![Page 1: The Project On Improvement of Chennai Port Operation Final Report · 2017-02-01 · 1 1.1 Chenn South Ea cities in T There governm as a gatew Chenn 2014 to Jawaharl case of in Chennai](https://reader033.vdocuments.mx/reader033/viewer/2022060323/5f0dd4467e708231d43c4aea/html5/thumbnails/1.jpg)
Republic of India
Chennai Port Trust
The Project
On
Improvement of Chennai Port Operation
Final Report
Summary
September, 2016
Japan International Cooperation Agency
The Overseas Coastal Area Development Institute of Japan
Mitsui Engineering & Shipbuilding Co., Ltd.
Hakata Port Terminal Co., Ltd.
4R
JR
16-035
![Page 2: The Project On Improvement of Chennai Port Operation Final Report · 2017-02-01 · 1 1.1 Chenn South Ea cities in T There governm as a gatew Chenn 2014 to Jawaharl case of in Chennai](https://reader033.vdocuments.mx/reader033/viewer/2022060323/5f0dd4467e708231d43c4aea/html5/thumbnails/2.jpg)
![Page 3: The Project On Improvement of Chennai Port Operation Final Report · 2017-02-01 · 1 1.1 Chenn South Ea cities in T There governm as a gatew Chenn 2014 to Jawaharl case of in Chennai](https://reader033.vdocuments.mx/reader033/viewer/2022060323/5f0dd4467e708231d43c4aea/html5/thumbnails/3.jpg)
List of Abbreviation and Terminology
Abbreviation Description
B/L Bill of Lading
CBIC Chennai-Bangalore Industrial Corridor
CCTL Chennai Container Terminal
CFS Container Freight Station
CHA Customs House Agent
ChPT Chennai Port Trust
CISF Central Industrial Security Force
CITPL Chennai International Terminals Pvt. Ltd.
CONCOR Container Corporation of India Ltd.
CWC Container Warehousing Corporation
DO Delivery Order
DPW Dubai Port World
DRF Delivery Request Form
EIR Equipment Interchange Receipt
FORM 13 FORM 13 ①Export FORM13 ②Import FORM13
HEP Harbour Entry Permit
HiTS Hakata Port Logistics IT System
ICD Inland Container Depot
IIT Indian Institute of Technology (Madras)
JNPT Jawaharlal Nehru Port Trust
MOS Ministry of Shipping
NACCS Nippon Automated Cargo and Port Consolidated System
NACFS National Association of Container Freight Station
NHAI National Highway Authority of India
NHTA Nagoya Harbor Transport Association
NUTS Nagoya United Terminal System
OOG Out Of Gauge (Cargo)
PDCA Plan-Do-Check-Action
PNR Public Notification of Regarding
PPP Public Private Partnership
PSA Port of Singapore Authority International
RFID Radio Frequency Identification
![Page 4: The Project On Improvement of Chennai Port Operation Final Report · 2017-02-01 · 1 1.1 Chenn South Ea cities in T There governm as a gatew Chenn 2014 to Jawaharl case of in Chennai](https://reader033.vdocuments.mx/reader033/viewer/2022060323/5f0dd4467e708231d43c4aea/html5/thumbnails/4.jpg)
RO/RO Roll On/Roll Off
S/C Steering Committee
TEU Twenty Feet Container Equivalent Unit
TOS Terminal Operating System
![Page 5: The Project On Improvement of Chennai Port Operation Final Report · 2017-02-01 · 1 1.1 Chenn South Ea cities in T There governm as a gatew Chenn 2014 to Jawaharl case of in Chennai](https://reader033.vdocuments.mx/reader033/viewer/2022060323/5f0dd4467e708231d43c4aea/html5/thumbnails/5.jpg)
Conten
Bac1
1.1
1.2
Tea2
Sur3
3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
3.10
3.11
3.12
3.13
Out4
4.1
4.2
4.3
Fut5
5.1
5.2
5.3
nts (Summ
ckground an
Background
Purpose of t
am Members
rvey and Stud
Outline of P
Status of Po
Status of Co
Implementa
Effects of M
Implementa
Examinatio
Study on th
Improveme
Related Info
Additional T
Arrangemen
Presentation
tcome and E
Systematic
Evaluation
Objective E
ture Issues ...
Follow-up f
Modernizat
Modernizat
mary)
d Purpose of
d of the Proje
the Project....
s and Dispatc
dy Activities
Project Activi
ort Activities .
ongestion ......
ation of Demo
Measures by S
ation of IT Re
n of Efficient
he Direction o
nt of Synergy
ormation .......
Technical As
nt of Study T
n Materials o
Evaluation of
Implementat
of Technical
Evaluation for
.....................
for improvem
tion of Chenn
tion of Chenn
f the Project
ect .................
.....................
ch Schedule .
s of the Proje
ities ..............
.....................
.....................
onstration Tri
Simulation M
elated Measur
t Process of T
of the Master
y on the Oper
.....................
sistance Issue
Tour in Japan .
n Activities a
f the Project
ion of Measu
Assistance ...
r the Project .
.....................
ment of Chenn
nai Port I .......
nai PortⅡ .....
t ....................
....................
....................
.....................
ect ................
....................
....................
....................
ials and Follo
Model ............
res ...............
Trailer Flow I
Plan ............
ration of Reg
....................
es .................
....................
and Outcome
....................
ures for Techn
....................
....................
.....................
nai Port opera
....................
....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
ow-up Activit
.....................
.....................
Inside the Por
.....................
ulatory Autho
.....................
.....................
.....................
s of the Proje
.....................
nical Assistan
.....................
.....................
.....................
ation .............
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
ties ...............
.....................
.....................
rt ..................
.....................
orities Conce
.....................
.....................
.....................
ect .................
.....................
nce. ...............
.....................
.....................
.....................
.....................
.....................
.....................
.....................
....................
....................
.....................
.....................
....................
....................
....................
....................
....................
....................
....................
....................
erned ............
....................
....................
....................
....................
.....................
....................
....................
....................
.....................
....................
....................
....................
.. 1
............. 1
............. 2
.. 3
.. 4
............. 4
............. 4
............. 6
............. 9
........... 13
........... 14
........... 15
........... 17
........... 18
........... 18
........... 20
........... 21
........... 21
22
........... 22
........... 26
........... 30
33
........... 33
........... 33
........... 34
![Page 6: The Project On Improvement of Chennai Port Operation Final Report · 2017-02-01 · 1 1.1 Chenn South Ea cities in T There governm as a gatew Chenn 2014 to Jawaharl case of in Chennai](https://reader033.vdocuments.mx/reader033/viewer/2022060323/5f0dd4467e708231d43c4aea/html5/thumbnails/6.jpg)
![Page 7: The Project On Improvement of Chennai Port Operation Final Report · 2017-02-01 · 1 1.1 Chenn South Ea cities in T There governm as a gatew Chenn 2014 to Jawaharl case of in Chennai](https://reader033.vdocuments.mx/reader033/viewer/2022060323/5f0dd4467e708231d43c4aea/html5/thumbnails/7.jpg)
1
1.1
Chenn
South Ea
cities in T
There
governm
as a gatew
Chenn
2014 to
Jawaharl
case of in
Chennai
On the
and outsi
as the po
a proper
terminal
Based
of Japan
Diploma
surround
POR
Backgro
Backgroun
nai port, locat
ast Asia. Jap
Tamil Nadu,
are thirteen
ment. Chennai
way of physi
nai port is no
March 2015
lal Nehru Por
ncluding priv
port drops to
e other hand,
ide the port a
oor condition
r set of docu
and that gate
on these circ
n-India Strat
atic Relations
ding facilities
RT GATE No1(
ound and
nd of the Proj
ted in Tamil N
anese firms i
contributing
major ports
port, a major
cal distributio
ow being con
5, making it
rt (Mumbai, M
vate ports, Mu
o 3rd place).
F
Chennai por
as shown in th
of the road n
uments, the f
e transactions
cumstances, J
tegic and Gl
s,” aiming t
in Ennore, C
DPW term
(only the gate
The
Purpose
ject
Nadu State, p
including aut
to the state’s
in India ma
r port located
on in Eastern
nverted to a c
the second l
Maharashtra),
undra port oc
Figure 1-1 O
rt is suffering
he pictures be
network, the te
fact that trail
are conducte
Japan and Ind
lobal Partner
to improve
Chennai and th
PSA te
inal
e to enter and
he Project on
1
of the Pro
plays a strate
tomobile ma
steady econo
anaged by th
d on the weste
n India.
container por
largest conta
, which hand
cupies 2nd pl
Overview of
g from seriou
elow. The hea
endency of tr
lers have to
ed manually a
dia signed a J
rship on the
infrastructur
he adjoining
erminal
d exit port)
n Improvem
oject
egic role in m
nufacturers a
omic growth.
he Ministry o
ern side of Ch
rt. It handled
iner handling
dled 4,467 tho
lace handling
f Chennai po
us congestion
avy congestio
railer drivers
go through t
and are gener
Joint Stateme
e 60th Anni
re such as
areas.
ment of Chen
marine transpo
are investing
of Shipping
hennai city, p
1,552 thous
g port among
ousand TEUs
g 2,720 thousa
rt
caused by co
on is a result o
to enter the q
three gates t
rally inefficien
ent on “Vision
iversary of
ports, indust
View o
nnai Port OpFina
ort to the Far
in Chennai
(MOS) of th
plays an impo
sand TEUs fr
g major port
in the same p
and TEUs in
ontainer trail
of various fac
queue withou
to reach the
ent, etc.
n for the Enh
the Establish
trial parks
of Chennai por
Operation al Report
r East and
and other
he central
ortant role
rom April
ts next to
period (in
2014 and
lers inside
ctors such
ut carrying
container
hancement
hment of
and their
t
![Page 8: The Project On Improvement of Chennai Port Operation Final Report · 2017-02-01 · 1 1.1 Chenn South Ea cities in T There governm as a gatew Chenn 2014 to Jawaharl case of in Chennai](https://reader033.vdocuments.mx/reader033/viewer/2022060323/5f0dd4467e708231d43c4aea/html5/thumbnails/8.jpg)
P
e
Conse
operation
collection
basic infr
and Indu
governm
Finally
easing th
1.2
Object
1) To
2) To
intr
Target
Picture 1-1 A lin
enter port gate N
quently, JICA
ns” (hereinaf
n survey rev
frastructure in
ustry in India
ment of India a
y, JICA decid
he congestion
Purpose
tive of this pr
enhance the
enhance the
roducing an e
t area of this p
ne of container
No1
A conducted
fter referred
ealed the nee
ncluding port
a, which con
and the State
ded to dispat
n in collaborat
of the Proje
roject is to ma
efficiency of
capacity of c
effective port
project is Che
Fig
The Pr
trailers waiting
d a study ent
to as “Data
ed to improv
facilities, po
nsists of over
of Tamil Nad
tch experts to
tion with Che
ct
ake Chennai
f Chennai por
ontainer oper
t operation an
ennai port and
gure 1-2 Lo
Project on Im
2
g to
titled “Data c
collection su
ve port operat
ort road and a
r 400 Japane
du to take me
o assist in im
ennai Port Tru
port user-frie
rt by reducing
ration in Che
nd traffic cont
d its surround
ocation of C
mprovement
Picture 1-2 T
terminal gate
collection su
urvey”) in O
tion and port
a parking lot.
ese companie
easures to imp
mproving port
ust.
endly through
g container m
nnai port thro
trol system
ding area.
hennai in In
t of Chenna
raffic congestio
urvey on the
October and D
t traffic contr
The Japan C
es located in
prove operatio
t operation in
h the followin
movement lead
ough technica
ndia
ai Port OperFinal R
on in front of th
improvemen
December 20
rol as well a
Chamber of C
India, also
ons at Chenn
n Chennai po
ng tasks.
d times etc.
al assistance f
ration Report
he
nt of port
013. Data
s develop
Commerce
urged the
nai port.
ort and in
for
![Page 9: The Project On Improvement of Chennai Port Operation Final Report · 2017-02-01 · 1 1.1 Chenn South Ea cities in T There governm as a gatew Chenn 2014 to Jawaharl case of in Chennai](https://reader033.vdocuments.mx/reader033/viewer/2022060323/5f0dd4467e708231d43c4aea/html5/thumbnails/9.jpg)
2
The JI
the first d
(1)
Team
Mana
CFS
Port I
Port I
Gate
Traff
Cont
(1)
Gate
Traff
Cont
(2) /
Note: Th
(2)
D
Note: Di
Team M
ICA Study Te
dispatch to th
Compositio
Assigned
m Leader / Po
agement and
IT System De
IT System De
Manageme
fic Manageme
tainer Traffic
Manageme
fic Manageme
tainer Traffic
Coordinator
here are a few
Dispatch S
Dispatch No
First
Second
Third
Fourth
Fifth
Sixth
Seventh
Eighth
spatch schedu
Members a
eam (hereina
he eight dispa
on of the Tea
Area
rt Planning
Operation of
esign (1)
esign (2)
nt and Port
ent (1)
c Simulation
nt and Port
ent (2)
c Simulation
w names in a n
chedule of T
.
29th
18t
29th
26t
ule includes t
and Dispa
after referred
atch are shown
am
N
Akira KO
f Takeshi S
Makoto M
Ryuichi K
Norihiro F
Hiroshi K
t Daitoku F
n Makoto M
Osamu KU
t Osamu IG
n Ken SAIT
name’s colum
The Team for
Dispa
16th July 201
September 2th January 20
12th April 2
6th July 201h September 2th January 20
23rd May 20
travel days to
The Proj
3
atch Sched
to as “The T
n below.
Name
OYAMA
SUZUKI
MIUTANI
KUWAJIMA
FUKAZAWA
KIMOTO
FUJINO
MIZUTANI
UNITA
GUCHI
TO
mn. The lower
r the first yea
atch Schedul
14 – 14th Aug
2014 – 7th Nov
15 – 28th Feb
2015 – 1st Ma
15 – 4th Augu
2015 – 28th O
16 – 24th Feb
016 – 10th Jun
o/from Japan.
ject on Impro
dule
Team”) memb
The Ove
Institute
OCDI
A Mitsui E
Shipbuil
Hakata P
Hakata P
OCDI
OCDI
OCDI
r name is a su
ar
le
ust 2014
vember 2014
bruary 2015
ay 2015
st 2015
October 2015
bruary 2016
ne 2016
ovement of Ch
bers and disp
Organiz
erseas Coasta
of Japan (OC
Engineering &
lding Co., Ltd
Port Terminal
Port Terminal
uccessor of th
Num
Ex
hennai Port OFin
patched sched
zation
al Area evelop
CDI)
&
d.
l Co., Ltd.
l Co., Ltd.
he upper nam
mber of
xperts
6
8
8
6
6
8
7
5
Operation nal Report
dule from
pment
e.
