The Paso del Norte Watershed Based Plan

Mitigation Measures to Reduce Bacterial Pollution in the Rio Grande

Page 2: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

T

Page 3: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

This report was prepared by the Paso del Norte Watershed Council with funding from the U.S. Environmental Protection Agency through the New Mexico Environment Department under the

authority of the Clean Water Act Section 319(h) Nonpoint Source grant program. The New Mexico Department of Agriculture served as fiscal agent for the grant.

The Paso del Norte Watershed Based Plan

Mitigation Measures to Reduce Bacterial Pollution in the Rio Grande

Page 4: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

The Paso del Norte Watershed Council (Council) is an alliance of private citizens, non-governmental organiza-tions, representatives of federal and state agencies, water utilities, municipal governments, and universities that partner and provide an integrated vision for watershed management in the Paso del Norte watershed region. The Council provides an open and inclusive forum for communication, collaboration, and innovative thinking con-cerning watershed issues for the benefit of agricultural, environmental, and municipal interests.

Creating The Paso del Norte Watershed Based Plan – Mitigation Measures to Reduce Bacterial Pollution in the Rio Grande required a collaborative effort by many talented individuals. The Council would like to thank the following for their time, services, and dedication to this project:

• Brian Hanson, 319(h) project Watershed Coordinator • Dr. Conrad Keyes, Jr., Council chair and consultant to the U.S. Army Corps of Engineers • Dr. Ari Michelsen, Professor and Resident Director, Texas A&M AgriLife Research & Extension Center • Chris Canavan, New Mexico Environment Department (NMED) • Julie Maitland, Hilary Brinegar (Council co-chair), Les Owen, Patricia Depner, Sumer Guffey, Yvonne Alexander, and Pamela Huerta of New Mexico Department of Agriculture (NMDA) • Board of Directors of the Elephant Butte Irrigation District (EBID) and Gary Esslinger, Valerie Beversdorf, James Narvaez, and Patrick Lopez • Dr. Phil King and Dr. Geof Smith of New Mexico State University • Paul Michaud, Senior Planner, City of Las Cruces • Peter Bennett, Public Works Department, City of Las Cruces • Elizabeth Verdecchia, Rebecca LittleOwl, and Gilbert Anaya of U.S. Section International Boundary and Water Commission • Gil Sorg, Councilor District 5, City of Las Cruces • Ray Lister, Cory Durr, U.S. Bureau of Land Management • Staff at the Mesilla Park Recreation Center (Frank O’Brien Papen Recreation Center) • The 319(h) Stakeholder Working Group:

Jan Kirwan, New Mexico State Parks Valerie Beversdorf, EBID James Narvaez, EBID Fernando Cadena, EBID Bill Quiñones, Quiñones Design Builds Les Finley, City of Las Cruces

Tom Mobley, Rancher Cory Durr, Bureau of Land Management Angela Roberson, Doña Ana County John Gwynne, Doña Ana County Flood Commission Joe Gonzales, Gonzales Dairy and the Doña Ana SWCD

Acknowledgements

Many individuals contributed and participated in the making of this document and may not be listed. Their efforts are greatly appreciated.

Page 5: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

LIST OF FIGURES ...................................................................................................................................................................iii LIST OF TABLES ..................................................................................................................................................................... iv EXECUTIVE SUMMARY ....................................................................................................................................................... v

CHAPTER 1-INTRODUCTION ..........................................................................................................................................1 Watershed Planning Process ...............................................................................................................................................1 New Mexico Water Quality Standards ...............................................................................................................................2 Total Maximum Daily Load ................................................................................................................................................2 Impairment of Concern in the Lower Rio Grande of New Mexico ...............................................................................2 Significance of the E. coli Water Quality Impairment .....................................................................................................2 Fate of E. coli in the Environment ......................................................................................................................................3

CHAPTER 2-PROJECT AREA BACKGROUND ..............................................................................................................4 Geographic and Geologic Location of the Project Area .................................................................................................4 Climate in Project Area .......................................................................................................................................................5 Historical Description of the Rio Grande in the Project Area .......................................................................................6 Colonization and Agricultural Development ...................................................................................................................6 The Rio Grande Project .......................................................................................................................................................7 Land Ownership ...................................................................................................................................................................8 Watershed Hydrology ..........................................................................................................................................................9

CHAPTER 3-IDENTIFICATION OF CAUSES AND SOURCES OF IMPAIRMENT .............................................10 Initial Data Analysis from Prior Studies and Efforts .....................................................................................................10 Identification of Data Gaps and Recommendations from Analysis of Prior Study Efforts ......................................13 319(h) Water Quality Sampling and Monitoring 2008-1011 ........................................................................................13 319(h) Water Quality Data Results and Discussion 2008-2011 ...................................................................................15 Bacterial Source Tracking .................................................................................................................................................18 E.coli Enumeration Results from Source Tracking Study .............................................................................................19 Bacterial Source Tracking Results and Discussion ........................................................................................................19 NMED-Surface Water Quality Bureau 2010-2012 Survey ............................................................................................21 Conclusions of Data Analysis from Prior Studies and Recent Monitoring Efforts ...................................................21 Potential Changes to the Impairment Status ..................................................................................................................22

CHAPTER 4-TARGET LOADS FOR E.COLI AND TARGETED LOAD ANALYSIS ..............................................23 TMDL for the Lower Rio Grande in New Mexico .........................................................................................................23 River Hydrology and Impacts to Potential Pollutant Loading .....................................................................................24 Load Analyses of E. coli at the Anthony Bridge and East Drain Sampling Sites, 2009-2010 ...................................24 Estimating Pollutant Loads from Specific Sources ........................................................................................................26

CHAPTER 5-MANAGEMENT MEASURES AND POTENTIAL LOAD REDUCTIONS ......................................27 Targeted Management Measures ......................................................................................................................................27 Potential Load Reductions from Targeted Management Measures .............................................................................33 General Management Measures .......................................................................................................................................33 The Potential for E.Coli Loading Reductions from General Managment Measures .................................................37

CHAPTER 6-OUTREACH PROGRAM ............................................................................................................................39 Initial Outreach Efforts 2006-2007 ..................................................................................................................................39 Watershed Tour, 2007 ........................................................................................................................................................40 Outreach, 2010 – 2012-Stakeholder Working Group ....................................................................................................41 Development of Informational Materials ........................................................................................................................41

table of Contents

i

Page 6: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

Outreach Events, 2010-2012 .............................................................................................................................................42 Watershed Tour, 2010 ........................................................................................................................................................42 Potential Future Outreach Campaign for the Paso del Norte Watershed ...................................................................43

CHAPTER 7-TECHNICAL AND FINANCIAL ASSISTANCE ....................................................................................45 Technical Assistance Resources ........................................................................................................................................45 Financial Needs ..................................................................................................................................................................46 Financial Assistance ...........................................................................................................................................................47

CHAPTER 8-IMPLEMENTATION SCHEDULE AND MEASURABLE MILESTONES ........................................49 Schedule and Measurable Milestones for Specific Implementation Projects .............................................................50

CHAPTER 9-EVALUATION CRITERIA AND MONITORING PLAN .....................................................................51 Evaluation Criteria .............................................................................................................................................................51 Monitoring Program Goals and Objectives ....................................................................................................................51 Modify Current Monitoring Efforts .................................................................................................................................52 Monitoring Targeted Management Measures .................................................................................................................52 Higher Resolution E. coli Monitoring - Recommendations .........................................................................................53 REFERENCES .........................................................................................................................................................................55Appendix I - Estimating Pollutant Loads .............................................................................................................................57Appendix II - Quality Assurance Project Plan ....................................................................................................................60Appendix III - List of Acronyms ...........................................................................................................................................73

table of Contents

ii

Page 7: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

List of FiguresFigure 1: Paso del Norte 319(h) Watershed Restoration Project Area. .............................................................................4

Figure 2: Average monthly precipitation recorded at the Climate Center, New Mexico State University, Las Cruces, N.M. 1981-2010. ...............................................................................................................................5Figure 3: Average Monthly daily high and low temperatures recorded at the Climate Center, New Mexico State University, Las Cruces, N.M.1981-2010.................................................................................................5

Figure 4: Las Cruces, New Mexico and surrounding agricultural valley as seen from the westescarpment. Pecan orchards are visible in the center...........................................................................................................6

Figure 5: In addition to pecans, cotton and alfalfa, a variety of fresh fruits and vegetables are grown in the watershed ......................................................................................................................................................7

Figure 6: Land Ownership in the El Paso-Las Cruces watershed and the location of floodcontrol dams and major erosion control structures. ............................................................................................................8

Figure 7: Leasburg Dam, one of three major diversion dams in the watershed ...............................................................9

Figure 8: USGS bacteriological data from the Rio Grande at El Paso (USGS Station 08364000,Rio Grande at El Paso), 1978-2005 .......................................................................................................................................10

Figure 9: USIBWC E. coli data for the Rio Grande above the confluence with the East Drain, at Anapra, and Courchesne Bridge. The maximum reporting level is 2,420 CFU/100mL. .............................................................11Figure 10: 2004 NMED-SWQB E. coli data from below Caballo Dam to Leasburg......................................................12

Figure 11: 2004 NMED-SWQB E. coli data from Leasburg to below Sunland Park. ....................................................12

Figure 12: Map of sampling stations within the 319(h) project area. ...............................................................................14

Figure 13: EBID staff collect a sample for E. coli analysis at the Leasburg gage on the Rio Grande. ...........................15

Figure 14: Opportunistic stormwater runoff sampling of arroyos July 2008 (Picacho Bridge, Haynor Bridge, and Leasburg Dam river stations in red). .............................................................................................................................15Figure 15: Routine E. coli sampling results from the Rio Grande, October 2008-December, 2011. ............................16

Figure 16: The relationship between flow and E. coli concentration at the Anthony 225 Bridge site . ........................17

Figure 17: The top three sources of E. coli at all source track sites were bird, livestock (cattle+horses+other livestock) and wildlife. .......................................................................................................................19

Figure 18: Sources of E. coli identified at Leasburg (mid-watershed) and the Sunland Park (bottom of the watershed) sites. ............................................................................................................................................20

Figure 19: Sources of E. coli identified at the Anthony 225 Bridge and East Drain sites ...............................................20

Figure 20: Initial release of irrigation water into the Leasburg Canal June 1, 2013. .......................................................24

Figure 21: Dairy manure piles and calf carcasses adjacent to the East Drain. ................................................................25

Figure 22: Targeted Management Measures in the vicinity of Sunland Park ..................................................................28

Figure 23: Targeted Management Measures in the vicinity of East Drain .......................................................................29

Figure 24: Proposed conceptual design of constructed wetland at the Sunland Park WWTP .....................................30

Figure 25: Conceptual design of oveflow wetland for Mesquite Drain. ...........................................................................31

table of Contents

iii

Page 8: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

Figure 26: Joint NMED and EBID enforcement with successful outcome. Horse manure andbedding materials placed adjacent to West Drain (top). The pile was 800’x30’x18”. A closeupof manure in West Drain at the site (middle right) and following cleanup of the site (bottom) ..................................32

Figure 27: Rain garden in Mesilla, New Mexico .................................................................................................................36

Figure 28: Detention basin serving as a park in Mesilla, New Mexico ............................................................................36

Figure 29: Curb cuts in a parking lot providing irrigation to median ..............................................................................37

Figure 30: A stop at Mesilla Dam on the watershed tour, 2007 .........................................................................................40

