the road maintenance & rehabilitation project for poland a proposed program based approach...
DESCRIPTION
The Road Maintenance & Rehabilitation Project for Poland A proposed Program Based Approach project. Half-day workshop on SWAp May 18, 2004. Poland at a glance …. Population: 39 million inhabitants GNP/Capita US4,570 Upper Middle Income Countries: US$5,040 - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: The Road Maintenance & Rehabilitation Project for Poland A proposed Program Based Approach project](https://reader035.vdocuments.mx/reader035/viewer/2022062423/56814683550346895db3a3c6/html5/thumbnails/1.jpg)
The Road Maintenance & Rehabilitation The Road Maintenance & Rehabilitation
Project for PolandProject for Poland
A proposed Program Based Approach projectA proposed Program Based Approach project
The Road Maintenance & Rehabilitation The Road Maintenance & Rehabilitation
Project for PolandProject for Poland
A proposed Program Based Approach projectA proposed Program Based Approach project
Half-day workshop on SWApHalf-day workshop on SWAp May 18, 2004 May 18, 2004 Half-day workshop on SWApHalf-day workshop on SWAp May 18, 2004 May 18, 2004
![Page 2: The Road Maintenance & Rehabilitation Project for Poland A proposed Program Based Approach project](https://reader035.vdocuments.mx/reader035/viewer/2022062423/56814683550346895db3a3c6/html5/thumbnails/2.jpg)
Poland at a glance…
Population: 39 million inhabitants GNP/Capita US4,570
Upper Middle Income Countries: US$5,040
Motorization rate is increasing fast: 9 million cars in 1990 14 million today
Poland compares poorly with EU neighboring countries both in terms of condition of the road network and safety
Road improvement: a CAS high priority
![Page 3: The Road Maintenance & Rehabilitation Project for Poland A proposed Program Based Approach project](https://reader035.vdocuments.mx/reader035/viewer/2022062423/56814683550346895db3a3c6/html5/thumbnails/3.jpg)
Total length of the road network : 370,000 km. – 2/3 are paved roads
![Page 4: The Road Maintenance & Rehabilitation Project for Poland A proposed Program Based Approach project](https://reader035.vdocuments.mx/reader035/viewer/2022062423/56814683550346895db3a3c6/html5/thumbnails/4.jpg)
0% 20% 40% 60% 80% 100%
AVERAGE
Slovenia
Slovak Republic
Romania
Poland
Lithuania
Latvia
Hungary
Estonia
Czech Republic
Bulgaria
Good
Fair
Poor
Condition of Road Network in 1999
![Page 5: The Road Maintenance & Rehabilitation Project for Poland A proposed Program Based Approach project](https://reader035.vdocuments.mx/reader035/viewer/2022062423/56814683550346895db3a3c6/html5/thumbnails/5.jpg)
Fatality rates per 100,000 population in OECD countries
0
5
10
15
20
25
30Fa
talit
ies/
100
000
popu
latio
n
Icel
and
Swed
en
Gre
at B
ritai
n
The
Net
herla
nds
Nor
way
Switz
erla
nd
Den
mar
k
Finl
and
Japa
n
Aust
ralia
Can
ada
Ger
man
y
Italy
Belg
ium
Irela
nd
Aust
ria
Fran
ce
Spai
n
New
Zea
land
Hun
gary
Cze
ch
USA
Pola
nd
Gre
ce
Sout
h Ko
rea
![Page 6: The Road Maintenance & Rehabilitation Project for Poland A proposed Program Based Approach project](https://reader035.vdocuments.mx/reader035/viewer/2022062423/56814683550346895db3a3c6/html5/thumbnails/6.jpg)
Poland RM&R project is a new kind of “hybrid”
This component is financed under a pooling of funds scheme
All the other components are using standard WB rules
The loan amount (Euro 100 million equivalent US$126 ) was requested by the borrower to match with its budget planning and to minimize the loan’s fees (Front-end and commitment fees)….
![Page 7: The Road Maintenance & Rehabilitation Project for Poland A proposed Program Based Approach project](https://reader035.vdocuments.mx/reader035/viewer/2022062423/56814683550346895db3a3c6/html5/thumbnails/7.jpg)
National road network: 18,000 km. – Maintenance backlog estimated to US$1 billion…
![Page 8: The Road Maintenance & Rehabilitation Project for Poland A proposed Program Based Approach project](https://reader035.vdocuments.mx/reader035/viewer/2022062423/56814683550346895db3a3c6/html5/thumbnails/8.jpg)
• WB’s support focusing on road maintenance & rehabilitation works (sub-program financed at 2/3 or 67%);
• WB funds (provided through a SIL Loan Agreement) are pooled with 2004 national budget for roads maintenance (see table next slide);
• Environmental/Social and Procurement due diligence were carried out to assess and approve country own procedures ( in view of granting a country “certification” for future projects);
• Environmental category: Financial Intermediary (FI). Publication of project OM chapter on environment and social was the only pre-requisite for appraisal.