![Page 10: The Project On Improvement of Chennai Port Operation Final Report · 2017-02-01 · 1 1.1 Chenn South Ea cities in T There governm as a gatew Chenn 2014 to Jawaharl case of in Chennai](https://reader033.vdocuments.mx/reader033/viewer/2022060323/5f0dd4467e708231d43c4aea/html5/thumbnails/10.jpg)
3
Major
3.1
Activi
3.2
(1)
Major
No.
Cong
Demon
I T R
M
Othe(Simu
Sur
P.O.LIRON ORFertilizerCoalContainerOthersTotal (TContainer(TEUs)
Cargo
Survey a
Activities un
Outline of P
ties conducte
Status of P
Cargo Han
cargo handle
.of Dispatch
gestion Surve
nstration Tri
Related Measures
Masterplan
er Activitielation,Hearirvey of other
ports)
S/CW/G
12,794
RE 10,815
882
3,990
r 18,049
10,624
ons) 57,154
r1,020
2007
and Study
ndertaken dur
Project Activ
ed as part of t
ort Activitie
ndling Trend
ed at Chennai
Table 3-
07-09
ey
ial
s
sng,r
2
○
◎
1 st
4 13,112
5 8,247
2 761
0 4,684
9 20,581
4 10,1064 57,491
0 1,143
2008
y Activitie
ring the two-y
vities
the Project are
s
i Port is show
-1 Major C
10-12
2014
○
◎
2 nd
Preparatio
Pr
Propasal o
13,425 13,
7,882 2,
591
3,362 2,
23,476 29,
12,321 12,61,057 61,
1,225 1,
Source: 2007-20
2009 201
The Proj
4
es of the P
year period o
e outlined in
wn in the table
Cargoes Hand
01-03 04
○
◎◎◎
3 rd 4
on Impleme
ropoasal
of Infrastructure Im
,882 13,295
,176 97
776 633
,503 961
,421 30,075
,702 10,646,460 55,707
,523 1,558
014; Indian PorSu
0 2011
ject on Impro
Project
f the project a
the table belo
e below.
dled at Chen
4-06 07-09
2015
◎
th 5 th
nration
mprovement
Trial
13,425
52
421
-
29,708
9,79853,404
1,539
rts Association, Aupplement: 200
2012 2
ovement of Ch
are as follows
ow.
nnai Port
9 10-12
○
◎
6 th
Evaluation, F
Study
Ev
12,784 12,73
- 14
415 54
- -
28,330 29,94
9,576 9,1751,105 52,54
1,468 1,55
April 2015 -Jun7 (April 2007 to
2013 2014
hennai Port OFin
s.
01-03
2016
○
◎◎
7 th
Follow-up
of Direction
valuation
36 11,890
46 -
41 260
-
45 30,210
73 7,70041 50,060
52 1,565
e 2016; ChPTo March 2008)
(In ‘000 Tons, ‘0
2015
Operation nal Report
04-06
◎
8 th
2016Apr-Jun
3,121
-
58
-7,293
2,67313,145
-
000 TEUs)
![Page 11: The Project On Improvement of Chennai Port Operation Final Report · 2017-02-01 · 1 1.1 Chenn South Ea cities in T There governm as a gatew Chenn 2014 to Jawaharl case of in Chennai](https://reader033.vdocuments.mx/reader033/viewer/2022060323/5f0dd4467e708231d43c4aea/html5/thumbnails/11.jpg)
(2)
The co
decreased
handling
steady at
table belo
As for
DPW han
2015. Ho
handled 4
Container H
ontainer han
d to 1,546 th
g volume incr
t 1,529 thous
ow.
r the share b
ndled 56.3%
owever, durin
48.6%.
JaFeMaApMaJuJuAuSeOcNoDeTo
JaFeMaApMaJuJuAuSeOcNoDeTo
JaFeMaApMaJuJuAuSeOcNoDeTo
JaFeMaApMaTo
2016
201020112012
2013
2014
2015
DPW+P
Handling Tr
ndling volume
housand TEU
reased to 1,52
sand TEUs in
Table 3-2
etween two t
and PSA ha
ng the period
laden co
714,8791,2758,4
anuary 65,6ebruary 55,8arch 57,8pril 61,9ay 62,2une 64,2uly 63,6ugust 62,2eptember 59,4ctober 57,2ovember 53,7ecember 57,9otal(2013) 722,1anuary 56,6ebruary 47,9arch 57,0pril 59,1ay 65,3une 66,4uly 67,6ugust 65,5eptember 68,9ctober 61,1ovember 59,1ecember 60,3otal(2014) 735,4anuary 60,1ebruary 53,2arch 61,0pril 70,7ay 65,9une 67,6uly 68,8ugust 60,4eptember 65,3ctober 60,6ovember 60,5ecember 62,0otal(2015) 756,6anuary 64,0ebruary 55,8arch 73,2pril 65,5ay 66,6otal(2016) 325,2
S
0
SA
rend
e in 2011 w
Us in 2012 a
27 thousand
n 2015. The
Container
terminals, DP
ndled 43.7%
d from Januar
ontainer empty cont
802 27,290200 20,535460 22,13216 1,95397 2,21440 2,50064 2,37612 1,62374 1,75445 2,45278 2,92484 3,40826 3,27191 3,44516 3,388143 31,30888 4,23405 4,34693 6,95896 5,49285 3,50417 4,75952 3,22820 4,44562 4,19604 4,10081 3,70418 5,635421 54,60108 3,99392 4,29410 6,51546 4,05147 3,89634 3,90175 3,38668 5,14728 6,96768 7,65057 3,85357 2,960690 56,61328 4,41603 3,07769 3,81844 4,16402 2,869246 18,344ource: 2010 - Marc
Import(TEU)
The Proj
5
was 1,579 tho
and 1,482 tho
TEUs in 201
container han
r Handling V
PW handled
in 2015. Thu
ry to May 20
tainer laden contai
0 481,4085 674,4072 554,6803 45,6274 47,0380 55,6896 46,4603 46,0704 47,9582 50,5474 49,9848 52,994
51,1005 47,0358 53,1818 593,6834 47,7166 50,1138 59,8902 49,9624 55,7059 47,3768 54,7565 53,7466 53,2410 51,0474 47,9345 53,7751 625,2613 48,0204 49,0475 55,021
51,4166 43,573
45,1156 50,5547 47,7617 47,9380 45,7683 36,6420 43,1513 564,0066 44,9507 46,0028 54,7744 40,7299 33,3664 219,821
Exp
ch 2013; Data Colle
ject on Impro
ousand TEUs
ousand TEUs
14 compared
ndling volum
Volume at Ch
52.6% and P
us, the share
16 PSA’s sha
ner empty containe
208,64687,013210,47216,54312,3529,6618,90213,54312,67414,53913,2608,10511,3047,2856,828
134,9966,9426,0284,4364,0466,9339,03914,06910,7959,90413,02912,35314,202111,7769,5506,4438,33511,08815,64812,07619,27214,48913,69914,98810,81911,825148,23215,69512,77715,48614,11116,30174,370
port(TEU)
ection Survey 2013
ovement of Ch
s, the highes
s in 2013. H
to the previo
me at Chenna
hennai Port
PSA handled
of DPW is in
are increased
er
10,3326,680802501163221220094262
2826641242031765066111742
21200000
572655400
2,0004,015
20140043
Tranship(TEU)
JICA, April 2013 -
hennai Port OFin
st on record,
However, the
ous year and
ai port is show
47.4% in 20
ncreased from
to 51.4% wh
1,442,4781,579,8351,546,546129,789117,617125,722119,704123,449126,662131,203128,446124,000122,943111,562121,315
1,482,412115,586108,398128,381118,697131,529127,595139,707134,506136,306129,281123,248134,436
1,527,670121,845113,078131,093137,301129,064128,726142,087127,865134,504129,729112,271121,993
1,529,556129,091117,659147,348124,588119,138637,824
Total(TEU)
May 2016; ChPT
Operation nal Report
but then
container
remained
wn in the
014 while
m 2014 to
hile DPW
![Page 12: The Project On Improvement of Chennai Port Operation Final Report · 2017-02-01 · 1 1.1 Chenn South Ea cities in T There governm as a gatew Chenn 2014 to Jawaharl case of in Chennai](https://reader033.vdocuments.mx/reader033/viewer/2022060323/5f0dd4467e708231d43c4aea/html5/thumbnails/12.jpg)
(3)
The Te
The Te
dispatch
Based
DPW te
suspende
thought t
3.3
(1)
The T
congestio
trailers o
from the
trailers o
collection
The m
survey to
efforts of
sharehold
make eff
cooperati
expansio
Trends of C
eam studied t
eam studied
as below.
on the infor
rminal switc
ed its service
that the conta
Status of C
Regular Ob
Team regular
on at each di
outside the po
flyover whe
outside the Po
n survey (De
maximum num
o the 2nd dis
f the Study T
ders through
forts to reduc
ion with the
on works.
Maximum/day
Average/day
Handled Contain
(TEU)/Month
0
20
40
60
80
1,00
1,20
1,40
1,60
Numbof Trai
Calling Vesse
the changes o
the details of
rmation from
ched to the
e at the DPW
ainer handling
Congestion
bservation o
rly observed
ispatch. As p
ort, observed
re inside the
ort during the
cember 2013
Table 3-3
mber of queu
spatch but no
Team to analy
the S/C and
e congestion.
private secto
Data CollectionSurvey
1st
1,097
819
ner
h121,315 1
1,097
819
121,315
1
0
0
0
0
0
0
0
0
0
ber lers
els
of calling vess
f the changes
m a shipping l
PSA termin
W terminal. T
g volume at D
f Traffic Con
the traffic c
part of its ob
d the end of
port can be v
period from
).
Number of
ing trailers w
o long queues
yze traffic con
so on. The d
. For example
or while the S
t Dispatch2nd
Dispatch
1,024 1,478
373 467
134,506 129,281
1,024 1,478
373 467
134,506 129,281
The Proj
6
sels at Chenn
s in container
line and ChP
nal following
These chang
DPW was dec
ngestion
congestion st
bservation wo
the queue, a
viewed, etc. T
the 1st dispat
f Queuing Tr
was more than
s have been
ngestion and
demonstration
e, ChPT start
State of Tami
h3rd
Dispatch D
568
162
1 113,078 1
568
162
1
113,078
1
ject on Impro
nai port.
r vessels calli
PT, some call
g the realign
es occurred
creased while
tatus and ex
orks, the Team
and confirmed
The figure be
tch to the 8th
railers Outsi
n 1,000 durin
observed sin
share inform
n trials may h
ted to implem
il Nadu impr
4th Dispatch
5th Dispatch
709 754
336 274
137,301 142,087
709 754
336 274
137,301 142,087
ovement of Ch
ing at two ter
ling vessels w
nment of AC
in early 201
that at PSA w
xamined the
m counted th
d congestion
elow shows t
h dispatch and
de the Port
ng the period
nce then. It is
mation on the
have also mot
ment measures
roved the acc
h6th
Dispatch Di
849
441
7 134,526 12
849 8
441
7 134,526
12
hennai Port OFin
rminals durin
which used t
CS. Moreove
6. Conseque
was increased
characteristi
he number o
status inside
the number o
d the period o
d of the data c
s thought to
congestion st
tivated stakeh
s to ease cong
cess road thro
7th ispatch
8th Dispatch
874 497
505 253
29,091 119,138
874
497
505 253
29,091 119,138
Operation nal Report
ng the 8th
to use the
er, feeder
ently, it is
d.
cs of the
f queuing
e the port
f queuing
of the data
collection
be due to
tatus with
holders to
gestion in
ough road
0
20,000
40,000
60,000
80,000
100,000
120,000
140,000
160,000
TEU
![Page 13: The Project On Improvement of Chennai Port Operation Final Report · 2017-02-01 · 1 1.1 Chenn South Ea cities in T There governm as a gatew Chenn 2014 to Jawaharl case of in Chennai](https://reader033.vdocuments.mx/reader033/viewer/2022060323/5f0dd4467e708231d43c4aea/html5/thumbnails/13.jpg)
Accord
queuing
(red colo
The queu
dispatch,
(2)
The Te
in 3.3 (1)
alleviatin
1) Sur
The Te
3rd disp
2) Sur
The T
to grasp
Date
L
3rd Jun
Truck Qu
1st Jun
2nd Jun
23th May
24th May
25th May
26th May
27th May
28th May
5th Jun
4th Jun
29th May
30th May
31st May
ding to the r
trailers insid
or indicates qu
ue starting fro
, but congesti
Survey on T
eam conducte
). These surv
ng the conges
rvey on Proc
eam conducte
patch.
rvey on Trail
Team conduc
p the process
Week Time
beyodBharat
Nagar Po
Location
Fri
long
Wed 17:00
Thu
ueue : nil, short (less than
A
y Mon 15:15 nil
y Tue 15:00 long
15:30Wedy
nil16:30Thuy
long
long17:00Friy
short15:30Saty
Sun
12:00
Sat 16:15 long
Suny
nil11:00Mony
long
nil
17:00
10:00
nil
y Tue 17:00 long
11:30 long
A
results of the
de the port sta
ueues of mor
om DPW IN
ion was signi
Figure 3
(
Traffic Cong
ed a various
veys aimed at
stion. The ove
essing Time
ed the survey
lers Passing t
ted the surve
ing capacity
dthoint
BharathNagar Point~TVT-Parking
TVT-PAcces
Ent
lo
long lo
n 30), long (30 or more),
Outside Port
B
nil
ikong lo
long
lolong
lolong
lo
lolomgt
loshort
long
nil
long
long
nil
lo
lo
long lo
BTVT‐Pa
e surveys on
arts from eith
re than 30 tra
Gate frequen
ficantly reduc
-1 Congest
(8th dispatch
gestion Statu
surveys other
t grasping the
erview and re
at Port Gate
y on the proce
through Gat
ey on trailers
at each gate.
Parking~ss Roadrance
Access RoadEntrance~Port Gate 1
Po
In
ong
ong syort
short
nil short
C D
nil nil
ong long
long
ong
ong
nil nil
lomgong
longong
long
longong
ong long
ong
ong long
long
C
arking
Outside Port
The Proj
7
the degree o
her DPW IN
ailers and oran
ntly occured d
ced during th
tion Status in
h: 23 May to
us
r than the reg
e status of the
esults of the m
e No.1
essing time at
tes
passing thro
E E´
ort Gate 1~X-Ray
ntersection
X-RayIntersection~
DPWEntrance
nilnil
shortnilnilnil
shortnilnilnilnilnilnilnilnilnilnilnil
longnil
longlong
ilnilnilnil
shortnil
nil
long
Truck Queue
F
short
long
nil
short
short
long
short
short
long
short
long
short
D
P
ject on Impro
of traffic con
N Gate, PSA I
nge color ind
during a peri
he 8th dispatc
nside outside
o 5 June 2016
gular observa
e traffic cong
major surveys
t Port Gate N
ugh Port Gat
DPWEntrance~DPW Exit
DPW ExitPSA
Entranc
nil short
nil
In
G H
nil
short long
nil
long
nil
long
short
nil
nilnil
longnil
longnil
lomgnil
lomglomg
nil
liongnil
short
longnil
L
F
D
Port Gate No.1 E´
E
ovement of Ch
ngestion outs
IN Gate, or P
dicates queues
od from the 3
h.
e the Port
6)
tion of traffic
estion and ex
s are describe
No.1 for outgo
te No.1 and t
t~
e
PSA Exit~PSA
Intersection
PSInterseFire S
nil n
nside Port
I J
nil
n
short
nil
sh
nshort
nnil
nnil
nnil
nnil
lolomg
nlong
n
nlong
nil
nil n
n
K
HG
Inside Port
hennai Port OFin
side Chennai
Port Gate No
s less than 30
3rd dispatch
c congestion
xamining mea
ed below.
oing trailers d
terminal gate
SAection~Station
Fire Station~DPW Exit
DPPo
nil nil
J K
nil nil
nil
hort short
nil nil
nilnil
nilnil
nilnil
nilnil
nilng
nilnil
nil
longnil
nil
nil nil
nil
J
I
Operation nal Report
Port, the
o.1 (Exit).