Figure 31: The stakeholder working group discussing the nature of E. coli as an impairmentand the strategies to develop a watershed based plan .........................................................................................................41

Figure 32: Cover of the Bacteria in the Rio Grande Basin Brochure.. ..............................................................................41

Figure 33: A stop on the 2010 waterhsed tour at the Selden Drain Project, an agricultural drainmodified to reduce flooding while mitigating NPS pollution (Selden Drain is in the background) ...........................42

Figure 34: At the final stop of the 2010 watershed tour Peter Bennett with the City of Las Crucesdicusses managing NPS pollution in Las Cruces at La LLorona Park on the Rio Grande ............................................43

List of TablesTable 1: Intensive sampling in multiple locations in East Drain and Mesquite Drain September-November 2011. ..................................................................................................................................................17

Table 2: Summary statistics for routine E. coli sampling on the Rio Grande .................................................................18

Table 3: Summary statistics for the four sampling sites in terms of the average, range and geometric mean of the samples taken in 2010 and 2011 for bacterial source tracking. ..............................................................................19

Table 4: Flow and Load Estimates: Rio Grande (Percha Dam downstream to Leasburg Dam). .................................23

Table 5: Flow and Load Estimates: Rio Grande (Leasburg Dam to International Boundary with Mexico). .............23

Table 6: E. coli daily loads at Anthony 225 Bridge on select sampling dates. .................................................................25

Table 7: E. coli daily loads at East Drain on select sampling dates. ..................................................................................25

Table 8: Expected load reductions from targeted management measures addressing specificsources at a specific location. .................................................................................................................................................33

Table 9: Summary of general BMPs to address pathogenic NPS pollution. ...................................................................38

Table 10: Suggested conversation series for water quality outreach .................................................................................44

Table 11: Estimate of Financial Needs for Implementation years 2014-2018..................................................................46

Table 12: General Implementation Schedule to track progress in accomplishing primary tasks .................................49

Table 13: Schedule and measurable milestones for specific implementation projects. ..................................................50

Table 14: Monitoring objectives for a modified routine monitoring program................................................................52

table of Contents

iv

Page 9: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

According to the U.S. Environmental Protection Agency, nonpoint source (NPS) pollution is the leading cause of water quality degradation in the United States and poses a substantial problem for the health of New Mex-ico’s streams and rivers. NPS pollution is caused by diffuse contaminants, and coordinated efforts are needed for remediation. In 1987 the U.S. Congress recognized that state and local water authorities were in need of financial resources and created the 319(h) grant amendment to the Clean Water Act (CWA). The CWA does not regulate NPS pollution; rather, it encourages a stakeholder-driven approach and provides financial resources through 319(h) grant funding to develop a Watershed Based Plan (WBP) to reduce pollutant loading. A water-shed based planning approach focuses on geographic boundaries defined by drainage basins instead of political or jurisdictional boundaries. This provides a flexible, coordinated framework to focus public and private efforts on problems within specific basins.

The guiding principles for creating a WBP are stakeholder partnerships, a geographic focus, and sound science. Over the years, successful 319(h) projects have demonstrated the positive effects of involving stakeholders in wa-tershed management decisions by generating sustainable levels of long-term support. A good WBP establishes a framework for protecting and restoring watershed health and water quality. This document presents The Paso del Norte Watershed Based Plan – Mitigation Measures to Reduce Bacterial Pollution in the Rio Grande. The watershed area is a subunit of the El Paso-Las Cruces Watershed United (USGS HUC 13030102) of the northern Chihuahuan Desert and is located in Sierra and Doña Ana counties in south central New Mexico. It extends from Caballo Res-ervoir, a main stem impoundment of the Rio Grande, to the New Mexico-Texas-Mexico boundary adjacent to the cities of Sunland Park, New Mexico; El Paso, Texas; and Ciudad Juarez, Mexico (approximately 105 river miles). This reach of the Rio Grande is entirely regulated for irrigation purposes under the Rio Grande Project which was authorized by the Secretary of the Interior on December 2, 1905, under the provisions of the Reclamation Act. The New Mexico portion of the Rio Grande Project includes Elephant Butte and Caballo Dams, three diversion dams, about 350 miles of agricultural drains, and about 300 miles of canals and laterals that provide irrigation water for over 4,000 farms consisting of 90,640 water-righted acres, of which about 70,000 acres are irrigated in a given year.

Based on data collected by the U.S. International Boundary and Water Commission, and additional data submit-ted by other entities, the Rio Grande from one mile downstream of Percha Dam to the international boundary with Mexico was listed as impaired for fecal coliform in the 2004-2006 State of New Mexico Integrated CWA §303(d) §305(b) Report. Also in 2004, the New Mexico Environment Department (NMED) conducted an intensive water quality survey, which documented an exceedance of the New Mexico Water Quality Standards for Escherichia coli (E. coli) in the Rio Grande from one mile downstream of Percha dam to the international boundary with Mexico. As a result, the listing was changed from fecal coliform to E. coli in 2006. Subsequently, the cause of impairment was identified as E. coli bacteria and a TMDL was calculated for the main stem of the Rio Grande below Elephant Butte Dam. The resulting document, Total Maximum Daily Load (TMDL) for the Main Stem of the Lower Rio Grande (from The International Boundary with Mexico to Elephant Butte Dam) was completed 2007.

To determine the sources of E. coli in the watershed, a review of past data collection efforts was conduct-ed followed by an intensive water quality survey that included opportunistic stormwater sampling, pe-riodic sampling of agricultural drains, and routine (monthly) sampling of the Rio Grande at select loca-tions. In addition, once “hotspots” were identified, a small bacterial source tracking study was conducted. The following conclusions were made as a result:

• The E. coli exceedance in the reach above Leasburg Cable is primarily related to stormwater runoff.• The E. coli exceedance in the reach from Anthony to the international boundary with Mexico is primarily

Executive Summary

v

Page 10: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

related to non-stormwater flows.• The drains on the east bank of the Rio Grande contain high levels of E. coli and may be a significant source of E. coli in the lower watershed.• Two wastewater treatment plants (WWTPs) may be a source of E. coli in the bottom of the watershed.

Pollutant loading estimates for specific sources of E. coli were determined by several methods. Actual estimated daily loads for Sunland Park and South Central Regional WWTPs were calculated from direct measurements col-lected from the facility outfalls during survey conducted by NMED in 2011. Daily loads were estimated for cattle, sewage, pet, and horse sources in the East Drain as well as horse sources in Montoya Drain.

Targeted management measures to mitigate E. coli pollution were developed for the “hotspots” that were identified from the Anthony 225 Bridge in New Mexico to Courchesne Bridge in El Paso, Texas. Management measures were chosen to target specific areas of concern that were identified as chronic sources of E. coli loading. These include recommendations for facility upgrades at the Sunland Park and South Central Regional WWTPs, constructed wetlands, and dairy waste management in the form of a manure digester. General management measures are also recommended and include detention basins, main stem restoration projects, sub-watershed restoration projects, domestic pet waste management, liquid waste management, Green Infrastructure/Low Impact Development, and continued development of a regional strategy.

The Paso del Norte Watershed Based Plan – Mitigation Measures to Reduce Bacterial Pollution in the Rio Grande also includes an Outreach Program; a discussion of technical and financial assistance needs; an implementation schedule that includes measurable milestones; a set of evaluation criteria to determine if the plan is working, and a monitoring plan to determine if mitigation measures are effective.

Executive Summary

vi

Page 11: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

IntroductIonchapter 1According to the U.S. Environmental Protection Agency (USEPA), nonpoint source (NPS) pollution is the leading cause of water quality degradation in the United States and poses a substantial problem for the health of New Mexico’s streams and rivers. NPS pollution is caused by diffuse contaminants, and coordinated efforts are need-ed for remediation. In 1987 the U.S. Congress recognized that state and local water authorities were in need of financial resources to develop and implement measures to control NPS pollution. In order to meet these needs, the U.S. Congress created the 319(h) grant amendment to the Clean Water Act (CWA). The CWA does not regulate NPS pollution; rather, it encourages a stakeholder driven approach and provides financial resourc-es through 319(h) grant funding to develop a watershed based plan (WBP) to identify causes and sources of impairment and recommend best management practices (BMPs) to reduce pollutant loading. A WBP approach focuses on geographic boundaries defined by drainage basins instead of political or jurisdictional boundaries. This approach provides a flexible, coordinated framework to focus public and private efforts on problems within specific basins.

Watershed Planning ProcessThe guiding principles for creating a WBP are stakeholder partnerships, a geographic focus, and sound science. Over the years, successful 319(h) projects have demonstrated the positive effects of involving stakeholders in watershed management decisions by generating sustainable levels of long-term support. A good WBP establishes a framework for protecting and restoring watershed health and water quality.

A watershed approach is effective due to the integration of the wide variety of issues between land use, climate, hydrology, drainage, and vegetation within a watershed basin. General components of a watershed include land-scape condition, species habitat, hydrology, geomorphology, water quality, and biological integrity (USEPA, 2012). A WBP provides a non-regulatory, stakeholder driven, voluntary approach to addressing NPS pollutant impacts to water quality within a designated watershed. This WBP is not based on legal obligations; it is a general blueprint for a comprehensive, watershed-wide restoration program. A WBP consists of nine key criteria (USEPA, 2008):

1. Identification of the causes and sources of NPS water pollution that will need to be controlled.2. An estimation of load reductions expected from the management measures used to achieve water quality goals.3. A description of the management measures that will need to be implemented to achieve pollution load reductions, i.e. implementation of pollution control and natural resource protection measures.4. Technical and funding needs to support the implementation and maintenance of restoration measures.5. A public outreach method(s) and structure that will be used to engage and maintain public and governmental involvement including local, state, federal, and tribal governments.6. A schedule for implementation of needed restoration measures and identification of appropriate lead agencies to oversee implementation, maintenance, monitoring, and evaluation.7. A description of interim, measurable milestones for the actions to be taken and desired water quality goals and outcomes.8. A set of criteria that can be used to determine whether load reductions are being achieved over time and substantial progress is being made toward achieving water quality standards.9. Any monitoring and evaluation activities needed to refine the problems or assess progress towards achieving water quality goals.

1

Page 12: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

chapter 1

New Mexico Water Quality StandardsUnder the CWA and the New Mexico Water Quality Act, New Mexico is required to adopt water quality standards. New Mexico’s water quality standards (Standards for Interstate and Intrastate Surface Waters, New Mexico Water Quality Control Commission, 20.6.4 NMAC, November 20, 2012) are written for three general categories: general criteria, designated use criteria, and segment specific criteria. The general criteria apply to all surface waters of the state unless a specified criterion is provided under the designated use criteria or the segment specific criteria.

The designated use criteria were developed to ensure that designated uses can be maintained. These uses include, but are not limited to, domestic water supply, irrigation, livestock watering, aquatic life, and wildlife habitat. Un-der the segment specific criteria, water bodies are divided into specific segments based upon the physical and chemical characteristics as well as designated uses of that segment. Determination of whether designated uses are being maintained is conducted by intensive water quality surveys performed by the Surface Water Quality Bureau (SWQB) of the New Mexico Environment Department (NMED).

