tidewater government industry council contract specifications and performance based work statements...
TRANSCRIPT
TIDEWATER GOVERNMENT INDUSTRY COUNCIL www.tasc-tgic.org
TGICEDUCATION
Tidewater Government Industry Council
TGICEDUCATION
Tidewater Government Industry Council
TIDEWATER ASSOCIATI0N OF SERVICE CONTRACTORS
TASCTIDEWATER ASSOCIATI0N OF SERVICE CONTRACTORS
TASC
Contract Specifications and Performance Based Work
Statements©
Tidewater Government Industry Council Training Program
TIDEWATER GOVERNMENT INDUSTRY COUNCIL www.tasc-tgic.org
TGICEDUCATION
Tidewater Government Industry Council
TGICEDUCATION
Tidewater Government Industry Council
TIDEWATER ASSOCIATI0N OF SERVICE CONTRACTORS
TASCTIDEWATER ASSOCIATI0N OF SERVICE CONTRACTORS
TASC
Flashbacks and Dots• Acquisition Planning/Market Research
– Market Surveillance and Investigation– Involve the Team– Commercial Items and Services– Requests for Information (RFI)– Draft Statement of Work– Draft Request for Proposal– Pre-Solicitation Conference– Procurement Administrative Lead Time
TIDEWATER GOVERNMENT INDUSTRY COUNCIL www.tasc-tgic.org
TGICEDUCATION
Tidewater Government Industry Council
TGICEDUCATION
Tidewater Government Industry Council
TIDEWATER ASSOCIATI0N OF SERVICE CONTRACTORS
TASCTIDEWATER ASSOCIATI0N OF SERVICE CONTRACTORS
TASC
More Flashbacks and Dots• Contract Types
– Risk Sharing Arrangement– Type and Complexity of Requirement– Doctrine of Contra Proferentem– What does the contract say?
• Competition– Incumbents and Competitors– Single-Award vs. Multiple Award Contracts
TIDEWATER GOVERNMENT INDUSTRY COUNCIL www.tasc-tgic.org
TGICEDUCATION
Tidewater Government Industry Council
TGICEDUCATION
Tidewater Government Industry Council
TIDEWATER ASSOCIATI0N OF SERVICE CONTRACTORS
TASCTIDEWATER ASSOCIATI0N OF SERVICE CONTRACTORS
TASC
Design & Performance Specifications
• Design– Detailed, prescriptive, how-to– Military and Federal Specifications– Detailed drawing packages
• Performance– Outcomes (within parameters)– Performance Measures
TIDEWATER GOVERNMENT INDUSTRY COUNCIL www.tasc-tgic.org
TGICEDUCATION
Tidewater Government Industry Council
TGICEDUCATION
Tidewater Government Industry Council
TIDEWATER ASSOCIATI0N OF SERVICE CONTRACTORS
TASCTIDEWATER ASSOCIATI0N OF SERVICE CONTRACTORS
TASC
FAR 37.102(a)
• Performance Based Acquisition– Preferred method for acquiring services– Must be used to the maximum extent
practicable except architect-engineer services, construction, utility services and services incidental to supply purchases
• Still has applicability, e.g., Design-Build, Service Levels, Commercial Installation Services
TIDEWATER GOVERNMENT INDUSTRY COUNCIL www.tasc-tgic.org
TGICEDUCATION
Tidewater Government Industry Council
TGICEDUCATION
Tidewater Government Industry Council
TIDEWATER ASSOCIATI0N OF SERVICE CONTRACTORS
TASCTIDEWATER ASSOCIATI0N OF SERVICE CONTRACTORS
TASC
FAR 37.601• Requirements are described in terms of results
rather than methods to perform the work– What versus how– Descriptive versus prescriptive
• Work is performed using measurable performance standards, e.g., timeliness, quantity, quality
• Price or fee reductions for unacceptable results• Performance incentives for better performance
TIDEWATER GOVERNMENT INDUSTRY COUNCIL www.tasc-tgic.org
TGICEDUCATION
Tidewater Government Industry Council
TGICEDUCATION
Tidewater Government Industry Council
TIDEWATER ASSOCIATI0N OF SERVICE CONTRACTORS
TASCTIDEWATER ASSOCIATI0N OF SERVICE CONTRACTORS
TASC
Technical Program Office Responsibilities
• A Statement of Work that clearly defines the required effort and specific tasks to be accomplished
• Quality assurance requirements for (objectively) determining acceptable performance
• Deliverables and their delivery dates
TIDEWATER GOVERNMENT INDUSTRY COUNCIL www.tasc-tgic.org
TGICEDUCATION
Tidewater Government Industry Council
TGICEDUCATION
Tidewater Government Industry Council
TIDEWATER ASSOCIATI0N OF SERVICE CONTRACTORS
TASCTIDEWATER ASSOCIATI0N OF SERVICE CONTRACTORS
TASC
Performance Based Acquisition in its Simplest Terms
• What do I need?