0 trailers).
to the 7th
described
asures for
during the
s in order
PW Exit~ort Gate 1
long
L
nil
nil
nil
nil
long
short
short
short
short
short
nil
long
long
![Page 14: The Project On Improvement of Chennai Port Operation Final Report · 2017-02-01 · 1 1.1 Chenn South Ea cities in T There governm as a gatew Chenn 2014 to Jawaharl case of in Chennai](https://reader033.vdocuments.mx/reader033/viewer/2022060323/5f0dd4467e708231d43c4aea/html5/thumbnails/14.jpg)
The Project on Improvement of Chennai Port Operation Final Report
8
3) Survey on Documents carried by Trailer Drivers
a. Harbor Entry Permit
The Team conducted interviews with trailer drivers of both import and export container vehicles at Port
Gate No.1 (IN) to determine if they were carrying the proper documents. The following figures show
the results of the surveys conducted at the data collection survey and at the 1st, 2nd, and 6th dispatch.
b. Sticker
According to the interview survey, sticker possession ratio of drivers was 60% (1st dispatch), but rose
to 88% (2nd dispatch) two months later.
The stickers are no longer used as trailer driver’s document possession ratio was improved.
4) Survey inside the Port
a. Survey on Parked Trailers
The Team conducted interviews with trailer drivers at Port Gate No.1 (OUT) at the 1st dispatch on their
entering time to the Port and calculated their staying time inside the Port. In addition, the Team
interviewed trailer drivers on their staying time inside the Port, double transactions1, and parking place
during the 2nd dispatch.
b. Survey on Traffic Congestion
The Team conducted a survey on the number of queuing trailers inside the Port for 24 hours every two
hours from 27 October to 3 November 2014.
c. Study on the Flow of Trailers using Monitoring Camera at Terminal IN Gate
The Team monitored incoming trailers to container terminal gates continuously by setting a fixed
point camera around IN Gates of both DPW and PSA terminals during the 6th and 7th dispatch.
d. Survey on Gate Processing Efficiency
The Team conducted site observation on the operational status of container inspection, document
check procedure, etc. in front of terminal IN Gates in addition to the observation by fixed point camera
during the 6th and 7th dispatch. The result shows that while Idling Time has been reduced, the reception
time has increased in both terminals. The reduction in the Idling Time is indicative of the smoother
trailer flow
5) Outside the Port Survey
a. CWC/CFS Survey
The Team counted the number of departing trailers headed to Port Gate No.1 each hour at CWC/CFS
from 17 to 18 October 2014. The Team also interviewed trailer drivers on staying time, stuffing place
and expiry date of Form 13 at CWC/CFS.
b. Transportation Time from CFS to Port Gate No.1
The Team interviewed trailer drivers about transportation time from departure (CWC, CFS,
etc.) to Port Gate No.1 (IN) during the 2nd, 7th, and 8th dispatch.
1 A trailer sometimes carries an import container out just after delivering an export container from/to container terminals.
![Page 15: The Project On Improvement of Chennai Port Operation Final Report · 2017-02-01 · 1 1.1 Chenn South Ea cities in T There governm as a gatew Chenn 2014 to Jawaharl case of in Chennai](https://reader033.vdocuments.mx/reader033/viewer/2022060323/5f0dd4467e708231d43c4aea/html5/thumbnails/15.jpg)
Th
hou
40 h
of tr
(3)
ChPT
on 18 Jan
1) Tra
Staff m
members
lane, ins
monitorin
2) Adv
ChPT,
check o
consist
contain
necessa
the road
Howev
from ce
to cong
The ac
the inter
confirme
trailer qu
persons o
aligned w
3.4
As pre
demonstr
of measu
(Monday
succeedin
he transportati
urs during the
hours during t
ransportation
Activities o
set up the Ta
nuary 2016. A
affic Control
members from
s take turns w
structing trai
ng area on m
vanced Carrie
, Terminal Op
of trailer driv
s of 4 person
ner have Form
ary document
d.
ver, trailer dr
ertain drivers)
estion inside
ctivities of tas
rview of pers
ed that the qu
ueue had dec
of the task for
with a lane.
Implement
eviously state
ration trials a
ures for allev
y) to 15 Feb
ng following
ion time from
8th dispatch
the 2nd dispa
n time.
of the Task F
ask Force Tea
According to
Outside the P
m the Trailer
working a 12
ilers to stop
motorbikes. Th
ed Document
perators and S
vers in advan
ns and they w
m 13, Shipp
ts are not allo
rivers withou
). Some drive
the port and
sk force team
sons involve
ueued trailers
creased. On t
rce team cont
tation of Dem
ed on the sta
as advanced m
viating the con
bruary 2015
up survey ar
m departure (C
, as compared
atch. The alle
Force Team
am which con
interviews w
Port
Owners Asso
- hour shift a
and go, wh
hey control th
t Check
Security Firm
nce around th
work in 8 hour
ing Bill, Gat
owed to proce
ut containers
er suggested t
that a docum
m outside the P
d, this was
s outside the
the other han
trolled the tra
monstration T
atus quo of tr
measures base
ngestion. The
(Friday). Th
re summarize
The Proj
9
CFS, etc.) to
d to 18 or 19
eviation of tra
nsists of Term
with concerned
ociation contr
and do such j
hile commun
he traffic flow
m (which is en
he entrance o
r shifts aroun
te Pass and
eed to the Por
were not su
that such insu
ment check for
Port were dis
because the
Port were a
nd, their activ
affic wheneve
Trials and F
raffic conges
ed on the traf
e trials were
he results an
ed below.
ject on Impro
Port Gate No
hours during
affic congestio
minal Operato
d persons, its
rol the trailer
jobs as confi
nicating with
w to the Port G
ntrusted by C
of the access
nd the clock. T
their validity
rt Gate No.1
ubject to a do
ufficient docu
r all drivers s
scontinued du
traffic cong
aligned as nev
vities inside t
er congestion
Follow-up Ac
tion outside
ffic survey re
conducted fo
nd evaluation
ovement of Ch
o.1 was shorte
the 7th dispa
on is steadily
ors, Trailer Ow
activities are
queue outsid
irming the tra
h colleagues
Gate when co
ChPT) are per
road to Port
They confirm
y. Drivers wh
and must park
ocument che
ument checks
hould be con
uring the 8th d
estion was b
ver before an
the Port cont
n occurred or
tivities
the port, the
esults in order
or one week f
n of the dem
hennai Port OFin
ened to 15
atch and 28 h
y in progress i
wners Associ
e described b
de the Port. T
ailer queue to
s by cell ph
ongestion occ
rforming the d
Gate No.1. O
m if trailer dri
ho do not po
rk along the le
eck (due to o
s were not con
nducted.
dispatch. Acc
being reduce
nd that the n
tinued. Traff
when trailers
Team condu
r to evaluate
from 9 Febru
monstration t
Operation nal Report
hours or
in terms
iation etc.
elow.
hirty staff
o a single
hones and
curs.
document
One team
ivers with
ossess the
eft side of
opposition
ntributing
cording to
d. It was
number of
fic control
s were not
ucted four
the effect
uary 2015
trials and
![Page 16: The Project On Improvement of Chennai Port Operation Final Report · 2017-02-01 · 1 1.1 Chenn South Ea cities in T There governm as a gatew Chenn 2014 to Jawaharl case of in Chennai](https://reader033.vdocuments.mx/reader033/viewer/2022060323/5f0dd4467e708231d43c4aea/html5/thumbnails/16.jpg)
(1)
1) Outl
The ai
by readin
The sy
hardware
the recom
and the s
for susta
code read
2) Eval
a. The
of th
Cust
b. Alth
recen
readi
syste
(2)
1) Outl
All tra
will guid
The u
impleme
were una
drivers w
2) Eval
a. Dem
the
that
shar
shor
b. One
driv
Demonstra
ine and follow
im of demons
ng a barcode
ystem develo
e failure and
mmendation o
succeeding 6
ainable operat
ding system,
luation
processing ti
he bar code
toms, etc. hav
ough the bar
ntly introduce
ing system a
em can also b
Demonstra
line and follo
ailers applying
de trailer drive
utilization o
ntation of de
able to enter
were able to e
luation
mo 2 was not
document w
t drivers be n
red among tra
rt to rectify th
e of the outco
vers and conf
ation Trial 1:
w-up status
stration trial
printed on th
oped for dem
a lack of a su
on Implemen
months of op
tion, setting u
etc.
ime at Port G
reading sys
ve contributed
code reading
ed RFID syst
and the recom
be applied to t
ation Trial 2:
ow-up status
g for HEP ha
ers back to R
of TVT-Park
emonstration
the gate and
nter and the i
t implemente
as prepared i
notified and a
ailer drivers,
he situation.
omes of the
firming the n
Simplificati
1 is to replace
e HEP.
monstration t
ustainable sys
nting Port En
peration. The
up emergency
Gate No.1 has
tem, though
d as well.
g system was
tem. The kno
mmendation p
the new syste
Utilization o
ave to enter T
Route 114.
king was no
trial in Febru
d wait there f
issuance of H
d in accordan
in advance in
a notice boar
traffic police
trial was lear
necessity of th
The Proj
10
ion of the pr
e the current
trial 1 was d
stem for cont
ntry/Exit Cont
e recommend
y contact pla
been largely
the several
discontinued
owledge obtai
prepared by t
em.
of TVT-Park
TVT-Parking.
ot effective
ruary, 2015 a
for HEP issua
HEP was in op
nce with Sco
n order to cla
rd be prepare
e and Pass Sec
arning that th
he HEP issua
ject on Impro
ocedure at P
hand-written
discontinued
tinuous opera
trol System b
dation include
an, system ex
y reduced. Th
procedural
d, Port Entry/
ined through
the Team on
king
Traffic police
for allevia
and after that
ance or the p
peration.
pe of Demon
arify the proc
ed etc. Howe
ction persons
e most of th
ance place. It
ovement of Ch
Port Gate No
n log book wi
in August 2
ation. Therefo
based on the
es running ru
xpansion plan
is is mainly d
changes intr
/Exit Control
the impleme
the establish
e stationed in
ting the co
. The Team c
proper docum
nstration Trial
cedure at TV
ver, the scop
s, and the peri
e HEP applic
t also helped
hennai Port OFin
o.1
ith electrical
2015 due to
ore, the Team
experience in
ules for work
n for re-starin
due to the int
roduced by t
is being con
entation of th
hment of a su
n front of TVT
ongestion du
confirmed th
ments. Howev
al of Demo 2,
VT-Parking an
pe of Demo 2
iod of the tria
cants were n
d ChPT recog
Operation nal Report
recording
repeated
m prepared
n the trial
ing group
ng the bar
troduction
the CISF,
ducted by
e barcode
ustainable
T-Parking
uring the
hat trailers
ver, trailer
, although
nd request
2 was not
al was too
ot trailers
gnized the
![Page 17: The Project On Improvement of Chennai Port Operation Final Report · 2017-02-01 · 1 1.1 Chenn South Ea cities in T There governm as a gatew Chenn 2014 to Jawaharl case of in Chennai](https://reader033.vdocuments.mx/reader033/viewer/2022060323/5f0dd4467e708231d43c4aea/html5/thumbnails/17.jpg)
imp
c. TVT
cont
offic
d. The
the
(3)
1) Outl
The ai
a. To d
b. To a
park
The Te
number o
2) Eval
a Num
‘No
wer
b The
disp
did
c An
dem
sinc
lane
d The
i) Tr
tea
ii) Pa
se
wi
iii) Pa
iv) Tr
no
portance of co
T-Parking pla
tinue because
ce is open on
e Team expec
traffic conge
Demonstra
ine and follow
im of Demon
designate No P
llocate Road
king trailers w
eam has cond
of parked trai
luation
mber of parke
o Parking’ rul
re still observ
e number of p
patch. Howev
not seem to s
increase of
monstration tr
ce the 7th dis
e separation b
e following m
raffic control
am should be
arking should
eparate trailer
ill not reach t
arking along t
rucks parked
o-reissuing of
ooperation wi
ays an import
e it is very co
nly during the
cts that the us
stion.
ation Trial 3:
w-up status
stration trial
Parking Road
Managemen
without driver
ducted the fo
ilers along the
ed trailers at
e was not fol
ved at the exit
parked trailers
ver, the numb
severely impe
trailers wai
rial, was not o
spatch thanks
by concrete cu
measures shall
activities ins
e continued.
d be strictly
r queues (i.e.
the Port Gate
the Periphery
for an exce
f HEP.
ith external or
tant function
onvenient for
e daytime.
age of TVT-P
Restriction
3 was as follo
d.
t Person in o
s and to repo
llow-up surv
e roads and w
the entrance
llowed on the
t route.
s both at the e
er of parked t
ede traffic.
iting in the
observed. Th
s to the road
urb, etc.
l be implemen
side the Port
y prohibited
, 2 lanes) can
No.1.
y Road should
essive period
The Proj
11
rganizations.
in issuing HE
users as it is
Parking as ex
of Parking o
ows.
order to order
ort vehicle num
veys continua
waiting areas
route was de
e No Parking
entrance rout
trailers had d
4 waiting a
his is because
d maintenance
nted in order
and guiding
from the DP
n be maintain
d be strictly p
of time sho
ject on Impro
EP. The issua
open for 24 h
xport CFS by
on Internal R
drivers to m
mbers of park
lly after the d
inside the Po
ecreasing afte
Roads. On th
te and the exi
decreased in th
areas, which
number of w
e work inside
to reduce the
of trailers to
PW Entrance
ned for DPW
prohibited to
ould be subje
ovement of Ch
ance of HEP a
hours while th
CWC will co
Roads
ove their trai
king trailers t
demonstration
rt.
er the 5th disp
he other hand
it route increa
he 8th dispatc
were set up
waiting trailer
e the Port, su
e parked traile
o the waiting
e to the Por
W and PSA an
facilitate the
ect to a pena
hennai Port OFin
at TVT-Parkin
the central pa
ontribute to a
ilers, to put st
to ChPT
n trial by cou
patch, even th
d, many parke
ased in the 6t
tch. The parke
p by ChPT
rs has been d
uch as road w
ers inside the
area by the t
rt Gate No.1
nd that traile
exit of trucks
alty, such as
Operation nal Report
ng should
ass section
alleviating
tickers on
unting the
hough the
ed trailers
th and 7th
ed trailers
after the
decreasing
widening,
e Port.