Total Maximum Daily Load Stream segments that do not meet water quality standards for diffuse pollutants must have a Total Maximum Daily Load (TMDL) calculated. A TMDL is the maximum amount of any given pollutant that a waterbody can assimilate (i.e. the loading capacity) without violating a state’s water quality standards. A TMDL is calculated as the sum of the individual waste load allocations for point sources, the load allocation for nonpoint sources, and natural background conditions. A TMDL is a nonregulatory document describing a budget for pollutant influx to a specific waterbody. The USEPA defines a TMDL document as “a written plan and analysis established to ensure that a waterbody will attain and maintain water quality standards, including consideration of existing pol-lutant loads, and reasonably foreseeable increases in pollutant loads.”

Impairment of Concern in the Lower Rio Grande of New MexicoBased on data collected by the U.S. International Boundary and Water Commission (USIBWC), and additional data submitted by other entities, the Rio Grande from one mile downstream of Percha Dam to the international boundary with Mexico was listed as impaired for fecal coliform in the state of New Mexico CWA §303(d) Integrated List of Assessed Surface Waters in 2004. That same year, NMED conducted an intensive water quality survey which documented an exceedance of the New Mexico Water Quality Standards for the coliform bacteria Escherichia coli (E. coli) in the Rio Grande one mile downstream of Percha dam to the international boundary with Mexico. As a result, the listing was changed from fecal coliform to E. coli in 2006. Subsequently, a TMDL was calculated for the main stem of the Rio Grande in New Mexico below Elephant Butte Dam. The resulting document, Total Maximum Daily Load (TMDL) for the Main Stem of the Lower Rio Grande (from The International Boundary with Mexico to Elephant Butte Dam) was completed in 2007.

Significance of the E. coli Water Quality ImpairmentE. coli bacteria are commonly found in the digestive tract of warm blooded animals, including humans. Most strains of E. coli are not harmful to humans and can be beneficial to the digestive tract by preventing the estab-lishment of some pathogenic bacteria and aiding in the production of vitamin K. However, E. coli 0157 is a toxic strain and has been implicated in several food borne illness outbreaks in the U.S. in recent years involving fresh vegetables.

E. coli enters the environment via excretion in feces, which can then be transported to surface waters. More toxic pathogens such as those associated with typhoid, hepatitis, cholera, and dysentery also inhabit the gut of warm blooded animals and may also be present in feces. Since E. coli is generally known to have a relatively short lifes-pan in water and is relatively easy and inexpensive to analyze, it is utilized by the USEPA as an indicator of recent fecal contamination of water. Therefore, the presence of E. coli confirms recent fecal contamination of surface

2

Page 13: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

chapter 1

waters and indicates the possible presence of other more toxic pathogens, which are more difficult and expensive to test. As a result, water quality standards are developed for E. coli to determine fecal contamination. The New Mexico Water Quality Standard for E. coli in the El Paso-Las Cruces Watershed is 410 coliform forming units per 100 mL (cfu/100 mL) in a single sample while for multiple samples a monthly geometric mean of 126 cfu/100 mL is used (20.6.4 NMAC 2012).

Exposure to E. coli from contaminated water has two primary pathways: direct ingestion of water and ingestion of uncooked food products that have been in contact with contaminated water. Untreated surface waters are not utilized for drinking in southern New Mexico, but accidental ingestion of water could occur while swimming or playing in the river. However, the Lower Rio Grande Valley of southern New Mexico produces a variety of foods that may be consumed fresh without cooking including lettuce, onions, tomatoes, jalapeños, melons, and squash. It should be noted that there has not been a documented case of waterborne illness due to ingestion of Rio Grande water from swimming or a documented case of foodborne illness from any food product grown in the Lower Rio Grande Valley of New Mexico resulting from exposure to irrigation water.

Fate of E. coli in the EnvironmentAs mentioned above, it is generally accepted that E. coli dies off rapidly in the water column and is used as an indi-cator for recent fecal contamination. However, research has found that E. coli commonly inhabits tropical stream bank soils in Hawaii (Hardina and Fujioka 1991) and Guam (Fujikoa 1999). The presence of naturally occurring E. coli strains in temperate Minnesotan soils has also been documented (Ishii et al. 2006) as was their ability to overwinter and grow in the soil. The source of these naturalized E. coli populations remains unclear. Long-term survival of cow manure-borne E. coli in freshwater sediments has also been reported, although die-off was accel-erated in the water column following resuspension from sediment (Garzio-Hadzick et al. 2010). There have also been documented reports of E. coli contamination resulting from airborne dispersion (Varma et al. 2003) and airborne bacteria associated with cattle feedlots (Wilson et al. 2002).

These studies have several important implications. Aquatic environments with high organic matter and nutrient content can harbor significant numbers of E. coli in their sediments. Periodic influx of manure-borne E. coli may accumulate in sediments forming a reservoir of E. coli that can be resuspended into the water column during scouring rain events or other sediment disturbing events. If adequate nutrients are present and other growth con-ditions are met, it is conceivable that the numbers of E. coli could be maintained or even multiplied in the water column. Airborne dispersal may also be a potential source to aquatic environments in close proximity to large feedlot operations.

The above discussion is significant because the persistence of E. coli in the environment may falsely indicate recent fecal contamination and may contribute to elevated colony counts indicating sizable loading of fecal contamination.

3

Page 14: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

proJect area BacKGroundchapter 2

4

Geographic and Geologic Location of the Project Area The watershed area is the portion of the Rio Grande basin from Caballo Reservoir (a main stem impoundment of the Rio Grande) to the New Mexico-Texas-Mexico boundary adjacent to the cities of Sunland Park, New Mexico,; El Paso, Texas and Ciudad Juarez, Mexico; approximately 35 miles south of Las Cruces (Figure 1). The area is a sub unit of the El Paso-Las Cruces Watershed (USGS HUC 13030102) of the northern Chihuahuan Desert and is lo-cated in Sierra and Doña Ana counties of south-central New Mexico. The watershed is comprised of 64 sixth level sub-watersheds (12 digit HUCs). The eastern edge of the watershed is bordered by the Caballo, Doña Ana, Organ, and Franklin mountain ranges. The western edge of the watershed is bordered by the Mimbres Mountains of the southern Black Range, the Sierra de las Uvas, the Robledo Mountains, and fault block volcanic uplands extending south to the East Potrillo Mountains (Hawley 2004).

Figure 1: Paso del Norte 319(h) Watershed Restoration Project Area.

Page 15: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

chapter 2

5

Climate in the Project Area At the center of the watershed, Las Cruces, New Mexico, receives an average annual precipitation of 248 mm (9.76 in) as recorded at the New Mexico Climate Center at New Mexico State University. This is primarily in the form of rainfall, almost half of which (129 mm, 2.93 in.) falls during the summer thunderstorm season from July through September (Figure 2).

The average annual maximum temperature is 25.6o C (78.1o F) with extended periods above 37.8o C (100o F) com-mon in June and July. The average minimum temperature is 8.27o C (46.9o F). The coldest months are January and December with an average minimum temperature of -1.6o C (29.1o F) (Figure 3).

Figure 2: Average monthly precipitation recorded at the Climate Center, New Mexico State University, Las Cruces, N.M. 1981-2010.

Figure 3: Average monthly daily high and low temperatures recorded at the Climate Center, New Mexico State University, Las Cruces, N.M 1981-2010.

Page 16: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

chapter 2

6

Historical Description of the Rio Grande in the Project Area Historically, the Rio Grande in the project area had a fairly wide floodplain with a sinuous and sometimes braided, meandering channel with small oxbows, sloughs, ciénegas, marshes, and other associated riparian features (Stotz 2002). A map prepared by John Pope in 1854 shows 25 meanders in the stretch of the Rio Grande from just above Doña Ana to Fort Fillmore a few miles south of Mesilla (Ackerly 1992). The map also depicts dual channels with small islands on many of the meander bends. Maps prepared for the U.S. Government Land Office (GLO) from the mid to late 1800’s outlining the acequia system of the Mesilla Valley also depict a meandering channel and identify several sloughs and a lagoon (Ackerly 1992). Diego Pérez de Luxan, a member of the Espejo expedition of 1582-1583, described pools and marshes including associated wetland vegetation along the Rio Grande in both the Mesilla and Palomas valleys (Luxan 1929). There are numerous similar accounts which include descriptions of elevated salinity in many of these areas. A U.S. government survey in 1857 described incrustations of salt and alkali on soils in the bottom lands around present day Sunland Park and Mesquite, NM.

The river channel was constantly evolving and changing location depending on the flow patterns which shifted from low flows during drought periods to catastrophic floods that realigned the channel. The high sediment load of the Rio Grande in southern New Mexico led to the formation of point bars, sand bars, islands, and plugging of the channel which often forced the river to find a new path. The effects of the sediment load were felt during both high and low flows. The United States Bureau of Reclamation (USBR) mapped the various known remnant river channels in the Mesilla Valley in 1914 and identified over nine different abandoned channels from 1844-1912 (Ackerly 1992). Portions of many of these remnant channels are still visible today.

Colonization and Agricultural DevelopmentNative Americans of the Mogollon culture are the earliest known inhabitants of the area. Petroglyphs and several small village sites which date from 100 BC to 1400 AD have been discovered in the Sierra de las Uvas and Robledo Mountains. The earliest Spanish explorers mention the Manso Apache Indians, and reports from Don Juan de Oñate’s expedition describe encounters with the Mansos in the area around present day El Paso, TX and Doña Ana, NM. The first formal European settlement did not occur until the Doña Ana Bend Colony was established in 1843. Within the next 15 years sev-eral communities and military out-posts were established in the Palo-mas and Mesilla valleys including La Mesilla, Las Cruces, Tortugas, Picacho, Fort Fillmore, and Fort Thorn. The principal economic activity was agriculture. The Rio Grande was tapped and extensive irrigation systems were built to sup-ply water to the crops. It is not en-tirely clear when the first irrigation systems were established, but by 1858 they were extensive enough to warrant surveying and mapping by the GLO (Ackerly 1992). Today, the Mesilla and Palomas valleys are ex-periencing rapid growth. Agricul-ture remains a mainstay of the local economy with such diverse crops as pecans, cotton, onions, alfalfa,

Figure 4: Las Cruces, New Mexico and surrounding agricultural valley as seen from the west escarpment. Pecan orchards are visible in the center.

Page 17: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

chapter 2

7

corn, and chile grown throughout the area. The population of Doña Ana County is 210,000, and estimated to increase growth to 325,000 over the next 30 years (City of Las Cruces 2011). With a population of 97,618, (U.S. Census Bureau 2010) Las Cruces is one of the fastest growing metropolitan areas in New Mexico second only to the city of Rio Rancho, northwest of Albuquerque. This growth has caused the con-version of agricultural lands in the Mesilla Valley to residen-tial subdivisions, while the majority of the land and residents in the southern Palomas Valley, around the communities of Hatch, Rincon and Garfield, remain deeply rooted in agri-culture. The Rio Grande and its associated irrigation canals still remain the lifeblood of the community today.

The Rio Grande ProjectThe future of agriculture along the Rio Grande in Southern New Mexico and West Texas has not always been certain. Following the Civil War, agricultural growth in the San Luis Valley of southern Colorado, and along the middle Rio Grande in New Mexico, placed increasing demands on the waters of the Rio Grande. Downstream users in New Mexico and West Texas were getting less and less water, and at times the Rio Grande would dry up altogether. Beginning in the late 1800’s fields in the Palomas and Mesilla Valleys began to dry up. In 1902, while on a trip through the Mesilla Valley, Bishop Henry Granjon described dry ditches, fallow and withered fields, and abandoned gardens (Ackerly 1992). Similar problems were apparent further downstream as well. As a result, the Rio Grande Dam and Irrigation Company (RGDIC) was formed by Dr. Nathan Boyd of Las Cruces with the inten-tion of building a dam to capture spring runoff waters for use later in the season (Kelly 1986). The RGDIC also had no intention of sharing any captured water with its downstream neighbors in either Texas or Mexico. Incensed by this idea, the Mexican government filed a note of protest with the United States Secretary of State on March 21, 1895, claiming a violation of the U.S./Mexico Treaty of Guadalupe-Hidalgo.

