transporation improvement program for the fond du lac urbanized area 2013

86
TRANSPORTATION IMPROVEMENT PROGRAM FOR THE FOND DU LAC URBANIZED AREA 2013 FOND DU LAC METROPOLITAN PLANNING ORGANIZATION Fond du Lac MPO OCTOBER 2012 FINAL

Upload: eric-fowle

Post on 26-Mar-2016

220 views

Category:

Documents


2 download

DESCRIPTION

The Transportation Improvement Program (TIP) is an annually prepared program of transportation projects that will be utilizing federal funding assistance in their implementation.

TRANSCRIPT

Page 1: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013

TRANSPORTATION IMPROVEMENT PROGRAMFOR THE

FOND DU LAC URBANIZED AREA

2013

FOND DU LAC METROPOLITAN PLANNING ORGANIZATION

Fond du Lac MPO

OCTOBER 2012

FINAL

Dave
Typewritten text
AMENDED 5/8/13
Page 2: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013

TRANSPORTATION IMPROVEMENT PROGRAM

FOR THE FOND DU LAC URBANIZED AREA

- 2013 -

Prepared by the

EAST CENTRAL WISCONSIN REGIONAL PLANNING COMMISSION

Adopted October 10, 2012

The East Central Wisconsin Regional Planning Commission’s CY 2012 planning program is supported by federal assistance. Specific funding for this report was provided by the Federal Highway Administration, Federal Transit Administration, the Wisconsin Department of Transportation, the Economic

Development Administration, the Wisconsin Department of Administration and the Wisconsin Department of Natural Resources. The contents of this document do not necessarily reflect the official views and policies of the U.S. Department of Transportation, Federal Highway Administration.

Page 3: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013

FOND DU LAC AREA METROPOLITAN PLANNING ORGANIZATION (MPO) POLICY BOARD

VOTING MEMBERS:

Allen Buechel, Chair – Fond du Lac County Wayne Rollin, Vice Chair – City of Fond du Lac

Joe Moore, – City of Fond du Lac Rick Gudex – City of Fond du Lac Jordan Skiff – City of Fond du Lac

Rob Vande Zande – City of Fond du Lac Tom Janke –Fond du Lac County

Chuck Hornung – Village of North Fond du Lac James Pierquet – Town of Empire (representing all towns)

Matt Halada – WisDOT, Northeast Region

NON-VOTING MEMBERS:

Sam Tobias (Alternate) – Fond du Lac County Jill Michaelson (Alternate) – WisDOT, Northeast Region

John Nordbo – WisDOT, Central Office Alexis Kuklenski – FHWA

Nick Leonard (Alternate) – Village of North Fond du Lac Walt Raith – East Central Wisconsin Regional Planning Commission

Page 4: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013

CONTENTS INTRODUCTION

Report Format ................................................................................................... 1 Certifications ..................................................................................................... 1

TRANSPORTATION IMPROVEMENT PROGRAM

Federal Planning Requirements ........................................................................... 3 The TIP Process ................................................................................................. 4

TIP Amendments ....................................................................................... 4 TIP Project Solicitation and Public Involvement ............................................. 5 Project Review for Eligibility ........................................................................ 6 Flexibility of Funding Sources ...................................................................... 6 Prioritization of STP-Urban Projects .............................................................. 7 STP-Urban Project Criteria ........................................................................... 8 STP-Urban Project Selection Procedure ........................................................ 13 STP-Urban Projects Recommended for Funding ............................................ 13

2013 TIP Project Listing ............................................................................... 15

TABLES Table 1 Fond du Lac Urbanized Area - Project Listing ............................................. 15 Table 2 Summary of Federal Funds Programmed and Available

Fond du Lac Urbanized Area, 2013-2017 ................................................ 18 Table 3 Implementation Status of 2012 Projects for the Fond du Lac Urbanized Area 19 Table A-1 Fond du Lac Urban Candidate Project Listing ............................................. A-1 Table A-2 STP Funding Allocations and Proposed Projects, 2012-2013 ........................ A-5 Table A-3 Evaluation and Ranking of Proposed STP Projects, 2012-2013 ...................... A-6 Table B-1 Transit Projects, Fond du Lac Urbanized Area ............................................ B-2 Table B-2 2012 Paratransit Projects, Fond du Lac Transit ........................................... B-3 Table B-3 Transit Financial Capacity Analysis, Fond du Lac Transit ............................. B-4 APPENDICES Appendix A STP-Urban Supplementary Tables ............................................................ A-1 Appendix B Federal Transit Operating and Capital Assistance ...................................... B-1

Justification for Capital Projects .......................................................... B-5 Transit Financial Capacity .................................................................. B-5

Appendix C Policy & Technical Advisory Committee, Land Regulatory Agency Contacts .. C-1 Appendix D Summary of Proceedings ........................................................................ D-1 Appendix E MPO Resolutions of Adoption ................................................................... E-1 Appendix F Documentation of Public Involvement Notices ........................................... F-1 Appendix G Environmental Justice ............................................................................. G-1 Appendix H Functional Classification System & STP-Urban Eligible Roadways ................ H-1 Appendix I TIP Amendments .................................................................................... I-1

Page 5: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013

INTRODUCTION

Page 6: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013

East Central Wisconsin Regional Planning Commission Transportation Improvement Program, Fond du Lac Urbanized Area October 2012

1

INTRODUCTION

The Transportation Improvement Program (TIP) is an annually prepared program of transportation

projects that will be utilizing federal funding assistance in their implementation. This TIP includes

projects within the Fond du Lac Urbanized Area. It has been developed by the East Central

Wisconsin Regional Planning Commission as the staff for the Metropolitan Planning Organization

(MPO). The MPO works in cooperation and coordination with the Wisconsin Department of

Transportation (WisDOT), which is responsible for preparing a State Transportation Improvement

Program (STIP) programming federally-assisted transportation projects statewide. The federal

funding assistance to be programmed is provided by the Moving Ahead for Progress in the 21st

Century Act (MAP-21) administered by the Federal Highway Administration (FHWA) and the Federal

Transit Administration (FTA).

In preparing this report, East Central has worked with WisDOT Northeast Region, transit operators,

and local governmental jurisdictions to compile a list of projects from their capital improvement

programs and budgets for the five-year period from 2013 to 2017. These lists of programmed

candidate projects were then reviewed for consistency with long range plans, prioritized, and

recommended by transportation Technical Advisory Committees (TACs) for the urbanized area. TAC

recommendations were in turn reviewed by the Policy Board for final action as the MPO

recommending these projects to WisDOT for inclusion in the STIP.

REPORT FORMAT

The first section of the TIP includes a brief description of the transportation planning process and its

relationship to the TIP. The second section outlines the process of developing the project list, the

method employed for prioritizing projects, and the procedure followed for consideration and

approval of the report. The final section contains the project list.

The appendices include a variety of background information.

CERTIFICATIONS

In accordance with 23 CFR 450.334(a) East Central Wisconsin Regional Planning Commission hereby

certifies that the metropolitan transportation planning process is addressing major issues facing the

metropolitan planning area and is being conducted in accordance with all applicable requirements of:

(1) 23 U.S.C. 134 and 49 U.S.C. 5303, and this subpart

(2) In non-attainment and maintenance areas, Sections 174 and 176 (c) and (d) of the Clean

Air Act as amended (42 U.S.C. 7504, 7506 (c) and (d)) and 40 CFR part 93;

(3) Title VI of the Civil Rights Act of 1964, as amended (42 USC 2000d-1) and 49 CFR part

21;

Page 7: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013

East Central Wisconsin Regional Planning Commission Transportation Improvement Program, Fond du Lac Urbanized Area October 2012

2

(4) 49 USC 5332, prohibiting discrimination on the basis of race, color, creed, national origin,

ex, or age in employment or business opportunity;

(5) Section 1101(b) of the Moving Ahead for Progress in the 21st Century Act (MAP-21) (Pub.

L. 112-141) and 49 CFR Part 26 regarding the involvement of disadvantaged business

enterprises in US DOT funded projects;

(6) 23 CFR part 230, regarding the implementation of an equal employment opportunity

program on Federal and Federal-aid highway construction contracts;

(7) The provisions of the Americans with Disabilities Act of 1990 (42 U.S.C. 12101 et seq.)

and 49 CFR Parts 27, 37, and 38;

(8) The Older Americans Act, as amended (42 U.S.C. 6101), prohibiting discrimination on the

basis of age in programs or activities receiving Federal financial assistance;

(9) Section 324 of title 23, U.S.C. regarding the prohibition of discrimination based on

gender; and

(10) Section 504 of the Rehabilitation Act of 1973 (29 U.S.C. 794) and 49 CFR 27 regarding discrimination against individuals with disabilities.

In addition, the MPO certifies that the TIP contains only projects that are consistent with the

metropolitan plans for the urbanized areas.

