scheduled to

    begin September 2020

    Staff Resource: David Walker

    Attachment B (p.12)

    c. HNTB – System Standards and New Bern Avenue BRT Final Design

    Staff Resource: Mila Vega

    d. Annual GoRaleigh and GoRaleigh Access Budget

    Staff Resource: Shavon Tucker

    Attachment C (p.14)

    III. Staff Information Items

    a. Wake Transit Plan FY21 Update

    Staff Resource: David Walker

    Attachment D (p.16)

    b. Covid-19 Update

    Staff Resource: David Eatman

    Performance Reports

    Income Statement (March 2020)

    Operating Statistics (March 2020)

    Evaluation by Route (March 2020)

    Ridership by Time of Day (March 2020)

    On-Time Performance Report (March 2020)

    Variance Analysis (January 2020)

    Variance Analysis Fiscal Year Breakdown (January 2020)

    Concluding Remarks

    Authority Members

    Staff

    Chairperson

    Adjournment

  • COVID-19 Update

    GoRaleigh Staff

    All GoRaleigh staff members are receiving daily wellness checks at the beginning

    of their shifts.

    GoRaleigh Cleaning Procedures

    •spraying and wiping all bus areas with Clorox commercial disinfecting spray;

    •spraying and wiping door handles, common areas and surfaces throughout

    GoRaleigh facilities multiple times a day with Clorox commercial disinfecting

    spray;

    •providing sanitizing wipes for all GoRaleigh staff including bus operators;

    •installing sanitizing pumps throughout GoRaleigh facilities;

    •providing sanitizing pumps for bus operators and public use on all buses;

    •social distancing signage for seating;

    •weekly fogging of buses with Zep Triton disinfectant;

    •nightly fogging with Zep Triton disinfectant for GoRaleigh Station public

    restrooms;

    •rear door boarding (front door access will be available for persons with

    disabilities);

    •N95 mask distribution to all front-line employees;

    •glove distribution to all operators;

    •spot sanitizing on buses throughout the day;

    •chain installed to promote additional social distancing behind bus operator at rear

    of wheel well; and

    •deep cleaning of entire fleet.

    GoRaleigh Service Reductions

    GoRaleigh routes are operating on a weekend schedule. Routes serving

    hospitals and other essential facilities (2 Falls of Neuse, 4 Rex, 15

    WakeMed, 19 Apollo Heights) are operating with the same frequencies.

    •The 20 Garner route will provide peak period service only

    •The 40X Wake Tech Express will remain on its Modified Service schedule

    •The R-Line will operate between the hours of 1 p.m. – 6 p.m.

    •The Wake Forest Loop will only operate the A route

    GoRaleigh Begins Implementing Rear Door Boarding

    Customers are boarding GoRaleigh buses using the rear doors in an effort

    to promote greater social distancing. GoRaleigh cannot collect fares at the

    rear doors, therefore we are also suspending fare collection during this

    time. Front door access is available for persons with disabilities.

    GoRaleigh Passengers

    GoRaleigh standard sized buses allow up to 16 passengers to comply with

    social distancing practices. If a bus reaches full capacity and resources

    are available at the time, a tripper bus will be sent to pick up any remaining

    passengers.

  • I. Preliminary Matters

    A. Call to Order

    B. Introductions

    C. Revisions or Additions to the Agenda

    D. Public Comment (emailed comments will be acknowledged)

    Staff Action Items

    a. ADA Functional Testing – Recommended Award of Contract

    Staff Resource: David Walker

    Attachment A (p.10)

    b. Request Public Hearing at June 11th RTA meeting for Service

    Improvements - Route 20 Garner and Route 21 Caraleigh scheduled to

    begin September 2020

    Staff Resource: David Walker

    Attachment B (p.12)

    c. HNTB – System Standards and New Bern Avenue BRT Final Design

    Staff Resource: Mila Vega

    d. Annual GoRaleigh and GoRaleigh Access Budget

    Staff Resource: Shavon Tucker

    Attachment C (p.14)

    III. Staff Information Items

    a. Wake Transit Plan FY21 Update

    Staff Resource: David Walker

    Attachment D (p.16)

    b. Covid-19 Update

    Staff Resource: David Eatman

    Performance Reports

    Income Statement (March 2020)

    Operating Statistics (March 2020)

    Evaluation by Route (March 2020)

    Ridership by Time of Day (March 2020)

    On-Time Performance Report (March 2020)

    Variance Analysis (January 2020)

    Variance Analysis Fiscal Year Breakdown (January 2020)

    Concluding Remarks

    Authority Members

    Staff

    Chairperson

    Adjournment

  • Adjournment