• When do I need it?
• How do I know it’s good?
TIDEWATER GOVERNMENT INDUSTRY COUNCIL www.tasc-tgic.org
TGICEDUCATION
Tidewater Government Industry Council
TGICEDUCATION
Tidewater Government Industry Council
TIDEWATER ASSOCIATI0N OF SERVICE CONTRACTORS
TASCTIDEWATER ASSOCIATI0N OF SERVICE CONTRACTORS
TASC
Benefits of Performance-Based
• Increased likelihood of meeting mission needs• Focus on results, not prescriptive process; Absence of
detailed Government specs and processes• Better value and enhanced performance • Flexibility in contractor experience and solutions• Enhanced competition• Reduced likelihood of protests and claims• Contractor responsible for quality control, Government
for quality assurance
TIDEWATER GOVERNMENT INDUSTRY COUNCIL www.tasc-tgic.org
TGICEDUCATION
Tidewater Government Industry Council
TGICEDUCATION
Tidewater Government Industry Council
TIDEWATER ASSOCIATI0N OF SERVICE CONTRACTORS
TASCTIDEWATER ASSOCIATI0N OF SERVICE CONTRACTORS
TASC
Fundamentally
• Federal contracts should mirror best commercial practices which tend to be outcome oriented
• More fundamentally, why are you contracting and with whom are you contracting?
• Most fundamentally, how do you execute personal procurements?
TIDEWATER GOVERNMENT INDUSTRY COUNCIL www.tasc-tgic.org
TGICEDUCATION
Tidewater Government Industry Council
TGICEDUCATION
Tidewater Government Industry Council
TIDEWATER ASSOCIATI0N OF SERVICE CONTRACTORS
TASCTIDEWATER ASSOCIATI0N OF SERVICE CONTRACTORS
TASC
Elements of the PBWS
• Performance Requirements
• Performance Standards
• Acceptable Quality Level
• Monitoring Method
• Incentive
• Performance Requirements Summary
TIDEWATER GOVERNMENT INDUSTRY COUNCIL www.tasc-tgic.org
TGICEDUCATION
Tidewater Government Industry Council
TGICEDUCATION
Tidewater Government Industry Council
TIDEWATER ASSOCIATI0N OF SERVICE CONTRACTORS
TASCTIDEWATER ASSOCIATI0N OF SERVICE CONTRACTORS
TASC
Performance Requirement
• Scrub to eliminate unnecessary tasks
• What is the requirement?
• What must be accomplished to satisfy the requirement?
• What deliverables are necessary and when are they due?
• Use the “so what” test.
TIDEWATER GOVERNMENT INDUSTRY COUNCIL www.tasc-tgic.org
TGICEDUCATION
Tidewater Government Industry Council
TGICEDUCATION
Tidewater Government Industry Council
TIDEWATER ASSOCIATI0N OF SERVICE CONTRACTORS
TASCTIDEWATER ASSOCIATI0N OF SERVICE CONTRACTORS
TASC
So What?