In addition, the Fond du Lac Metropolitan Planning Organization’s public participation and

certification process satisfies the Fond du Lac Area Transit public participation requirements for the

Program of Projects.

Page 8: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013

TRANSPORTATION IMPROVEMENT PROGRAM

Page 9: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013

East Central Wisconsin Regional Planning Commission Transportation Improvement Program, Fond du Lac Urbanized Area October 2012

3

TRANSPORTATION IMPROVEMENT PROGRAM

FEDERAL PLANNING REQUIREMENTS

MAP-21, signed into law in July of 2012, and predecessor transportation legislation require that all

urbanized areas have a comprehensive, cooperative, and continuing planning process in place to

guide effective use of federal funding assistance. MAP-21 planning requirements reemphasize the

integral relationship of land use with transportation infrastructure, as well as the need to address all

mobility from a multimodal perspective, as previously emphasized under TEA-21 and SAFETEA-LU.

Additional areas of challenge under MAP-21 include:

• Improving safety;

• Maintain infrastructure condition;

• Reducing traffic congestion;

• System reliability;

• Freight movement and economic vitality;

• Environmental sustainability;

• Reduced project delivery delays.

To carry out the comprehensive planning program, ISTEA, TEA-21, SAFETEA-LU, and MAP-21 have

reconfirmed the role of a cooperative planning institution, the MPO, to guarantee that all aspects of

the urbanized area will be represented in the plan's development and that planning will be conducted

on a continuing basis. As the designated staff for the MPO for the Fond du Lac urbanized area, the

East Central Wisconsin Regional Planning Commission is responsible for carrying out these

transportation planning responsibilities.

The Fond du Lac urbanized area is located in Fond du Lac County; includes all or parts of the five

towns of Eden, Empire, Fond du Lac, Friendship and Taycheedah; the City of Fond du Lac; and the

Villages of North Fond du Lac and Eden. The 2010 census figures show the population of the

urbanized area to be 54,901.

Page 10: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013

East Central Wisconsin Regional Planning Commission Transportation Improvement Program, Fond du Lac Urbanized Area October 2012

4

THE TIP PROCESS

One of the objectives of TEA-21, SAFETEA-LU and subsequently by MAP-21 is to forge a stronger

link between plan preparation and plan implementation. It seeks to accomplish this, in part, by

broadening public involvement and elevating the importance and authority of the MPO in the TIP

prioritization process.

The TIP is a staged multi-year program of both capital and operating projects designed to

implement both the long-range element of the transportation plan and the shorter-range

transportation system management (TSM) element. The TIP covers a period of five years with

projects identified for each of the first four years as the minimum program. Projects for 2017 are

considered future year projects. The MPO and WisDOT agree that the first year of the TIP

constitutes an agreed to list of projects for project selection purposes and that no further project

selection action is required for WisDOT or the transit operator to proceed with federal fund

commitment. Although the TIP is updated annually, if WisDOT or the transit operators wish to

proceed with projects not scheduled in the first year of the TIP, the MPO agrees that projects from

the second, third or fourth year of the TIP can be advanced to proceed with federal funding

commitment without further action by the MPO.

TIP Amendments

No Amendment Required

• Schedule

• Changing the implementation schedule for projects within the first four years of the TIP. Provided that the change does not trigger redemonstration of fiscal constraint.

• Scope

• Changes in scope (character of work or project limits) while remaining reasonably consistent with the approved project.

• Funding

• Changing the source (Fed, state, local); category (IM, NHS, STP, earmarks); or amount of funding for a project without changing the scope of work or schedule for the project or any other project within the first four years of the TIP.

Minor Amendment (processed through MPO committee structure and WisDOT, public involvement handled through the committee process)

• Schedule

• Adding an exempt/preservation project to the first four years of the TIP, including advancing a project for implementation from an illustrative list (Table A-1) or from the out-year of the TIP.

• Moving an exempt/preservation project out of the first four years of the TIP.

• Scope

• Changing the scope (character of work or project limits) of an exempt/ preservation project within the first four years of the TIP such that the current

description is no longer reasonably accurate.

Page 11: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013

East Central Wisconsin Regional Planning Commission Transportation Improvement Program, Fond du Lac Urbanized Area October 2012

5

• Funding

• Change in project funding that impacts the funding for other projects within the first four years of the TIP forcing any exempt/preservation project out of the four-year window.

Major Amendment (public involvement opportunity and processed through MPO committee structure and WisDOT)

• Schedule

• Adding a non-exempt/expansion project to the first four years of the TIP, including advancing a project for implementation from an illustrative list or from the out-year of the TIP.

• Moving a non-exempt/expansion project out of the first four years of the TIP.

• Scope

• Significantly changing the scope (character of work or project limits) of a non-exempt/expansion project within the first four years of the TIP such that current description is no longer reasonably accurate.

• Funding (thresholds to be defined by the MPO in consultation with WisDOT and FHWA and subject to WisDOT approval).

• Adding or deleting any project that exceeds the lesser of:

• 20% of the total Federal funding programmed for the calendar year, or $1,000,000.

Even though a new TIP has been developed and approved by the MPO, WisDOT can continue to

seek federal fund commitment for projects in the previous TIP until a new STIP has been jointly

approved by FHWA and FTA. Highway and transit projects reflected in any of the first four years of

the approved TIP may be advanced for federal fund commitment without requiring any amendment

to the TIP. It is the intent of WisDOT and the MPO to advance only projects, including transit

operating assistance, that are included in an approved TIP and STIP. WisDOT relies on the public

involvement process conducted by the MPO in the development of their TIP to satisfy the Federal

Transit Administration program and planning requirements, as established for the Section 5307 and

5309 programs.

TIP Project Solicitation and Public Involvement

Annually, each transit operator, municipality or county is requested to submit a list of proposed

transportation projects covering the next five-year period for inclusion in the TIP. Notification was

provided by direct letter, dated April 18, 2012, requesting candidate projects to be identified. On

September 9, 2012, a legal notice was published in the Fond du Lac daily paper, identifying a review

and comment period, from September 9 to October 8, 2012. The Technical Advisory Committee

would meet September 12, 2012 to act on the draft project list for inclusion in the TIP and that the

TIP would receive final consideration by the MPO at its October 10, 2012 Policy Board meeting.

Documentation of the TIP published public involvement notice is included in Appendix F. No public

responses were received relative to any of the notices.

Page 12: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013

East Central Wisconsin Regional Planning Commission Transportation Improvement Program, Fond du Lac Urbanized Area October 2012

6

Project Review for Eligibility

Projects submitted must be included in a locally adopted Capital Improvements Program and are

reviewed for consistency with transportation plan recommendations, availability of federal and state

funds, and compliance with relevant state and federal regulations. All federally funded highway,

transit, and other projects must be included in the TIP to compete for the receipt of federal funding

assistance. "Regionally significant" projects scheduled for implementation with state and local funds

must also be included for informational and coordinative purposes, except that all projects impacting

highways functionally classified as principal arterials must be included in the TIP regardless of

funding source.

Flexibility of Funding Sources

A hallmark of the (MAP-21) legislation, while retaining categorical programs, was the introduction of

fairly wide latitude to flexibly use funds from one category for projects in other categories. The

intent is to provide states and local areas with the ability to address priority needs in their

jurisdictions. Flexible programs include:

Federal-aid Highway Programs

MAP-21 SAFETEA-LU

National Highway Performance Program (NHPP)

NHS, IM, & Bridge (on NHS)

Surface Transportation Program (STP) STP & Bridge (non-NHS) Congestion Mitigation & Air Quality Improvement Program (CMAQ)

CMAQ

Highway Safety Improvement Program (HSIP)

HSIP (incl. High Risk Rural Roads)

Railway-Highway Grade Crossing Railway Highway Grade Crossing Transportation Alternatives Transportation Enhancements, Safe Routes to

School, Recreational Trails

Federal-aid Transit Programs

MAP-21 SAFETEA-LU

Urbanized Area Formula Grants (5307) Urbanized Area Formula Grants (5307) Job Access & Reverse Commute Program (5316) (Part)

Enhanced Mobility of Seniors and Individuals with Disabilities (5310)

Elderly & Persons with Disabilities Program (5310) New Freedom Program (5317)

Rural Area Formula Grants (5311) Nonurbanized Area Formula Program (5311) Job Access & Reverse Commute Program (5316) (Part)

State of Good Repair Program (5337) (Formula)

Fixed Guideway Modernization (5309) (Discretionary)

Bus and Bus Facilities Formula Program (5339)

Bus and Bus-Related Projects (5309) (Discretionary)

Fixed Guideway Capital Investment Grants (5309)

New Starts & Small Starts Programs (5309) (Discretionary)

Page 13: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013

East Central Wisconsin Regional Planning Commission Transportation Improvement Program, Fond du Lac Urbanized Area October 2012

7

Following is a list of the categorical programs included in the MAP-21 legislation as they apply to the

Fond du Lac urbanized area:

Categorical Program Acronym

National Highway System

State NHS

Bridge Replacement & Rehabilitation

State BR, BH

Surface Transportation Program

Enhancements EN

Urban URB

Rural RU

State STP

Safety HSIP

Miscellaneous MSC

Transit

Section 5307

Formula Capital and

Operating Assistance Section 5307

Section 5310

Elderly & Disabled Section 5310

Of these categorical programs, the majority are programmed by WisDOT. The forum of the TIP will

serve to provide comment from the MPO annually and should generate additional public exposure to

influence the project prioritization by WisDOT. The Section 5307 Transit programs are developed

directly by the transit operators in conformance with the Transit Development Programs, Americans

with Disabilities Act (ADA) plans, and the long-range multimodal plan. The Section 5310 elderly and

disabled paratransit capital projects are listed in the TIP as candidate projects only with later

prioritization and funding determinations by WisDOT.