task force
1, so that
ers queues
s.
a fine or
![Page 18: The Project On Improvement of Chennai Port Operation Final Report · 2017-02-01 · 1 1.1 Chenn South Ea cities in T There governm as a gatew Chenn 2014 to Jawaharl case of in Chennai](https://reader033.vdocuments.mx/reader033/viewer/2022060323/5f0dd4467e708231d43c4aea/html5/thumbnails/18.jpg)
v) In
sh
(4)
1) Outl
Demon
X-Ray In
a. Intro
i) No
ii) Ve
b. Allo
DPW Int
a. Intro
i)
ii)
b. Allo
The T
impleme
2) Eval
X-Ray In
a. Traff
Regu
Scre
b. Traff
park
c. The
i) To m
ii) To a
DPW Int
a. Traff
durin
b. Traff
guid
c. The
i) To a
ii) To c
nfrastructure d
hall be further
Demonstra
ine and follow
nstration trial
ntersection
oduction of Tr
o Vehicles m
ehicles to/from
ocate 2 Traffic
tersection
oduce Traffic
No Vehicle
Vehicles fro
ocate 2 Traffic
Team has c
ntation of tra
luation
ntersection
ffic Flow Reg
ulated Traffic
ening Center
ffic Flow Reg
ked/stopped tr
following me
monitor the X
allocate traffi
tersection
ffic Flow Reg
ng congested
ffic Flow Reg
ded to go out f
following me
allocate traffi
clearly indica
development
r promoted.
ation Trials 4
w-up status
l 4 was imple
raffic Flow R
ay stay in the
m X-Ray Scr
c Control Per
Flow Regula
es may stay in
om DPW and
c Control Per
continually c
affic regulatio
ulations were
c Area were o
r.
ulations were
railers within
easures are re
X-Ray Interse
ic control per
ulations inclu
periods whic
ulation was f
from the DPW
easures shoul
ic control per
ate no parking
inside the P
4: Allocation
emented as fo
Regulation.
e Regulated T
reening Cente
rsons
ation
n the Regulate
PSA should
rsons.
confirmed th
on at the inter
e not followed
observed whic
e followed ev
the intersecti
equired in ord
ection by usin
sons whenev
uding moving
ch prevented
followed to so
W Exit by a tr
ld continue to
sons whenev
g/stopping rul
The Proj
12
Port such as r
of Traffic C
ollows.
Traffic Area.
er have priori
ed Traffic Are
move alterna
he status on
rsections after
d during the d
ch sometimes
ven when traf
ions were stil
der to keep th
ng outdoor ca
ver the traffic
g vehicles fro
trailers from
ome extent af
raffic control
o be impleme
ver the traffic
les by markin
ject on Impro
road widenin
ontrol Perso
ity.
ea.
ately.
n allocation
r the demonst
demonstratio
s prevented tr
ffic control pe
ll observed up
he smooth traf
ameras
congestion o
om DPW and
DPW from e
fter the demo
l person at con
nted
congestion o
ng white line
ovement of Ch
ng, waiting a
ons in Port A
of traffic
tration trial.
n trial. Traile
railers from e
ersons were n
p to 7th dispa
ffic flow at th
ccurs.
PSA alternat
exiting.
nstration trial
ngested times
ccurs.
on the road.
hennai Port OFin
area enhancem
Area
control pers
ers staying in
entering the X
not present, al
atch.
he intersection
tely were not
als and trailers
s.
Operation nal Report
ment, etc.
sons and
the
X-Ray
lthough
ns.
followed
s were
![Page 19: The Project On Improvement of Chennai Port Operation Final Report · 2017-02-01 · 1 1.1 Chenn South Ea cities in T There governm as a gatew Chenn 2014 to Jawaharl case of in Chennai](https://reader033.vdocuments.mx/reader033/viewer/2022060323/5f0dd4467e708231d43c4aea/html5/thumbnails/19.jpg)
3.5
The Te
the Steer
(1)
a. Dem
The
dem
b. Dem
The
Roa
c. Dem
The
turn
The sim
1) Curr
Traffic
waiting t
2) Dem
Althou
time. Tot
3) Dem
Althou
long time
current s
Effects of M
eam used a s
ring Committ
Feedback D
mo1 (Simplifi
e aim of De
monstrated tha
mo3 (Restrict
e aim of Dem
ad. The simul
mo4 (Allocati
e aim of Dem
ns entering th
mulation mod
rent Situation
c congestion
time for traffi
mo1
ugh the traffic
tal waiting tim
mo3,4
ugh traffic co
e at Port Gate
ituation).
Measures by
simulation mo
tee on 23rd Fe
Figure
Demonstrati
fication of Ga
emo1 was to
at gate proced
tion of Parkin
mo3 was to e
lation model d
ion of Traffic
mo4 was to ea
e intersection
del was not a
n
occurred at P
ic congestion
c queue did n
me was 3.2 ho
ongestion clea
e No.1(IN, OU
Simulation
odel to illustr
ebruary 2015
e 3-2 Simula
on Trials to S
ate Procedures
o reduce gat
dure time was
ng on Internal
ease traffic co
demonstrated
c Control Pers
ase traffic co
n. The simula
able to reflect
Port Gate No.
and gate pro
not occur at P
ours on avera
ared up along
UT). Total w
The Proj
13
Model
rate the effec
5.
ation Model
Simulation M
s at Port Gate
te procedure
s shortened in
l Roads)
ongestion bou
d the effective
son in Port Ar
ongestion by
ation model re
t the results o
1 (IN, OUT)
ocedure time w
Port Gate No.
age (1.1 hours
g the Periphe
waiting time w
ject on Impro
ts of Demon
for the 3rd D
Model
e No.1)
e time at Po
n Demo1.
und for Port
es of Demo3.
rea)
ensuring that
eflected the re
f Demo2.
and in front
was 4.3 hours
.1 (IN), vehic
s less than the
ery Road and
was 3.8 hours
ovement of Ch
stration Trial
ispatch
ort Gate No.
Gate No.1(O
t vehicles fro
esults of Dem
of the PSA te
s on average.
cles remained
e current situ
the intersect
on average (
hennai Port OFin
ls (Demo1, 3
.1. Simulatio
OUT) at the
om different l
mo4.
erminal entran
d inside the P
uation).
tion, vehicles
(0.5 hours les
Operation nal Report
and 4) at
on model
Periphery
lanes take
nce. Total
ort a long
s waited a
s than the
![Page 20: The Project On Improvement of Chennai Port Operation Final Report · 2017-02-01 · 1 1.1 Chenn South Ea cities in T There governm as a gatew Chenn 2014 to Jawaharl case of in Chennai](https://reader033.vdocuments.mx/reader033/viewer/2022060323/5f0dd4467e708231d43c4aea/html5/thumbnails/20.jpg)
4) Dem
In the
the traffi
Gate in f
current s
3.6
The Te
congestio
(1)
The sy
congestio
places. A
will be av
The T
ChPT du
the exist
MOU wi
additiona
mo1, 3, 4
case of cond
ic congestion
front of Port G
ituation).
Implement
eam has stud
on.
Web Porta
ystem aims a
on. The infor
A live picture
vailable. Vess
Team exchang
uring the 6th
ting ChPT H
ith the coope
al pages.
ducting Demo
n inside the P
Gate No.1 (O
tation of IT R
ied the imple
l System for
at providing
rmation to be
of the conges
sel schedule i
ged the MOU
dispatch. Th
omepage. Th
eration of Ch
o1, 3 and 4 at
Port was redu
OUT). Total w
Related Mea
ementation of
sharing info
more effectiv
e shared amo
sted road, rea
information,
U on implem
he trial is for
he trial was i
PT and CISF
The Proj
14
the same tim
uced. Howev
waiting time w
asures
f IT systems a
ormation rel
ve informatio
ong stakehold
al-time summ
issuing status
mentation of d
publishing th
implemented
F. The follow
ject on Impro
me, trailers en
ver, traffic co
was 3.1 hours
as one of the
ated to traffi
on for stakeh
ders includes
mary of trailer
s of FORM13
demonstration
he informatio
d during the 7
wing figure sh
ovement of Ch
ntered Port Ga
ongestion occ
on average (
measures for
ic congestion
holders in ord
traffic conge
rs passing thro
3, DRF, etc. c
n trial of We
on related the
7th and 8th d
hows the ChP
hennai Port OFin
ate No.1 smo
curred at the
(1.2 hours les
r alleviating t
n
rder to allevia
estion status a
ough several
can also be ac
eb Portal Sys
e traffic cong
dispatch base
PT Homepag
Operation nal Report
oothly and
Customs
s than the
the traffic
ate traffic
at various
gates, etc.
ccessed.
stem with
gestion on
ed on the
ge and the
![Page 21: The Project On Improvement of Chennai Port Operation Final Report · 2017-02-01 · 1 1.1 Chenn South Ea cities in T There governm as a gatew Chenn 2014 to Jawaharl case of in Chennai](https://reader033.vdocuments.mx/reader033/viewer/2022060323/5f0dd4467e708231d43c4aea/html5/thumbnails/21.jpg)
(2)
The Te
inside th
Entry/Ex
3.7
The T
outside th
(1)
The Te
CFS and
Documen
Proposal of
eam propose
e Port. Initial
xit Control Sy
Examinatio
Team has con
he Port.
Examinatio
eam conducte
d container te
nt Check Flo
f Entry/Exit
d a Port Entr
lly, the Team
ystem after le
on of Efficien
nducted the f
on of Operat
ed surveys in
erminals in o
ow, which de
Figure 3-4
Control Sys
ry/Exit Contr
m proposed th
arning that su
nt Process of
following act
tion Flow
nside and outs
order to gras
escribes the d
4 Modificat
The Proj
15
stem for the P
rol System at
he barcode rea
uch a system
f Trailer Flow
tivities in or
side the port i
sp the operat
documentatio
tion to the C
ject on Impro
Port
t Port Gate N
ading system
was planned
w Inside the
rder to enhan
including inte
tion flow. Th
on required a
hPT Homep
ovement of Ch
No.1 to enhan
m but later opt
to be implem
Port
nce the flow
erviews with
he results we
and procedure
page
hennai Port OFin
nce the flow o
ted for an RF
mented.
of trailers in
ChPT, CISF,
ere summariz
es between C
Operation nal Report
of trailers
FID based
nside and
, Customs,
zed in the
CFS, Port
![Page 22: The Project On Improvement of Chennai Port Operation Final Report · 2017-02-01 · 1 1.1 Chenn South Ea cities in T There governm as a gatew Chenn 2014 to Jawaharl case of in Chennai](https://reader033.vdocuments.mx/reader033/viewer/2022060323/5f0dd4467e708231d43c4aea/html5/thumbnails/22.jpg)
Gate, and
(2)
a. Inco
The T
passing
b. Outg
The Te
documen
during th
(3)
The Te
for each
The da
reading s
As for
terminal
The Te
during 6t
summari
(4)
The T
based on
which re
entry pro
a. Stud
A mon
examinin
the Team
night and
during th
taken con
of suspen
2 The cachanges
d terminal ga
Survey on P
ming Trailers
Team calculat
g through the
going Trailers
eam conduct
ntation check
he 3rd dispatc
Survey on N
eam conducte
hour.
ata at Port Ga
system) and th
r terminal ga
gates for thre
eam requeste
th dispatch in
zed. Howeve
Survey aro
Team conduct
n the request f
duce termina
ocess at termi
dy on the Flow
nitoring came
ng the causes
m has monitor
d on holiday
he 6th and 7th
ntinuously in
nsion time, w
amera was insin the situatio
ates.
Processing T
s to the Port
ted the proce
gate as the d
s from the Po
ted the surve
k is conducted
ch for 2 days
Number of T
ed a survey o
ate No.1 is su
he daily summ
ates, the Tea
ee days durin
ed both termin
n order to col
er, data was n
ound Contain
ted the follow
from ChPT. A
al gate efficien
inal IN Gates
w of Trailers u
era is a usef
s and counterm
red incoming
s by setting a
h dispatch2. T
n 30 second in
which is defi
stalled only aton.
Time at Port
ssing time fo
ocumentation
rt
ey on the pr
d at multiple
and the proce
Trailers Pass
n the number
ummarized fr
mary manual
am conducted
g the 4th disp
nals to submi
llect the data
ot submitted
ner Terminal
wing survey
As a result, th
ncy. Based on
during the 8t
using Monito
ful tool for g
measures of t
g trailers to co
a fixed point
The Team has
ntervals durin
ined as a stop
t DPW termin
The Proj
16
Gate No.1
or incoming t
n check is on
rocessing tim
e windows by
essing times f
sing Through
r of trailers pa
from the data
lly prepared b
d the survey
patch.
it the statistic
a covering lon
by the PSA t
ls
around conta
he Team ident
n these findin
th dispatch.
oring Camera
grasping the o
traffic conge
ontainer term
t camera arou
s analysed th
ng the survey
ppage in trai
nal in the 7th
ject on Impro
trailers to the
ly conducted
me for outgo
y CISF and C
for 400 traile
h Gates
assing throug
collected by
by the CISF.
on actual n
cal data of tra
nger period o
terminal.
ainer termina
tified instance
ngs, the Team
a at Terminal
operational s
stion in front
minal gates co
und IN Gates
he flow of tra
y period. The
iler movemen
h dispatch to d
ovement of Ch
e Port using
at a single w
oing trailers
Customs. The
rs were collec
gh Port Gate N
the demonst
number of tra
ailers entering
f time. The d
als during the
e of ‘Suspens
m proposed op
IN Gates
status of the
t of terminal
ontinuously fo
s of both DP
ilers using th
Team has co
nt for more t
determine if t
hennai Port OFin
the number o
window of CIS
from the Po
he survey is c
cted.