Main features of the proposed project for Poland
![Page 9: The Road Maintenance & Rehabilitation Project for Poland A proposed Program Based Approach project](https://reader035.vdocuments.mx/reader035/viewer/2022062423/56814683550346895db3a3c6/html5/thumbnails/9.jpg)
Main features of the proposed project for Poland
• Implementation within a two-year time period to be followed by “repeater” projects with a wider scope of investment.
• Disbursement highly facilitated: chunky advance payment (40%), followed by periodic replenishments (remaining 60% after 6 months).
• The entire loan is expected to be disbursed in 12 to 18 months time period, including retroactive financing since January 1st, 2004.
• Procurement: essentially using Polish NCB rules with relatively high ICB threshold (€6 million) and “four exceptions” to EU Public Procurement Directives.
![Page 10: The Road Maintenance & Rehabilitation Project for Poland A proposed Program Based Approach project](https://reader035.vdocuments.mx/reader035/viewer/2022062423/56814683550346895db3a3c6/html5/thumbnails/10.jpg)
Pooling of WB funds
![Page 11: The Road Maintenance & Rehabilitation Project for Poland A proposed Program Based Approach project](https://reader035.vdocuments.mx/reader035/viewer/2022062423/56814683550346895db3a3c6/html5/thumbnails/11.jpg)
Main features of the proposed project for PolandProcurement
• Prequalification: Not foreseen.
• For Works and Goods above € 6 million equivalent: WB ICB.
• For Works and Goods, up to € 6 million equivalent: NCB with no prior review.
• Exception to Polish Public Procurement Law:
No domestic preference shall be used;
The term “Best (the most advantageous) offer” shall be understood as the lowest evaluated bid selected following evaluation with use of quantifiable factors expressed in terms of money; and
No merit points system shall be used to evaluate bids.
• Consultant services: World Bank guidelines apply
![Page 12: The Road Maintenance & Rehabilitation Project for Poland A proposed Program Based Approach project](https://reader035.vdocuments.mx/reader035/viewer/2022062423/56814683550346895db3a3c6/html5/thumbnails/12.jpg)
Main features of the proposed project for PolandDisbursement
• Financial Monitoring Reports (FMRs): Quarterly report based on monthly budget execution reports.
• Special Account open in National Bank of Poland by MoF.
• Loan proceeds disbursed to Special Account and then through budget accounts to MoI and GDDKiA.
• First disbursement for retroactive expenditures plus advance covering 6 months financial needs (est. 40%).
• Annual external audit by an independent auditor under TOR acceptable to the Bank.
![Page 13: The Road Maintenance & Rehabilitation Project for Poland A proposed Program Based Approach project](https://reader035.vdocuments.mx/reader035/viewer/2022062423/56814683550346895db3a3c6/html5/thumbnails/13.jpg)
• Previous road projects have helped in the reform of the Polish road sector;
• e.g., use of modern Pavement, Bridges and Highway Management systems;
• This project is not really a SWAp, but should be better be mentioned as a
Program Based Approach project (PBAp) using SWAp principles;
• It aims at filling the gap between Adjustment and Investment lending;
• It includes some key innovations to better respond to client’s needs;
• Based on reciprocal trust between World Bank and “mature” client countries;
Conclusions 1/2
![Page 14: The Road Maintenance & Rehabilitation Project for Poland A proposed Program Based Approach project](https://reader035.vdocuments.mx/reader035/viewer/2022062423/56814683550346895db3a3c6/html5/thumbnails/14.jpg)
Conclusions 2/2
• Shifting from an”ex-ante” to “ex-post” control system;
• Report-based, faster disbursement against % of total program expenditures;
• Maximized use of existing administrative procedures, with a few exceptions;
• e.g., procurement under NCB up to Euro 6 million with no prior review!;
• Not tying up huge amount of loan, but fitting Client’s fiscal year budget; and
• Before the end of this year, we will know how well it works…..
PS. At the end of the December negotiations, the Government has asked informally the World Bank to prepare the next operation (with same approach but including new investments) by November this year…