There was a second concern as well. Since the Rio Grande had become the border between the United States and Mexico, its propensity to move laterally and change position had become a territorial boundary issue. All parties agreed that a dam was a reasonable solution to store water for later use, stabilize the boundary between the United States and Mexico, and reduce the impacts of flooding. After ten years of political wrangling on both sides of the border, President Theodore Roosevelt signed a Proclamation on a Convention Between the United States and Mex-ico Providing for the Equitable Distribution of the Waters of the Rio Grande for Irrigation Purposes on May 21, 1906. Article I of the proclamation outlined a proposed storage dam to be built near Engle, NM for the storage and sub-sequent delivery of 60,000 acre-feet of water annually from the United States to Mexico at the head of the Acequia Madre above Ciudad Juarez, Mexico. On March 4, 1907 the U.S. Congress appropriated an initial $1,000,000 to the Rio Grande Project to build a dam and associated distribution system, and on June 3, 1913, the first concrete was poured for what would later become Elephant Butte Dam.

Farmers in the Rio Grande Project area received their first deliveries of water in January of 1915, and by March 21, 1915 (the first day official records were kept) Elephant Butte Reservoir was already holding 47,515 acre-ft. a full year before the dam was completed. For the first time in decades, farmers had a reliable supply of water. Being unaccustomed to such an abundant supply of water, and in conjunction with the high water table in many areas, some fields became saturated. As a result, work began in 1917 on a series of drainage canals to drain off the excess water. Today, the New Mexico portion of the Rio Grande Project includes Elephant Butte and Caballo Dams, three

Figure 5: In addition to pecans, cotton, and alfalfa a variety of fresh fruits and vegetables are grown in the watershed.

Page 18: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

chapter 2

8

diversion dams, about 350 miles of agricultural drains and approximately 300 miles of canals and laterals that pro-vide irrigation water for over 4,000 farms consisting of 90,640 water-righted acres, of which about 70,000 acres are irrigated in a given year (King and Maitland, 2003). There are also 48 flood control structures on tributaries to the Rio Grande in the watershed that are not part of the Rio Grande Project.

Land OwnershipThe U.S. Bureau of Land Management (BLM) is the major land owner within the project area, managing 58% of the watershed (Figure 6). Private landownership accounts for 22% of the watershed; the State of New Mexico accounts for 16%; U.S. Forest Service (USFS) 3% and the U.S. Department of Defense (DOD)1%. The United States Section of the International Boundary and Water Commission (USIBWC) owns 1%, primarily along the Rio Grande corridor.

!

!

!

!

!

!

M e x i c oM e x i c o

Te x a sTe x a s

S i e r r aS i e r r a

D o n a A n aD o n a A n a

L u n aL u n a

El Paso

Rio GrandeCaballo Reservoir

§̈¦10

§̈¦25Hatch

Deming

Anthony

Columbus

Las Cruces

Sunland Park

£¤70

NM

TX

AZ

Legend

Flood/Erosion Control DamsCity of Las CrucesBureau of Land ManagementBureau of ReclamationDept. of Defense

U.S. Forest ServicePrivateState TrustState Parks

0 4 8 12 162Kilometers

Land Ownership and Dam Sites

Ê

0 3 6 9 121.5Miles

MX

Figure 6: Land ownership in the El Paso-Las Cruces watershed and the location of flood control dams and major erosion control structures.

Page 19: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

chapter 2

9

Watershed HydrologyThe Rio Grande is the major surface water feature in the project area. There are also two perennial streams in the far northwestern boundary of the watershed – Tierra Blanca Creek, and Berrenda Creek. While these two creeks are perennial in their upper reaches, they are ephemeral by the time they reach the Rio Grande. The remaining drainages in the watershed are ephemeral.

The flow of Rio Grande water within the project area is almost entirely regulated and determined by irrigation needs. The combined storage ca-pacity of the two reservoirs is 2,554,288 acre-ft. with a full annual irrigation allotment of 790,000 acre-ft. Annual water releases from Elephant Butte and Caballo reservoirs normally begin in February or March when the system is watered up and prepared for the irrigation season. Re-leases generally continue through mid-Septem-ber to early October when the irrigation season ends. Flow during the winter months is generally a combination of agricultural return from drains, minor groundwater input, and point source dis-charges such as those from municipal wastewater treatment plants (WWTP’s). During periods of drought, sections of the river may cease to flow entirely during the winter months. Stormwater inputs from ephemeral drainages and municipal storm drains sometimes carry a considerable amount of flow into the Rio Grande following the intense thunderstorms from July through September.

Until recently, the flow regime described above had been typical for 25 years and much of the time since Elephant Butte and Caballo reservoirs were built. The two reservoirs depend on spring runoff from the mountains in south-ern Colorado above the San Luis Valley. Due to onging drought throughout the west, snow pack in the southern Rockies has diminished in the last 15 years, reducing spring runoff considerably. Reservoir storage, which had been near capacity in the 1990’s, began dropping rapidly in 2000, and dropped from 1,982,100 acre ft in 1998 to 101,500 acre ft by the end of the irrigation season in 2005. This has led to irrigation seasons shortened from 6 months in 1998 to 6 weeks in 2012, and has resulted in extended periods when the Rio Grande has gone dry in most of the watershed.

Figure 7: Leasburg Dam, one of three major diversion dams in the water-shed.

Page 20: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

chapter 3 IdentIfIcatIon of causes and sources of ImpaIrment

The cause of impairment was identified as E. Coli bacteria in the document Total Maximum Daily Load (TMDL) for the Main Stem of the Lower Rio Grande (from The International Boundary with Mexico to Elephant Butte Dam) (NMED 2007). To determine the sources of E. Coli in the watershed, a review of past data collection efforts was conducted followed by an intensive water quality survey that included opportunistic storm water sampling, periodic sampling of agricultural drains, and routine (monthly) sampling of the Rio Grande at select locations. In addition, once “hotspots” were identified, a small bacterial source tracking study was conducted.

Initial Data Analysis from Prior Studies and EffortsA data survey consultant was hired in the spring 2007 to compile all existing data concerning both fecal coliform and E. Coli pollution in the Rio Grande from Caballo Dam downstream to the international boundary with Mexico. The data was analyzed to identify potential trends and to determine where data gaps existed. There were three data sets of primary significance from prior studies that were conducted by the U.S. Geological Survey (USGS); the USIBWC Texas Clean Rivers Program; and the NMED 2004 Survey that led to the development of the TMDL.

U.S. Geological Survey (1978-1995, 2003-2005)The USGS maintains a flow measurement station at the El Paso Narrows above American Dam at Courchesne Bridge (USGS Station 08364000, Rio Grande at El Paso). Samples for bacteriological analyses were collected from January 1978 through May 1995 and from November 2003 to August 2005 at intervals ranging from about one to three months. Total coliforms were measured from October 1979 through October 1980. Fecal streptococcus was measured from January 1978 through May 1995. E. Coli was measured from November 2003 through August 2005. Fecal coliforms were assessed the entire period of record (Figure 8). The E. Coli data show exceedance of the regulatory limit of 410 cfu/100 mL in six of the 14 samples (42 percent). Four of these exceedances occurred between November 2003 and May 2004. Another exceedance, in July 2004, could be related to rainfall-induced runoff. Although the USGS data provide a long-term record, it is only a single site.

10

Figure 8: USGS bacteriological data from the Rio Grande at El Paso (USGS Station 08364000, Rio Grande at El Paso), 1978-2005.

Page 21: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

chapter 3

Figure 9: USIBWC E. coli data for the Rio Grande above the confluence with the East Drain, at Anapra, and Courchesne Bridge. The maximum reporting level is 2,420 CFU/100 mL.

U.S. International Boundary and Water Commission Texas Clean Rivers Program (2001-2012)The USIBWC Texas Clean Rivers Program reports bacteriological data from three sites in the Rio Grande above the international boundary with Mexico (listed upstream to downstream): above the confluence of the East Drain and the Rio Grande near the New Mexico-Texas state line, at Anapra downstream of Sunland Park, and at Courchesne Bridge. These are all located near the bottom of the watershed. The data provide a bit more spatial and temporal coverage than the USGS data and reveal multiple exceedances of the 410 cfu/100 mL criterion and indicate that E. coli sources exist between the upstream sampling point above the East Drain and Courchesne Bridge (Figure 9).

NMED – Surface Water Quality Bureau 2004 SurveyIn 2004 the NMED-SWQB conducted an intensive water quality survey in the watershed assessing a wide vari-ety of potential pollutants as part of its regular monitoring program. Samples were collected from ten stations along the Rio Grande from just downstream of Caballo Reservoir to Sunland Park just upstream of the Texas- New Mexico border and the international boundary with Mexico. Oxygen, temperature, specific conductance, and pH were measured in the field. All samples were analyzed for nutrients, ions, and total and dissolved metals; and some were analyzed for bacteria, radionuclides, and anthropogenic organic compounds. Bacterial analyses included both fecal coliform and E. coli.E. coli was the only pollutant that did not meet New Mexico’s water quality standards. Of the 23 samples collected within the upstream reach between Caballo and Leasburg dams, 4 samples (17 percent) exceeded the water quality standard of 410 cfu/100 mL for E. coli (Figure 10). Of the 53 samples collected within the downstream reach from Leasburg Dam to the international boundary with Mexico, 16 samples (30 percent) ex-ceeded the water quality standard of 410 cfu/100 mL for E. coli (Figure 11). Eight of the exceedances occurred in a reach (Anthony to Sunland Park) where there were known problems with non-compliant discharges from two WWTPs. A likely explanation for the exceedance of E. coli in this reach was from a point source discharge of fecal material into the river during the sample collection period. As a direct result of the 2004 study, the Total Maximum Daily Load (TMDL) for the Main Stem of the Lower Rio Grande (from the International Boundary with Mexico to Elephant Butte Dam) was written (NMED, 2007).

11

Page 22: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

chapter 3

Figure 10: 2004 NMED-SWQB E. coli data from below Caballo Dam to Leasburg.

Figure 11: 2004 NMED-SWQB E. coli data from Leasburg to below Sunland Park.

12

1

10

100

1000

10000

100000

E. co

li (c

fu/1

00m

L)

DATE

BLW CABALLO

DERRY

HATCH

RINCON

410 cfu/100mL

1

10

100

1000

10000

100000

E. co

li (c

fu/1

00m

L)

DATE

LEASBURG

PICACHO

MESILLA

ANTHONY

ABV SUNLAND

BLW SUNLAND

410 cfu/100mL

There is evidence that some exceedances may have been related to precipitation events and subsequent storm-water flow. As part of the analysis, rainfall measurements were collected from the National Oceanic and Atmospheric Administration (NOAA) stations at Anthony, New Mexico, and Leasburg, New Mexico, and were used to identify potential trends between elevated E. coli levels and rainfall. In general, the data for the Palo-mas Valley reach (Caballo Dam to Leasburg Dam) showed low E. coli levels in the early months of the year with exceedances occurring downstream of Derry during the monsoon season from the end of June through September. The data showed a positive association between E. coli and rainfall events (r = 0.75) (NMED, 2007). The TMDL document concluded that elevated levels of E. coli in the reach from Leasburg Dam to Percha Dam were directly related to stormflow events (NMED 2007).

