tracking and vertexing with a thin cmos pixel beamtelescope and thin ladder studies m battaglia jm...

18
Tracking and Vertexing with a Thin CMOS Pixel BeamTelescope and Thin Ladder Studies M Battaglia JM Bussat, D Contarato, P Giubilato, LE Glesener, LC Greiner, B Hooberman UC Berkeley, LBNL, INFN Padova LCWS07 Conference DESY May 31, 2007

Upload: wilfred-mckenzie

Post on 29-Jan-2016

216 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Tracking and Vertexing with a Thin CMOS Pixel BeamTelescope and Thin Ladder Studies M Battaglia JM Bussat, D Contarato, P Giubilato, LE Glesener, LC Greiner,

Tracking and Vertexing

with a Thin CMOS Pixel BeamTelescopeand Thin Ladder Studies

M BattagliaJM Bussat, D Contarato, P Giubilato, LE Glesener, LC Greiner, B Hooberman

UC Berkeley, LBNL, INFN Padova

LCWS07 ConferenceDESY May 31, 2007

Page 2: Tracking and Vertexing with a Thin CMOS Pixel BeamTelescope and Thin Ladder Studies M Battaglia JM Bussat, D Contarato, P Giubilato, LE Glesener, LC Greiner,

CMOS Pixel Back-thinningCMOS Pixel Back-thinning

Study change in charge collection and S/N before/after back-thinning: MIMOSA 5 sensors (1 M pixels, 17 m, 18x18 mm2 surface, AMS 0.6)

55FeDetermine chip gain and S/N for 5.9 keV X rays

1.5 GeV e- beam Determine S/N and cluster size for m.i.p.

S/N

Feasibility of Back-thinning CMOS sensors demonstrated

Program of back-thinning of diced chips using grinding process by APTEK;

Thinned over 15 chips,yield of functional chips~90%,Process reliable down to 40 mMeasured thickness of chips:

5.0550 Before

“50 m”

“40 m”

750 641

Page 3: Tracking and Vertexing with a Thin CMOS Pixel BeamTelescope and Thin Ladder Studies M Battaglia JM Bussat, D Contarato, P Giubilato, LE Glesener, LC Greiner,

The LBNL Thin Pixel Pilot TelescopeThe LBNL Thin Pixel Pilot TelescopeThe LBNL Thin Pixel Pilot TelescopeThe LBNL Thin Pixel Pilot Telescope

Layout: 3 layers of thin Mimosa 5 sensors (17m pixels) (40m + 50m + 50m) + reference detector;

Sensor spacing: 1.7 cm

1234

beam

Beam: 1.5 GeV e- from ALS booster at BTS

• First beam telescope based on thin pixel sensors;• Prototype for proposed FNAL MBTF telescope & T966;• System test of multi-M pixel detector in realistic conditions.

Page 4: Tracking and Vertexing with a Thin CMOS Pixel BeamTelescope and Thin Ladder Studies M Battaglia JM Bussat, D Contarato, P Giubilato, LE Glesener, LC Greiner,

Thin Pixel Thin Pixel Pilot TelescopePilot Telescope

Run 056 Event 001

TPPT allows us to perform detailed studies of ILC VTX particle tracking with various, controllable, levels of track density (0.5-5 tracks mm-2) under realistic conditions;

TPPT Data e+e- HZat 0.5 TeV

Distance of Closest Hit

TPPT layout chosen to resemble ILC VTX.

Page 5: Tracking and Vertexing with a Thin CMOS Pixel BeamTelescope and Thin Ladder Studies M Battaglia JM Bussat, D Contarato, P Giubilato, LE Glesener, LC Greiner,

Thin Pixel Thin Pixel Pilot TelescopePilot Telescope

Run 049 Run 056

Hit density on TPPT Layer 1

Page 6: Tracking and Vertexing with a Thin CMOS Pixel BeamTelescope and Thin Ladder Studies M Battaglia JM Bussat, D Contarato, P Giubilato, LE Glesener, LC Greiner,

Thin Pixel Thin Pixel Pilot TelescopePilot Telescope

Alignment performed using ATLAS optical survey machineand sample of 20000 tracks;

2

Extrapolation on Layer 2:Residuals in X

)1.09.6( m

Page 7: Tracking and Vertexing with a Thin CMOS Pixel BeamTelescope and Thin Ladder Studies M Battaglia JM Bussat, D Contarato, P Giubilato, LE Glesener, LC Greiner,

