the project charter
DESCRIPTION
Elements of the charterTRANSCRIPT
The First Document of the First Phase of the Project Cycle
1. Need and Final Deliverable:
End customer’s needs drive the objective; A project makes a “promise” – value
proposition;2. High Level Deliverables:
Practically the final deliverable and the deliverable that directly link to this;
3. Milestones:
Major events;
4. Technical Requirements:
Key technical requirements5. Limits and Exclusions:
What is clearly inside and outside the scope of the project;
What are the assumptions; What are the constraints or limitations.
6. Organizational Arrangements:
Stakeholders; Reporting and review of deliverables,
budgets etc