    Adani Power Maharashtra Limited (APML), a subsidiary of Adani Group is constructing India's

    first super-critica technoogy based therma power pant at !iroda, Maharashtra" !iroda power

     pant wi be the biggest power generation faciity in Maharashtra, with an instaed capacity of

    #,#$$M% (&$M%)"

    !he Lohara west and Lohara etension coa deposits in Maharashtra proide coa for the !iroda

     power pant units I and II"

    Adani Power Maharashtra has, in addition, signed a fue-suppy agreement with *outh +astern

    oa fieds for the suppy of "# miion tonnes of coa for the !iroda power pant"

    !he company has aso aid a .$"&/m cross-country pipeine from 0hapewada barrage on

    %ainganga 1ier in order to meet the water re2uirements of the power pant"

    Tiroda power plant development!he !iroda Power pant of Adani Group is being deeoped in two stages" !he first stage

    consisted of three coa-fired super-critica generation units rated at $M%, with a combined

     power generation capacity of .,34$M%"

    !he second stage comprises two $M% coa-fired super-critica generation units"

    APML commissioned the first two $M% units of !iroda super critica power pant in August

    $. and 5anuary $.#" !he third unit was commissioned in 5une $.# mar/ing the competion

    of the first stage of the pro6ect"

    !he first two units ($M%) are registered with the 7nited 8ations 9ramewor/ onention

    on imate hange (789), as cean deeopment mechanism (0M) pro6ect"

     Transmission and sale of power generated by Tiroda power plant

    A ::$/; !iroda-%arora doube circuit A transmission ine was constructed for eacuating the

     power generated by !iroda power pant"

    A

  • 8/19/2019 Tiroda Adani Thermal Power Plant

    2/3

     Technology used for the Tiroda power project

    !he boier tube is e2uipped with an acoustic ea/age detection system incuded with adanced

    sensors for noise signa measurement and eimination" !he ea/age in the boier tube is detected

    through acoustic fre2uency spectrum anaysis"

    >nce-through boier technoogy is used for the feed water contro in the super-critica boier

    systems" !he automation system is made up of Adanced 9oboro Inensys IA system"

    Mutiariabe transmitters are instaed in the process measurement" !he compressor system is

    e2uipped with pie?oeectric sensor technoogy"

    Adanced software based inspection management system was used in the construction of the

  • 8/19/2019 Tiroda Adani Thermal Power Plant