Prioritization of STP-Urban Projects

The only categorical program that the MPO prioritizes is the STP-Urban program in each of the

urbanized areas. The five-year program, 2013-2017, itemized in the listing this year includes the

2012 and 2013 projects that were submitted by the local entities. Since the 2002 TIP, two years’

programming recommendations have been made in the even year TIP (2004, 2006,…), and are

reaffirmed in the odd year TIP (2007, 2009…). In developing this 2013 TIP, a project was selected

by the Policy Board for the 2012 and 2013 biennium.

The allocation of STP-Urban funds for 2012-2013 is $685,641 in the Fond du Lac urbanized area.

This allocation is distributed among the municipalities within the respective urbanized areas based on

their share of total federal functionally classified mileage. For example, the City of Fond du Lac's

Page 14: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013

East Central Wisconsin Regional Planning Commission Transportation Improvement Program, Fond du Lac Urbanized Area October 2012

8

share of the total urbanized area allocation is 29.67 miles divided by the Fond du Lac area total of

71.22 functionally classified miles = .4166 or 41.6 percent. This allocation is then added to the

accounting balance for the City of Fond du Lac and is used in determining its entitlement balance.

As will be noted in the description of the prioritization process that follows, this entitlement is used in

determining the community's eligibility to compete, and as a ratio of funding balance to project cost

as one ranking criterion. However, it does not guarantee that the funds will ever be available to the

community, and is therefore not to be considered a suballocation of the urban funds.

STP-Urban Project Criteria

As part of the project approval process, federal metropolitan planning regulations require that all

federally funded projects, as well as certain non-federally funded projects, be included in the

Transportation Improvement Program. The regulations also intend that the TIP set priorities for

project approval. Toward this end, a system for prioritizing the 2012-2013 project candidates, as part

of the 2013 TIP, is being used that was developed in 2005, as the first TIP was being adopted for

the Fond du Lac urbanized area. Below are the criteria used to evaluate and prioritize the project

candidates. The criteria assess plan consistency, preservation of the existing system, capacity

needs, safety, multimodality, capital programming, and funding availability.

1. PLAN CONSISTENCY. This criterion establishes project legitimacy within the overall

transportation network. It rates projects higher when they conform in scope and timing to

appropriate comprehensive or modal transportation plan element (local comprehensive plans,

arterial plans, Transit Development and other transit plans, bicycle/pedestrian plans, regional

long range plan and related elements) and evidence good regional coordination.

Score 5 Direct Relationship

3 Some Relationship

0 No Relationship

2. PRESERVES EXISTING SYSTEM. This criterion emphasizes the goal of maximizing the

efficiency of present infrastructure. A project is rated using only the most appropriate of the

alternative rating categories. For instance, a project which adds lanes to an arterial, could be

rated by pavement condition, showing project timeliness, or as a new facility showing

functional need.

Highway applications. Alternative ratings are available by project type based on pavement

condition, new facilities, or traffic operations improvements.

a. Pavement Condition. For existing highways, an indicator of pavement surface

condition is based on the Pavement Surface Evaluation and Rating Manual (PASER).

Pavements with lower ratings have greater pavement distress and are scored higher.

Score 5 Rating of 1-2 (in very poor condition, reconstruction necessary)

5 Rating of 3-4 (significant aging, would benefit from an overlay)

3 Rating of 5-6 (surface aging, sealcoat or overlay warranted)

Page 15: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013

East Central Wisconsin Regional Planning Commission Transportation Improvement Program, Fond du Lac Urbanized Area October 2012

9

1 Rating of 7-8 (slight wearing, routine maintenance)

0 Rating of 9-10 (no visible distress)

b. New Facilities. For new streets and highways, an evaluation is made of the criticality of

the project to the overall functionality and efficiency of the existing network.

Score 5 Very critical, needed to avoid lost opportunity relative to timing and cost of

other programmed projects

3 Beneficial to the overall performance of the system

1 Some current need, more important to system performance in long term

0 No relationship to system performance

c. Traffic Operations Improvements. Principally intersection channelization or

signalization projects or improvements to corridor performance through access

management.

Score 5 Very critical, eliminates major hindrance to system performance and safety

3 Beneficial to the overall performance of the system

1 Some current need, more important to system performance in long term

0 No relationship to system performance

Non-highway applications. An assumption is made that an increase in travel options improves

the efficiency of the existing infrastructure.

d. Freight Operations.

Score 5 A project that improves operations of the existing freight transportation

system

3 Beneficial to the overall performance of the system

1 Some current need, more important to system performance in long term

0 No relationship to system performance

e. Transit Improvements.

Score 5 A project that provides, or is an integral factor in providing, a transit or

paratransit option

3 A project that enhances a transit or paratransit option, thereby making a

transit mode more attractive

1 A project that meets transit or paratransit needs, but does not impact the

demand for SOV (single-occupant vehicle) travel

0 A project that inappropriately addresses transit or paratransit needs

f. Bicycle and Pedestrian Improvements. Projects can be categorized as either barrier

crossing or corridor improvements and rated using the appropriate set of criteria.

Page 16: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013

East Central Wisconsin Regional Planning Commission Transportation Improvement Program, Fond du Lac Urbanized Area October 2012

10

1) Barrier Crossing Improvements. Provides facility over/under non-compatible

transportation route or natural feature. (Scores of criteria a), b) and c) are averaged

and rounded to the nearest integer.)

a) Spacing. (distance between facilities)

Score 5 2.01 miles or greater

4 1.51 to 2 miles

3 1.01 to 1.50 miles

2 0.76 to 1 mile

1 0.51to 0.75 miles

0 0.5 miles or less

b) Level of Use. (origin/destination pairs)

Score 5 residential to multimodal transfer locations

5 residential to employment centers/schools/colleges

3 residential to commercial/recreational

1 residential to residential

0 recreational to recreational

c) User Safety. (Is at-grade crossing possible?)

Score 5 no potential for at-grade crossing

3 at-grade crossing possible; safety concerns remain

0 safe at-grade crossing is possible

2) Corridor Improvements. Provides a bicycle and pedestrian route on or along a

transportation route or natural feature. (Scores of criteria a), b), and c) are averaged

and rounded to the nearest integer.)

a) Spacing.

Score 5 No alternative parallel route available

3 Adjacent parallel route would be better option

0 Adequate parallel route already exists

b) Level of Use. (origin/destination pairs)

Score 5 residential to multimodal transfer locations

5 residential to employment centers/schools/colleges

3 residential to commercial/recreational

1 residential to residential

0 recreational to recreational

Page 17: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013

East Central Wisconsin Regional Planning Commission Transportation Improvement Program, Fond du Lac Urbanized Area October 2012

11

c) User Safety.

Score 5 safety concerns addressed without compromising usefulness;

promote increased use by all user groups

3 safety measures may encourage increased use by some user

groups, but discourage use by other user groups

0 safety concerns cannot be adequately addressed

3. CAPACITY. This criterion is an indicator of corridor or intersection capacity problems. A

higher existing volume to capacity ratio reflects greater capacity deficiency. Highway Capacity

standards developed by the Federal Highway Administration and WisDOT are used to

determine the volume to capacity ratio. For new facilities the non-existent V/C ratio is replaced

by the long-range plan projection year V/C ratio on the designed facility for rating purposes.

Corridor based non-highway projects, those directly involving travel in a highway corridor,

would be rated identically to highway projects using the highway V/C ratio. Non-corridor based

projects would use the alternate rating based on the appropriateness of their location,

magnitude and size, and projected usage.

Score 5 > 1.00

4 0.80 - 1.00 3 0.60 - 0.79 2 0.40 - 0.59 1 0.20 - 0.39 0 < .20

Alternate Rating (non-corridor based projects)

Score 5 Very critical, needed to avoid lost opportunity relative to timing and cost of other

programmed projects 3 Beneficial to the overall performance of the system 1 Some current need, more important to system performance in long term 0 No relationship to system performance

4. SAFETY. This criterion emphasizes a goal of eliminating or minimizing corridor or

intersection safety problems on the system. Alternative ratings are available by project type based on segment crash rates, high accident locations, and new facilities. 1) Segment Crash Rates. WisDOT determines average crash rates per 100 million

vehicle miles driven by facility type or functional classification. These crash rates can be determined for segments of urban streets.