• Who needs the output?
• Why is the output needed?
• What occurs as a result?
• Is it worth the effort and cost?
• Would a different output be preferable?
• Requirements vs. “desirements”– Saw it, liked it, wanted it.
TIDEWATER GOVERNMENT INDUSTRY COUNCIL www.tasc-tgic.org
TGICEDUCATION
Tidewater Government Industry Council
TGICEDUCATION
Tidewater Government Industry Council
TIDEWATER ASSOCIATI0N OF SERVICE CONTRACTORS
TASCTIDEWATER ASSOCIATI0N OF SERVICE CONTRACTORS
TASC
Performance Standards• Drive level-of-effort and cost; should be
consistent with minimum mission needs• What are the standards for timeliness, quantity,
and quality, e.g., work volume, completeness, accuracy, reliability, customer satisfaction, cost, etc.
• How much deviation can the mission tolerate?• Will commercial standards meet mission needs?
TIDEWATER GOVERNMENT INDUSTRY COUNCIL www.tasc-tgic.org
TGICEDUCATION
Tidewater Government Industry Council
TGICEDUCATION
Tidewater Government Industry Council
TIDEWATER ASSOCIATI0N OF SERVICE CONTRACTORS
TASCTIDEWATER ASSOCIATI0N OF SERVICE CONTRACTORS
TASC
Examples of Performance Standards
• Response times, delivery times, timeliness meeting deadlines or due dates
• Error rates (number)
• Accuracy rates (percentage)
• Completion milestones (% complete and time)
• Cost control (non-fixed price contracts)
TIDEWATER GOVERNMENT INDUSTRY COUNCIL www.tasc-tgic.org
TGICEDUCATION
Tidewater Government Industry Council
TGICEDUCATION
Tidewater Government Industry Council
TIDEWATER ASSOCIATI0N OF SERVICE CONTRACTORS
TASCTIDEWATER ASSOCIATI0N OF SERVICE CONTRACTORS
TASC
Checklist for Performance Standards
• Do your selected standards address quality, quantity, and timeliness?
• Are they objective and measureable?
• Are you using commercial standards?
• Will two evaluators come to the same performance conclusions using the same chosen standards?
TIDEWATER GOVERNMENT INDUSTRY COUNCIL www.tasc-tgic.org
TGICEDUCATION
Tidewater Government Industry Council
TGICEDUCATION
Tidewater Government Industry Council
TIDEWATER ASSOCIATI0N OF SERVICE CONTRACTORS
TASCTIDEWATER ASSOCIATI0N OF SERVICE CONTRACTORS
TASC
Acceptable Quality Levels
• AQLs – Performance thresholds for minimally acceptable level of performance
• Should be consistent with mission needs and budget
• Some level of unacceptable work will always happen and zero tolerance is expensive
• How much error is acceptable and how much perfection is affordable.
TIDEWATER GOVERNMENT INDUSTRY COUNCIL www.tasc-tgic.org
TGICEDUCATION
Tidewater Government Industry Council
TGICEDUCATION
Tidewater Government Industry Council
TIDEWATER ASSOCIATI0N OF SERVICE CONTRACTORS
TASCTIDEWATER ASSOCIATI0N OF SERVICE CONTRACTORS
TASC
Checklist for AQLs
• Clearly defined?
• Realistic and achievable?
• AQL time period clearly defined?
• Performance evaluators identified, trained, and technically knowledgeable?
• Will AQL satisfy customer?