Page 23: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

chapter 3

In the downstream reach from Leasburg Dam to the international boundary with Mexico, the exceedances primarily occurred in late summer, which was similar to that of the Palomas Valley. However, the site below Sunland Park showed exceedances in April 2004 reaching as high as 1.6 million cfu/100mL. The data showed no relationship between E. coli and rainfall events (r = -0.07) (NMED, 2007). The TMDL concluded that elevated E. coli levels in this reach are not associated with stormwater runoff but possibly associated with more chronic sources. Moreover, the Discharge Monitoring Reports (DMRs) revealed that the city of Sunland Park WWTP (NPDES permit #NM0030201) was in violation for fecal coliforms the weeks of April 8 - 14, April 15 - 21, April 22 - 28, and August 12 - 18, 2004. The South Central Regional WWTP (NPDES permit #NM0030490) was also in violation for fecal coliforms during the weeks of November 7-13 and November 21-27, 2004.

The 2007 NMED TMDL document identified probable sources of impairment based on general watershed char-acteristics, watershed hydrology, and natural and anthropogenic activities within the watershed. It identified nine probable sources of impairment, which include:

1. Impervious surface/parking lot runoff 2. Municipal point source discharges 3. Urbanized high density areas 4. On-site treatment systems 5. Permitted runoff from confined animal feeding operations (CAFO) 6. Rangeland grazing 7. Waste from pets 8. Waste from waterfowl 9. Waste from wildlife other than waterfowl

Identification of Data Gaps and Recommendations from Analysis of Prior Study EffortsThe impairment in the Rio Grande downstream of Percha Dam is clearly identified as E. coli in the NMED-SWQB’s TMDL document. However, neither the 2004 study nor the interpretation method that led to the development of the TMDL was designed to identify sources of impairment other than in general terms. In 2007, members of the Council and other stakeholders identified the following data/information gaps critical to characterizing the sources of impairment in the watershed:• There was concern that because 2004 was a drought year and stream flow was at a 30 year low, it was not a representative year for the watershed. While there was disagreement over this concern, it was agreed that no single year would have been representative. A multi-year sampling effort for E. coli was recommended.

• The complex nature of the watershed with respect to water releases (irrigation season), water diversions, irrigation return flows, drain return flows, stormwater flows, and point source discharges was not represented well enough in the sampling design of any of the prior studies to accurately characterize E. coli inputs from these sources, especially in the sub-watersheds.

• A greater understanding of the impact from point source discharges such as WWTPs, CAFOs, and possible unpermitted discharges is needed to differentiate these impacts from nonpoint sources.

Due to these data gaps, there was insufficient information to identify sources of E. coli, so development of a future study was recommended.

319(h) Water Quality Sampling and Monitoring 2008-2011Based on the recommendations from the data analysis of prior studies, a monitoring program was designed to fill the identified data gaps. This E. coli monitoring program started in July 2008 and is ongoing. Data considered for this watershed plan was collected through 2011. Routine river sampling sites were co-located at stream gaging stations

13

Page 24: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

chapter 3

Figure 12: Map of sampling stations within the 319(h) project area.

to assist in differentiating stormwater flow from base flow and the subsequent relationship to E. coli concentration. In addition to these sites, the river at Sunland Park was added to the study to monitor the terminal end of the study area. The seven routine sampling sites were Caballo Dam, Haynor Bridge, Leasburg Cable, Picacho Bridge, Mesilla Dam, Anthony Bridge, and Sunland Park (Figure 12). Because there is no flow gage in the Rio Grande at Sunland Park, flow data was used from the Rio Grande at El Paso gage at Courchesne Bridge, which is a short distance down-stream of the Sunland Park site. Sampling of agricultural drains was also conducted. During the course of the study, sampling of the drains was modified to focus on specific drains where elevated E. coli concentrations were identified.

14

Page 25: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

chapter 3

Figure 14: Opportunistic stormwater runoff sampling of arroyos July 2008 (Picacho Bridge, Haynor Bridge, and Leasburg Dam river stations in red).

The Caballo Dam site, upstream of the impaired reaches, was chosen to provide background data of water entering the system. It is located just downstream of Caballo Reservoir, which releases water for irrigation into the system. There are no major arroyos entering the Rio Grande between the dam and the sampling point. It should be noted the Caballo Dam site has a more stringent water quality standard of 235 cfu/100 mL than the river downstream. For purposes of this study, which was to determine causes and sources of impairment to the impaired reach, the significant criterion of 410 cfu/100 mL was used to evaluate the Caballo Dam site samples as well.

Samples were collected by the hydrology staff at EBID in con-junction with their ongoing water quality monitoring program. Sample collecting and handling standards were modified from the USEPA report (1978) and described in the NMED Quality Assurance Project Plan (NMED 2010). A swing sampler mount-ed on a 12-foot extension pole was used for sample collection from the channel away from near bank flow eddies (Figure 13). Samples were analyzed utilizing the m-ColiBlue24® method ap-proved by the USEPA. Other parameters were measured in the field including temperature, pH, turbidity, conductivity, and dis-solved oxygen.

319(h) Water Quality Data Results and Discussion 2008-20112008 MonitoringThe 2008 sampling effort began prior to development of the rou-tine monthly sampling plan and fo-cused on opportunistic stormwater sampling in the upper watershed during the monsoon season. This effort revealed E. coli concentra-tions ranging from 400 cfu/100 mL to 560,000 cfu/100 mL at the arroyo sampling sites during storm events, and it is assumed these tributaries contributed to the observed elevat-ed levels in the river (Figure 14). Three river sites were also sampled during July, 2008. Haynor Bridge was 900 cfu/100 mL on July 9, while Leasburg Dam was 700 cfu/100 mL on July 10. The Picacho Bridge site did not show a similar response. These were the only main stem river samples collected in July 2008. Monthly sampling of the main stem of the Rio Grande in 2008 consisted of just three sampling events beginning in Octo-ber (Figure 15). All samples were below the 410 cfu/100 mL criterion for a single sample. E. coli concentrations ranged from <1 cfu/100 mL (Caballo Dam) to 210 cfu/100 mL (Sunland Park).

15

Figure 13: EBID staff collect a sample for E. coli anal-ysis at the Leasburg gage on the Rio Grande.

Page 26: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

chapter 3

16

Only the Mesquite Drain was sampled in 2008. This sampling occurred on October 10 at four locations and revealed elevated levels that ranged from 200 cfu/100 mL to 1200 cfu/100 mL. The limited sampling in 2008 indi-cated that stormwater runoff could play a significant role in increasing E. coli concentrations above the 410 cfu/100 mL standard. No other patterns or trends could be determined from the 2008 sampling effort.

2009-2011 MonitoringSamples were collected every four to five weeks at seven river sites: Caballo Dam, Haynor Bridge, Leasburg Cable, Picacho Bridge, Mesilla Dam, Anthony 225 Bridge, and Sunland Park Bridge. Quarterly sampling of eight drains began in March: Hatch Drain, Rincon Drain, Del Rio Drain, La Mesa Drain, East Drain, Anthony Drain, New-Mexas Drain, and West Drain. Some opportunistic stormwater sampling of arroyos was also conducted.

During 2009, four samples from the routine river sampling exceeded 410 cfu/100 mL (Haynor Bridge with 630 cfu/100 mL on July 29; Anthony 225 Bridge with 710 cfu/100 mL on May 29; 510 cfu/100 mL on June 30; and 430 cfu/100 mL on August 27 (Figure 15). All other stations remained below 410 cfu/100 mL, although one sample from the Caballo Dam site and one from the Anthony 225 Bridge site approached the limit. A storm on July 26, 2010, resulted in elevated E. coli levels throughout the system ranging from 800 cfu/100 mL at Mesilla Dam to 2,300 cfu/100 mL at Leasburg Cable. Anthony 225 Bridge had the only nonstorm-related exceedance in 2010 at 470 cfu/100 mL in March. There were four exceedances in the main stem of the Rio Grande in 2011 which oc-curred at Sunland Park on February 28, September 29, October 25, and November 30. These exceedances were also not stormwater related.

Figure 15: Routine E. coli sampling results from the Rio Grande, October 2008-December, 2011. * On November 30, 2011, the sample collected at Sunland Park showed 4,800 cfu/100mL, which is off the scale of the graph.

0

500

1000

1500

2000

2500

E. c

oli,

CFU

/100

mL

Caballo

Haynor

Leasburg

Picacho

Mesilla

Anthony

Sunland Park

410 CFU/100mL

DAtE

Page 27: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

chapter 3

Drain sampling revealed extremely high E. coli concentrations in June and September of 2009, especially in the southern (downstream) drains. More intensive sampling occurred in East Drain and Mesquite Drain in 2010, which both had consistently shown elevated levels of E. coli (Table 1).

Correlating Storm Flows with E. coli ConcentrationCorrelating rainfall to E. coli concentration is problematic due to the size of the watershed, localized thunder-storms, and limited weather stations. However, releases from Caballo Reservoir are known, and since all tributar-ies are ephemeral, flow that exceeds releases can be iden-tified as resulting from storm-flow runoff. As water moves down the watershed and is diverted, examining trends for base flow is the most prac-tical method of determining storm flows. Although a de-tailed analysis was conducted by correlating sample collec-tion date and time with gage data at the sample site, Figure 16 provides a graphical ex-ample of the flow vs E. coli analysis that was done. The exceedances at the Anthony 225 Bridge in 2009 were not storm related, nor was the one exceedance from March 2010. However, the E.coli ex-ceedance in July 2010 was.

17

0

500

1000

1500

2000

2500

0

1000

2000

3000

4000

5000

6000

7000

cfu/

100

mL

Flow

, cfs

Flow,cfs

410 cfu/100mL

E. coli, cfu/100 mL

DAtE

Figure 16: The relationship between flow and E. coli concentration at the Anthony 225 Bridge site.

Date Sampling Location E. coli cfu/100 ml9/30/2010 East Drain 750010/5/2010 East Drain 2400010/5/2010 East Drain - Above Ohara Road 1400010/5/2010 East Drain - Above Joy Road 2000010/5/2010 East Drain - Harding Road 2500010/12/2010 Mesquite Drain - East Drain Confluence 460010/12/2010 Mesquite Drain - Franco Rd. 1500010/12/2010 Mesquite Drain - Upstream of Franco Rd. 2000010/12/2010 Mesquite Drain - Lechuga St. 236010/12/2010 Mesquite Drain - La Fe Ave 210011/16/2010 Mesquite Drain - Upstream of Franco Rd. 80011/16/2010 Mesquite Drain - Lechuga St. 110011/16/2010 Mesquite Drain - Vado Rd. 60011/16/2010 Mesquite Drain - Swannack Rd. 800

Table 1: Intensive sampling in mulitiple locations in East Drain and Mesquite Drain September-November, 2010.