No.1 and term
tration trial 1
ailers passing
g/exiting for
data obtained
e 6th and 7th
sion’ and ‘Idl
perational rul
terminal IN
gates. For th
for a week inc
PW and PSA
he pictures wh
onfirmed the
than 20 minu
there were an
Operation nal Report
of trailers
SF..
ort as the
conducted
minal gate
(barcode
g through
one week
d has been
h dispatch
ing Time’,
les for the
Gate and
his reason,
cluding at
terminals
hich were
existence
utes. Gate
ny
![Page 23: The Project On Improvement of Chennai Port Operation Final Report · 2017-02-01 · 1 1.1 Chenn South Ea cities in T There governm as a gatew Chenn 2014 to Jawaharl case of in Chennai](https://reader033.vdocuments.mx/reader033/viewer/2022060323/5f0dd4467e708231d43c4aea/html5/thumbnails/23.jpg)
operation
b. Surv
The T
container
and 7th d
During
smoothly
vacant an
as “Idling
Team con
Time’ ac
c. Stud
The Te
and deliv
were con
a. In
b. Co
c. Si
3.8
During
Based on
included
observati
In the
were con
were disc
The m
1) Meetin
2) Copin
3) Devel
4) More
5) Better
6) Promo
7) Review
8) Enviro
n was evaluat
vey on the Ga
Team consider
r terminal ga
dispatch in or
g the site ob
y. Namely, th
nd many trail
g Time” and
nsiders that s
counted for f
dy on the Trai
eam has cond
very in order
nducted for bo
nterviews on y
ollection of s
ite observatio
Study on th
g the 1st to 5
n the inform
the improvem
ion, and exch
7th dispatch
nfirmed. Wor
cussed and pr
main points dis
ng the cargo
ng with the inc
opment of ro
utilization of
r Connection
otion of railw
w of land use
onmental imp
ted by identif
ate Process Pe
red the possi
tes. Therefor
rder to find ou
bservation, th
here were tim
lers were wai
reported its r
some measur
from 16% to 3
iler Process In
ducted a surv
r to enhance
oth DPW and
yard operatio
tatistical repo
on
he Direction
5th dispatch,
mation collect
ment of port
hanged views
, the current
rkshops were
rojects that w
scussed at the
demand and r
creasing size
oads and waiti
f IT, i.e. inform
to the hinterl
way use
e
provement an
fying and mea
erformance
ibility that th
re, the Team c
ut the reasons
he Team ofte
es when no tr
iting behind.
ratio against t
res for reduci
37% of the to
nside Termina
vey on the con
the processin
d PSA termina
n
orts from con
of the Maste
the Team col
ted, the Team
infrastructure
with ChPT o
land use plan
e held twice
will enhance th
e workshops
role-sharing a
of container
ing areas for
mation servic
and of the po
nd sustainable
The Proj
17
asuring the su
he bottleneck
conducted a
s for the traff
en observed t
trailer procee
The Team re
the total time
ing the ‘Idlin
otal reception
als
ntainer handl
ng of trailers
als since the
ntainer termin
er Plan
llected inform
m made prop
e. During the
on the directio
n inside the p
in which im
he efficiency
were as follo
among ports
ships
trailers.
ce to the drive
ort
e developmen
ject on Impro
uspension tim
k of the incom
survey aroun
fic congestion
that the abov
ded to the ter
efers to such
e to pass throu
ng Time’ will
n time.
ling status in
s at container
6th dispatch.
nals
mation relate
posals to alle
6th to 8th di
on of the mas
port, and the
mportant issue
of the port w
ows.
ers via Intern
nt
ovement of Ch
me during the
ming trailer
nd the termina
n.
ve works had
rminal gate w
times, when
ugh a termina
be required
the yard as f
r terminals. T
d to the activ
viate the traf
spatch, the Te
ster plan.
situation of t
es related to
were proposed
net
hennai Port OFin
period.
flow originat
al gates durin
d not been c
windows even
no work is c
al gate at the
as the averag
for container
The followin
vities of Chen
affic congesti
Team conduct
the roads and
the master p
d.
Operation nal Report
ted at the
ng the 6th
conducted
n if it was
onducted,
S/C. The
ge ‘Idling
receiving
g surveys
nnai Port.
on which
ed further
d railways
plan study
![Page 24: The Project On Improvement of Chennai Port Operation Final Report · 2017-02-01 · 1 1.1 Chenn South Ea cities in T There governm as a gatew Chenn 2014 to Jawaharl case of in Chennai](https://reader033.vdocuments.mx/reader033/viewer/2022060323/5f0dd4467e708231d43c4aea/html5/thumbnails/24.jpg)
In the
discussed
Nec
Nec
Sha
Nec
Nec
In resp
entrance
feasibilit
3.9
The T
specifica
section a
steering c
a draft ru
A task
Trailers O
As the
port oper
Furthe
police an
3.10
(1)
From
Port with
CWC/CF
This m
was start
increase
improved
means th
sticker sy
collected
lately.
8th dispatch
d.
ccessity of de
cessity of upg
aring of cargo
cessity of infr
cessity of dee
ponse to the
of the Jaw
ty studies on t
Improveme
Team has s
ally coordinat
and the road
committee is
unning rule fo
k force was
Owners Asso
ese activities
ration as a wh
ermore, the T
nd the road de
Related Inf
Introductio
15 August 2
hout appropri
FSs are provid
means that a t
ted when the
the number
d from 80%
hat the percen
ystem was no
d and as a resu
h, a workshop
epening berth
grading the ac
o among Kattu
rastructure de
pening the Ja
strong requ
wahar Dock.
the projects p
ent of Synerg
strongly rec
tion with reg
department t
deemed nece
or the enlarge
formed at th
ciation, Term
are meaning
hole, such act
Team would a
epartment, ne
formation
on of a Sticke
015, all laden
iate stickers (
ded with stick
trailer which
e screening ce
of trailer dr
to nearly 90
ntage of driv
ot properly ex
ult we were g
p on the mas
hs of the DPW
ccess road
upalli, Kamar
evelopment an
awahar Dock
est of the pr
ChPT reque
proposed by t
gy on the Op
ommended
gulatory auth
to tackle cong
essary for sus
ed steering co
he initiative o
minal Operato
gful not only
tivities need t
again like to e
eeds to becom
er System
n container t
(Refer to the p
kers without
has the sticke
entre operatio
rivers carryin
0% according
vers carrying
xplained to d
gradually seei
The Proj
18
ster plan was
W terminal
rajar, Krishna
nd funding m
and widenin
resident of C
ested JICA t
the Team.
peration of R
strengthening
horities of th
gestion issue
stainable imp
ommittee has
of ChPT to
ors and CFS a
for congesti
to be continu
emphasize th
me more invol
trailers from
pictures belo
fail after che
er is also carr
on at the TV
ng the prope
g to the surv
the proper d
drivers as man
ing fewer con
ject on Impro
s also held in
aopatnam, an
methods
g the entranc
ChPT, the Tea
to continue
Regulatory A
g further c
he state gove
es effectively.
provement in t
been prepare
tackle conge
association etc
ion alleviatio
ed.
hat the state g
lved in issues
CWC & CFS
ow). All the la
cking all rele
rying the prop
VT parking w
er documents
vey conducte
documents ha
ny were unsu
ntainers with
ovement of Ch
n which the
d Chennai
e
am examined
technical as
Authorities C
oordination
ernment such
. The establis
the operation
ed.
estion issues.
c.
n but also fo
government, s
s related to co
S have not be
aden containe
evant docume
per documen
as discontinu
. The sticker
ed during the
as increased a
ure where stic
stickers and
hennai Port OFin
following iss
d the wideni
ssistance and
Concerned
among stak
h as the traff
shment of an
ns of Chennai
. It consists
or improveme
specifically, t
ongestion
een permitted
er trailers exi
ents.
nts. This stick
ued. The purp
r possession
e 2nd dispatc
as well. How
ckers were ch
did not see th
Operation nal Report
sues were
ng of the
d conduct
keholders,
ffic police
n enlarged
i port, and
of ChPT,
ent of the
the traffic
d into the
iting from
ker system
pose is to
rate was
ch, which
wever, the
hecked or
hem at all
![Page 25: The Project On Improvement of Chennai Port Operation Final Report · 2017-02-01 · 1 1.1 Chenn South Ea cities in T There governm as a gatew Chenn 2014 to Jawaharl case of in Chennai](https://reader033.vdocuments.mx/reader033/viewer/2022060323/5f0dd4467e708231d43c4aea/html5/thumbnails/25.jpg)
(2)
The T
Frequenc
procedur
being im
a. Syste
The rec
one on te
b. Syst
The rec
trailer is
c. Syste
The re
informati
RFID car
The sy
was to in
has not y
hardware
(3)
The Te
(includin
the subje
Almos
transit tim
(4)
The T
(also kno
from Che
i)
ii)
iii)
Jawah
container
Study on In
Team has been
cy Identifier)
res. The RFID
mplemented co
em 1
ception proce
erminal arriva
em 2
ception proce
recorded auto
em 3
eception proc
ion for a per
rd.
ystem verifica
nstall the hard
yet in operati
e has been ins
Interviews
eam, in coop
ng forwarders
ect of congest
st all the com
me became 1
Survey at O
Team conduct
own as Nhava
ennai Port Tru
Jawaharlal N
Gateway Te
NYK Line (
harlal Nehru
r terminals: G
ntroduction
n studying th
) system afte
D system con
oncurrently an
edure at a ter
al are recorde
edure of a tra
omatically
cedure of a
rsonnel is re
ation test for
dware equipm
ion mainly be
stalled at maj
with Japane
eration with
s, shipping li
tion and trans
mpanies have n
6-20 hours fr
Other Major
ted a field su
a Sheva Port)
ust accompan
Nehru Port T
erminal India
(India) Ltd.
Port, located
Gateway Term
of RFID Sys
he details of
er confirming
nsists of the
nd System 3
rminal gate is
ed automatica
iler at Port G
personnel at
ecorded autom
both System
ment for each
ecause only 5
or CFSs, Por
ese Compani
JETRO Chen
nes, etc.) in
sit time (lead
noticed both
rom 3days as
r Ports
urvey and hel
), the largest c
nied the Team
Trust
Pvt. Ltd.
d 70km from
minal India, J
The Proj
19
stem
the impleme
g that ChPT
following 3
will be imple
s speeded up
ally
Gate No.1 is s
at Port Gate
matically. Ha
1 and 2 was
h gate and att
5% of trailer
rt Gate No.1,
ies
nnai, conduct
Chennai and
time) during
an improvem
before, whic
ld a hearing
container por
m. The Team v
m Mumbai,
Jawaharlal Ne
ject on Impro
entation plan
had the plan
sub-systems
emented in fe
and the info
speeded up an
No.1 is spe
arbor Entry P
completed at
tach RFID tag
s currently h
and DPW/PS
ted interviews
d Bangaluru w
the 8th dispa
ment in the lev
ch is similar to
on congestio
rt in India dur
visited the fo
is a dedicate
ehru Port Con
ovement of Ch
and its statu
n to impleme
. System 1 a
ew years later
ormation on C
nd Port entry/
eeded up an
Permit (HEP
t the end of 2
gs on trailers
ave RFID tag
SA terminals.
s with severa
which usually
atch.
vel of congest
o the result of
on issues at J
ring the 2nd d
llowing organ
ed container
ntainer Termi
hennai Port OFin
us of the RFI
ent it to expe
and System 2
r.
CFS departur
y/exit informa
nd the Port
P) will be rep
2015; all that
. However, th
gs. On the ot
.
al Japanese C
y use Chenna
tion and a red
f the Team’s
Jawaharlal N
dispatch. Two
anizations:
r port consis
inal, and Nha
Operation nal Report
ID (Radio
edite gate
2 are now
re and the
ation for a
entry/exit
placed by
remained
he system
ther hand,
Companies
ai port on
duction in
survey.
Nehru Port
o officials
ting of 3
ava Sheva
![Page 26: The Project On Improvement of Chennai Port Operation Final Report · 2017-02-01 · 1 1.1 Chenn South Ea cities in T There governm as a gatew Chenn 2014 to Jawaharl case of in Chennai](https://reader033.vdocuments.mx/reader033/viewer/2022060323/5f0dd4467e708231d43c4aea/html5/thumbnails/26.jpg)
Internatio
Major
i)
ii)
iii)
iv)
v)
vi)
Circum
facilities
Port. Ho
considere
i)
ii)
iii)
iv)
3.11
Initiall
follows:
T
E
In
In
In
D
E
The fo
E
S
Im
onal Containe
findings of th
Heavy cong
congestion
roads.
The Port ha
toward eac
Security ch
For exampl
Measures fo
pre-examin
Customs do
X-Ray scan
Manageme
mstances in a
, and land use
owever, the fo
ed at the Port
lane separat
pre-screenin
allocation o
simplificati
Additional
ly, technical
Traffic Norma
Efficient Inspe
ntroduction o
ntroduction o
ntroduction o
Draft Long Te
Establishment
ollowing issue
Efficient Inspe
Study on Basi
mprovement
er Terminal.
he survey and
gestion was o
might not af
ad three port g
ch port gate w
heck procedur
le, it is not ne
for alleviating
ation space, a
o not carry ou
nning of rando
ent System) i
and around th
e around the
following con
t of Chennai:
tion on the ro
ng by Custom
of pre-examin
on of gate pr
Technical A
assistance is
alization with
ection at Port
of Traffic Reg
of Portal Web
of Authenticat
erm Port Faci
t of Cooperat
es were added
ection at Term
ic Direction o
of Synergy o
d hearing wer
observed tow
ffect residents
gates, one in
was separated
re is more sim
ecessary to ob
g congestion
and traffic co
ut a physical i
omly selected
is conducted b
he port, such
port, etc. are
ngestion allev
oads toward th
ms
nation space
ocedures
Assistance Iss
sues for the
h CFS Cooper
t Gate No.1
gulation
b System
te Gate Syste
lity Plan
tion Framewo
d in the secon
minal Gate
of Master Plan
of Authority
The Proj
20
re as follows
ward port gat
s since few r
each containe
d for about 1 k
mplified and
btain a HEP (H
such as the c
ontrol by the p
inspection of
d import cont
before exiting
as container
different bet
viation measu
he gates
sues
project on im
ration
em
ork
nd year of tec
n
ject on Impro
:
tes just like t
residential bu
er terminal. T
km.
computerize
Harbour Entr
construction o
police have b
f export conta
tainers as per
g from each t
r throughput,
tween the Por
ures taken at
mprovement
chnical assista
ovement of Ch
the Port of C
uildings are o
The lane of th
d than that in
ry Permit) bef
of a by-pass r
een taken.
iners at the p
Customs RM
terminal.
the layout o
rt of Chennai
t Jawaharlal N
of Chennai p
ance at the re
hennai Port OFin
Chennai. How
observed alon
he roads
n the Port of
fore entering
road, the allo
port gate (IN)
MS (Risk
of roads and o
and Jawahar
Nehru Port s
port operation
equest of ChP
Operation nal Report
wever, the
ngside the
f Chennai.
the Port.
ocation of
.
other port
rlal Nehru
should be
n were as
PT.
![Page 27: The Project On Improvement of Chennai Port Operation Final Report · 2017-02-01 · 1 1.1 Chenn South Ea cities in T There governm as a gatew Chenn 2014 to Jawaharl case of in Chennai](https://reader033.vdocuments.mx/reader033/viewer/2022060323/5f0dd4467e708231d43c4aea/html5/thumbnails/27.jpg)
In this
agencies
3.12
Japan
for decre
out site v
The ch
tentativel
3.13
Japanes
manufact
measures
assistanc
The Tea
past 2 ye
Furtherm
there.
s way, the Tea
concerned.
