the thick shelled river mussel (unio crassus) brings life+ back to rivers - uc4life - 2012 - 2016...
TRANSCRIPT
The thick shelled river mussel (Unio crassus) brings LIFE+ back to rivers
- U
C4L
IFE
-
2012
- 2
016
Målarmusslans återkomst ger friskare åar
Why focusing on Uc?
- Indicator, complex life-cycle…
- Uc-habitats not yet recognized (ie. semi-lentic habitats)
- Wide historical distribution rangein EU and Sweden…
- Few LIFE-projects targeting Uc
- FPM LIFE-project experiences
- Uc-Natura 2000 linkages…
A Flagship species
…Threatened…
Objectives
1) Strengthen the Uc-conservation status
2) Improve the ecological status of water-bodies
River name and
project site site Current CS 2016 CS Current ES 2016 ES
Klingavälsån extinct uf1 poor moderate Cg
Fyleån extinct uf1 moderate good Cg
Brusaån uf uf2 moderate good
Emån uf f moderate good Cg, Ll, Mm
Mörrumsån uf f good good Ss, Ll, Mm
Bräkneån uf f moderate good Ll, Mm
Storån uf f moderate good
Kisaån uf f poor moderate
Kapellån uf f moderate good Cg
Vretaån extinct uf moderate good Cg, Ct, Ll
Svärtaån uf f moderate good Cg
Vedaån uf f moderate good Cg
The thick shelled river mussel The Water Framework Directive Other endegerad species
- Improved knowledge and better understanding -
The 18 A, C, D and E actions
C.1: Host-fish mapping (sa)
C.2: Restoration actions at 12 project sites
C.3: Re-introduction and allocation (sa)
A1 – 3: Staff training; Permits; Work-plans [C-actions]
D1 - 7: Notice boards and posters; Webb site and blog; Dissemination events; Handbook; School-projects; Layman’s report; International conference.
E1 - 5: Project Management; Monitoring activities; Networking; Financial audit; After-LIFE
Prep
Concrete
Informatio
n
Management
Monitorin
g
C-Actions at the Skåne project sites…
Administration and budget
1) Operation and Management…
2) Cost breakdown per actions…3) Cost breakdown C actions…
4) CAB Skånes contribution/co-financing…
5) The Project Manager…6) Project status…
Klingavälsån
Fyleån
Brusaån
Emån
Mörrumsån
Bräkneån
Storån
Kisaån
Kapellån
Vretaån
Svärtaån
Vedaån
The Projectsites
Project Manager
The reference group- Public Bodies- Stakeholders- NGO’s
Financial Manager
Project Coordinator
Scientific Coordinator
Beneficiary no 2 Beneficiary no 3 Beneficiary no 4 Beneficiary no 5
Non-beneficiariesCAB KronobergCAB KalmarCAB Örebro
Water Councils and Sub contractors
Beneficiary no 1
Beneficiary no 6(field staff)
C.1, C.2, C.3 C.1, C.2, C.3 C.1, C.2 C.1, C.2 C.1, C.2, C.3The C-actions:
Klingavälsån
Fyleån
Brusaån
Emån
Mörrumsån
Bräkneån
Storån
Kisaån
Kapellån
Vretaån
Svärtaån
Vedaån
The Projectsites
Project Manager
The reference group- Public Bodies- Stakeholders- NGO’s
Financial Manager
Project Coordinator
Scientific Coordinator
Beneficiary no 2 Beneficiary no 3 Beneficiary no 4 Beneficiary no 5
Non-beneficiariesCAB KronobergCAB KalmarCAB Örebro
Water Councils and Sub contractors
Beneficiary no 1
Beneficiary no 6(field staff)
C.1, C.2, C.3 C.1, C.2, C.3 C.1, C.2 C.1, C.2 C.1, C.2, C.3The C-actions:
Operation and Management
Total budget: 4 927 119 €
Budget
Name of action € %
A (preparatory) 138 335 3,0C (concrete) 3 245 447 70,5D (dissemination) 402 758 8,7E (management) 818 245 17,8
TOTAL* 4 604 785 100,0
*OH (322 334 €) not included)
0 500 000 1 000 000 1 500 000 2 000 000 2 500 000
C.2 Restoration
C.3 Re-introduction
E.1 Op and Management
C.1 Host fish mapping
E.2 Monitoring
D.3 Info and Dissemination
D.5 School project
