the presentation will begin shortly. us 441... · 2021. 1. 5. · u.s. 441 (state road 500) from...

25
U.S. 441 (State Road 500) From East of State Road 44 to South of Lincoln Avenue If you are experiencing technical difficulties, please call our project team representative at 407-637-7461. January 7, 2021 The presentation will begin shortly.

Upload: others

Post on 30-Aug-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: The presentation will begin shortly. US 441... · 2021. 1. 5. · U.S. 441 (State Road 500) From East of State Road 44 to South of Lincoln Avenue If you are experiencing technical

U.S. 441 (State Road 500)

From East of State Road 44 to

South of Lincoln Avenue

If you are experiencing technical difficulties, please call

our project team representative at 407-637-7461.January 7, 2021

The presentation will begin

shortly.

Page 2: The presentation will begin shortly. US 441... · 2021. 1. 5. · U.S. 441 (State Road 500) From East of State Road 44 to South of Lincoln Avenue If you are experiencing technical

Using GoToWebinar

From East of State Road 44 to South of Lincoln

Avenue

Page 3: The presentation will begin shortly. US 441... · 2021. 1. 5. · U.S. 441 (State Road 500) From East of State Road 44 to South of Lincoln Avenue If you are experiencing technical

Accessing the control panel

Using GoToWebinar

Page 4: The presentation will begin shortly. US 441... · 2021. 1. 5. · U.S. 441 (State Road 500) From East of State Road 44 to South of Lincoln Avenue If you are experiencing technical

Accessing the control panel

CommentForm

Handout

Using GoToWebinar

Page 5: The presentation will begin shortly. US 441... · 2021. 1. 5. · U.S. 441 (State Road 500) From East of State Road 44 to South of Lincoln Avenue If you are experiencing technical

Downloading project files

CommentForm

Handout

Using GoToWebinar

Page 6: The presentation will begin shortly. US 441... · 2021. 1. 5. · U.S. 441 (State Road 500) From East of State Road 44 to South of Lincoln Avenue If you are experiencing technical

Downloading project files

Comment Form

Handout

CommentForm

Handout

Using GoToWebinar

Page 7: The presentation will begin shortly. US 441... · 2021. 1. 5. · U.S. 441 (State Road 500) From East of State Road 44 to South of Lincoln Avenue If you are experiencing technical

CommentForm

Using GoToWebinar

Asking a Question

Page 8: The presentation will begin shortly. US 441... · 2021. 1. 5. · U.S. 441 (State Road 500) From East of State Road 44 to South of Lincoln Avenue If you are experiencing technical

Megan OwensFDOT Project Manager

Phone: (386) 943-5140

[email protected]

Page 9: The presentation will begin shortly. US 441... · 2021. 1. 5. · U.S. 441 (State Road 500) From East of State Road 44 to South of Lincoln Avenue If you are experiencing technical

Resurfacing and Safety Project

U.S. 441(State Road 500)From East of State Road 44 toSouth of Lincoln Avenue

Mount DoraLake County

January 7, 2021Financial Project ID No.:

443592-1

PUBLIC

HEARING

Page 10: The presentation will begin shortly. US 441... · 2021. 1. 5. · U.S. 441 (State Road 500) From East of State Road 44 to South of Lincoln Avenue If you are experiencing technical

Purpose of Hearing

This public hearing is being held to present information regarding

project plans on U.S. 441 and to receive community feedback.

A recording is being made of this hearing and will be part of the public record for this project.

Financial Project ID No.: 443592-1

Page 11: The presentation will begin shortly. US 441... · 2021. 1. 5. · U.S. 441 (State Road 500) From East of State Road 44 to South of Lincoln Avenue If you are experiencing technical

Jennifer Smith

FDOT District Five Title VI Coordinator

719 South Woodland Boulevard

DeLand, Florida 32720

386-943-5367

[email protected]

Jacqueline Paramore

State Title VI Coordinator

605 Suwannee Street, Mail Station 65

Tallahassee, Florida 32399-0450

850-414-4753

[email protected]

Financial Project ID No.: 443592-1

Florida Statutes and Title VIThis public hearing is being held in accordance with:

Section 339.155, Florida Statutes (Transportation Planning)

Section 339.199, Florida Statutes (Access Management)

Section 120.525, Florida Statutes (Meetings, hearings, and workshops)

Section 286.011, Florida Statutes (Government in Sunshine Law)

Consistent with Americans with Disabilities Act of 1990 (ADA)

Title VI:

This hearing is being conducted without regard to race, color, national origin, age, sex, religion, disability or family status.

Persons wishing to express their concerns relative to FDOT compliance with Title VI may do so by contacting:

All inquiries or complaints will be handled according to FDOT procedure and in a prompt

and courteous manner.

Page 12: The presentation will begin shortly. US 441... · 2021. 1. 5. · U.S. 441 (State Road 500) From East of State Road 44 to South of Lincoln Avenue If you are experiencing technical

Limit Ave.

Lincoln Ave.

Wolf Branch Rd.