Score 5 > 280

3 150-279

0 < 149

2) High Accident Locations. Intersections defined as any location with crashes > 5 in

any one year.

Page 18: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013

East Central Wisconsin Regional Planning Commission Transportation Improvement Program, Fond du Lac Urbanized Area October 2012

12

Score 5 > 5

3 1 - 4

0 0

3) New Facilities. An assumption is made that an increase in travel options improves

the efficiency and safety of the existing infrastructure by shifting trips traveled to

safer facilities.

Score 5 safety concerns addressed without compromising usefulness; promote

increased use by all user groups

3 safety measures may encourage increased use by some user groups,

but discourage use by other user groups

0 safety concerns cannot be adequately addressed

5. MULTIMODAL. This criterion emphasizes projects that address needs of all appropriate

modes (vehicular, transit, pedestrian, bicycle, freight) or TDM actions in the corridor.

Score 5 In a multimodal corridor, the project addresses the needs of all listed modes.

3 In a multimodal corridor, at least two modes are addressed, though not all listed

modes are addressed.

1 In a multimodal corridor, only one mode, other than vehicular, is addressed.

0 Project is not in a multimodal corridor, or is in a multimodal corridor and only the

vehicular mode is addressed.

6. PLANNED PROGRAMMING. An indicator of capital improvement planning, prioritizing, and

scheduling by local communities. Projects in the TIP for three to five years which have

progressed from out-year to annual element status are scored higher than projects appearing

in the TIP for only one or two years. To be eligible for consideration in the TIP, projects must

be included in a multi-year capital improvements program adopted by the sponsoring

jurisdiction.

Score 5 Five Years or More

4 Four Years

3 Three Years

2 Two Years

1 One Year

7. AVAILABILITY OF FUNDING. An indicator of how well projects correspond to funding

entitlement. Appendix A, Table A-2 shows each jurisdiction's 2011 funding balance, 2011

allocation, and the resulting entitlement. It also shows the resulting funding availability rating

for each project, which is calculated by taking the maximum STP portion of project costs and

dividing it into the jurisdictions entitlement. If the jurisdiction has more than one project, the

entitlement is adjusted by subtracting the prior project's STP funding before calculating the

funding availability rating. This rating ranges from the highest positive number being the

highest ranking to the lowest negative number being the lowest ranking. There is an

overriding criterion that a county or community project must have a positive funding

Page 19: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013

East Central Wisconsin Regional Planning Commission Transportation Improvement Program, Fond du Lac Urbanized Area October 2012

13

availability rating to compete for STP funding. Also, when ties occur among projects having

the same total score, the funding availability rating is used as the tie-breaker.

Score 5 > 1.50

4 1.00 - 1.50

3 0.50 - 0.99

2 0.25 - 0.49

1 0.00 - 0.24

0 < 0.00

The project scores for each criterion are totaled and ranked from highest to lowest score. Any

project that is not ranked because it has a negative funding eligibility rating is deemed ineligible for

participation in the STP-Urban program.

STP-Urban Project Selection Procedure

The projects are selected for funding awards by rank order as determined by the prioritization

process. The specific procedure followed is characterized as "Maximize Funding for Projects" and

reads as follows:

Fund all projects in prioritized order at the 80 percent maximum federal funding

level until all of the annual allocation is fully utilized. The final project will be

funded at no less than the 20 percent minimum federal funding level.

If the remaining allocation is inadequate to fund the final project at 20 percent,

then, in reverse prioritization order, the previously funded projects' funding will

be reduced to no less than the 20 percent federal funding level until balance is

achieved with the allocation.

If the final project cost is so large that funding it at the 20 percent minimum

federal funding level cannot be achieved by reducing all prior projects to the 20

percent minimum federal funding level, then that project shall be passed over to

the next project on the list.

STP-Urban Projects Recommended for Funding

Application of the above project selection procedure to projects competing for the 2012-2013

allocations resulted in staff recommending funding for one project in the Fond du Lac urbanized

area. This project was selected by action of the Policy Board for the Fond du Lac urbanized area, on

May 9, 2012:

Fond du Lac Project: Available Funding Allocation of $685,641

� Fond du Lac County’s CTH VV / Hickory Street to Military Road.

Page 20: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013

** Funds are listed in Year of Expenditure $. *Amended 5/8/13

Agency/Program 2013 2014 2015 2016 2017 2013 2014 2015 2016 2017

Federal Highway Administration

Interstate Highway Maintenance $0 $0 $0 $0 $0 National Highway System 400 400 400 400 400 400 400 400 400 400 Bridge Replacement/Rehab 0 291 0 0 0 0 291 0 0 0 Congestion Mitigation & Air Quality 0 0 0 0 0 Surface Transportation Program Fond du Lac Urbanized Area 624 0 0 0 0 624 0 0 0 0 Surface Transportation Program State Flexibility 4,960 18,814 19,291 3,154 38,358 4,960 18,814 19,291 3,154 38,358 Surface Transportation Program Safety (HSIP) 0 844 0 0 0 0 844 0 0 0 Surface Transportation Program Enhancements 0 0 0 0 0 0 0 0 0 0

Programmed Expenditures 5,984 20,349 19,691 3,554 38,758 5,984 20,349 19,691 3,554 38,758

* Annual Inflation Factor 2.8% 168 570 551 100 1,085 168 570 551 100 1,085Estimated Need with Inflation Factor 6,152 20,919 20,242 3,654 39,843 6,152 20,919 20,242 3,654 39,843

Federal Transit Administration

Section 5307 Operating $469 $483 $498 $512 $528 $469 $483 $498 $512 $528 Section 5307 Capital 48 50 52 54 56 48 50 52 54 56 Programmed Expenditures 517 533 550 566 584 517 533 550 566 584

* Annual Inflation Factor 2.8% 14 15 15 16 16 14 15 15 16 16

Estimated Need with Inflation Factor 531 548 565 582 600 531 548 565 582 600

Section 5310 0 0 -not yet programmed- 0 0 --not yet programmed--

* MAP-21 requires that revenue and cost estimates must use an inflation rate to reflect year of expenditure dollars

Programmed Expenditures

TABLE 2

FOND DU LAC URBANIZED AREA, 2013-2017

($000) SUMMARY OF FEDERAL FUNDS PROGRAMMED AND AVAILABLE

18

Estimated Available Funding

------------------------Not Eligible------------------------------

-------------------------Not Eligible------------------------------

Page 21: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013

East Central Wisconsin Regional Planning Commission

Transportation Improvement Program, Fond du Lac Urbanized Area October 2012

** Funds are listed in Year of Expenditure $.

Agency/Program

2013

2014

2015

2016

2017

2013

2014

2015

2016

2017

Fed

era

l H

igh

wa

y A

dm

inis

tra

tio

n

Interstate Highway Maintenance

$0

$0

$0

$0

$0

National Highway System

400

400

400

400

400

400

400

400

400

400

Bridge Replacement/Rehab

0291

00

00

291

00

0

Congestion Mitigation & Air Quality

00

00

0

Surface Transportation Program

Fond du Lac Urbanized Area

624

00

00

624

00

00

Surface Transportation Program

State Flexibility

4,548

18,742

18,796

3,154

38,358

4,548

18,742

18,796

3,154

38,358

Surface Transportation Program

Safety (HSIP)

0844

00

00

844

00

0

Surface Transportation Program

Enhancements

00

00

00

00

00

P

rog

ram

me

d E

xp

en

dit

ure

s5,572

20,277

19,196

3,554

38,758

5,572

20,277

19,196

3,554

38,758

* A

nn

ua

l In

fla

tio

n F

acto

r 2

.8%

156

568

537

100

1,085

156

568

537

100

1,085

Esti

ma

ted

Ne

ed

wit

h I

nfl

ati

on

Fa

cto

r5,728

20,845

19,733

3,654

39,843

5,728

20,845

19,733

3,654

39,843

Fed

era

l Tra

nsit

Ad

min

istr

ati

on

Section 5307 Operating

$469

$483

$498

$512

$528

$469

$483

$498

$512

$528

Section 5307 Capital

48

50

52

54

56

48

50

52

54

56

P

rog

ram

me

d E

xp

en

dit

ure

s517

533

550

566

584

517

533

550

566

584

* A

nn

ua

l In

fla

tio

n F

acto

r 2

.8%

14

15

15

16

16

14

15

15

16

16

Esti

ma

ted

Ne

ed

wit

h I

nfl

ati

on

Fa

cto

r531

548

565

582

600

531

548

565

582

600

Section 5310

00

-not yet programmed-

00

--not yet programmed--

* M

AP

-21 r

equi

res t

hat

reve

nue

and

cost

estim

ates

mus

t use

an inf

latio

n r

ate

to r

efle

ct y

ear

of e

xpend

iture

dolla

rs

Programmed Expenditures

T

AB

LE 2

F

ON

D D

U L

AC

UR

BA

NIZED

AR

EA

, 2

01

3-2

01

7

($000)

