van Thiel United b.v. Page: 1 of 15

Erection manual

Thiel-Lock transom

Concept

van Thiel United b.v. Page: 2 of 15

Subject Page

Artist impression of Thiel-Lock transom concept 3

Parts of Thiel-Lock transom concept 4

Legislation 5

Technical data Thiel-Lock transom 6

Technical data Tube-Lock® 7

Erecting Thiel-Lock transom scaffold 8

Bracing and tying 11

Handling equipment 12

Storage of scaffold equipment 13

Load 14

Ties 15

Ladder use & lift assembly 16

Contents

van Thiel United b.v. Page: 3 of 15

Thiel-Lock transom concept scaffold

Artist impression

Features of Thiel-Lock transom

• No need for ledger bracing, because of exceptionally rigid corner joint

• Fast erection; less tightening then conventional scaffolding

• No loose fittings

• Suitable for every form of building and height

• Guarantees a stable scaffold

van Thiel United b.v. Page: 4 of 15

Thiel-Lock transom concept combines flexibility, simplicity, strength and quick

(dis)assembly.

The multifunctional Thiel-Lock transom concept scaffold consists of 6 parts:

• The Thiel-Lock transom, provides a stiff scaffold without the need for ledger bracing

• Strong welded right-angle couplers connect uprights

• Right-angle couplers connect railings and horizontal ledgers at an angle of 90°

• Swivel couplers connect diagonals at a different angle

• Transoms + extenders make assembly of the Thiel-Lock concept scaffold easy

because the standards are placed at the correct distance from each other

• Standards, approx. 1270 mm centre to centre, connect the horizontal ledgers on the

work floor with each other so that 5 scaffold planks can be laid alongside each other.

• Transom + extender is provided with a pull-out that enables the assembly of a

maximum of 3 scaffold planks between the inside standard and the building.

• Additional: hop-up brackets with or without extenders.

• Because of the design the use of loose tubes and couplers other then provided isn’t

necessary. Van Thiel advises to use only original parts and if necessary tubes

according to specifications in EN39 and class B couplers according to EN74.

Thiel-Lock transom concept is designed for the construction of independent scaffolds and

can also be used in industry, shipbuilding and the aircraft industry. It prefabricates a

transom tube and 4 fittings to produce a rigid unit that speeds scaffold erection. In

combination with Tube-Lock® transom standards and ledgers it forms a quickly erected, 5

board wide ‘system’ access scaffold.

Parts of Thiel-Lock transom concept

All parts are available in solid galvanised steel

van Thiel United b.v. Page: 5 of 15

Legislation

The products manufactured by van Thiel United satisfy the strict quality and production

standards.

The values described in this manual concern steel Thiel-Lock transom concept scaffold

parts.

Regulations from the newest European legislation and standards govern the assembly of

Thiel-Lock transom concept scaffolds.

In connection with safety and legal liability we advise you to use only Thiel-Lock transom

concept parts.

Thiel-Lock transom concept scaffold parts can be combined with wooden scaffold parts

that comply to the product certificate for wooden scaffold parts.

Scaffolding in a form not described in this manual should be considered with the aid of

statistical calculations. van Thiel United can take care of these calculations in consultation

with you.

Check all parts for damage before assembly. Damaged parts may not be used.

An instructor is available for advice at your request.

van Thiel United b.v. Page: 6 of 15

Technical data Thiel-Lock transom P1650

M= 1230 Nm

F= 8000 N

van Thiel United b.v. Page: 7 of 15

F= 19,2 kN

( M= 2,4 kNm EN 74-1)

250 250

250 250

F=43 kN F=43 kN

0,5 L 0,5 L

L= 2000 mm

F= 50 kN

346

F=72 kN F=72 kN

Technical data Tube-Lock®

All loads are ultimate loads and do not include safety factor

van Thiel United b.v. Page: 8 of 15

Erecting a Thiel-Lock transom concept scaffold

The following diagrams show a typical sequence of erection. It should be noted that only

one temporary tube is used, which can be left in the structure until it is time to

dismantle. In some of the diagrams different activities are shown- the sequence is always

A,B,C.

1. Placing base plates 2. Position first pair of standards

3. Fix Thiel-Lock transom on standards 4. Repeat at the other side

5. Fix ledgers below Thiel-Lock transom 6. Fix next Thiel-Lock transom and

standards on ledgers

Fix ledgers below the Thiel-Lock transom

A. Fix Thiel-Lock transom

on both standards

B. Levelled

Repeat A. Fix Thiel-Lock transom on standards

Fix next Thiel-Lock transom on the ledgers and standards

Assemble temporary tube

Assemble the brace

van Thiel United b.v. Page: 9 of 15

8. Place transoms and brace 9. Place boards and toe-board

10. Place guardrail

A. assemble the system transoms

A. place boards

B. place toe-board

Assemble the guardrail

van Thiel United b.v. Page: 10 of 15

Artist Impression

12. Thiel-Lock transom scaffold

van Thiel United b.v. Page: 11 of 15

Bracing

Typical bracing arrangements for a Thiel-Lock transom scaffold.

EN-12811 / TG20 - class 3

EN 12810 – 4D – SW12/200 – H2 – A - LS

Guardrails an toe-board not drawn for clarity – guardrails should be placed at 500

and 1000 mm above floor level and a toe-board shall be used.

Tie pattern as shown when using Thiel-Lock® and extender transom together

- Ties can be mounted at inner standard

- Façade bracing every 5th bay

- Max. height 24 m – lift height 2,0 m – max. bay length 2,0 m

- Max. wind speed 24 m/s – maximum tie-load 6 kN (unclad or with debris

netting, sheeting not allowed) - Maximum load on foundation app. 14 kN at maximum height.

van Thiel United b.v. Page: 12 of 15

Handling equipment

Stacking the equipment

Transportation

If handled by crane, always strap the equipment on 2 tube containers

During transportation strap equipment on to the truck

van Thiel United b.v. Page: 13 of 15

The valid agreements for the storage of scaffold material are:

Thiel-Lock transoms 60 pieces four posted pallet

Scaffold tubes 57 pieces tube containers (sorted per length)

Scaffold planks 50 pieces in piles (5 wide, 10 high)

Right-angle coupler fixed wedge 250 pieces in bin

Swivel coupler fixed wedge 250 pieces in bin

System transom + extender 90 pieces four posted pallet

Base plate 250 pieces in bin

Tie tube 57 pieces tube container

It frequently occurs that the bins are not full when taken away. Therefore check when

taken away if there is packaging present. If not, order packaging when reporting

removal.

Constant check

• Foundation

• Load

• Ties - amount

- pattern

- quality

Storage of scaffold material

van Thiel United b.v. Page: 14 of 15

Load

Brickwork scaffolds 200 kg/m² in accordance with class 3

Example of floor load scaffold class 3

van Thiel United b.v. Page: 15 of 15

Ties

Ladder use