Arrangeme
has a lot of e
easing traffic
visits in order
hairman i/c an
ly scheduled
Presentatio
se companies
turing activit
s taken to i
ce .
am created pr
ears and provi
more, the Tea
am has contin
ent of Study
experience in
congestion. T
r to learn abou
nd traffic man
to stay in Jap
on Materials
s including
ties in Tami
improve port
resentation m
ide key inform
am also visite
nuously condu
Tour in Japa
improving po
Therefore it w
ut port operat
nager of ChP
pan from 12th
on Activitie
those in the
il Nadu. It i
t manageme
materials whic
mation to stak
ed Bengaluru
The Proj
21
ucted technic
an
ort operation
would be usef
tions in Japan
PT have been h to 15th Septe
s and Outco
e automotive
is important
ent & operat
ch explain the
akeholders in
u and made a
ject on Impro
cal assistance
including the
ful for officia
n.
invited to vis
ember.
mes of the P
e industry a
to conduct
tion at Chen
e activities an
India as well
a presentation
ovement of Ch
in cooperatio
e successful a
ls of ChPT to
sit Japan in Se
roject
are increasin
public relati
nnai Port un
nd outcomes
l as Japanese
n on the proj
hennai Port OFin
on with ChPT
adoption of m
o visit Japan a
eptember. Th
ng their busi
ions activitie
nder JICA’s
of the Projec
companies in
ject to Japan
Operation nal Report
T and
measures
and carry
hey are
iness and
es on the
technical
ct over the
n Chennai.
nese firms
![Page 28: The Project On Improvement of Chennai Port Operation Final Report · 2017-02-01 · 1 1.1 Chenn South Ea cities in T There governm as a gatew Chenn 2014 to Jawaharl case of in Chennai](https://reader033.vdocuments.mx/reader033/viewer/2022060323/5f0dd4467e708231d43c4aea/html5/thumbnails/28.jpg)
4
4.1
(1)
The Tea
concerne
assistanc
Major a
items bel
1) Stee
The Ste
Terminal
informati
2) Wor
The wo
provide
chaired b
offices o
3) Intr
Outcom
Systematic
Measures i
am implemen
ed authorities
ce are outlined
F
activities and
low.)
ering Commi
eering Comm
l operators,
ion in the com
rking Group
orking group(
an opportuni
by the Traffic
f ChPT partic
roduction of
e and Eva
Implementa
introduced u
nted measure
s. Decongesti
d below.
Figure 4-1
outcomes of
ittee on Imp
mittee(S/C) h
CFSs , Truc
mmittee and t
p on Improve
(W/G) meetin
ity to discus
c Manager an
cipated.
a Sticker for
aluation o
ation of Mea
under Techni
es for the alle
ion measures
Activities U
f the project a
rovement of
has been set
cker Associat
tackle traffic
ement of Che
ng has also b
s various iss
nd representat
r a Container
The Proj
22
of the Pro
asures for Tec
ical Issues
eviation of tr
s which were
Undertaken u
are listed belo
f Chennai Po
up to impr
tions and JIC
problems and
ennai Port O
been held as
sues on Chen
tives of traffi
r Trailer
ject on Impro
oject
chnical Assis
raffic congest
e systematica
under Techni
ow. (The num
ort Operation
rove the oper
CA etc. Con
d so on togeth
Operation
preparatory
nnai port ma
c, civil and m
ovement of Ch
stance.
tion in coope
ally organize
ical Assistanc
bers in the fig
n
ration of Ch
ncerned perso
her.
talks before
anagement &
mechanical, IT
hennai Port OFin
eration with C
ed under the
nce
gure correspo
hennai Port b
ons can shar
the S/C as w
& operation. W
T, financial a
Operation nal Report
ChPT and
technical
ond to the
by ChPT,
re related
well as to
W/G was
and others
![Page 29: The Project On Improvement of Chennai Port Operation Final Report · 2017-02-01 · 1 1.1 Chenn South Ea cities in T There governm as a gatew Chenn 2014 to Jawaharl case of in Chennai](https://reader033.vdocuments.mx/reader033/viewer/2022060323/5f0dd4467e708231d43c4aea/html5/thumbnails/29.jpg)
The Project on Improvement of Chennai Port Operation Final Report
23
As trailer drivers who do not carry the proper documents are one of the causes of traffic congestion, a trial
was conducted with the cooperation of the private sector in which stickers were attached to trailers when
drivers possessed the proper documents. This was a good initiative which demonstrated the willingness on
the part of the private sector to cooperate in congestion alleviation measures. However, the sticker system
was soon discontinued due to management problems.
4) Simulation Model Analysis for Traffic Congestion
The Team developed a traffic simulation model and showed the qualitative effect of measures for
decongestion in the S/C. It is hoped that ChPT and stakeholders will continue efforts to alleviate the
congestion.
5) Effective Utilization of TVT Parking ( Demonstration Trial )
HEP (Harbor entry permit) was issued to trailer drivers at the TVT Parking located along State Highway
114, about 5km north from Port Gate No.1. Utilizing this parking space, required documents for drivers
were pre-checked as a demonstration trial. The area was also used as a waiting space for trailers to
discourage drivers from parking trailers along the road while waiting to enter the port.
6) No Parking along internal Roads and Establishment of Waiting Area(Demonstration Trial)
Parking along internal roads encumbers trailers as they move. Parking has been banned at some road
sections and a waiting area has been set up for trailers to wait inside Chennai Port.
7) Allocation of Traffic Officers (Demonstration Trial)
Congestion at the intersection in Chennai Port was so serious that traffic control was becoming
increasingly necessary. Therefore, traffic officers were allocated at key intersections to give instructions to
drivers inside the port.
8) Additional Gate for empty container trailers at DPW terminal
An additional terminal gate for empty container trailers was set up at the area of the DPW terminal which
used to be for the handling of iron ore. It has streamlined the traffic flow inside Chennai Port and
contributed to alleviating traffic congestion.
9) Pre-Document Check prior to Port entry (Task Force Activity)
Task Force Team was formed at the initiative of Chennai Port Trust to combat traffic congestion. It
consists of ChPT, Terminal Operators and CFS association etc. Before entry to the port, trailer drivers are
subject to a document check by the Task Force. They are not allowed to enter the port until they show the
proper documents.
![Page 30: The Project On Improvement of Chennai Port Operation Final Report · 2017-02-01 · 1 1.1 Chenn South Ea cities in T There governm as a gatew Chenn 2014 to Jawaharl case of in Chennai](https://reader033.vdocuments.mx/reader033/viewer/2022060323/5f0dd4467e708231d43c4aea/html5/thumbnails/30.jpg)
The Project on Improvement of Chennai Port Operation Final Report
24
10) Promoting Traffic Discipline among Drivers (Task Force Activity)
As one of activities of the Task Force Team, trailer drivers are instructed to keep proper intervals by traffic
officer while forming a line on the road toward Port Gate No.1. The officer patrols the road on a motorbike.
Traffic discipline of drivers is expected to be improved and traffic congestion decreased.
11) Survey of Terminal Gate Operation
With the cooperation of the DPW terminal, the movement of container trailers passing through the
terminal gate was recorded by a camera set up at the entrance in order to grasp the efficiencty of gate
processing. This survey was useful for analyzing the causes of congestion related to the terminal gate and
suggesting measures for alleviation.
12) Incoming Traffic throughput Analysis
The Team analyzed the processing capacity of Port Gate No.1, terminal gates and terminal yards in order
to identify bottlenecks and proposed measures for upgrading the processing capacity to attain the target at
each gate and yard.
13) Continuous Traffic Congestion Survey
The Team conducted a traffic congestion survey outside/inside Chennai Port during every dispatch. The
survey results were utilized to grasp the present situation and examine the outcome of efforts to alleviate
traffic congestion and so on. Findings were fed back to the study activity on improvement of Chennai Port
Operation.
14) Technical Seminar for staff of Chennai Port Trust and CISF
Technical Seminars were held for staff of ChPT and CISF by the Team when the bar-code reading system
was introduced as a demonstration trial. Trainees could learn how to use the bar-code reading system in the
seminar.
15) Introduction of Bar-code Reading System ( Demonstration Trial)
As part of modernization of access control procedures for trailers using IT, the Bar-code reading system
was introduced at the Port Gate No.1
16) Introduction of Web Portal System ( demonstration Trial)
As one of the demonstration trials to alleviate traffic congestion using IT, Web Portal System has been
established to provide congestion information. Everyone can access the information on the number of
trailers passing through the Port Gate No.1 on an hourly basis using the website of ChPT.
17) Introduction of RFID System
ChPT has a plan to introduce an RFID (Radio Frequency Identification) System to attach IC tags to
trailers with the cooperation of related organizations. The system aims to increase the efficiency of cargo
![Page 31: The Project On Improvement of Chennai Port Operation Final Report · 2017-02-01 · 1 1.1 Chenn South Ea cities in T There governm as a gatew Chenn 2014 to Jawaharl case of in Chennai](https://reader033.vdocuments.mx/reader033/viewer/2022060323/5f0dd4467e708231d43c4aea/html5/thumbnails/31.jpg)
The Project on Improvement of Chennai Port Operation Final Report
25
handling management and gate processing by sharing information among ChPT, CFS and terminal
operators etc.
18) Widening and improvement of roads in Chennai Port
The widening and improvement of internal roads have been carried out inside Chennai Port to alleviate
traffic congestion. In addition, the traffic flow has been clearly separated.
19) Expansion of Port Gate No.1
Port Gate No.1 is the only gate for container trailers to enter and exit Chennai Port, but the lane capacity
was insufficient to cope with the number of waiting trailers. Accordingly, ChPT expanded Port Gate No.1
from 4 to 8 lanes.
20) Widening and Improvement of State Highway 114
State highway 114 is the only road connecting to the Port Gate. Widening and improvement works of
Highway 114 are ongoing in order to provide a dedicated lane for container trailers.
21) Development of Approach Road to Port Gate No.1
Insufficient road infrastructure is also one of the causes of traffic congestion. The approach road to Port
Gate No.1 has been widened and improved to improve the traffic flow of trailers.
22) Study on Direction of the Master Plan
The workshop on the master plan was held in ChPT. The Team discussed the direction of the master plan
and stressed the importance of infrastructure projects as well as the need to further alleviate traffic
congestion.
23) Strengthening of Partnership with Tamil Nadu Government
ChPT invited officials of the Tami Nadu Government to attend the S/C. Officers from Traffic Police and
Road section of Tamil Nadu joined the expanded S/C to assist with congestion alleviation efforts.
24) Activity Report of JICA Study
The Team prepared an activity report which details the current state of traffic congestion, analyzes
congestion trends, describes the efforts and outcome of measures to decrease congestion and all other study
activities undertaken at each dispatch. It is submitted to ChPT, JICA etc. ChPT will utilize the results of the
report to take further measures for decongestion.
![Page 32: The Project On Improvement of Chennai Port Operation Final Report · 2017-02-01 · 1 1.1 Chenn South Ea cities in T There governm as a gatew Chenn 2014 to Jawaharl case of in Chennai](https://reader033.vdocuments.mx/reader033/viewer/2022060323/5f0dd4467e708231d43c4aea/html5/thumbnails/32.jpg)
4.2
(1)
The m
1) Intro
The s
introdu
Howev
disappe
improv
when it
2) Simu
The s
(Barcod
officers
visualiz
3) Effe
The u
up the
employ
to the o
a HEP
central
4) No P
The
demons
other h
extent)
some tr
internal
the wai
5) Allo
Traffi
officer,
task fo
allocate
because
Evaluation
Optimizati
measures impl
oduction of a
sticker introd
uced to confi
ver, as the per
eared. Accor
ved by 3-4 %
t was first imp
ulation Mode
simulation m
de reading sy
s). The simula
ze the effects
ective Utilizat
utilization of
HEP. The tri
yees of CHA
optimization o
can be issue
HEP issuanc
Parking along
traffic regul
stration trial
hand, the esta
. After the tri
railers. Howe
l roads did no
iting areas is
ocation of Tra
ic officers co
, security gua
orce team ar
ed during per
e instructions
n of Technica
on of Trailer
emented for o
Sticker for a
duced during
rm whether
rcentage of d
rding to the
at the 6th dis
plemented.
el Analysis fo
model analysis
ystem), trial 3
ation contribu
of the trials b
tion of TVT-P
TVT-Parking
ial, however,
(Customs Ho
of trailer flow
ed at TVT-Pa
e office. In th
g Internal Roa
lation to pro
and the parke
ablishment of
ial, four waiti
ever, despite t
ot decrease. A
required as w
affic Officers
ontinued to b
ard or a ChPT
re allocated
riod of heavy
s by traffic of
al Assistance
r Flow
optimizing tr
a Container Tr
g the 1st and
a trailer had
drivers carryin
survey cond
spatch, when
or Traffic Dec
s was conduc
3 (No parkin
uted to the op
before their im
Parking (Dem
g was origina
revealed tha
ouse Agent),
w. However, T
arking 24 hou
his sense, it c
ads and Set-u
ohibit parkin
ed cars are st
f the waiting
ing areas wer
the establishm
Accordingly,
well as compl
(Demonstrat
be allocated a
T officer, wa
lately. The T
y congestion.
fficers were so
The Proj
26
railers flow ar
railer
d 2nd dispat
d cleared the
ng the proper
ducted by th
stickers were
congestion
cted in order
ng rule and w
ptimization o
mplementatio
monstration T
ally based on
at most of the
CFS, etc. Th
TVT-Parking
urs a day wh
ontributed to
up of Waiting
ng along int
till one of the
area did con
re newly estab
ment of there
further enha
iance with th
tion Trial 4)
after the dem
as allocated a
Team also o
. However, tr
ometimes ign
ject on Impro
re evaluated a
ch is no lon
documentat
r documents
he Team, the
e no longer u
r to project th
waiting area),
f trailer flow
on.
Trial 2)
the idea that
e people who
herefore, this
plays an imp
hile it can on
the optimiza
g Area (Demo
ternal roads
e main factor
ntribute to op
blished inside
e waiting area
ancement of m
he no parking
monstration t
at first, office
observed that
raffic officers
nored by trail
ovement of Ch
as follows.
nger being us
ion check as
increased, th
e document
used, compare
he effects of
and trial 4 (
as it allowed
a trailer driv
o came inside
measure did
portant functio
nly be issued
ation of trailer
onstration Tria
was not im
rs impeding th
timizing the
e the Port wh
as, the numbe
measures to g
rule along th
rial. Althoug
ers from mult
t CISF offic
s require train
er drivers.
hennai Port OFin
sed. It was
s it entered t
he need for th
possession r
ed to the 2nd
f demonstrati
(arrangement
d the relevant
ver himself w
e were not d
not directly c
on in issuing
during the d
r flow indirec
al 3)
mplemented
the trailer flow
trailers flow
hich have bee
er of cars park
guide parked
he internal roa
gh just a sing
tiple organiza
cers were ad
ning on traff
Operation nal Report
originally
the gates.
his system
ratio was
d dispatch,
on trial 1
of traffic
parties to
would pick
rivers but
contribute
the HEP;
day at the
ctly.
after the
w. On the
(to some
n used by
ked along
trailers to
ads.
gle traffic
ation as a
dditionally
fic control
![Page 33: The Project On Improvement of Chennai Port Operation Final Report · 2017-02-01 · 1 1.1 Chenn South Ea cities in T There governm as a gatew Chenn 2014 to Jawaharl case of in Chennai](https://reader033.vdocuments.mx/reader033/viewer/2022060323/5f0dd4467e708231d43c4aea/html5/thumbnails/33.jpg)
The Project on Improvement of Chennai Port Operation Final Report
27
6) Additional Gate for Empty Trailers at DPW Terminal
The implementation of the new DPW gate specialized for empty trailers in April 2015 was one of the
effective measures for the optimization of trailer flow. Separating the flow of empty trailers from that of
export container trailers has been effective because empty trailers often wait for job orders or proper
documents inside the Port.