Page 28: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

chapter 3

18

Summary of Conclusions from the 2008-2011 MonitoringFrom October 2008 to December 2011, only seven percent of the samples exceeded the 410 cfu/100 mL criterion for E. coli (Table 2). There were 15 samples; seven were directly related to stormwater runoff events and six of those seven occurred during a single thunderstorm event on July 26, 2010. With the exception of that date, elevated E. coli concentrations at Anthony 225 Bridge were unrelated to storm water runoff. The northern drains in the upper part of the watershed had several instances of elevated E. coli concentrations in the early stages of the monitoring program, but no clear pattern developed. The drains in the bottom section of the watershed continued to show elevated concentrations of E. coli. Mesquite Drain and East Drain were identified as problem areas. None of the exceedances in the drains were associated with stormwater runoff events. As a result of these efforts and review of the preliminary findings, four sites were chosen for a bacterial source tracking study in 2010.

Bacterial Source TrackingAs stated in the Introduction, E. coli is a natural inhabitant of the gastrointestinal tract of warm-blooded animals. Each E. coli variant is genetically adapted to its animal host, thus variants are genetically distinct between hosts. Consequently, it is possible to track E. coli in water samples back to its animal host using genetic analyses. There are limitations to the method (USEPA 2005), so source tracking studies must only be considered reasonable esti-mates as to sources of E. coli rather than exact attributions.

Sampling Site SelectionDue to budget constraints, source tracking was limited to four sampling sites, which were chosen based on previous occurrence of elevated E. coli. The Anthony 225 Bridge site and the East Drain site were chosen because of repeated exceedances observed in the river at both sites. The two other sites chosen were the Leasburg Cable site and the Sunland Park site because periodic high exceedances had been observed at both sites. Additionally, the Leasburg Cable and Sunland Park sites are located near the upper and lower reaches of the targeted area and, there-fore, represent the water entering and leaving this reach of the Rio Grande. As with the E. coli sampling survey, all sites were co-located with a permanent stream gage to facilitate collection of flow data.

Sampling, E. coli Enumeration and Source Tracking ProceduresSamples were taken at each site using USEPA-approved sterile plastic I-Chem bottles for bacteriological test-ing. Bottles were attached to the end of a swing sampler mounted on a 12 foot extension pole, and samples were taken eight to ten feet from the bank of the river (Anthony 225 Bridge and Sunland Park) or from a sampling platform (Leasburg Cable and East Drain). Similar to a previous New Mexico source tracking study (Smith 2007), replicate samples were taken at five minute intervals in triplicate or quadruplicate and were analyzed

Station n cfu/100mL>410 Percent average, cfu/100 mLCaballo 32 0 0% 25Haynor 30 2 7% 111

Leasburg 33 1 3% 105Picacho 29 1 3% 77mesilla 29 1 3% 75Anthony 30 5 17% 200Sunland Park 32 5 16% 346Total 215 15 7% 135

Table 2: Summary statistics for routine E. coli sampling on the Rio Grande.

Page 29: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

chapter 3

separately for E. coli levels. The samples were enumerated using the m-ColiBlue24® method (USEPA Method 10029).

Due to limitations of the analytical procedure, only incubated samples with colony counts greater than 200 cfu/100 mL E. coli were shipped to the source tracking contract lab for analyses. Between five and 20 E. coli isolates were genetically identified from each sample date; and between 62 and 127 E. coli isolates were source-identified from each of the four sample sites, totaling 376 distinct isolates source-identified. Source track data is reported as per-centage attributable to each source from the total number of E. coli analyzed from each sample.

E. coli Enumeration Results from Source Tracking StudyAll water samples collected for source tracking were quantified for E. coli. The three river sites showed similar concentrations of E. coli with the highest levels typically occurring at Anthony. In contrast, E. coli levels in the East Drain were typically more than an order of magnitude greater than at the river sites. E. coli concentrations were the lowest at the most upstream sampling site at Leasburg (Table 3). The East Drain clearly exceeded both the 410 cfu/100 mL limit for a single sample and the 126 cfu/100 mL geometric mean for multiple samples.

19

Location E.coli (cfu/100 mL)Average (range) Geometric Mean Exceedance*

Leasburg river (n=117) 103 (0-705) 34 No/NoAnthony River (n=42) 249 (30-864) 126 No/YesEast Drain (n=42) 5,562 (697-11,833) 4346 Yes/YesSunland River (n=112) 218 (0-1,288) 78 No/No

Table 3: Summary statistics for the four sampling sites in terms of the average, range, and geometric mean of the samples taken in 2010 and 2011 for bacterial source tracking. *NMED water quality standards are 410 cfu/100mL for a single sample or a geometric mean of 126 cfu/100 mL for mulitiple samples.

Bacterial Source Tracking Results and DiscussionOver the two-year study, 376 E. coli were source tracked from the four sites. The largest percentage of iso-lates from the three river sites was tracked to birds, which are typi-cally waterfowl in the absence of commercial chicken operations. In contrast, the largest percent of isolates at the single drain site were tracked to livestock, which are fur-ther broken down into cattle, hors-es, and other livestock. Figure 17 provides the percentage of isolates tracked to major sources aver-aged over all four sites: 32% of all E. coli typed were tracked to birds, followed by livestock (24%) and wildlife (17%). Livestock includ-ed cattle (12%) horses (8%) and the remaining distributed between

Figure 17: The top three sources of E. coli at all source track sites were bird, livestock (cattle+horses+other livestock) and wildlife.

Page 30: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

chapter 3

20

pigs, sheep, and goats (4%). The top four sources of wildlife (other than ducks and geese in the avian category) were raccoons (5%), rodents (beaver, mice, etc., 5%) deer (4%), and coyote (1%). All the natural sources (avi-an+wildlife) summed together at the four sites accounted for 49% of the E. coli typed while the anthropogenic sources (livestock+pets+sewage) accounted for 38%. The remaining 13% of the E. coli were unidentified.

Sources of E. coli had similar percentages at the Leasburg and Sunland Park river sites with natural sources com-prising 53% of the total at both sites (Figure 18). Anthropogenic sourc-es (livestock+pets+sewage) were also similar with Leasburg (27.3%) and Sunland Park (31.5%). How-ever, Leasburg had 10% more bird sources than Sunland Park, and the latter had 2.9 times more sewage sources than Leasburg. Also, there was relatively fewer horse sources at Sunland Park (3.1%) compared to Leasburg (8%).

Compared to Leasburg and Sun-land Park, the samples taken on the river at Anthony 225 Bridge and in the nearby East Drain showed significantly higher anthropogenic sources, (43.2% and 51.4%, respec-tively). The highest percentage of cattle E. coli was isolated at Anthony River (15%) and East Drain (14%). Similarly, the highest sources of horse derived E. coli were found at East Drain (12%). Compared to the sewage-originated E. coli at the three river sites (3.9%) the average percentage of sewage-originated E. coli at East Drain was significantly greater 13.3% (Figure 19).

Though the current study is limit-ed by its two-year time frame and only four locations, some conclu-sions can be made. It appears the East Drain is a significant source of human-derived E. coli (which, by definition, is an indicator of human pathogens, i.e., microbes that cause human disease). The East Drain sampling site is located 2.3 miles upstream of the confluence with the Rio Grande and had a flow rate of approximately nine cfs during sam-

Figure 18: Sources of E. coli identified at Leasburg (mid-watershed) and the Sunland Park(bottom of the watershed) sites.

Figure 19: Sources of E. coli identified at the Anthony 225 Bridge and East Drain sites.

Page 31: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

chapter 3

ple collection. If the observed concentrations of E. coli are maintained to the confluence, then the East Drain could be discharging up to 4.3 million E. coli from human sewage per second into the Rio Grande. Compared to the sew-age-derived E. coli already in the river at Anthony (5.4 %) when the East Drain (13.3 % sewage E. coli) discharges into the Rio Grande, it would more than double the amount of pathogen-indicating microbes in the river. For a complete discussion on E. coli loading from specific sources, see Chapter 4.

NMED – Surface Water Quality Bureau 2010-2012 SurveyFrom December 2010 through April 2012, NMED conducted an intensive water quality survey examining a wide variety of potential pollutants as part of its regular monitoring program and to assess the non-attainment of the primary contact water quality standard for E. coli in the 319(h) grant project area. Samples were collected from nine stations along the Rio Grande from just downstream of Elephant Butte Dam to Courchesne Bridge just up-stream of the Texas and New Mexico border and the international boundary with Mexico. Sampling stations were chosen to provide good spatial coverage and to be consistent with the study conducted from 2008-2011 under the 319(h) project. The stations were located at the USGS gage downstream of Elephant Butte Dam, just downstream of the Truth or Consequences WWTP at Williamsburg, Caballo Dam, Haynor Bridge, Leasburg Cable, Picacho Bridge, Mesilla Dam, Anthony 225 Bridge, and Courchesne Bridge. Courchesne Bridge was chosen rather than the Sunland Park site because it is co-located with the Rio Grande at El Paso USGS gage and is at the very bottom of the reach before crossing the border into Texas. Samples were also collected from several tributaries in the up-per watershed. In addition, samples were collected at the outfalls of all the WWTPs in the assessment area. These included the Sierra County WWTP, Truth or Consequences WWTP, Salem WWTP, Hatch WWTP, the city of Las Cruces Jacob Hands WWTP, South Central Regional WWTP, Anthony Water and Sanitation District, Gadsden Independent School District, Sunland Park WWTP, and El Paso Electric. Field measured parameters included dissolved oxygen, temperature, specific conductance, and pH. All samples were analyzed for nutrients, ions, and total and dissolved metals. More limited analysis was conducted for total coliforms and E. coli bacteria, radionu-clides, and anthropogenic organic compounds.

Summary Results for E. coli Bacteria for the SWQB SurveyAll bacteriological samples were processed utilizing the IDEXX Colilert Quanti-Tray® incubation system. This is a most probable number (MPN) analytical technique with a method detection limit (MDL) of 2,419 cfu/100mL E. coli. There was only one exceedance of E. coli in the main stem of the Rio Grande and that occurred at Courchesne Bridge on August 18, 2011, which exceeded the MDL of 2,419 cfu/100mL. However, the South Central Regional WWTP exceeded the criterion of 410 cfu/100mL and the MDL of 2,419 cfu/100mL on three out of six sampling dates, while the Sunland Park WWTP exceeded the criterion of 410 cfu/100mL four out of six of the sampling dates (three of which were above the MDL of 2.419 cfu/100mL). Both WWTPs were exceeding the E. coli standard on August 18 when the Courchesne Bridge river station was also exceeding the standard. These results corrobo-rate with earlier studies suggesting that some of the E. coli impairment at the lower end of the watershed may be attributed to point source discharges from WWTPs.

Conclusions of Data Analysis from Prior Studies and Recent Monitoring EffortsThe data collection efforts conducted by the USGS and USIBWC Clean Rivers Program clearly identify a trend of exceedance of the 410 cfu/100mL criterion for E. coli at the bottom of the watershed. The 2004 NMED water qual-ity survey provided further data that confirmed these findings and, in addition, documented E. coli impairment in the upper watershed that appeared to be related primarily to stormwater runoff. The monitoring effort conducted as part of this planning effort from 2008-2011 provides additional data confirming the E. coli exceedance in the upper watershed correlates with stormwater runoff, while exceedance in the lower watershed may occur from stormwater runoff, but primarily correlates with non-stormwater flows. The targeted source tracking study further identified specific areas of concern and the percent attributable to anthropogenic activities. The 2010-2012 NMED

21

Page 32: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

chapter 3

22

survey identified problems at two WWTPs at the bottom of the watershed. As a result, the following conclusions can be made:

• The E. coli exceedance in the reach above Leasburg Cable is primarily related to stormwater runoff.