S

UM

MA

RY

OF F

ED

ER

AL F

UN

DS

PR

OG

RA

MM

ED

AN

D A

VA

ILA

BLE

Estimated Available Funding

------------------------Not Eligible------------------------------

-------------------------Not Eligible------------------------------

18

Page 22: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013

19

East Central Wisconsin Regional Planning Commission Transportation Improvement Program, Fond du Lac Urbanized Area October 2012

Fed State Local Total Completed Underway Delayed

Fond du Lac Co Wild Goose-Prairie Trail Connector PE

Fond du Lac Hickory - Main ROW X

3824-01-00,21,71,72 CONST 107 0 27 134

443-08-001 URB 1.6m. (E) TOTAL 107 0 27 134

WisDOT Subway Road, Town of Friendship PE

Fond du Lac CN RR Crossing Gates ROW X

1009-93-45 CONST 91 50 0 141

443-10-012 STP (P) TOTAL 91 50 0 141

TABLE 3

IMPLEMENATION STATUS OF 2012

FOND DU LAC URBANIZED AREA PROJECTS

2012Primary

JursdictionProject Description

T ype o f

C o st

Status

Page 23: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013

APPENDICES

Page 24: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013

APPENDIX A

URBAN AREA CANDIDATE PROJECT TABLES

Page 25: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013
Page 26: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013

TA

BLE

A-1

, con

t.F

ON

D D

U L

AC

CA

ND

IDA

TE

PR

OJE

CT

LIS

TIN

G

($000)

Fed

State

LocalTotal

Fed

State

LocalTotal

Fed

State

LocalTotal

Fed

State

LocalTotal

Fed

State

LocalTotal

To

f F

rie

nd

ship

Su

bw

ay

Ro

ad

Ov

erp

ass

of

CN

RR

PE

00

00

0

Fo

nd

du

La

cR

OW

00

00

0

Illu

stra

tive

CO

NS

T0

00

00

04

00

04

00

0

Lo

cal

.4 m

.(E

)T

OT

AL

00

00

00

00

00

00

00

00

00

40

00

40

00

V o

f N

Fo

nd

du

La

c La

ke

sho

re D

r O

ve

rpa

ss o

f C

NR

RP

E0

00

00

Fo

nd

du

La

cR

OW

00

00

0

Illu

stra

tive

CO

NS

T0

00

00

07

50

07

50

0

Lo

cal

(E)

TO

TA

L0

00

00

00

00

00

00

00

00

07

50

07

50

0

C o

f F

on

d d

u L

ac

Mili

tary

Ro

ad

/Hic

ko

ry -

We

ste

rnP

E0

00

00

Fo

nd

du

La

cR

eco

nst

ruct

ion

, u

rba

nR

OW

00

00

0

Illu

stra

tive

CO

NS

T0

00

00

01

97

01

97

0

Lo

cal

.50

m.

(P)

TO

TA

L0

00

00

00

00

00

00

00

00

01

97

01

97

0

Fo

nd

du

La

c C

oC

TH

V/C

TH

K-N

ati

on

al

Av

e

PE

00

00

0

Fo

nd

du

La

cR

eco

nst

ruct

ion

, 4

-la

ne

, u

rba

nR

OW

00

00

0

Illu

stra

tive

CO

NS

T0

00

00

03

00

03

00

0

Lo

cal

1.5

0 m

.(E

)T

OT

AL

00

00

00

00

00

00

00

00

00

30

00

30

00

Fo

nd

du

La

c C

oC

TH

VV

/Ma

in-U

SH

45

PE

00

00

10

00

10

00

Fo

nd

du

La

cR

OW

00

00

40

04

00

Illu

stra

tive

CO

NS

T0

00

00

01

00

00

10

00

0

Lo

cal

2.0

m.

(E)

TO

TA

L0

00

00

00

00

00

00

00

00

01

14

00

11

40

0

Fo

nd

du

La

c C

oP

lan

k T

rail/

US

H 1

51

-FD

L&

SH

E C

o L

ine

PE

00

00

0

Fo

nd

du

La

cR

OW

00

00

0

Illu

stra

tive

CO

NS

T0

00

00

01

00

01

00

0

Lo

cal

12

.5 m

.(P

)T

OT

AL

00

00

00

00

00

00

00

00

00

10

00

10

00

Fo

nd

du

La

c C

oM

asc

ou

tin

Va

lley

Tra

il E

xte

nsi

on

PE

00

00

0

Fo

nd

du

La

cC

TH

VV

-CT

H V

VV

RO

W0

00

00

Illu

stra

tive

CO

NS

T0

00

00

03

90

39

0

Lo

cal

0.2

5 m

.(P

)T

OT

AL

00

00

00

00

00

00

00

00

00

39

03

90

Fo

nd

du

La

c C

oC

TH

T/S

TH

23

-Est

erb

roo

kP

E0

00

00

Fo

nd

du

La

cR

eco

nst

ruct

ion

, 4

-la

ne

, u

rba

nR

OW

00

00

0

Illu

stra

tive

CO

NS

T0

00

00

02

80

02

80

0

Lo

cal

1.5

m.

(E)

TO

TA

L0

00

00

00

00

00

00

00

00

02

80

02

80

0

Fo

nd

du

La

c C

oC

TH

T/N

ati

on

al-

CT

H K

PE

00

00

0

Fo

nd

du

La

cR

eco

nst

ruct

ion

, 4

-la

ne

, u

rba

nR

OW

00

00

0

Illu

stra

tive

CO

NS

T0

00

00

03

50

03

50

0

Lo

cal

2.0

m.

(E)

TO

TA

L0

00

00

00

00

00

00

00

00

03

50

03

50

0

Fo

nd

du

La

c C

oC

TH

V/U

SH

45

-CT

H V

VP

E0

00

00

Fo

nd

du

La

cR

eco

nst

ruct

RO

W0

00

00

Illu

stra

tive

CO

NS

T0

07

35

73

50

00

00

34

00

34

00

Lo

cal

1.0

m.

(P)

TO

TA

L0

07

35

73

50

00

00

00

00

00

00

03

40

03

40

0

TABLE A-1

FOND DU LAC URBANIZED AREA - CANDIDATE PROJECT LISTING (2013-2017)

2014

Type of

Cost

Project Description

Primary

Jursdiction

2015

2013

A-1

2017 +

Illustrative Projects

2016

Page 27: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013

TA

BLE

A-1

, con

t.F

ON

D D

U L

AC

CA

ND

IDA

TE

PR

OJE

CT

LIS

TIN

G

Fed

State

LocalTotal

Fed

State

LocalTotal

Fed

State

LocalTotal

Fed

State

LocalTotal

Fed

State

LocalTotal

2014

Type of

Cost

Project Description

Primary

Jursdiction

2015

2013

2017 +

Illustrative Projects

2016

Fo

nd

du

La

c C

oC

TH

K/U

SH

15

1-C

TH

VP

E0

00

00

Fo

nd

du

La

cR

eco

nst

ruct

ion

, 4

-la

ne

, u

rba

nR

OW

00

00

0

Illu

stra

tive

CO

NS

T0

00

00

04

00

04

00

0

Lo

cal

5.0

m.

(E)

TO

TA

L0

00

00

00

00

00

00

00

00

04

00

04

00

0

Fo

nd

du

La

c C

oC

TH

H/U

SH

45

In

ters

ect

ion

Re

loca

tio

nP

E0

00

00

Fo

nd

du

La

cR

eco

nst

ruct

ion

, 4

-la

ne

, u

rba

nR

OW

00

00

00

25

02

50

Illu

stra

tive

CO

NS

T0

00

00

02

50

25

0

Lo

cal

.10

m.

(E)

TO

TA

L0

00

00

00

00

00

00

00

00

05

00

50

0

Fo

nd

du

La

c C

oC

TH

K/U

SH

15

1-C

TH

HP

E0

00

00

Fo

nd

du

La

cR

eco

nst

ruct

ion

RO

W0

00

00

Illu

stra

tive

CO

NS

T0

00

00

02

00

02

00

0

Lo

cal

1.0

m.