Thin Pixel Thin Pixel Pilot TelescopePilot Telescope

Extrapolation on Layer 1:

Run 049

Run 056

Track Sample Residual

(m)

2+3 Hits Tracks

3 Hits Tracks

Low Density

High Density

2.04.9 5.09.8 2.02.9 5.09.9

Page 8: Tracking and Vertexing with a Thin CMOS Pixel BeamTelescope and Thin Ladder Studies M Battaglia JM Bussat, D Contarato, P Giubilato, LE Glesener, LC Greiner,

Thin Pixel Thin Pixel Pilot TelescopePilot Telescope

Cluster Shape vs. Track Point of Impact

extrapolatedtrack

Reco Hit

Cluster

Despite m.s. limitations,extrapolation resolution is<< pixel size allowing some studies of cluster shape vs. track point of impact:

Page 9: Tracking and Vertexing with a Thin CMOS Pixel BeamTelescope and Thin Ladder Studies M Battaglia JM Bussat, D Contarato, P Giubilato, LE Glesener, LC Greiner,

Thin Pixel Thin Pixel Pilot TelescopePilot Telescope

Extrapolation Resolutionon Layer 1: = m matches ILC requirements.

= 9.4 m

ILC Target Resolution

TPPTData

Estimate extrapolationresolution to IP from TPPT data at ALS byunfolding MIMOSA5resolution (from G4+Marlin)

Page 10: Tracking and Vertexing with a Thin CMOS Pixel BeamTelescope and Thin Ladder Studies M Battaglia JM Bussat, D Contarato, P Giubilato, LE Glesener, LC Greiner,

Response to Pair BackgroundResponse to Pair Background

Pair e- HitSimulated in PixelSim

Beam tests using 0.05 - 1.0 GeV e- beams at LOASIS and ALS to validate simulation.

GuineaPig+Mokka Simulation of 1 BX ILC 0.5 TeV in LDC

LDRD-2 responseto ALS beam halo

Page 11: Tracking and Vertexing with a Thin CMOS Pixel BeamTelescope and Thin Ladder Studies M Battaglia JM Bussat, D Contarato, P Giubilato, LE Glesener, LC Greiner,

VTX Simulation, Reconstruction, AnalysisVTX Simulation, Reconstruction, AnalysisVTX Simulation, Reconstruction, AnalysisVTX Simulation, Reconstruction, Analysis

Physics Benchmarks

PixelSimCluster Reconstruction

PixelAna

ALS & FNAL Beam Test Data

G4/Mokka

Sensorand Ladder

Characterization

Track Fitand Extrapolation

VTX Pattern Recognition

lcio

lcio

Jet Flavour Tagging+ CDF Vtx Fit

lcioMarlin

Sensor Simulation

Page 12: Tracking and Vertexing with a Thin CMOS Pixel BeamTelescope and Thin Ladder Studies M Battaglia JM Bussat, D Contarato, P Giubilato, LE Glesener, LC Greiner,

Beam Test at FNAL MBTF 120 GeV p beam-line (T-966) (June 25-July 8,2007)(UC Berkeley + LBNL + INFN Padova + Purdue U Collaboration)

T-966 Beam Test Experiment T-966 Beam Test Experiment at Fermilabat Fermilab

Deploy two pixel beam telescope: • TPPT-2 telescope: 4 layers of 50m thick MIMOSA-5 sensors, • LDRD telescope: 4 layers of LDRD-2 sensors,ILC-like geometry, extrapolation resolution on 1st plane ~ 1m

Study LDRD-1, LDRD-2 and LDRD-SOI sensors: • single point resolution & sensor efficiency, • response to inclined tracks,• tracking capabilities in dense environment,• vertex reconstruction accuracy with thin target,

Validate simulation, test patrec and reco algorithms, plan to make lcio hit data available for joint LBNL+FNAL tracking studies.