A.3 Work plans
D.4 Handbook
E.3 Networking
A.2 Permits
D.6 Layman’s report
D.7 Conferences (int)
D.1 Notice boards
A.1 Staff training
D.2 Webb-site and blog
E.4 Financial audit
E.5 After LIFE
Costs (€)
The C-actions
The C-actions
Name of action € %
C.1 Host fish mapping 215 752 6,6C.2 Restoration, habitats 2 374 840 73,2C.3 Rearing and re-introduction 654 855 20,2
TOTAL 3 245 447 100,0
C.1Project site € %
Klingavälsån/ Karup 30 205 14Fyledalen 25 890 12Brusaån 32 363 15Emån (västra)
Mörrumsån
Bräkneån 32 363 15Storån vid Falerum
Föllingsö 32 363 15Lagerlunda/Tolefors
Ramundsbäck-Vretaån 34 520 16Svärtaån 28 048 13Vedaån
TOTAL 215 752 100
C.2€ %
781 120 33825 280 35163 767 7
76 774 365 603 3
186 387 832 184 132 019 120 688 193 078 456 490 241 452 2
2 374 840 100
C.3€ %
317 628 48,5317 628 48,5
4 100 0,63 800 0,6
0,00,00,00,00,0
5 850 0,90,0
5 850 0,9
654 855 100
Total€ %
1 128 953 351 168 798 36
200 229 680 574 265 603 2
218 750 732 184 164 381 220 688 1
133 448 484 538 347 302 1
3 245 447 100
Actions
CAB Skånes contribution
As salary costs and/or funds…
Contribution breakdown
Contributor € %
EC 2 463 559 50,0%EPA 1 258 494 25,0%CAB Skåne 602 533 12,5%CAB's + KAU 602 533 12,5%
TOTAL 4 927 119 100%
602 533 € Co-financing breakdown
CAB Skåne contribution € € per year Work-months
Skåne Coordinator* 100 520 20 104 (20 months)
Financial Manager*1 163 625 32 725 (30 months)
Non-salary funds*2 338 388 67 678
TOT 602 533
* Ryms i tjänsten
*1 Medel friläggs (IO off)
*2Jordbruksverkets våtmarksinvesteringsstöd "betalningsvilja" > 600 000 €
The Project Manager
* The cost of temporary personnel specifically recruited for the duration of the project and exclusively dedicated to its implementation shall not be taken into account in the calculation of the minimum amount of the public bodies' contribution mentioned above, on condition that:(a) The contracts of such personnel do not begin before the date of signature of the grant agreement, nor finish after the end date of the project.(b) The contracts mention the LIFE+ project specifically.(c) The personnel concerned are employed exclusively for the implementation of tasks foreseen in the LIFE+ project. (ref the guideline)
- Rimligt att alla partners delar kostnaden för PM…- Annonsering av tjänsten lämpligt…- Modellen prövad på LIFE-Kinnekulle…- NV-konsult tycker vi skall köra…
Genom denna modell belastar PM’s lönekostnad “hela projektet” och inte enbart CAB Skånes “lönepott”.
For 5 yearsType of Contract Beneficiary Person days Salary
Temporary staff/full time* Skåne PM 1 063 361 250
Number of workdays
CAB Skåne (Coordinator)
7%
CAB Skåne (Financial manager)
10%CAB Jönköping
7%CAB Blekinge6%
CAB Södermanland6%
CAB Skåne PM20%
KAU Senior20%
KAU Field Ass19%
CAB Östergötland6%
Beneficiary work days (total) Salaries in €
CAB Skåne PM 1 063 361 250CAB Skåne (Coordinator) 359 100 520CAB Skåne (Financial manager) 531 163 625CAB Jönköping 378 109 853CAB Blekinge 302 84 722CAB Östergötland 319 92 829CAB Södermanland 309 84 048KAU Senior 1 058 349 140KAU Field Ass 981 208 025
TOTAL 5 300 1 554 012
Project status – GO!
- Original requested budget: 5.033.976 €- Revised (2011-04-04) budget: 4.927.119 €
One international conference deleted…
Budget not fixed, c 10% flexibility between budget categories
June 6: Deadline…July: Final acceptance and Signing grant agreement…
Eleven signatures: A3, A8, Public body declaration, Legal entity file and Financial ID