the wind power of Åland islands · 2018. 1. 12. · Åland islands and three turbines on mainland....
TRANSCRIPT
The Wind Power
of Åland Islands
About Me
• Henrik Lindqvist
• CEO at Allwinds Ab
• Over 20 years in the wind turbine business
• Project manager for all wind turbines at Åland Islands
• Project leader for Båtskär “off shore on the rocks” project
In the beginning of the 90:th Century Ålands Landskaps-
styrelse gave Ålands TekologiCentrum (with Robert2) the mission
to build a modern wind turbine on Åland Islands.
In the same time...
Harry Lindqvist worked with a project consisting of three wind
turbines in the same class (225 – 300 kW) which he wanted to
build on his summer vacation island, Stackskär in Lemland.
In the Beginning
These two projects was the starting point for the wind power in Åland Islands
and the starting point for Ålands Vindenergi Andelslag.
Late 1991 The first wind turbine ”Vinghals”, a Vestas V27 225 kW, was erected on the island Sottunga.
January 1992 “Vinghals” was taken into production
• Founded in February 1994
• Has today approximately 1300 owners; re-found by lower
energy prices or by interest
• Owns seven wind turbines
• Owns 25 % of Leovind AB (Båtskärs wind turbines)
Ålands Vindenergi Andelslag
Ålands Vindkraft Ab
• Founded in year 1997
• Owns five wind turbines on Åland Islands
• 17 owners, both companies and private at Åland
Ålands Vindkraft Ab
Leovind Ab
• Founded in year 2003 due to the Båtskär project
• Owns six wind turbines
• 47 owners, both companies and private on Åland Islands
• Allwinds started January 1st 2011.
• Owned by Ålands Vindenergi Andelslag Ab, Ålands Vindkraft Ab and
Leovind Ab.
• Five full time employees and several part time employees.
• Offers service, maintenance and fault finding on all the 19 wind turbines on
Åland Islands and three turbines on mainland.
• Testsite at Lilla Båtskär is used to test small wind turbines together with
Intertek Semko
• Project and consultant service works in Sweden, Finland and Åland.
• Electricity to customers in Åland Islands. Has 10% of the market -
mainly companies but also private
• Solar panels (mainly bigger projects)
Allwinds Ab
The ”Fleet” of Today
Vinghals, Vestas V27 225 kW, 1992, disassembled in August 2010
Preciosa, Vestas V39 500 kW, 1995, disassembled in May 2016
Mika, Enercon E-40 500 kW, 1997
Fortuna, Frans, Freja and Fredrika; Vestas V44 600 kW,1997
Altai, Fursten and Gideon; Enercon E-40 500 kW, 1998
Albert and Svea; Enercon E-44 600 kW, 1999
Astrea och Amalthea; Enercon E-44 600 kW, 2003
Avenir, Vestas V29 225 kW, 2004 (from Holland, first erected in 1994), disassembled 2014
Oskar, Vestas V47 660/200 kW, 2005 (from Holland, first erected in 1998)
Donatus, Konrad, Leo, Trefanten, Anna and Wendla, Enercon E-70 2,3 MW, 2007
All turbines, except Vinghals and Oskar, has been given names from old sailing
ships that have been good for the community were the turbine stands.
The ”fleet” of today of t”
Pettböle 2 x E-40 500 kW
1 x E-40/6.44 600 kW
Vårdö 1 x E-40 500 kW
Sottunga 1 x V47 660/200 kW
Kökar 1 x E-40 500 kW
Föglö 1 x E-40/6.44 600 kW
Krogstad 2 x E-44 600 kW
Båtskär 6 x E-70 2,3 MW
Knutsboda 4 x V44 600 kW
Mellanön 1 x 600 – 800 kW
Production Chart
Instantaneous does the wind power of today produce more
than the total demand on Åland Islands
Export
Yearly Production
MW Share Totally
Installed turbines of today 20 20 % 20 %
Project Långnabba (6 x 3MW-class) 18 ~20 % 40 %
Project Långnabba II (4 x 3MW-class) 12 ~15 % 55 %
Project Stenarna (6 x 2 – 2,5 MW-class) 18-24 ~20 - 25 % 75 %
Project Rödskär 18 ~20 % 100 %
Project Östra skärgården 100 ~110 % 210%
Yearly production compared to the
yearly consumption on Åland Islands
Projects in ”Pipeline”
Project
Långnabba +
Långnabba II
Project
Stenarna Project
Rödskär
Project
Östra
skärgården
Project Långstenarna is the umbrella term for the three combined projects Långnabba I & II and Stenarna.
Project Långnabba I • Was started in 2006 by Ålands Vindenergi Andelslag, Ålands Vindkraft Ab and Leovind Ab as a continuation of the development of wind power
in Åland after the Båtskär project.
• The project consist of six wind turbines on the Southernmost part of the rural district of Eckerö
• The wind turbines are normal ”onshore sites”
Project Stenarna • Was started in 2006 by Ålands Elandslag as part of the company’s venture in renewable sources of energy
• The project consists of six wind turbines located on islands between the Southernmost parts of the rural districts of Eckerö and Hammarland
• The locations are so called ”semi offshore sites” in accordance with the concept developed in connection with the construction of the Båtskär
project
• Ålands Elandelslag has come to an agreement with Alandia Insurance about a joint venture in the Stenarna project
Project Långnabba II • Was initiated when Ålands Elandelslag commissioned Ålands Vindenergi Andelslag to oversee the planning of the project Stenarna.
• From this followed that the connected power supply from project Stenarna could be transferred to a second phase of Långnabba
• The project consists of four wind turbines at the Southernmost part of the rural district of Eckerö
• The locations are normal ”onshore sites”
ECKERÖ
LÅNGNABBA I
LÅNGNABBA II
STENARNA
ÅLAND
ÅLAND
Ö Skärgården 1
Ö Skärgården 2
Ö Skärgården 3
Project Östra skärgården + 100 MW
- How can we harvest this wind potential in
a smart way and to provide Åland Island
with 100 % renewable electricity from it ?
Finally the big question:
Contact
Thank You!