• Allow for improvement…incentives
TIDEWATER GOVERNMENT INDUSTRY COUNCIL www.tasc-tgic.org
TGICEDUCATION
Tidewater Government Industry Council
TGICEDUCATION
Tidewater Government Industry Council
TIDEWATER ASSOCIATI0N OF SERVICE CONTRACTORS
TASCTIDEWATER ASSOCIATI0N OF SERVICE CONTRACTORS
TASC
Monitoring Methods
• Random Sampling & Periodic Sampling– Most appropriate for frequently recurring tasks– Sample size and frequency calibrated to
experienced performance– Periodic sampling similar to random but at
specific intervals or dates
TIDEWATER GOVERNMENT INDUSTRY COUNCIL www.tasc-tgic.org
TGICEDUCATION
Tidewater Government Industry Council
TGICEDUCATION
Tidewater Government Industry Council
TIDEWATER ASSOCIATI0N OF SERVICE CONTRACTORS
TASCTIDEWATER ASSOCIATI0N OF SERVICE CONTRACTORS
TASC
Monitoring Methods
• Trend Analysis– Used regularly and continually to assess
ongoing performance over time– Maintained in customer database– May be used to recalibrate performance
assessment methods and/or frequencies
TIDEWATER GOVERNMENT INDUSTRY COUNCIL www.tasc-tgic.org
TGICEDUCATION
Tidewater Government Industry Council
TGICEDUCATION
Tidewater Government Industry Council
TIDEWATER ASSOCIATI0N OF SERVICE CONTRACTORS
TASCTIDEWATER ASSOCIATI0N OF SERVICE CONTRACTORS
TASC
Customer Feedback
• Supplements other forms of evaluation
• Likely complaint-oriented and subjective
• Must be validated by Contracting Officer’s Technical Representative (COTR)/Quality Assurance Evaluator (QAE)
TIDEWATER GOVERNMENT INDUSTRY COUNCIL www.tasc-tgic.org
TGICEDUCATION
Tidewater Government Industry Council
TGICEDUCATION
Tidewater Government Industry Council
TIDEWATER ASSOCIATI0N OF SERVICE CONTRACTORS
TASCTIDEWATER ASSOCIATI0N OF SERVICE CONTRACTORS
TASC
Determining the Assessment Method
• Best match-up with outcomes and standards• Criticality of task to mission• Length of assessment period• Frequency and cost of assessment• Availability of capable Assessors• Commercial practice for the service area• Practicality and reasonableness of contractor • re-performance
TIDEWATER GOVERNMENT INDUSTRY COUNCIL www.tasc-tgic.org
TGICEDUCATION
Tidewater Government Industry Council
TGICEDUCATION
Tidewater Government Industry Council
TIDEWATER ASSOCIATI0N OF SERVICE CONTRACTORS
TASCTIDEWATER ASSOCIATI0N OF SERVICE CONTRACTORS
TASC
Performance Assessment Plan
• Government-initiated document in parallel with PBWS• Describes how QAE will evaluate and assess performance• One or more methods for each performance objective• Describes how performance information will be captured and
documented• Revised and modified as necessary• Incorporated into contract or otherwise furnished to contractor
– Based on the premise that contractor is responsible for Quality Control
• Contractor-developed Quality Control Plan may be required in proposal or as an initial contract deliverable
TIDEWATER GOVERNMENT INDUSTRY COUNCIL www.tasc-tgic.org
TGICEDUCATION
Tidewater Government Industry Council
TGICEDUCATION
Tidewater Government Industry Council
TIDEWATER ASSOCIATI0N OF SERVICE CONTRACTORS
TASCTIDEWATER ASSOCIATI0N OF SERVICE CONTRACTORS
TASC
The Contractor’s QCP
• The contractor’s procedures to ensure:– Successful completion of tasks– Compliant, timely deliverables– Cost-efficient task completion– Effective management of workforce, level-of-
effort, labor mix– Tracking of labor hours to correct or replace