G4 simulation of 120 GeV p Alinteraction in T-966

Page 13: Tracking and Vertexing with a Thin CMOS Pixel BeamTelescope and Thin Ladder Studies M Battaglia JM Bussat, D Contarato, P Giubilato, LE Glesener, LC Greiner,

T966 T966 TelescopeTelescope

4-layeredTelescope

DUT

New Thinned MIMOSA5Telescope (TPPT-2):• new mezzanine with low profile components and larger clear region below chip;• 4 layers of 50 m thin chips precisely spaced by 1.5 cm;• precise positioning of chip on mezzanine (< 50 m) using vacuum chuck;• DUT installed on computer controlled XY stage for alignment/scan.

Page 14: Tracking and Vertexing with a Thin CMOS Pixel BeamTelescope and Thin Ladder Studies M Battaglia JM Bussat, D Contarato, P Giubilato, LE Glesener, LC Greiner,

T966 T966 TelescopeTelescope

4-layeredTelescope

DUT

Test run of TPPT-2 at ALS with 1.23 GeV e- beam(May 2007);

S/N of TPPT-2 detectors @ 27oC

<S/N> ~ 15Alignment in progress;Runs with LDRD-2 as DUT.

Hits DensityRun 102

Page 15: Tracking and Vertexing with a Thin CMOS Pixel BeamTelescope and Thin Ladder Studies M Battaglia JM Bussat, D Contarato, P Giubilato, LE Glesener, LC Greiner,

VTX Ladder Design & TestingVTX Ladder Design & TestingVTX Ladder Design & TestingVTX Ladder Design & Testing

LCRD funding supports new program of engineering design, construction and characterization of full ladder equipped with back-thinned CMOS pixel sensors in collaboration with STAR HFT project;

• Mechanical and thermal characterization of STAR prototype, study of heat removal using low-speed airflow;

IR Camera ImageAir Cooling Test

Thin Chips Heating cable

(80mW/cm2)0.282% X0

• STAR Low mass carrier: 50m CFC+3.2mm RVC+50m CFC (=0.11%X0);

T(0C)

Page 16: Tracking and Vertexing with a Thin CMOS Pixel BeamTelescope and Thin Ladder Studies M Battaglia JM Bussat, D Contarato, P Giubilato, LE Glesener, LC Greiner,

VTX Ladder Design & TestingVTX Ladder Design & Testing

X

Y

Z

2-15 2-20 2-26 2-29 2-30 2-32 2-27 2-1

X

Y

Z

2-15 2-20 2-26 2-29 2-30 2-32 2-27 2-1

STAR study of accuracy of chip positioning on carrier:50 m backthinned MIMOSA5 are positioned using a vacuum chuck with alignment bump edge and individual vacuum chuck valves;

20.32

20.33

20.34

20.35

20.36

20.37

20.38

0 50 100 150

MIMOSA5 corner locationson prototype ladder

bottom corner Ytop corner Y

Y

X

Profile of Chip Elevation on CarrierChip Corner Locations

Flat to ~ 30 m

Accurate to~ 20 m

Measurementsusing OpticalSurvey Machinewith ~ 1 m accuracy.

Page 17: Tracking and Vertexing with a Thin CMOS Pixel BeamTelescope and Thin Ladder Studies M Battaglia JM Bussat, D Contarato, P Giubilato, LE Glesener, LC Greiner,

VTX Ladder Design & TestingVTX Ladder Design & Testing

• FEA of prototype structures: (core-cooled Si/CF/RVC sandwich, Si/Al/RVC sandwich, CVD coated CF) in progress using data from surveys of 40 and 50 m thin chips, first results promising, test of prototype in 2008;

Stress of flattened 50 m chip

Low density (0.2-0.6g/cc)High thermal conductivity (40-180W/m K) carbon foam

Concept forSymmetric LadderSandwich Support with Air Coolingthrough Core

Page 18: Tracking and Vertexing with a Thin CMOS Pixel BeamTelescope and Thin Ladder Studies M Battaglia JM Bussat, D Contarato, P Giubilato, LE Glesener, LC Greiner,

ConclusionsConclusions

Marlin Reconstruction ofG4 simulated 120 GeV p Alinteraction in T-966

• Successful program of CMOS pixel chip back-thinning to 40 m and characterisation;

• First Thin Pixel Beam Telescope commissioned at LBNL ALS, extrapolation resolution matches expectations;

• T-966 Beam Test experiment will use two new beam telescopes for broad program of tracking and vertexing studies on FNAL 120 GeV p beam;

• Program of design, characterisation of lightweight ladder carried out as LCRD project in close collaboration with LBNL STAR HFT group.