(P)

TO

TA

L0

00

00

00

00

00

00

00

00

02

00

02

00

0

Wis

DO

TC

TH

VV

/We

st P

ion

ee

r R

oa

dP

E0

00

00

Fo

nd

du

La

cH

ick

ory

- M

orr

isR

OW

00

00

0

Ca

na

dia

n N

ati

on

al 4

83

1-0

4-7

1C

ON

ST

00

11

20

11

20

0

0

00

44

3-0

6-0

01

UR

B(P

)T

OT

AL

00

11

20

11

20

00

00

00

00

00

00

00

00

Wis

DO

TS

TH

23

/Fo

nd

du

La

c -

Rip

on

PE

00

16

04

00

20

00

0

Fo

nd

du

La

cC

orr

ido

r S

tud

yR

OW

00

00

0

14

30

-16

-00

CO

NS

T0

00

00

44

3-0

7-0

02

ST

P1

9 m

.(P

)T

OT

AL

00

00

00

00

16

04

00

20

00

00

00

00

0

Wis

DO

TS

TH

23

/ST

H 6

7 -

US

H 4

1P

E0

00

00

Fo

nd

du

La

cR

eco

nst

ruct

ion

, 4

-la

ne

RO

W0

00

00

14

40

-15

-22

, 4

0,

71

,72

,73

CO

NS

T0

16

46

81

91

21

22

34

37

82

31

67

35

41

84

02

09

19

00

44

3-0

8-0

05

ST

P1

.9 m

.(E

)T

OT

AL

00

00

16

46

81

91

21

22

34

37

82

31

67

35

41

84

02

09

19

00

00

00

00

Wis

DO

TU

SH

45/

Ede

n -

Fon

d du

Lac

PE

00

00

0

F

on

d d

u L

ac

Res

urfa

cing

RO

W0

00

00

4110

-26-

00. 7

1C

ON

ST

00

00

33

90

84

22

44

25

6

44

3-0

9-0

01

ST

P

5.5

2 m

.(P

)T

OT

AL

00

00

00

00

00

00

00

00

33

90

84

22

44

25

6

Wis

DO

TU

SH

41

/Milw

au

ke

e -

Osh

ko

shP

E0

00

00

Fo

nd

du

La

cS

CL

- S

TH

26

Cra

ck F

illin

gR

OW

00

00

0

11

00

-31

-30

,60

CO

NS

T0

0

00

84

02

10

01

05

0

44

3-1

1-0

01

ST

PR

DM

TN

(P)

TO

TA

L0

00

00

00

00

00

00

00

08

40

21

00

10

50

Wis

DO

TS

TH

23

/Ro

sen

da

le -

US

H 4

1P

E0

00

00

Fo

nd

du

La

cS

TH

26

- C

TH

VV

, R

esu

rfa

ceR

OW

0

0

00

05

02

01

25

50

62

75

14

30

-18

-00

,71

CO

NS

T0

00

00

44

3-1

1-0

21

ST

P(P

)T

OT

AL

00

00

00

00

00

00

00

00

50

20

12

55

06

27

5

Wis

DO

TU

SH

45

/Sco

tt -

NC

LP

E0

00

00

Fo

nd

du

La

cR

esu

rfa

ceR

OW

00

00

0

41

10

-28

-00

,71

CO

NS

T0

0

00

52

30

13

08

06

53

8

44

3-1

1-0

22

ST

P(P

)T

OT

AL

00

00

00

00

00

00

00

00

52

30

13

08

06

53

8

Wis

DO

TM

elo

dy

La

ne

Bri

dg

eP

E0

00

00

T o

f F

rie

nd

ship

An

de

rso

n C

ree

k B

rid

ge

RO

W0

00

00

Fo

nd

du

La

c4

80

8-0

6-0

0,

71

P-2

0-0

92

9C

ON

ST

02

91

07

33

64

00

0

44

3-1

1-0

25

BR

.0 m

.(P

)T

OT

AL

00

00

29

10

73

36

40

00

00

00

00

00

0

A-2

Page 28: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013

TA

BLE

A-1

, con

t.F

ON

D D

U L

AC

CA

ND

IDA

TE

PR

OJE

CT

LIS

TIN

G

Fed

State

LocalTotal

Fed

State

LocalTotal

Fed

State

LocalTotal

Fed

State

LocalTotal

Fed

State

LocalTotal

2014

Type of

Cost

Project Description

Primary

Jursdiction

2015

2013

2017 +

Illustrative Projects

2016

Wis

DO

TS

TH

17

5P

E0

00

00

By

ron

By

ron

-Fo

nd

du

La

cR

OW

00

00

0

Fo

nd

du

La

c3

36

0-1

0-3

0,6

0C

ON

ST

01

94

40

19

44

00

00

44

3-1

1-0

30

ST

P(P

)T

OT

AL

01

94

40

19

44

00

00

00

00

00

00

00

00

Wis

DO

TU

SH

15

1/C

TH

V I

nte

rch

an

ge

PE

00

00

0

Fo

nd

du

La

cF

on

d d

u L

ac

By

pa

ssR

OW

00

00

0

14

20

-22

-00

,21

,71

CO

NS

T0

0

00

11

49

12

87

30

14

36

4

44

3-1

1-0

31

ST

P(E

)T

OT

AL

00

00

00

00

00

00

00

00

11

49

12

87

30

14

36

4

Wis

DO

TU

SH

15

1/C

TH

T O

ve

rpa

ssP

E0

00

00

Fo

nd

du

La

cF

on

d d

u L

ac

By

pa

ssR

OW

00

00

0

14

20

-23

-00

,21

,71

CO

NS

T0

0

00

45

76

11

44

05

72

0

44

3-1

1-0

32

ST

P(E

)T

OT

AL

00

00

00

00

00

00

00

00

45

76

11

44

05

72

0

Wis

DO

TS

TH

17

5/B

yro

n -

Fo

nd

du

La

cP

E0

00

00

Fo

nd

du

La

cC

TH

F -

US

H 1

51

By

pa

ssR

OW

00

00

0

33

60

-11

-30

,60

CO

NS

T0

0

01

28

03

20

01

60

0

0

44

3-1

2-0

10

ST

P(P

)T

OT

AL

00

00

00

00

00

00

12

80

32

00

16

00

00

00

Wis

DO

TU

SH

45

/Fo

nd

du

La

c A

ve

.P

E0

00

00

C o

f F

on

d d

u L

ac

CT

H V

- 6

th S

tre

et

RO

W0

00

00

41

10

-31

-00

,71

CO

NS

T0

00

04

89

51

22

40

61

19

44

3-1

2-0

18

ST

P1

.47

m.

(P)

TO

TA

L0

00

00

00

00

00

00

00

04

89

51

22

40

61

19

Wis

DO

TU

SH

45

, M

ain

Str

ee

t, C

ity

of

Fo

nd

du

La

cP

E0

00

00

C o

f F

on

d d

u L

ac

Me

rrill

Av

e -

Jo

hn

son

Str

ee

tR

OW

00

00

0

41

10

-30

-00

,71

CO

NS

T0

00

01

04

22

61

01

30

3

44

3-1

2-0

19

ST

P0

.28

m.

(P)

TO

TA

L0

00

00

00

00

00

00

00

01

04

22

61

01

30

3

Wis

DO

TC

TH

VV

/CT

H V

VV

- M

ilita

ry R

dP

E3

12

07

83

90

00

00

Fo

nd

du

La

c C

o.

Re

con

stru

ctR

OW

00

00

0

49

86

-00

-21

CO

NS

T0

00

00

44

3-1

2-0

20

UR

B0

.67

m.

(P)

TO

TA

L3

12

07

83

90

00

00

00

00

00

00

00

00

Wis

DO

TP

rev

en

tati

ve

Ma

int.

Na

tio

na

l H

igh

wa

yP

E0

00

00

Gro

up

ed

Pro

ject

sR

OW

00

00

0

CO

NS

T4

00

10

00

50

04

00

10

00

50

04

00

10

00

50

04

00

10

00

50

04

00

10

00

50

0

44

3-1

3-0

01

ST

P(P

)T

OT

AL

40

01

00

05

00

40

01

00

05

00

40

01

00

05

00

40

01

00

05

00

40

01

00

05

00

Wis

DO

TP

rev

en

tati

ve

Ma

int.

