timetablers forum monday 9 july, 2012 8.8.47

16
Timetablers Forum Monday 9 July, 2012 8.8.47

Upload: baruch

Post on 25-Feb-2016

36 views

Category:

Documents


0 download

DESCRIPTION

Timetablers Forum Monday 9 July, 2012 8.8.47. 2013 Timetabling Timelines. Phase 1 Timetable Preparation01/06/12 – 15/07/12 Central Office Tasks: Snapshot of 2012 data – 12 June Validation of Suitabilities for centrally managed teaching space Purge all ad hoc bookings - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Timetablers Forum Monday 9 July, 2012 8.8.47

Timetablers ForumMonday 9 July, 20128.8.47

Page 2: Timetablers Forum Monday 9 July, 2012 8.8.47

Property Services, Space Planning and Management 2

2013 Timetabling Timelines

Phase 1 Timetable Preparation 01/06/12 – 15/07/12Central Office Tasks:• Snapshot of 2012 data – 12 June

• Validation of Suitabilities for centrally managed teaching space

• Purge all ad hoc bookings

• Reset physical teaching space

• Add new locations and identify locations no longer required

• Preparation of 2013 database for WDC

RMIT University©2012

Page 3: Timetablers Forum Monday 9 July, 2012 8.8.47

Property Services, Space Planning and Management 3

2013 Timetabling Timelines

Phase 1 Timetable Preparation 01/06/12 – 15/07/12School Timetabler Tasks:• Gather timetable information

• Commence preparation of timetables with key school staff

• Identify and add new modules (courses) for inclusion

• Confirm deleted courses

RMIT University©2012

Page 4: Timetablers Forum Monday 9 July, 2012 8.8.47

Property Services, Space Planning and Management 4

2013 Timetabling Timelines

Phase 2 – WDC Data Collection 16/07/12 – 26/08/12School Timetabler Tasks:• Verification of all timetable requirements within WDC, includes semester 1

and 2

• Confirm / delete classes for 2013

• Addition of new classes for 2013

• Update existing classes with new requirements for 2013 where necessary

RMIT University©2012

Page 5: Timetablers Forum Monday 9 July, 2012 8.8.47

Property Services, Space Planning and Management 5

2013 Timetabling Timelines

Phase 3 – Location Scheduling 27/08/12 – 23/09/12Central Office Tasks:• Activities confirmed in WDC during Phase 2 are transferred to Syllabus Plus• Timetable data analysed, and reported back to schools for correction:

– Over constrained activities where no rooms match the requirements– Oversubscribed activities, where too many classes are requesting the

same venue at the same time– Data gaps, no campus selected, no zone selected

• Classes scheduled and location priority groups:– Specialist spaces– Computer labs– Lecture theatres– Flat floor teaching spaces

• Scheduling reports provided to Schools after each group scheduled

RMIT University©2012

Page 6: Timetablers Forum Monday 9 July, 2012 8.8.47

Property Services, Space Planning and Management 6

2013 Timetabling Timelines

Phase 4 – Draft Timetable Review 24/09/12 – 18/10/12School Timetabler Tasks:• Review allocations and scheduling from central timetable office

• Address timetable issues

• Draft review can commence from when the first report is received during Phase 3

• Setting Section ID within Syllabus Plus for STS purposes

RMIT University©2012

Page 7: Timetablers Forum Monday 9 July, 2012 8.8.47

Property Services, Space Planning and Management 7

2013 Timetabling Timelines

Phase 5 –Timetable Published 19/10/12• Higher Ed – Timetable published on STS

• TAFE – Timetable published on School website

RMIT University©2012

Page 8: Timetablers Forum Monday 9 July, 2012 8.8.47

Property Services, Space Planning and Management 8

Web Data Collector 2.5

Improvements and Changes to the Interface• True support for Jointly Taught Activities (STAs)

RMIT University©2012

Page 9: Timetablers Forum Monday 9 July, 2012 8.8.47

Property Services, Space Planning and Management 9

Web Data Collector 2.5

Improvements and Changes to the Interface• Student Sets

RMIT University©2012

Page 10: Timetablers Forum Monday 9 July, 2012 8.8.47

Property Services, Space Planning and Management 10

Web Data Collector 2.5

Improvements and Changes to the Interface• Identifying Service Taught activities

RMIT University©2012

Page 11: Timetablers Forum Monday 9 July, 2012 8.8.47

Property Services, Space Planning and Management 11

Web Data Collector 2.5

Improvements and Changes to the Interface• Reporting

RMIT University©2012

Page 12: Timetablers Forum Monday 9 July, 2012 8.8.47

Property Services, Space Planning and Management 12

Web Data Collector 2.5

Improvements and Changes to the Interface• Edit existing specialist classes

RMIT University©2012

Page 13: Timetablers Forum Monday 9 July, 2012 8.8.47

Property Services, Space Planning and Management 13

Housekeeping

• Syllabus Plus Fat Client – issues and future• Joanne Farruggia on leave during July

Nicole Eaton and Craig King only staff members in the central office

Refer school staff to the Web Room Booking system for ad hoc bookings

Refer to WDC manual for technical issues

RMIT University©2012

Page 14: Timetablers Forum Monday 9 July, 2012 8.8.47

Property Services, Space Planning and Management 14

Printing and Reporting from Classic

RMIT University©2012

Page 15: Timetablers Forum Monday 9 July, 2012 8.8.47

Property Services, Space Planning and Management 15

General Business/Open Forum for Questions

RMIT University©2012

Page 16: Timetablers Forum Monday 9 July, 2012 8.8.47

Property Services, Space Planning and Management 16

Thank you for your Attendance

RMIT University©2012