the process of development of ippc legislation robert sarlamanov ma, ippc expert ministry of...

22
The Process of The Process of Development of IPPC Development of IPPC Legislation Legislation Robert Sarlamanov MA, IPPC Expert Robert Sarlamanov MA, IPPC Expert Ministry of Environment and Physical Planning, Ministry of Environment and Physical Planning, Bercen Exchange Programme, Prague, October, 2004 Bercen Exchange Programme, Prague, October, 2004

Upload: virginia-sutton

Post on 02-Jan-2016

216 views

Category:

Documents


3 download

TRANSCRIPT

The Process of The Process of Development of IPPC Development of IPPC

LegislationLegislation

The Process of The Process of Development of IPPC Development of IPPC

LegislationLegislation

Robert Sarlamanov MA, IPPC ExpertRobert Sarlamanov MA, IPPC Expert

Ministry of Environment and Physical Planning, Ministry of Environment and Physical Planning,

Bercen Exchange Programme, Prague, October, 2004Bercen Exchange Programme, Prague, October, 2004

2

Situation until September, Situation until September, 20022002

The Law on Environment and Nature Protection and Promotion (still in force);

Single declarative provision on IPPC;No subsidiary legislation;No templates;Technical-environmental studies in

place;

3

IPPC in the Macedonian IPPC in the Macedonian LegislationLegislationCurrent legislation:

Act for protection and improvement of the environment” (Articles 28 and 30);

Forthcoming legislationLaw on Environment – Chapter on:

Integrated Environmental Permitting and Chapter on Adjustment Plans;

Special Laws on air quality, water, waste management

4

Process of Development of Process of Development of National National

IPPC RegulationIPPC RegulationSeptember, 2002 – September,

2004;Multidisciplinary approach;Multi-sectoral approach;Transparency;Public Involved

5

Industry & other Industry & other Stakeholders Stakeholders

InvolvedInvolved Leaving the old “command & control” policy;

Adopting the DIALOG policy with the industry and the public in general;

The goal – high level of protection of environment as a whole

6

MethodologyMethodology GAP Analysis; Drafting; Stakeholders’ participation; Tuning; Entering governmental procedure; 1st reading in the Parliamentarian

commissions; Public debates; Stakeholders, comments Final drafting; Table of concordance; Parliamentary Procedure; Adopting the Law

7

ResultsResults

The Law on Environment (IPPC regulation);

IPPC Decree (issued by the Government, defining the list of A and B IPPC activities and the applying schedule);

IPPC Ordinance (issued by the MEPP, defining the procedure and templates)

8

Supporting resultsSupporting resultsFinalised:National Inventory of current A IPPC

Installations; IPPC BrochureDraft versions: IPPC Manual (Internal and external); IPPC Guide for IndustryPreparatory phase:Manual for development of Adjustment

Plans;Pilot Integrated Environmental Permit

9

ActivitiesDone:70% of the potential IPPC Installations visited; Training for the MEPP IPPC related employees; IPPC Seminar for the IndustryPlanned: Training for IPPC related MEPP employees; Training for LSGU staff; Training seminar for each IPPC sector Other activities: Training for IPPC experts (BAS action); Development of Adjustment plans for 250-300

SME through BAS trained consultants

10

Defines and precise the:Activities under IPPC regulation (A and B);Significant changes of the existing

installations???; Time-schedule for applying for an Integrated

Environmental Permit or Adjustment permit;Environmental score sheet for determining

the charges

IPPC DecreeIPPC Decree for Determining the Installations for which for Determining the Installations for which an Integrated Permit is required and Time an Integrated Permit is required and Time Schedule for submission of the Adjustment Schedule for submission of the Adjustment

PlansPlans

11

Adjustment PlanAdjustment PlanWhat is it:Obligation for Operators that will apply for

Adjustment permit;Sets the operating conditions of the

installation including the ELV and EQS to all environmental media;

Sets the time schedule for applying the conditions;

Determines BAT for the concerned location;

Considers the best practices for the existing technology;

Plan how to reach BAT in sustainable way

12

Type of PermitsType of Permits

Installations falling under A list of activities:A Integrated environmental permit (new installations);A Adjustment permit with approved Adjustment Plan

(existing installations)

Installations falling under B list of activities:B Integrated Environmental Permit (new installations);B Adjustment Permit with approved Adjustment Plan

(existing installations, based on lower BAT standards;

13

Schedule for Applying for Schedule for Applying for Integrated/Adjustment PermitIntegrated/Adjustment Permit

The schedule for applying for Adjustment Permit is being developed according: Assessment of the economic impact from

IPPC Implementation (including productivity factor);

General assessment of the technical level in IPPC sectors (both: technology used and techniques applied);

Pollution risk assessment by different IPPC sectors and different installations

14

Applying scheduleApplying schedule

Start 01.01.06

30.06.06

31.12.06

30.06.07

31.12.07

30.06.08

END of applying 31.12.08

METALURGY

ENERGYWASTE

management

MINERALS

CHEMISTRY

OTHERS

15

Adjustment Period - Adjustment Period - Implementation Plan Implementation Plan

Start 01.01.06

METALURGY

ENERGY WASTE management

MINERALS

CHEMISTRY

OTHERSEND of applying 31.12.08

END of adjustment period 01.04.14

B A T level

16

IPPC Implementation IPPC Implementation PlanPlanExisting Installations:

Compliance with BAT norms by development of an Adjustment Plan (2006-2009) and their implementation until April, 2014, or

Comply with BAT standards immediately and Apply directly for Integrated Environmental Permit

New Installations:For new installations (2006-01.07.2007) by

choice:- Immediately BAT or- Adjustment Plan

For new installations after 01.07.2007, immediate compliance with BAT

17

Charges determinationCriteria for charging an individual

installation:Environmental impact (emissions to air,

water, soil and other influences);Environmental management (EMAS, ISO

14000, not certified);Sensitivity of receptors (close to

inhabited or protected area);Other criteria – eco-labeling or voluntary

agreement

18

IPPC OrdinanceIPPC Ordinancefor Regulating the Procedure for for Regulating the Procedure for

obtaining A Integrated Environmental obtaining A Integrated Environmental PermitPermit Format and the content of the Registar

of A Permits; Format and the content of the

Application for Integrated/Adjustment Permit;

Applying Procedure; Procedure in case of trans-boundary

impact. Content of the A Integrated/Adjustment

Perrmit; Content of the Adjustment Plan; Procedure for negotiation on the

Adjustment plan conditions;

19

Pr ocedu r e

D i ag r am

Preparation forapplying forIntegrated

permit

Submission ofapplication tothe Regulator

Assessment ofthe Application

Publicparticipation

Decision onissuing of an

Permit

Announcementof the Permit

Improvement of theApplicatio

n

Additional data required

Commission

Dispute

Look ifinstallation is

under IPPC

yes

Announcementof the

application

Approval

Negotiationsbetween theOperator andthe Regulator

20

Implementation Implementation remarksremarksAdvantages:

Good overview of the situation;Legislation and sub-legislation readyAwareness materials distributed;Training programmes for administration

and consultants;Covering 50% of the costs for

development of the Adjustment Plans;Relatively long adjustment period

21

Disadvantages and risks:Bad socio-economic factors in most of

the sectors;Low enforcement capacities;Low administrative capacities especially

on municipal levelPossible resistance from the industry;Possible low consultant capacities;Relatively short implementation period

for certain installations

Implementation Implementation remarksremarks

22

Thank youRobert Sarlamanov, MA

[email protected]

[email protected]: ++ 389 70 69 69 89

work: ++ 389 2 3066 930 ext:128