work not meeting contract requirements
TIDEWATER GOVERNMENT INDUSTRY COUNCIL www.tasc-tgic.org
TGICEDUCATION
Tidewater Government Industry Council
TGICEDUCATION
Tidewater Government Industry Council
TIDEWATER ASSOCIATI0N OF SERVICE CONTRACTORS
TASCTIDEWATER ASSOCIATI0N OF SERVICE CONTRACTORS
TASC
A Suggested PBWS Format
• Introduction (brief)– What is overall need and why important
• Background Information (relatively brief)– How need supports the mission
• Scope (brief)– What specifically is needed and included in the framework of the
contract.• Applicable Documents
– Directives, instructions, publications• Pertinent and available
TIDEWATER GOVERNMENT INDUSTRY COUNCIL www.tasc-tgic.org
TGICEDUCATION
Tidewater Government Industry Council
TGICEDUCATION
Tidewater Government Industry Council
TIDEWATER ASSOCIATI0N OF SERVICE CONTRACTORS
TASCTIDEWATER ASSOCIATI0N OF SERVICE CONTRACTORS
TASC
A Suggested PBWS Format
• Performance Requirements (narrative)– Performance outcomes and their measures– Performance Requirements Summary
• Special Requirements– Security– Period of Performance– Place(s) of Performance– Government Furnished Facilities/Equipment/Information
• Deliverables– Tie their purpose to needs and mission– Who will use them and why
TIDEWATER GOVERNMENT INDUSTRY COUNCIL www.tasc-tgic.org
TGICEDUCATION
Tidewater Government Industry Council
TGICEDUCATION
Tidewater Government Industry Council
TIDEWATER ASSOCIATI0N OF SERVICE CONTRACTORS
TASCTIDEWATER ASSOCIATI0N OF SERVICE CONTRACTORS
TASC
Tips for PBWS Authors• Assume nothing and avoid generalities• Don’t rush to produce volume• Commit to clarity, “what,” not “how”• Don’t include extraneous material or over-specify• Avoid redundant repetition• Think before you write• Active, not passive, voice• Plain language, explain acronyms• Avoid run-on sentences• Describe requirements, don’t write around them• Write to explain, not impress
TIDEWATER GOVERNMENT INDUSTRY COUNCIL www.tasc-tgic.org
TGICEDUCATION
Tidewater Government Industry Council
TGICEDUCATION
Tidewater Government Industry Council
TIDEWATER ASSOCIATI0N OF SERVICE CONTRACTORS
TASCTIDEWATER ASSOCIATI0N OF SERVICE CONTRACTORS
TASC
Today’s Closing Thought
“What does the contract say?”
Bernard Sargrad, 1974
TIDEWATER GOVERNMENT INDUSTRY COUNCIL www.tasc-tgic.org
TGICEDUCATION
Tidewater Government Industry Council
TGICEDUCATION
Tidewater Government Industry Council
TIDEWATER ASSOCIATI0N OF SERVICE CONTRACTORS
TASCTIDEWATER ASSOCIATI0N OF SERVICE CONTRACTORS
TASC
Closing Questions?
TIDEWATER GOVERNMENT INDUSTRY COUNCIL www.tasc-tgic.org
TGICEDUCATION
Tidewater Government Industry Council
TGICEDUCATION
Tidewater Government Industry Council
TIDEWATER ASSOCIATI0N OF SERVICE CONTRACTORS
TASCTIDEWATER ASSOCIATI0N OF SERVICE CONTRACTORS
TASC
TGIC Training Program for FY 2014
TOPIC PRESENTERS
REED INTEGRATION, INC.
SUFFOLK
TIDEWATER COMMUNITY COLLEGE
VA BEACH
1 Synopsis, Competition, and Sole Source
Jeff Brunner and Damien Walsh
November 5th December 3rd
2 Small Business and Other Socioeconomic Set-Asides
Dona Storey and Brad Reaves
January 14th February 25th
3 Contract Specifications and Performance Based Work Statements
Jeff Brunner and Damien Walsh
March 11th April 1st
4 Contract Pricing and Pricing Strategies
Beverly Arviso May 13th June 10th
5 Source Selection, Debriefings, and Protests
Damien Walsh and Terence Murphy
July 22nd August 5th