Project Overview

Location:

▪ Mount Dora

▪ Lake County

Limits:

▪ Begin: 670 feet east of S.R. 44

▪ End: 615 feet south of Lincoln Avenue

Length:

▪ 1.73 miles

Project Purpose:

▪ Extend the service life of the existing roadway

▪ Improve safety

Financial Project ID No.: 443592-1

Page 13: The presentation will begin shortly. US 441... · 2021. 1. 5. · U.S. 441 (State Road 500) From East of State Road 44 to South of Lincoln Avenue If you are experiencing technical

Project Improvements

Extend the service life of the roadway by:

▪ Repaving existing roadway

▪ Widening turn lanes and shoulders

Improve safety by:

▪ Providing pedestrian crossings and lighting at

three locations:

• Country Club Boulevard

• Wolf Branch Road

• Lincoln Avenue

▪ Constructing additional sidewalk to fill the gaps

and connect existing sidewalk and bus stops

▪ Converting median opening at Pine Avenue

Page 14: The presentation will begin shortly. US 441... · 2021. 1. 5. · U.S. 441 (State Road 500) From East of State Road 44 to South of Lincoln Avenue If you are experiencing technical

Full Median Opening -

18 Conflict Points

Enhancing Safety Through Access Management

Financial Project ID No.: 443592-1

What are conflict points ?

▪ Places where vehicles cross paths and where incidents could occur

Fewer conflict points helps reduce severe crashes

Two Way Directional

Median Opening –

4 Conflict Points

Page 15: The presentation will begin shortly. US 441... · 2021. 1. 5. · U.S. 441 (State Road 500) From East of State Road 44 to South of Lincoln Avenue If you are experiencing technical

Access Management at Pine Avenue

Financial Project ID No.: 443592-1

Proposed: Directional Opening

Existing: Full Opening

Page 16: The presentation will begin shortly. US 441... · 2021. 1. 5. · U.S. 441 (State Road 500) From East of State Road 44 to South of Lincoln Avenue If you are experiencing technical

Extend Turn Lanes

PR

OJE

CT

BEG

IN

Chase

BankABC Fine

Wine & Spirits

Bob

Evans

Mt. Dora

Centra

Care

Starbucks/

Chipotle

Extend Turn Lanes

Financial Project ID No.: 443592-1

Proposed Improvement Walk-Through

Page 17: The presentation will begin shortly. US 441... · 2021. 1. 5. · U.S. 441 (State Road 500) From East of State Road 44 to South of Lincoln Avenue If you are experiencing technical

Hampton Inn

Mt. Dora

Frontage Rd.

Frontage Rd.B

rist

ol Lake R

d.

Extend MedianNew Crosswalks

Shorten MedianShorten Median

Financial Project ID No.: 443592-1

Proposed Improvement Walk-Through

Page 18: The presentation will begin shortly. US 441... · 2021. 1. 5. · U.S. 441 (State Road 500) From East of State Road 44 to South of Lincoln Avenue If you are experiencing technical

7-Eleven

RaceTrac

Animal

Wellness

Center

Florida

Natural

Stone

Reconstruct

Raised Island

Reconstruct

Raised Island

Directional Opening

New Crosswalks

Financial Project ID No.: 443592-1

Proposed Improvement Walk-Through

Page 19: The presentation will begin shortly. US 441... · 2021. 1. 5. · U.S. 441 (State Road 500) From East of State Road 44 to South of Lincoln Avenue If you are experiencing technical

PR

OJE

CT

EN

D

Hallmark

Nameplate

Renningers

Antique

Center

New Crosswalks Shorten Median

Financial Project ID No.: 443592-1

Proposed Improvement Walk-Through

Page 20: The presentation will begin shortly. US 441... · 2021. 1. 5. · U.S. 441 (State Road 500) From East of State Road 44 to South of Lincoln Avenue If you are experiencing technical

Right of Way Requirements

All work is within existing right of way

▪ No right of way needed

▪ No relocations

Financial Project ID No.: 443592-1

Page 21: The presentation will begin shortly. US 441... · 2021. 1. 5. · U.S. 441 (State Road 500) From East of State Road 44 to South of Lincoln Avenue If you are experiencing technical

Financial Project ID No.: 443592-1

Schedule and Estimated Construction Cost

Estimated Construction Cost = $3.7 Million

Anticipated to be complete

Summer

2021

Anticipated to begin

Late

2021

Page 22: The presentation will begin shortly. US 441... · 2021. 1. 5. · U.S. 441 (State Road 500) From East of State Road 44 to South of Lincoln Avenue If you are experiencing technical

Financial Project ID No.: 443592-1

Questions and comments during the hearing

In Person Attendees Online Attendees

• Complete a speaker request card

• Come to the microphone when called and

provide your question or comment

• Complete a comment form and drop it in the

Comments Box or return later to the address

shown on the form

• Request to speak by typing

your name and “I wish to

speak” in the Question box

• Type your comment or

question into the Question

pane

• Download a comment form

and return later to the

address shown on the form

Page 23: The presentation will begin shortly. US 441... · 2021. 1. 5. · U.S. 441 (State Road 500) From East of State Road 44 to South of Lincoln Avenue If you are experiencing technical

Financial Project ID No.: 443592-1

Contact the Project Manager

directly by phone, email or

U.S. Mail at:

Megan Owens

719 S. Woodland Boulevard

MS 2-542

DeLand, FL 32720

386-943-5140

[email protected]

Questions and comments after the hearing

Page 24: The presentation will begin shortly. US 441... · 2021. 1. 5. · U.S. 441 (State Road 500) From East of State Road 44 to South of Lincoln Avenue If you are experiencing technical

Financial Project ID No.: 443592-1

www.cflroads.com/project/443592-1

For more project information …

Page 25: The presentation will begin shortly. US 441... · 2021. 1. 5. · U.S. 441 (State Road 500) From East of State Road 44 to South of Lincoln Avenue If you are experiencing technical

THANK YOU FOR ATTENDING

For additional information, please contact:

Megan OwensFDOT Project Manager

Phone: 386-943-5140

[email protected]

Mark F. Bertoncini, P.E.Project Consultant

Phone: 407-839-4006

[email protected]