Na

tio

na

l H

igh

wa

yP

E0

00

00

Gro

up

ed

Pro

ject

sR

OW

00

00

0

CO

NS

T4

00

10

00

50

04

00

10

00

50

04

00

10

00

50

04

00

10

00

50

04

00

10

00

50

0

44

3-1

3-0

01

NH

S(P

)T

OT

AL

40

01

00

05

00

40

01

00

05

00

40

01

00

05

00

40

01

00

05

00

40

01

00

05

00

Wis

DO

TS

TH

Pre

ve

nta

tiv

e M

ain

t. C

on

ne

ctin

g H

igh

wa

yP

E0

00

00

Gro

up

ed

Pro

ject

sR

OW

00

00

0

CO

NS

T4

00

01

00

50

04

00

01

00

50

04

00

01

00

50

04

00

01

00

50

04

00

01

00

50

0

44

3-1

3-0

02

ST

P(P

)T

OT

AL

40

00

10

05

00

40

00

10

05

00

40

00

10

05

00

40

00

10

05

00

40

00

10

05

00

Wis

DO

TE

nh

an

cem

en

tsP

E0

00

00

Gro

up

ed

Pro

ject

sR

OW

00

00

0

CO

NS

T1

20

03

01

50

12

00

30

15

01

20

03

01

50

12

00

30

15

01

20

03

01

50

44

3-1

3-0

03

ST

P(P

)T

OT

AL

12

00

30

15

01

20

03

01

50

12

00

30

15

01

20

03

01

50

12

00

30

15

0

A-3

Page 29: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013

TA

BLE

A-1

, con

t.F

ON

D D

U L

AC

CA

ND

IDA

TE

PR

OJE

CT

LIS

TIN

G

Fed

State

LocalTotal

Fed

State

LocalTotal

Fed

State

LocalTotal

Fed

State

LocalTotal

Fed

State

LocalTotal

2014

Type of

Cost

Project Description

Primary

Jursdiction

2015

2013

2017 +

Illustrative Projects

2016

Wis

DO

TS

afe

ty F

un

ds

PE

16

40

20

16

40

20

16

40

20

16

40

20

16

40

20

Gro

up

ed

Pro

ject

sR

OW

00

00

0

CO

NS

T8

02

00

10

08

02

00

10

08

02

00

10

08

02

00

10

08

02

00

10

0

44

3-1

3-0

04

ST

P(P

)T

OT

AL

96

24

01

20

96

24

01

20

96

24

01

20

96

24

01

20

96

24

01

20

Wis

DO

TR

ail/

Hw

y X

ing

Sa

fety

P

E0

00

00

Gro

up

ed

Pro

ject

sR

OW

00

00

0

CO

NS

T8

02

00

10

08

02

00

10

08

02

00

10

08

02

00

10

08

02

00

10

0

44

3-1

3-0

05

ST

P(P

)T

OT

AL

80

20

01

00

80

20

01

00

80

20

01

00

80

20

01

00

80

20

01

00

Wis

DO

TH

wy

Sa

fety

Im

pro

ve

me

nt

Pro

gra

m (

HS

IP)

PE

00

00

0

Gro

up

ed

Pro

ject

sR

OW

00

00

0

CO

NS

T9

00

10

10

09

00

10

10

09

00

10

10

09

00

10

10

09

00

10

10

0

44

3-1

3-0

06

ST

P(P

)T

OT

AL

90

01

01

00

90

01

01

00

90

01

01

00

90

01

01

00

90

01

01

00

Wis

DO

TR

R X

ing

ST

P p

rote

ctiv

e D

ev

ice

sP

E0

00

00

Gro

up

ed

Pro

ject

sR

OW

00

00

0

CO

NS

T1

44

36

01

80

14

43

60

18

01

44

36

01

80

14

43

60

18

01

44

36

01

80

44

3-1

3-0

07

ST

P(P

)T

OT

AL

14

43

60

18

01

44

36

01

80

14

43

60

18

01

44

36

01

80

14

43

60

18

0

Wis

DO

TS

TN

Pre

ve

nta

tiv

e M

ain

t. C

on

ne

ctin

g H

wy

PE

00

00

0

Gro

up

ed

Pro

ject

sR

OW

00

00

0

CO

NS

T4

00

01

00

50

04

00

01

00

50

04

00

01

00

50

04

00

01

00

50

04

00

01

00

50

0

44

3-1

3-0

08

ST

P(P

)T

OT

AL

40

00

10

05

00

40

00

10

05

00

40

00

10

05

00

40

00

10

05

00

40

00

10

05

00

Wis

DO

TO

CR

P

E0

00

00

Gro

up

ed

Pro

ject

sR

OW

00

00

0

CO

NS

T1

44

36

01

80

14

43

60

18

01

44

36

01

80

14

43

60

18

01

44

36

01

80

44

3-1

3-0

09

ST

P(P

)T

OT

AL

14

43

60

18

01

44

36

01

80

14

43

60

18

01

44

36

01

80

14

43

60

18

0

Wis

DO

TU

SH

41

In

ters

tate

Co

nv

ers

ion

Pla

nP

E6

00

15

00

75

00

00

0

Fo

nd

du

La

cI-

94

to

I-4

3R

OW

00

00

11

13

-00

-00

CO

NS

T0

00

0

44

3-1

3-0

10

ST

P(P

)T

OT

AL

60

01

50

07

50

00

00

00

00

00

00

00

00

Wis

DO

TU

SH

41

/ S

CL

- U

SH

15

1P

E0

36

04

00

40

00

00

Fo

nd

du

La

cR

esu

rfa

ceR

OW

00

00

11

00

-50

-00

CO

NS

T0

00

0

44

3-1

3-0

11

ST

P(P

)T

OT

AL

00

00

36

04

00

40

00

00

00

00

00

00

0

Wis

DO

TS

afe

Ro

ute

s to

Sch

oo

lP

E0

00

00

Cit

y o

f F

on

d d

u L

ac Cro

ss W

alk

pa

inti

ng

, si

gn

ag

eR

OW

00

00

48

09

-09

-00

/71

CO

NS

T7

20

07

20

00

0

44

3-1

3-0

17

ST

P(P

)T

OT

AL

72

00

72

00

00

00

00

00

00

00

00

A-4

Page 30: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013

Funding

STP

%2011

Entitle-

Entitle-

Total

Federal

Local

Avail.

Jurisdiction

Miles

Miles

Balances

ment

Balance

Share

ment

Project Requests

Costs

Funds

Cost

Rating

Fond du Lac

C. Fond du Lac

29.67

41.66

528,185

528,185

528,185

285,635

1,195,800

Military Road / Hickory-W

estern

1,970,000

685,641

1,284,359

1.74

Fond du Lac Co.

35.96

50.49

308,465

308,465

308,465

346,190

654,627

CTH V/ CTH VV-U

SH 45

4,200,000

685,641

3,514,359

0.95

CTH V/ CTH K-N

ational

3,000,000

685,641

2,314,359

(0.05)

CTH VV/M

ain-U

SH 45

11,400,000

685,641

10,714,359

(1.05)

Plank Trail/USH 151-FDL & SHE Co Line

1,000,000

685,641

314,359

(2.05)

Mascoutin Vallley Trail Ext/CTH VV-CTH VVV 390,000

685,641

0(3.05)

T. Fond du Lac

1.16

1.63

129,591

99,991

99,991

11,167

144,637

T. Friendsh

ip1.18

1.66

14,690

14,690

14,690

11,359

27,440

Subway Road O

verpass

4,000,000

685,641

3,314,359

0.04

V. North Fond du Lac3.25

4.56

118,245

118,245

118,245

31,288

164,481

Lakesh

ore Drive O

verpass

7,500,000

685,641

6,814,359

0.24

Total

71.22

100.00

685,639

33,460,000

5,485,128

28,270,513

A-5

2011

TABLE A-2

STP-URBAN FUNDING ALLOCATIONS AND BALANCES, (2014-2015 biennium)

FOND DU LAC URBANIZED AREA

Allocation = $685,641

Total miles = 71.22

2011

Page 31: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013

2012 & 2013

Total

Project

Max. STP

Jurisdiction

STP Projects

Score

Cost

Funding

Federal $

Local $

Fond du Lac Allocation = $685,641

V. North Fond du LacLakeshore Drive Overpass

5avg 5

53

3c.

5VPBt

3NA

30.25

327

$7,500,000

Fond du Lac Co.

CTH VV (Main-USH 45)

3PC (1)

31.08

5208

5VPBT

5NA

4(0.51)

025

$11,400,000

CTH V (CTH VV-USH 45)

3PC (7)

10.64

380

0VPBT

5NA

4(0.06)

016

$4,200,000

Mascoutin Trail Ext. over USH 41/ CTH VV-CTH VVV

5avg 3.6

43

3c.