• The E. coli exceedance in the reach from Anthony to the international boundary with Mexico is primarily related to non-stormwater flows.

• Mesquite Drain and East Drain on the east bank of the Rio Grande contain high levels of E. coli and may be a significant source of E. coli in the lower watershed.

• Two WTTPs in the lower watershed may be a significant source of E. coli in the bottom of the watershed.

Potential Changes to the Impairment Status The assessment units utilized during the 2004 NMED survey that led to the TMDL were changed in the 2006-2008 State of New Mexico CWA §§303(d)/305(b) Integrated List & Report from two assessment units to four. The assessment unit from Leasburg Dam to one mile below Percha Dam was retained while the assessment unit from Leasburg Dam to the international boundary with Mexico was broken into three assessment units: the internation-al boundary with Mexico to Anthony Bridge, Anthony Bridge to Picacho Bridge, and Picacho Bridge to Leasburg Dam. Based on these new assessment units and the data generated from the routine river sampling from 2008-2011 and the NMED 2010-2012 survey, there does not appear to be sufficient justification for continued listing of the Rio Grande from Picacho Bridge to one mile below Percha Dam (the assessment units: Picacho Bridge to Leasburg Dam and Leasburg Dam to one mile below Percha dam). All the data confirm that the reach of the Rio Grande from the international boundary with Mexico to Picacho Bridge is impaired although this appears con-fined to the bottom assessment unit (International Boundary with Mexico to Anthony Bridge).

Page 33: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

chapter 4 tarGet Loads for e.coLI and TARGETED LoAD ANALYSiS

Table 4: Flow and Load Estimates: Rio Grande (Percha Dam downstream to Leasburg Dam).

Table 5: Flow and Load Estimates: Rio Grande (Leasburg Dam to International Boundary with Mexico).

LOAD CALCULATION VARIABLES FLOW CONDITIONShigh Moist Mid-Range dry Low

Measured E. coli (cfu/100mL) -- -- 1662 -- --Mid-point flow (cfs) -- -- 982 -- --Measured Loads (cfu/day) -- -- 4.00x1013 -- --Target Loads (cfu/day) -- -- 1.05x1012 -- --Percent Reduction -- -- 97.40% -- --

LOAD CALCULATION VARIABLES FLOW CONDITIONShigh Moist Mid-Range dry Low

Measured E. coli (cfu/100mL) -- 1,308 523 228,732 150Mid-point flow (cfs) -- 826 490 133 28Measured Loads (cfu/day) -- 2.65x1013 6.29x1013 7.45x1014 1.01x1011

Target Loads (cfu/day) -- 1.93x1012 9.63x1011 1.82x1011 8.08x1010

Percent Reduction -- 92.70% 84.70% 100% 20.20%

Load analysis is critical to understanding the nature of the impairment relative to stream flow. It is also a critical com-ponent in watershed based planning to determine where pollution mitigation implementation is needed and has the greatest potential to reduce the impairment to the waterbody of concern. This section discusses the load esti-mates provided in the 2007 NMED TMDL document; a discussion of river hydrology for the Lower Rio Grande in New Mexico as it relates to potential impacts to pollutant loading, and a load analysis conducted for this planning effort.

TMDL for the Lower Rio Grande in New MexicoNMED utilized a load duration curve method for the 2007 NMED TMDL document. Since pollutant loads are an expression of pollutant concentration in relation to flow, the TMDLs were calculated for the different flow con-ditions as determined by flow duration curve analysis in relation to when exceedance of E. coli occurred (Tables 4 and 5).

23

Exceedances in the reach from Percha Dam to Leasburg Dam only occurred under mid-range flow conditions (as determined by the flow duration curve). As a result, only a single TMDL was calculated indicating a percentage reduction to E. coli loading of 97 percent to meet water quality standards. However, for the reach from Leasburg Dam to the international boundary with Mexico, exceedance of the standard occurred under all but high flow conditions indicating a percentage reduction to E. coli loading ranging from 20.2 percent to 100 percent necessary to meet water quality standards (NMED, 2007).

The TMDL document concluded: “The duration curve method, by itself, is limited in the ability to track individual source loadings or relative source contributions within a watershed. Additional analyses is needed

Page 34: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

chapter 4

to identify pollutant contributions from different types of probable sources and activities (i.e., construction zone versus agricultural area) or individual sources of a similar source category (i.e., WWTP #1 versus WWTP #2). Practitioners interested in more precise source characterization should consider supplementing the duration curve framework with a separate analysis. An added analytical tool might aid in evaluating allocation scenarios and tracking individual sources or source categories. This could allow for improved targeting of restoration activities.” (NMED, 2007)

River Hydrology and Impacts to Potential Pollutant LoadingThe flow duration curve method used by NMED to determine the TMDL target loads is not an accurate repre-sentation of the flow regime in the Rio Grande from Caballo Dam downstream. While it provides a range of flow conditions and associated target loads for E. coli, it does not take into account the highly regulated flow below Ca-ballo Dam. As mentioned in the Introduction, the Rio Grande in southern New Mexico is regulated for irrigation purposes. During the irrigation season (March to September), flow is determined by demand. Long-term flow records maintained by EBID show an average flow rate of 1,200-1,300 cfs above the Leasburg diversion and a flow rate of 500-600 cfs below the Mesilla diversion during the irrigation season. In the past, during years with abundant water supply, the river often continued to flow after termination of releases as a result of the hydrologic connection between the shallow groundwater table and the river. These flows were somewhere on the order of 20-30 cfs, de-pending on location. However, in recent years the shallow groundwater table has receded due to decreased recharge from limited irrigation releases and increased groundwater pumping to supplement the decreasing surface water supply. A consequence of this is that some of the drains have temporarily dried up, and most of the drains cease to flow following cessation of releases. Large stretches of the river also cease to flow. As such, when releases are terminated for the season, the main contributor to flow is either the sys-tem drains or point source discharges such as WWTPs. There can also be a minor contribution from small upwelling of deeper groundwater in specific areas.

As discussed previously, it has been determined that the pri-mary driver for E. coli input to the river from Leasburg Dam to Caballo Dam is stormwater flow during the summer mon-soon season which also coincide with flows released for ir-rigation (1,200-1,300 cfs). This roughly corresponds to the mid-range flows identified in the TMDL for this reach of the river. On the other hand, from Leasburg Dam to the inter-national boundary with Mexico, it has been determined that much of the exceedance is more chronic in nature and not limited to stormwater flow. From Leasburg Dam to the international boundary with Mexico, two significant flows have been determined. The first is associated with base flow following cessation of releases (<20 cfs). The second is the flow associated with the average flow during the irrigation season (500-600 cfs). These flows correspond to the low and mid-range flows in the TMDL for this reach. As a result, the target loads associated with these flows are considered to take precedence over the others.

Load Analyses of E. coli at the Anthony Bridge and East Drain Sampling Sites, 2009-2010At the Anthony 225 Bridge and the East Drain sites, which each have a gaging station, bacterial load analyses were performed to normalize the E. coli data reported during the source tracking survey to take into account flow rate differences between the river and the drain. Following the cessation of the irrigation season during the late fall and winter months, reservoir releases are terminated and flow in the river and drains is minimal. Only data from the summer months were chosen for analyses when flow rate data is most accurate. Though this analysis is limited to

24

Figure 20: Initial release of irrigation water into the Leasburg Canal, June 1, 2013.

Page 35: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

chapter 4

only five distinct samples over a two-year period, some interpretations can be made. The Anthony 225 Bridge site flow rate is significantly higher than that of the East Drain site (by a factor of 38), but the E. coli concentrations in the East Drain are similarly as big a difference (the drain on average had 32 times more E. coli, (Tables 6 and 7).

When these factors are integrated, the bacterial load in the drain is 82 percent of the load at the Anthony 225 Bridge site. East Drain discharges into the Rio Grande 2.3 miles south of the East Drain sampling site. Though the E. coli concentrations at this confluence are unknown, this means the East Drain could potentially almost double the daily load of E. coli in the river.

Both the Mesquite Drain and the East Drain run par-allel and adjacent to the area known locally as dairy row (≈ 12 dairies) in the Mesilla Valley. Each dairy has in place a Nutrient Management plan to dispose of any land-applied waste that is on the facility or other land utilized by the dairy to grow crops to en-sure protection of water resources. However, some of the manure is sold for use as fertilizer. There is currently little regulation governing this activity. On occasion, manure has been stockpiled adjacent to irrigation drains and canals which could facilitate movement into surface waters. In addition, as dis-cussed in the Introduction, there have been reports of airborne distribution of E. coli in the literature, indicating the potential for unintentional distribu-tion of E. coli without there being a discharge from a dairy. It is unknown if that is occurring here. However, given the close proximity of the drains to the dairies, occasional improper storage of manure, and the annual occurrence of high wind and dust storms, there is the potential for E. coli to enter either of the drains.

25

Date E.coli Flow Daily Loadcfu/100 mL cu/ft/sec cfu/day

6/30/2009 510 805 1.00x1013

9/30/2009 400 243 2.37x1012

8/24/2010 81 988 1.96x1012

9/30/2010* 200 260 1.27x1012

9/30/2010* 182 260 1.16x1012

average 275 511 3.44x1012

Table 6: E. coli daily loads at Anthony 225 Bridge on select sampling dates. * Represents duplicate samples

Date E.coli Flow Daily Loadcfu/100 mL cu/ft/sec cfu/day

6/30/2009 4000 25.2 2.46x 1012

9/30/2009 20000 9.5 4.65x1012

8/24/2010 270 13.3 8.81x1012

9/30/2010* 7500 9.2 1.68x1012

9/30/2010* 11833 9.2 2.66x1012

average 8721 13.3 2.81x1012

Table 7: E. coli daily loads at East Drain on select sampling dates. * Represents duplicate samples

Figure 21: Dairy manure piles and calf carcasses adjacent to the East Drain.

Page 36: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

chapter 4

Estimating Pollutant Loads from Specific SourcesPollutant load estimations allowed under the NPDES permit were calculated for the Sunland Park and South Central Regional WWTPs. Actual estimated daily loads for the WWTPs were calculated from direct measure-ments collected from the facility outfalls during the 2011 NMED survey. Daily loads were estimated for cattle, sewage, pet, and horse sources in the East Drain as well as horse sources in the Montoya Drain. The estimated daily loads for the East Drain were calculated from data collected during the source tracking study. The esti-mated daily loads for Montoya Drain were calculated utilizing agricultural census statistics and ground truth surveying. Estimates were determined using methods outlined in the Protocol for Developing Pathogen TMDLs (EPA 2001) (Appendix I).