However, the trailer flow has not been completely separated because empty trailers were still accepted
at the DPW IN Gate which was meant for export container trailers. Furthermore, the empty trailer flow
and the export trailers flow sometimes crossed at the intersection near the X-Ray inspection area after the
implementation of the new gate. Further optimization of the trailers flow can be achieved if these issues
are addressed and the empty and export container flows are completely separated.
7) Pre-Document Check Prior to Port Entry (Task Force Activity 1)
The pre-document check, which was conducted on the access road toward Port Gate No.1 during the 7th
dispatch, was one of the activities undertaken by the Task Force Team (which consists of ChPT, container
terminals, trucking companies, etc).
These screening activities have somewhat contributed to optimization of trailers flow inside and outside
the Port.
8) Promoting Traffic Discipline among Drivers (Task Force Activity 2)
The Team observed that traffic officers instructed trailer drivers to drive along a lane, keep proper
intervals, etc. during 7th dispatch. The traffic officers were dispatched from trucking companies
organized by ChPT. It was the first attempt for ChPT to organize such a team by themselves. Thanks to
the instructions from officers, situation in which container trailers prevented general vehicles from
proceeding were avoided. Furthermore, together with the restrictions on trailers entering the city area
which have been enforced by the traffic police, the traffic flow along the State Highway 114 has greatly
improved. These activities definitely contribute to optimizing the traffic flow outside the Port.
Although activities undertaken by the task force team were discontinued at the 8th dispatch, the traffic
flow has remained in good condition.
9) Survey on Terminal Gate Operation
Based on the findings from the survey on terminal gate operation during the 6th and 7th dispatch, the
Team proposed the TOR for the operational rules on the entry process of trailers at terminal IN Gates
during the 8th dispatch. If the TOR is fully implemented, the trailer flow in front of DPW IN Gate will
become smoother, which will enhance not only the trailer flow towards terminals inside the Port but also
the whole trailer flow towards the Port.
10) Incoming Traffic Throughput Analysis
The Team studied the relation between the trailer processing capacity among major points in the trailer
flow and the traffic congestion during the 8th dispatch.
![Page 34: The Project On Improvement of Chennai Port Operation Final Report · 2017-02-01 · 1 1.1 Chenn South Ea cities in T There governm as a gatew Chenn 2014 to Jawaharl case of in Chennai](https://reader033.vdocuments.mx/reader033/viewer/2022060323/5f0dd4467e708231d43c4aea/html5/thumbnails/34.jpg)
Figu
The st
terminal
can be ac
11) Con
The T
dispatc
trailer f
The Te
congest
(2)
i) Bar
The i
confirm
time wa
The T
in the tr
also be
ii) Web
The T
The ai
congest
objectiv
Howe
ure 4-2 The
tudy clarified
yard handlin
chieved by bo
ntinuous Traf
Team has con
h and summa
flow inside a
eam believes
tion alleviatio
Introductio
code Reading
introduction
ming and reco
as reduced du
Team propose
rial and the s
applied to th
b Portal Syste
Team conduc
m of the de
tion with sta
ves prior to th
ever, the syst
e Compariso
d the target p
ng. The targe
oth ChPT and
ffic Congestio
nducted the
arized the res
and outside th
it is necessa
on measures b
on of IT Rela
g System (De
of the syste
ording the en
ue to the cont
ed the establi
ucceeding 6
he RFID syste
em
cted the demo
emonstration
akeholders. A
he start of the
tem operation
on of Process
processing ca
et values and
d container te
on Survey
traffic conge
sults in the a
he Port by ma
ary to continu
base on the fi
ated Measur
emonstration
em helped a
ntry and exit
tinuous impro
ishment of a s
months of op
em which wil
onstration tri
trial was to
Although the
e trial and thu
n was finally
The Proj
28
sing Capacity
apacity of tra
the optimiza
erminals if the
estion survey
activity report
aking a vario
ue conductin
findings.
res
Trial 1)
alleviate the
of trailers at
ovements of t
sustainable sy
peration of th
ll be impleme
ials on Web P
o show the
trial period
us believes th
suspended a
ject on Impro
y among maj
ailers both at
ation of traile
e necessary im
continuously
ts. Furthermo
ous proposals
ng such traffi
traffic conge
Port Gate N
the procedure
ystem at Port
e Barcode Re
ented and ope
Portal System
importance
was short, t
he aim was ac
fter several i
ovement of Ch
jor Points in
the port gat
er flow inside
mprovements
y from the 1
ore, the Team
based on the
ic congestion
estion as the
o.1 was shor
es at Port Gat
t Gate No.1 b
eading System
erated by ChP
m during the
of sharing i
he Team tho
hieved.
ssues arose. N
hennai Port OFin
n the Trailer
te, terminal g
e and outside
s are made.
1st dispatch t
m tried to opt
e results of th
n surveys and
e processing
rtened. The p
te No.1 by CI
base on the e
m. This pro
PT.
7th and 8th
information o
oroughly exp
No actions w
Operation nal Report
Flow
gates, and
e the Port
to the 8th
timize the
he survey.
d propose
time for
processing
ISF.
xperience
oposal can
dispatch.
on traffic
plained its
were taken
![Page 35: The Project On Improvement of Chennai Port Operation Final Report · 2017-02-01 · 1 1.1 Chenn South Ea cities in T There governm as a gatew Chenn 2014 to Jawaharl case of in Chennai](https://reader033.vdocuments.mx/reader033/viewer/2022060323/5f0dd4467e708231d43c4aea/html5/thumbnails/35.jpg)
to reso
receptio
thus re
continu
iii) RFI
RFID
contrib
dissemi
RFID t
(3)
1) Imp
The Tea
traffic co
ChPT) su
expedited
congestio
2) Imp
Widenin
committe
on-going
3) Exa
The Tea
through h
As traff
ChPT joi
infrastruc
4) Exa
The Ch
dock is lo
The purp
(4)
1) Steerin
The Ste
Concerne
The work
olve these iss
on of failure r
ecognized th
uously as desc
ID System
D system is to
ute to impro
ination of mo
ags.
Improveme
provement of
am has surve
ongestion at
uch as extens
d. According
on should be
provement of
ng of State H
ee. Furtherm
g. These proje
amination of t
am examined
holding work
fic congestion
intly conduct
cture projects
amination for
hairman in cha
ocated in the
pose of remod
Developme
ng Committe
eering Comm
ed authorities
king group (W
sues despite t
report, arrang
e necessity
cribed above.
improve the
oving the eff
ore advanced
ent of infrast
infrastructure
eyed the statu
every dispat
sion of the ga
gly, ChPT’s e
positively ev
access roads
Highway 114
more, improve
ects have been
the basic dire
d the basic dir
kshops.
n has been re
ted, ChPT req
s for improve
remodeling o
arge requeste
center of the
deling the doc
ent of Social
ee on Improve
mittee (S/C) h
s can share re
W/G) meetin
the fact that
gement of the
of establishi
.
processing e
ficiency of th
d information
tructure
e inside the p
us of infrastru
tch. Based o
ate, widening
efforts to imp
valuated.
outside the p
4 (SH114) h
ement works
n contributing
ction for a m
rection for fo
educed thank
quested the T
ement of port
of Jawahar do
ed the Team t
e port and han
ck is to increa
Environmen
ement of Che
as been set u
elated inform
g, where prel
The Proj
29
the Team co
e persons in c
ing a sustain
efficiency at t
he reception
n on traffic co
port
ucture inside
on these prop
g of the roads
prove infrastr
port
has been exp
of the appro
g to reduction
master plan
ormulation of
ks to the con
Team to condu
operation.
ock
to support the
ndles bulk ca
ase cargo han
nt
ennai Port Op
up to discuss
mation in the
liminary disc
ject on Impro
overed such m
charge, etc. du
nable system
erminal gates
procedure a
ongestion by
e the port and
posals, variou
, and streaml
ructure inside
edited on th
oach road fr
n of traffic co
f a master pla
gestion allev
uct the maste
e study on the
argoes; howev
ndling efficien
peration
and impleme
committee an
cussions are h
ovement of Ch
matters as th
uring its stay
m in order to
s. Furthermor
at Port Gate
using the inf
d has propose
us projects (
lining of the v
e the port in o
e recommend
om SH114 t
ongestion.
an and propos
iation measu
er planning st
e remodeling
ver, its facilit
ncy.
ent measures
nd tackle traf
held prior to t
hennai Port OFin
he detection
in Chennai. T
o operate th
re, the system
No.1 and e
formation col
ed measures
(originally pl
vehicle flow
order to redu
dation of the
to Port Gate
sed some pro
ures that the T
tudy which fo
g of Jawahar d
ties are super
for easing co
ffic problems
the S/C, has
Operation nal Report
of issues,
The Team
he system
m will also
nable the
llected by
to reduce
lanned by
are being
uce traffic
e steering
No.1 are
oject ideas
Team and
focuses on
dock. The
rannuated.
ongestion.
s together.
also been
![Page 36: The Project On Improvement of Chennai Port Operation Final Report · 2017-02-01 · 1 1.1 Chenn South Ea cities in T There governm as a gatew Chenn 2014 to Jawaharl case of in Chennai](https://reader033.vdocuments.mx/reader033/viewer/2022060323/5f0dd4467e708231d43c4aea/html5/thumbnails/36.jpg)
set up. T
participa
discussio
2) Establ
The Tea
results of
The TOR
plan for r
Although
recognize
own initi
on the W
maintena
was obse
3) Streng
The Tam
congestio
a sugges
expanded
initiative
this way,
4.3
The o
evalua
(1)
The Tea
queuing
number o
container
volume o
The Team re
ants to deepe
ons, various m
lishment of a
am prepared
f the demons
R includes ru
re-staring the
h the TOR ha
ed in ChPT a
iative with CI
Web Portal Sy
ance at severa
erved
gthening the P
mil Nadu Gov
on issues. Th
stion by the
d S/C to assi
e to combat tr
, the managem
Objective E
outcomes of t
ated as follow
Outcome o
am surveyed
trailers along
of queuing tr
r handling vo
of 100 thousa
eported on th
en their und
measures to a
sustainable P
the TOR on
stration trial o
unning rules f
e bar code rea
as not been im
and CISF. In
ISF and ChPT
ystem. CISF a
al meetings.
Partnership w
vernment whi
herefore, ChP
Team. Office
ist with cong
raffic congest
ment & opera
Evaluation fo
the efforts ma
ws.
of measures f
the congestio
g SH 114 and
railers outsid
olume; therefo
and containers
he status of c
derstanding o
lleviate cong
Port Entry/Ex
implementing
on the barcod
for sustainabl
ading system,
mplemented,
particular, Ch
T EDP sectio
also stressed t
In this way, a
with the Tamil
ch develops
T invited offi
ers from the
gestion allevia
tion. It consis
ation of ChPT
or the Projec
ade to decrea
for decreasin
on status outs
d Manali area
e the port is
ore, the figur
s per month.
The Proj
30
congestion a
of congestion
estion have b
xit Control Sy
g a sustainab
de reading sys
le operation,
etc.
the need to e
hPT traffic de
on in order to
the necessity
a change in t
l Nadu Gover
and manages
ficials of Tam
Traffic and
ation. ChPT
sts of ChPT.
T has been gre
ct
ase congestion
ng the numbe
side the port
a was counted
as follows. T
re is converte
ject on Impro
nd presented
n issues. Aft
been successf
ystem
ble Port Entry
stem and the
an emergenc
establish a su
epartment he
discuss issue
y of establishi
thinking on th
rnment
s the access r
mil Nadu Gov
Road sectio
has also form
Terminal Op
eatly improve
n over the las
er of trailers
from the beg
d every day d
The number
d to the numb
ovement of Ch
d its survey r
ter reaching
fully impleme
y/Exit Contro
succeeding 6
y contact pla
stainable syst
ld a Working
es related to t
ing a sustaina
he part of Ch
oads to the p
ernment to at
on of Tamil N
med a Task F
erators and C
ed.
t 2 years are
outside the
inning of the
uring the Tea
of queuing tr
ber of queuin
hennai Port OFin
results which
a consensus
ented.
ol System bas
6 months of o
an, a system e
tem is gradua
g Group meet
the demonstr
able system f
hPT and CIS
port is also in
ttend the S/C
Nadu have j
Force Team a
CFS associati
objectively
port
e study. The n
am’s stay. Tre
railers depen
ng trailers per
Operation nal Report
h enabled
s through
sed on the
operation.
expansion
ally being
ting on its
ation trial
for system
F officers
nvolved in
C based on
oined the
at its own
ion etc. In
number of
end of the
nds on the
r handling
![Page 37: The Project On Improvement of Chennai Port Operation Final Report · 2017-02-01 · 1 1.1 Chenn South Ea cities in T There governm as a gatew Chenn 2014 to Jawaharl case of in Chennai](https://reader033.vdocuments.mx/reader033/viewer/2022060323/5f0dd4467e708231d43c4aea/html5/thumbnails/37.jpg)
The ma
trailers s
Manali a
police an
Port Gate
(2)
The pro
process a
Proces
Aver
Time
ChPT in
be possib
No. of T
outside t
Maximum
Max No./Day
Average N
Ave No./Day
Figu
aximum numb
showed a slig
area but not o
nd the task fo
e No.1 instea
Outcome o
ocessing effi
and introducin
ssing Time a
rage Processi
e / Truck / La
ntends to intr
ble not only to
N
Trailers
the Port
Dat
Collec
Surv
6‐7/12/
No./Day 90
y on SH114 -
No./Day 67
y on SH114 -
No. o
f Trailers
Table 4-1
ure 4-3 Tre
ber of queuin
ght declining
on SH114. T
orce in which
ad of SH114.
of measures f
ciency at Po
ng the bar-co
Table
t Port Gate N
ing
ane
IN
OUT
roduce a RFID
o secure entry
Number of Trailer
ta
ction
vey
/2013
1st Dispatch
21/7‐13/8/2014
6 759
- 297
6 278
- 160
0
200
400
600
800
1000
1200
1400
Number o
end of numb
ng trailers has
g tendency. R
This reason is
trailers have
Overall traffi
for improvin
ort Gate No.1
ode reading sy
e 4-2 Proce
No.1 Jun
Gate
T Gate
D system whi
y/exit control
rs by converting th
First Year Technical A
4
2nd Dispatch
30/9‐5/11/2014
3r
19/
1146
346
362
186
Maximum/d
The Proj
31
of queuing tr
ber of queui
s clearly been
Recently, hea
s thought to
e been forced
ic control ope
ng the proces
1 was drastic
ystem (althou
essing time a
n. 2014FeDe
3.5
5.5
ich is now in
l, but also to
245
230
he handled contai
Assistance
rd Dispatch
/1‐7/2/2015
4th Dispa
13‐24/4/2
517502
217
143
53 133
day Averag
ject on Impro
railer outsid
ing trailers o
n reduced, wh
avy congestio
be due the t
to make que
erations will b
sing time at
cally improv
ugh the latter
at Port Gate
eb. 2015(duremonstration
2.5
2.0
the trial stag
enhance the p
193
0 216
ners per month to
5thDispatch
7‐28/7/2015 3
S
atch
2015
7 530
113
ge/day
ovement of Ch
de the port
outside the p
hile the avera
on has often
raffic control
ues at the Ma
be required.