3vPBt

3NA

4(60.84)

022

$390,000

C of Fond du Lac

Military Road (Hickory - W

estern)

3PC (4)

51

480

0VPBT

5NA

11.74

522

$1,970,000

T of Friendship

Subway Road Overpass

3PC (4)

50.05

035

0Vpbt

1NA

10.04

111

$4,000,000

Total

$29,460,000

$0

tency

System

Plan

Planned

Pro-

gramming

Consis-

A-6

V/C

Modal

Rank

ability

Funding

Grant Awards

Avail-

Multi-

TABLE A-3

EVALUATION AND RANKING OF PROPOSED STP-URBAN PROJECTS, (2014-2015 biennium)

FOND DU LAC URBANIZED AREA

Project Evaluation (Criteria)/Score

Existing

Safety

Preserve

Capacity

Page 32: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013
Page 33: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013
Page 34: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013
Page 35: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013
Page 36: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013
Page 37: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013
Page 38: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013
Page 39: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013
Page 40: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013
Page 41: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013
Page 42: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013
Page 43: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013
Page 44: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013
Page 45: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013
Page 46: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013
Page 47: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013
Page 48: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013
Page 49: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013
Page 50: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013
Page 51: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013
Page 52: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013
Page 53: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013
Page 54: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013
Page 55: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013
Page 56: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013
Page 57: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013
Page 58: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013
Page 59: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013
Page 60: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013
Page 61: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013
Page 62: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013
Page 63: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013
Page 64: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013
Page 65: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013
Page 66: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013
Page 67: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013
Page 68: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013
Page 69: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013
Page 70: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013
Page 71: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013
Page 72: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013
Page 73: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013
Page 74: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013
Page 75: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013
Page 76: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013
Page 77: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013

Figure G-1Fond du Lac Urbanized Area TIP Projects (2013 - 2017) and

Percent Households by Census Tract with Low to Extremely Low Income (2006 - 2010)

Sources: American Community Survey 2006 - 2010 TIGER Census Tracts. 2000 Metropolitan Planning Area and the 2000 Adjusted Urbanized Area provided by ECWRPC & WisDOT. Fond du Lac County provided 2011 centerline and 2005 hydrology.

This data was created for use by the East Central Wisconsin Regional Planning Commission Geographic Information System. Any other use/application of this information is the responsibility of the user and such use/application is at their own risk. East Central Wisconsin Regional Planning Commission disclaims all liability regarding fitness of the information for any use other than forEast Central Wisconsin Regional Planning Commission business.

Lake Winnebago

11-025

09-003

11-031

11-032

13-01

1

08-005 08-005

06-001

11-03

0

13-01012-020

12-01

9

12-018

11-021

09-001

11-02

2

11-001

12-01

0

07-002

40 1 20.5

Scale in Miles

Households with Low to Extremely Low Income

45% - 59.99%30% - 44.99%15% - 29.99%Less than 15%

60% or More

2000 Metropolitan Planning Boundary2000 Adjusted Urbanized Boundary

Prepared By: EAST CENTRAL WISCONSIN

REGIONAL PLANNING COMMISSIONAUGUST 2012

TIP Project Year and Number

2016

201320142015

201706-056

06-05606-056

06-056

06-056TIP Intersection Project Year and Number

# 2016

201320142015

#

#

#

2017#

06-056

06-05606-056

06-056

06-056mz: O:\MikeZ\Dave\FDL\2013FDLTIP\MXD\FDLTIP13G1.mxd

Page 78: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013

Figure G-2Fond du Lac Urbanized Area TIP Projects (2013 - 2017) and

Non-White Population Concentration (2010)

Sources: U.S. Census Bureau - 2010 TIGER Census Tracts. 2000 Metropolitan Planning Area and the 2000 Adjusted Urbanized Area provided by ECWRPC & WisDOT. Fond du Lac County provided 2011 centerline and 2005 hydrology.

This data was created for use by the East Central Wisconsin Regional Planning Commission Geographic Information System. Any other use/application of this information is the responsibility of the user and such use/application is at their own risk. East Central Wisconsin Regional Planning Commission disclaims all liability regarding fitness of the information for any use other than forEast Central Wisconsin Regional Planning Commission business.

Lake Winnebago

11-025

09-003

11-031

11-032

13-01

1

08-005 08-005

12-020

11-03

0

13-01006-001

12-01

9

12-018

11-021

09-001

11-02

2

11-001

12-01

0

07-002

4

Prepared By: EAST CENTRAL WISCONSIN

REGIONAL PLANNING COMMISSIONAUGUST 2012

0 1 20.5

Scale in Miles

2000 Metropolitan Planning Boundary2000 Adjusted Urbanized Boundary

TIP Project Year and Number

2016

201320142015

201706-056

06-05606-056

06-056

06-056TIP Intersection Project Year and Number

# 2016

201320142015

#

#

#

2017#

06-056

06-05606-056

06-056

06-056mz: O:\MikeZ\Dave\FDL\2013FDLTIP\MXD\FDLTIP13G2.mxd

Percent Non-White Population by Census Tract

15% or More10% - 14.99%5% - 9.99%Less than 5%

Page 79: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013
Page 80: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013
Page 81: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013
Page 82: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013
Page 83: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013

ââââââââ ââââ

ââââââââââ

ââââ ââââââ ââââ

ââ

ââ ââ ââ ââ ââ ââââââââââââââââ

ââ ââââââ

Lake Winnebago

Town of Empire

CITY OF FOND DU LAC

Town of Fond du Lac

Town of Taycheedah

Town of Lamartine

Town ofByron

Town ofEden

Town of Friendship

Town of Eldorado

Town of Oakfield

VILLAGE OF NORTH FOND DU LAC

USH 41

PAR

K

CTH

V

PIONEER

USH

151

CTH

T

CTH OOO

CTH HC

TH K

FOREST

SE

YM

OU

R

NAT

ION

AL

USH 45

MIN

NE

SO

TA

PE

TER

S

4th

MA

RTI

N

CTH

UU

15th

CTH

QQ

USH 45

DIVISION

CTH

UU

STH 23

CTH V

9th

STH 175

USH 45

HICK

ORY

CTH

UU

HIC

KO

RY

STH 175

PIONEER

SCOTT

JOHNSON

US

H 4

5 17

5

LUC

O

CTH OO

ROLLING MEADOWSC

TH K

PIONEER

STH 23

CTH T

VAN DYNE

Figure H-1Fond du Lac Urbanized Area

Functional Classification System

2012

Source: ECWRPC & WisDOT provided the 2004 Urbanized Functional Classification System. ECWRPC & WisDOT provided the 2000 adjusted urbanized area and the metropolitan planning

area. Fond du Lac County 2006 municipality boundaries, hydrology, and centerline Data.

Prepared By: EAST CENTRAL WISCONSIN

REGIONAL PLANNING COMMISSION - August 2012

This data was created for use by the East Central Wisconsin Regional PlanningCommission Geographic Information System. Any other use/application of thisinformation is the responsibility of the user and such use/application is at theirown risk. East Central Wisconsin Regional Planning Commission disclaims allliability regarding fitness of the information for any use other than for EastCentral Wisconsin Regional Planning Commission business.

40 1 20.5

Scale in Miles

Urban Principal Arterialââ ââ ââ ââ ââ ââ Urban Planned Principal Arterial

Urban Minor Arterial

Urban Collectorââ ââ ââ ââ ââ ââ ââ Urban Planned Collector

Rural Principal Arterial

Rural Minor Arterial

Rural Major Collector

Rural Minor Collector

Local

2005 Adjusted Urbanized Area

2005 Metropolitan Planning Area

mz: O:\MikeZ\Dave\FDL\2013FDLTIP\MXD\FDLTIP13H1.mxd

Page 84: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013

APPENDIX I

TIP AMENDMENTS

Page 85: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013
Page 86: Transporation Improvement Program for the Fond du Lac Urbanized Area 2013

** Amended 5/8/13. ($000) ** Funds are obligated to projects approximately 6 weeks prior to LET date.

Fed State Local Total Fed State Local Total Fed State Local Total Fed State Local Total Fed State Local Total

WisDOT Larson Dr. - RR Crossing PE 0 0 0 0 0

Fond du Lac McNelus Steel, Inc. ROW 0 0 0 0 0

1420-25-50 CONST 0 600 600 1200 0 0 0 0

443-13-020 TEA 0.9 m. (P) TOTAL 0 600 600 1200 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

WisDOT WIS 175 PE 0 10 0 10 0 0 0 0

Fond du Lac Box Culvert ROW 0 0 0 0 0

3360-14-00/71 CONST 0 28 7 0 35 0 0 0

443-13-021 STP (P) TOTAL 0 10 0 10 28 7 0 35 0 0 0 0 0 0 0 0 0 0 0 0

WisDOT USH 45/Fond du Lac Ave. PE 360 90 0 450 0 0 0 0

Fond du Lac CTH V - 6th St Reconstruct ROW 0 0 0 0 0

4986-07-00 CONST 0 0 0 0 0

443-13-022 STP 1.47 m. (P) TOTAL 360 90 0 450 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

WisDOT USH 151/DuCharme Intersection turn lanes PE 0 125 0 125 0 0 0 0

Fond du Lac ROW 0 0 0 0 0

1420-26-00 CONST 0 0 495 100 79 674 0 0

443-13-023 STP (P) TOTAL 0 125 0 125 0 0 0 0 495 100 79 674 0 0 0 0 0 0 0 0

** Funds are obligated to projects approximately 6 weeks prior to LET date.** Amended 5/8/13. ** Funds are listed in Year of Expenditure $.

TABLE 1

FOND DU LAC URBANIZED AREA - PROGRAMMED PROJECTS LISTING (2013-2017)

2014Type of

CostProject Description

Primary

Jursdiction

2017 +2015 20162013