Port Gate N
ed by simpli
has been disc
e No.1
ring the n Trial)
ApDe
e. After full i
processing ef
326
332
o 100,000
6th Dispatch
0/9‐20/10/2015
7th
27/1‐
Second Year Technical
628
130
hennai Port OFin
port
age number o
been observ
l efforts by t
anali junction
No.1
ifying the ve
continued).
pr. 2015(aftemonstration
1.8
2.3
implementati
fficiency at th
391
147
211
248
127
415
Dispatch
16/2/2016
Assistance8thDispat
22/5‐
10/6/201
678
88
Operation nal Report
of queuing
ved at the
the traffic
n far from
erification
ter the n Trial)
on, it will
he Gate.
tch
16
![Page 38: The Project On Improvement of Chennai Port Operation Final Report · 2017-02-01 · 1 1.1 Chenn South Ea cities in T There governm as a gatew Chenn 2014 to Jawaharl case of in Chennai](https://reader033.vdocuments.mx/reader033/viewer/2022060323/5f0dd4467e708231d43c4aea/html5/thumbnails/38.jpg)
(3)
The Tea
occasion
shortenin
measures
Note: Durinthat day wa
During
Chennai
Aver
NoNo. of
TransCFS
Outcome o
am also cond
ns. Shortening
ng of the tran
s. The results
Ta
ng the 8th dispatcas unusually smal
interviews,
port has been
rage Transit TimeSurveys
o. of Trailers survf Queuing Trailer
Survey days
it Time RequirSs to Port Gate
of measures f
ducted survey
g of the trans
nsit time is t
of the three s
able 4-3 Tr
ch, the average trl (only 75 trailers
Japanese com
n shortened.
0e during
28
veyedrs on the
red frome No.1
for reducing
ys on the tran
sit time resul
thought to be
surveys on th
ransit time r
ransit time on Juns). Therefore, the
mpanies in C
04 Oct.
8:29 hrs
155
595
First Ye2nd Dispatch
The Proj
32
the transit t
nsit time (lea
lts in signific
e an index to
he transit time
required fro
ne 1st was 7:22 hteam regarded th
Chennai and
18/19 Oct.
40:25 hrs
200
803/689
ar(2014)
ject on Impro
time from CF
ad time) from
cant economi
o grasp the e
e are shown b
m CFSs to P
hrs. (no. of samplhis as an anomaly
Bengaluru c
12 Feb.
17:43 hrs
327
874
7th Disp
ovement of Ch
FSs to Port g
m CFSs to Po
ic merits for
effect of the
below.
Port gate No
les: 351.) Howevy and data obtaine
confirmed th
13 Feb.
19:24 hr
398
785
Second Yepatch (2016)
hennai Port OFin
gate No.1
ort gate No.1
port users. D
congestion a
o.1
ver, no. of queuined is used for refe
hat the transi
8th Disp02 Ju
rs 14:54
129
497
ear
Operation nal Report
1 on three
Degree of
alleviation
ng trailers on erence only
it time in
patchun.
hrs
9
7
![Page 39: The Project On Improvement of Chennai Port Operation Final Report · 2017-02-01 · 1 1.1 Chenn South Ea cities in T There governm as a gatew Chenn 2014 to Jawaharl case of in Chennai](https://reader033.vdocuments.mx/reader033/viewer/2022060323/5f0dd4467e708231d43c4aea/html5/thumbnails/39.jpg)
5
5.1
In the
alleviatin
processin
the effect
Some
such as th
possess t
introduce
impleme
managem
should b
sustainab
The te
measures
to succes
hardware
assistanc
addition
5.2
(1)
The W
represent
inside an
ChPT Ho
there is n
state gov
the stake
and 8th d
which is
real time
In add
the acces
sometime
Traffic c
Future I
Follow-up
project on im
ng congestion
ng situation a
tiveness of it
of the measu
he web porta
the expertise
e a RFID s
ntation of th
ment and ope
be extended f
bly operate th
echnical assis
s. Such measu
ssfully compe
e aspects (in
ce for impro
to following
Moderniza
Introductio
Web Portal S
ting the degr
nd outside th
omepage, Po
no such a syst
vernment and
eholders from
dispatch. It i
capable of au
e, is now bein
dition, traffic
ss roads outs
es control the
congestion in
Issues
for improvem
mprovement o
n after exam
at terminal ga
s proposed m
ures introduc
al system usin
to effectivel
system at al
he RFID and
eration capaci
for an additio
hese systems b
stance rendere
ure should co
ete with new
nfrastructure).
ving the ope
up on the abo
ation of Chen
on of a Web P
System, whic
ree of conges
he Port. Altho
ort Communit
tem which pr
trailer union
m the beginnin
is an opportu
utomatically
ng implemente
control by th
side the Port.
e trailer flow
n the suburbs
ment of Che
of Chennai P
mining the sta
ates. The Team
measures.
ced have alre
ng IT require
y operate suc
ll major por
d web portal
ity. Accordin
onal year in o
by itself.
ed in this pro
ontinue to be
ly developed
. In discussio
eration of C
ovementioned
nnai Port I
Portal Syste
ch publishes
stion, is an i
ough, there a
ty System, H
rovides the PK
ns. The Team
ng the project
une time to in
collecting in
ed.
he Task Force
. Although th
too much in t
s is also exac
The Proj
33
nnai Port op
Port Operation
atus of traile
m also condu
eady produced
further techn
ch as system
rts including
l systems be
ngly, the proj
order for ChP
oject to date h
refined. How
d neighboring
ons on the d
Chennai port
d software m
m
information
indispensable
are many acti
Homepages o
KI for traffic
has proposed
t and even im
ntroduce the
formation as
e Team or th
his is effectiv
the suburbs s
cerbated. The
ject on Impro
peration
n, the Team h
er movement
ucted several
d the desired
nical assistanc
m. In addition,
g Chennai P
e combined
ect on impro
PT to gain th
has mainly fo
wever, the mo
g ports, and th
direction of
by introduc
measures.
such as a K
e measure for
ive Web Sys
f DPW/PSA
congestion t
d the necessit
mplemented a
Web Portal
a common in
he traffic poli
ve for allevia
so that only fe
e introduction
ovement of Ch
has conducted
s inside /out
trials includin
d results. How
ce from JICA
, the Indian g
ort. It is re
in order to
ovement of C
he expertise w
ocused on non
odernization o
hus it is also
the Master P
ing the requ
Key Perform
r alleviating
tem around C
terminals an
to all the stak
ty of such We
a demonstrati
System becau
ndicator of th
ce has recent
ating the traff
ew trailers arr
n of an IT s
hennai Port OFin
d various mea
tside the por
ng the use of
wever, other
A as ChPT do
government i
ecommended
increase ChP
Chennai Port
which will a
n-structural (
of Chennai po
necessary to
Plan, ChPT
uired infrastr
mance Indica
the traffic c
Chennai Port
nd shipping l
keholders incl
eb Portal Sys
ion trial durin
ause the RFID
he traffic cong
tly been cond
ffic congestio
rive at Port G
system to imp
Operation nal Report
asures for
rt and the
f IT to test
measures
es not yet
intends to
that the
PT’s port
operation
allow it to
(software)
ort is vital
o focus on
requested
ructure in
tor (KPI)
ongestion
t, such as
ines, etc.,
luding the
stem to all
ng the 7th
D system,
gestion in
ducted on
on, it may
Gate No.1.
prove the
![Page 40: The Project On Improvement of Chennai Port Operation Final Report · 2017-02-01 · 1 1.1 Chenn South Ea cities in T There governm as a gatew Chenn 2014 to Jawaharl case of in Chennai](https://reader033.vdocuments.mx/reader033/viewer/2022060323/5f0dd4467e708231d43c4aea/html5/thumbnails/40.jpg)
current s
(2)
The de
2nd disp
The Team
experienc
the need
Port.
ChPT
trailers a
Port Ent
impleme
establish
This rem
5.3
The go
Chennai
issues rel
(1)
Conge
access ro
but it is
should be
(2)
No par
officers a
been intr
construct
the envir
(3)
Chenn
largest p
ituation shou
Improveme
emonstration
atch. Since th
m has propo
ce in operatin
to establish a
is currently
at Port Gate N
try/Exit Con
ntation of t
hment of the s
mains a challen
Moderniza
overnment o
Port. The ne
lated to infras
Improveme
estion created
oads to the po
currently not
e examined to
Infrastruct
rking along i
and widening
roduced as pa
tion of a new
ronment are a
Competing
nai port is pla
port in easter
uld be examin
ent of Gate E
n trial on the
hen, the gate
sed the impl
ng the barcod
a sustainable
implementing
No.1 instead
ntrol system
the RFID b
sustainable sy
nging issue.
ation of Chen
f India and C
cessary infra
structure dev
ent of access
d by container
ort is an urgen
t utilized to a
o increase the
ture developm
internal roads
g and improve
art of this pro
w flyover nee
also importan
g with neighb
aying an imp
rn India. How
ned.
Efficiency an
barcode read
e processing e
ementation o
de reading sy
system is gra
g the first ste
of the barcod
using the
ased HEP,
ystem propos
nnai PortⅡ
ChPT should
structures nee
elopment of C
to the hinte
r trailers was
nt issue which
a great exten
e efficiency o
ment to ease
s, the establis
ement of inte
oject. Howev
eds to be exam
t issues which
boring ports
portant role in
wever, new p
The Proj
34
nd Port Entr
ding system w
efficiency ha
of sustainable
ystem. Althou
adually being
ep of the RF
de reading sy
RFID system
in order to
sed by the Te
d request JIC
ed to be deve
Chennai Port
rland
the main rea
h needs to be
nt. According
of operations.
e congestion
shment of a w
ernal roads in
ver, further im
mined. Enha
h should be s
n stimulating
ports such as
ject on Impro
ry/Exit Contr
was impleme
s been contin
e Port Entry/
ugh the propo
g recognized
ID system fo
ystem. It is n
m up to th
modernize
am is also re
A assistance
eloped in ord
t are as follow
ason behind th
e addressed. R
gly, the mode
and enhance
waiting area f
Chennai por
mprovement o
ancing cargo h
simultaneousl
g economic g
s Kamarajar
ovement of Ch
rol System
ented at Port
nuously impr
/Exit Control
osal has not b
among the st
or controlling
ecessary for
he 2nd step,
Chennai Po
quired for op
in formulati
er to modern
ws.
his project. Fu
Railroad is ex
ernization of
e cargo hand
for trailers, tr
rt are positive
of road infras
handling ope
ly addressed.
growth around
and Kattupa
hennai Port OFin
Gate No.1 d
roved in Chen
l System bas
been impleme
takeholders in
g the entry an
ChPT to com
, which incl
ort. Furtherm
perating there
ing the maste
nize the port.
urther improv
xtended inside
railroad infra
dling efficien
raffic control
e measures w
structure incl
erations and p
nd Chennai ar
ali have rece
Operation nal Report
during the
nnai Port.
ed on the
ented yet,
n Chennai
nd exit of
mplete the
ludes the
more, the
e systems.
er plan of
The main
vement of
e the port,
astructure
ncy
by traffic
hich have
luding the
protecting
rea as the
ntly been
![Page 41: The Project On Improvement of Chennai Port Operation Final Report · 2017-02-01 · 1 1.1 Chenn South Ea cities in T There governm as a gatew Chenn 2014 to Jawaharl case of in Chennai](https://reader033.vdocuments.mx/reader033/viewer/2022060323/5f0dd4467e708231d43c4aea/html5/thumbnails/41.jpg)
develope
Chennai
ports, it w
cooperati
(4)
Custo
significa
point ou
Therefo
through
(5)
Proper
governm
scheme f
facilities
(6)
Enviro
the city. I
does han
improved
as ensuri
Recen
clean env
ed which fea
port as well
will be neces
ive relationsh
Improveme
oms service
ant impact
uted that th
ore it is imp
h interviews
Timely dev
r procuremen
ment is facing
for the devel
. The Govern
Implement
onmental burd
Iron ore and
ndle gravel a
d such as pro
ing that there
ntly, ChPT lau
vironment sho
ature modern
l as managem
ssary to deter
hip with neigh
ent of Custom
procedures
on traffic co
heir busines
portant to g
s with stake
velopment of
nt of a budg
g financial c
lopment of p
nment will ha
tation of sust
den related to
coal are no lo
and fertilizer
oviding a suff
is a sufficien
unched a trial
ould be elabo
nized port fa
ment & opera
rmine which
hbouring port
ms service
s inside/outs
ongestion. J
ss activities
grasp the s
eholders an
f infrastructu
get is necess
constraints, P
port facilities
ve to finance
tainable deve
o port activiti
onger handled
which may
ficient numbe
nt water suppl
l of the use s
orated in a co
The Proj
35
acilities. The
ation need to
types of carg
rts should be f
side the por
Japanese co
are hampe
situation an
d so on.
ure through
ary to devel
PPP (Public
s. However,
e the developm
elopment inc
ies should be
d at Chennai
generate dus
er of toilets an
ly.
solar energy f
mprehensive
ject on Impro
erefore, the m
o be examine
go Chennai p
fostered.
rt for expor
ompanies w
red by the i
nd identify
PPP and OD
lop port faci
Private Partn
a PPP schem
ment of non-p
cluding envir
e reduced at C
port due to e
st. The work
nd shaded bre
for small buil
master plan.
ovement of Ch
modernization
ed. To compe
port should ta
rt/import co
hich utilize
inefficient c
aspects tha
DA
lities in a ti
nership) is o
me is only ap
profitable fac
ronmental pr
Chennai port d
environmental
king environm
eak areas for
ldings. Furthe
hennai Port OFin
n of infrastr
ete with neig
arget. In this
ontainer als
e Chennai p
customs pro
at can be im
imely manne
one possible
pplicable to
cilities.
rotection me
due to its pro
al concerns bu
ment also ne
trailer driver
er efforts to p
Operation nal Report
ructure at
ghbouring
regard, a
o have a
port have
ocedures.
mproved
er. As the
effective
profitable
easures
oximity to
ut the port
eds to be
rs, as well
promote a