WWTP Daily Load Estimates for E. coliWWTP NPDES permit limits for E. coli (discharge in mL/day)(126 cfu/100mL) = cfu/day Sunland Park (7.57 x 109 mL/day)(126 cfu/100mL) = 9.54 x 109 cfu/day South Central Regional (3.97 x 109)(126 cfu/100mL) = 5.00 x 109 cfu/day

WWTP Actual Estimated Loads from NMED sampling 2011 (discharge in mL/day)(observed cfu/100mL) = cfu/day Sunland Park estimated load (7.57 x 109 mL/day)(705 cfu/100mL)= 5.34 x 1010 cfu/day South Central Regional estimated load (3.98 x 107 mL/day)(605 cfu/100mL)=2.40 x 1010 cfu/day

WWTP Estimated Load above permitted discharge (Actual – Permit)

Sunland Park= 4.39 x 1010 cfu/day South Central Regional= 1.90 x 1010 cfu/day

East Drain Daily Load Estimates for E. coliEast Drain (actual load from BST study)= 2.81 x 1012 cfu/day Cattle (14%)(2.81 x 1012 cfu/day)= 3.93 x 1011 cfu/day Sewage (13.3%)(2.81 x 1012 cfu/day)= 3.74 x 1011 cfu/day Pets (7.1%)(2.81 x 1012 cfu/day)= 2.00 x 1011 cfu/day Horse (12%)(2.81 x 1012 cfu/day)= 3.37 x 1011 cfu/dayMontoya Drain (estimated from NMDA census statistics and field observation) There are an estimated 2,206 horses in Dona Ana County (NMDA Census 2007). The primary concentration is in the vicinity of Montoya Drain, which runs adjacent to Sunland Park Race Track and was estimated to comprise 50 percent of the total (1,103). The E. coli load was estimated using a conservative assumption that 0.2 percent of the E. coli from 1,103 horses is discharged to Montoya Drain per day. One horse is estimated to produce 2.1 x 108 cfu E. coli per day (EPA 2002; Doyle and Erickson 2006).

Estimated Load transmitted to Montoya Drain = 4.62 x 108 cfu/day

Estimated E. coli Load from DairiesThere are ≈ 20,000 dairy cows at the dairies adjacent to Mesquite and East Drains. One dairy cow is estimated to produce 5.0 x 1010 cfu E. coli/day (EPA 2002, Doyle and Erickson 2006). Utilizing a conservative assumption that 0.01 percent of the cattle-source E. coli is transmitted to drain (2 cows).

Estimated Load transmitted to East Drain= 1.00 x 1011 cfu/day

26

Page 37: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

chapter 5 manaGment measures and potentIaL Load reductIons

The scientific literature and technical guidance documents related to mitigation of pollutants provide numerous examples of best management practices (BMPs) with various degrees of suitability and efficacy (Clary et al 2008,; C. Brozozoski 2012). In recent years, the term BMP has often taken on the connotation of structural implemen-tation with the focus lost on management (Cudia 2012). The best mitigation plans include a balance of structural implementation with adaptive management plans and practices. The vast majority of stakeholders in a position to implement mitigation measures for E. coli in the watershed are land and water managers. Therefore, mitigation measures to reduce bacterial pollutant sources should focus on overall management strategies that provide a bal-ance of structural implementation and integrative adaptive management.

As summarized in Chapter 4, exceedances of E. coli in the watershed can be separated into episodic (stormflow related) and chronic. The sources were further delineated by stormwater driven impacts in the upstream portions of the watershed (Leasburg Dam to one mile below Percha Dam), and chronic sources at the bottom of the water-shed (International Boundary with Mexico to Anthony Bridge). The targeted management measures listed below were developed to address the chronic “hotspot” areas identified during the planning process, and all but one were designed to address specific sources at a specific location. Estimated load reductions for E. coli were calculated for each of the targeted management measures. A list of general management measures that address a range of watershed issues and water quality problems are also provided for use throughout the watershed to provide addi-tional water quality benefits. Estimated load reductions were not calculated for the general management measures although potential for load reduction and benefits to water quality are presented.

Targeted Management MeasuresWWTP UpgradesThe DMRs submitted under the NPDES permit requirements indicate the South Central Regional WWTP is in compliance for E. coli for the last three years. The DMRs submitted for the Sunland Park WWTP indicate that the plant has been out of compliance periodically for more than 10 years. The results of the NMED water quality sur-vey suggest that there may be a bigger problem than indicated by the DMRs submitted by these facilities. WWTP upgrades are a priority mitigation measure identified in this plan to reduce the E. coli load to the Rio Grande in an effort to meet the TMDL.

Sunland Park WWTP(s)

The Camino Real Regional Utility Authority (CRRUA) was formed in 2009 to manage and operate the water and wastewater systems in Sunland Park, Santa Teresa and the adjacent unincorporated areas in southern Doña Ana County. As of 2012, CRRUA manages both the Main Sunland Park WWTP (Figure 22) and the North Sunland Park WWTP (formerly known as the Sunland Park-Santa Teresa WWTP). Both facilities are authorized to dis-charge to the Rio Grande under NPDES. A third plant located on the escarpment to the west of Sunland Park, the West Mesa/Santa Teresa WWTP, has a groundwater discharge permit issued by the state of New Mexico to land apply their effluent and does not currently discharge to the Rio Grande.

The North Plant was built in the 1970’s and has a design capacity of 0.53 MGD. It has been receiving flows exceed-ing its design capacity since the early 2000’s. As of 2012, it was receiving flows as high as 0.8-0.9 MGD, exceeding the hydraulic capacity of the facility. Due to the inability to effectively treat flows above the design capacity, the effluent from the North Plant (a mix of pre-treated water from the effluent holding pond and raw sewage) has been pumped to the Main Sunland Park WWTP for treatment since 2006. Combined with the growth of the commu-nity at large, this has placed an increased burden on the Main Sunland Park WWTP. Upgrading or replacing the North Plant is viewed as a priority to bring the Main Sunland Park WWTP into compliance.

27

Page 38: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

chapter 5

Plans to upgrade or replace the North Plant were initiated in 2009 by the City of Sunland Park. CRRUA has con-tinued with those efforts and a plan to replace the plant has been developed. Plant designs are currently being re-viewed by the USEPA and the NMED Constructions Program Bureau. CRRUA has requested financial assistance from the Border Environmental Cooperation Commission (BECC) under the USEPA funded Border Environ-mental Infrastructure Fund (BEIF) to replace the North Plant. A Technical Memorandum has been prepared that will be used in the acquisition of funding from the U.S. Department of Agriculture-Rural Development Agency, New Mexico Finance Authority’s Colonias Program, and the North American Development Bank through BEIF.

Capital Outlay Requests were submitted to the 51st Legislature of the New Mexico House of Representatives. In 2013, $600,000 under HB 337 was authorized to repair, design and construct water and wastewater system infra-structure in the area. In 2014, $3,700,000 under HB 55 was authorized to plan, design and construct a new North WWTP. Both bills were approved and signed by the governor. The remaining funding will come from BECC. Contract bidding is anticipated for November 2014 with construction to commence in 2015.

South Central Regional WWTPThe South Central Regional WWTP has been in operation since 2003 and serves the communities of Vado, Del Cerro, La Mesa, San Miguel, Berino and Chamberino (Figure 23). The Village of Mesquite was added in 2012.

28

Rio Grande

Mulberry Dam-Rio Grande

Coronado Hills-Rio Grande

130301021009

City of Santa TeresaLa Union-Rio Grande

City of El Paso-Rio Grande

Source: Esri, DigitalGlobe, GeoEye, i-cubed, USDA, USGS, AEX, Getmapping, Aerogrid, IGN, IGP,swisstopo, and the GIS User Community

LegendMontoya DrainFrontera DrainNM-TX-MX Borderhuc_12Drains and Wasteways

Sunland Park Area

Ê0 0.35 0.7 1.05 1.40.175

Miles

North Sunland Park WWTP

Main Sunland Park WWTP

Montoya Drain Project Site

N e w M e x i c oN e w M e x i c o Te x a sTe x a s

M e x i c oM e x i c o

Figure 22: Targeted Management Measures in the vicinity of Sunland Park.

Page 39: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

The communities are designated as Colonias, which are rural unin-corporated subdivisions within 62 miles of the U.S.-Mexico border that lack adequate sewage systems and in some cases, decent, safe, and sanitary housing. During a facility inspection in August 2011, the operator indicated the plant had a periodic problem with dis-infection since it was built (this is not reflected in the DMRs). The plant underwent a small facility upgrade in September 2011 that involved installing a new UV dis-infection system. However, the South Central Regional WWTP faces some of the same challeng-es as Sunland Park with respect to increasing residential growth in the area. A thorough assessment of the efficacy of the upgrade of the UV system is recommended. DMRs submitted since that time, show that the system is in compli-ance, but that was the case prior to the upgrade when sampling in 2011 revealed discharges exceed-ing state water quality standards for E. coli. If the 2011 upgrade was insufficient to reduce E. coli to within water quality standards, then a facility upgrade support-ed by state and federal funding options is recommended for the South Central WWTP as well.

A Capital Outlay Request to expand and upgrade the facility was submitted during the 51st legislature of the New Mexico House of Representatives but failed to pass. Potential additional funding sources include: BECC under BEIF; the U.S. Department of Agriculture – Rural Development Agency, New Mexico Financial Authority’s Colo-nias Program; and the North American Development Bank through the BEIF.

Constructed WetlandConstructed wetlands that intercept storm flow, or are utilized as a final filtration for wastewater, are a proven tool to reduce E. coli loading. A primary function of wetlands is water purification including filtering of pathogens from stormwater. The design and placement of the constructed wetland is critical to achieve reduction. Improper design and placement can actually lead to an increase in E. coli (Clary et al 2008).

chapter 5

Rio Grande

§̈¦ 10

Vado

Lanark

Berino

La Mesa

Anthony

Mesquite

La Union

El Ojito

San Miguel

Chamberino

Santo Tomas

Hacienda Acres

Black Mountain Anthony Wash-Rio Grande

La Union-Rio Grande

Nunn Ranch

Mossman Arroyo

Anthony Wash

Achenback Canyon

Achenback Canyon-Rio Grande

City of Santa TeresaAvispa Canyon-Rio Grande

Santo Tomas de Yturbide Colony

130301021008Source: Esri, DigitalGlobe, GeoEye, i-cubed, USDA, USGS, AEX, Getmapping,Aerogrid, IGN, IGP, swisstopo, and the GIS User Community

Legendhuc_12East DrainMesquite DrainFlood Control DamDairies

East Drain Area

Ê0 1 2 3 40.5

Miles

Mesquite Drain Project Site

R-Cubed Digester Site

South Central Regional WWTP

Figure 23: Targeted Management Measures in the vicinity of East Drain.

29

Page 40: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

Constructed Wetland-WWTP Discharge Polishing

A feasibility study was conducted in 2011 on behalf of the Council to build a wetland to treat the Sunland Park WWTP effluent prior to discharge to the Rio Grande (Figure 24). The resulting study determined that the site had been a wetland previously and still retained the qualities that would improve viability of a successful project. The process for developing the proposed design included an analysis of removal rates for fecal coliforms as well as BOD, nitrogen, phosphorous and TDS. Potential drawbacks that were identified included mosquitos and in-creased fecal coliforms from birds drawn to the wetland. These were addressed with design criteria that included a multiple cell design, cell configuration, flow path and water level regulation. Specific detail was given to a sub-sur-face flow design prior to discharge to enhance removal of coliforms.

The project was also conceived as an outreach tool to promote awareness of large scale liquid waste management, present innovative techniques for treatment, the benefits of improved water quality, and the beniefits of wetlands and a healthy riparian community. Additional design criteria include elevated walkways, viewing areas and edu-cational signs.

Constructed Wetland-Drain Modification

Agricultural drains serve to drain off excess water and salts from cropland that utilize flood irrigation by intersect-ing the shallow groundwater table and returning excess water to the river that supplies the water. As stated in the Introduction, the El Paso-Las Cruces watershed contains approximately 90,640 acres of irrigated agriculture with an extensive system of irrigation canals and agricultural drains crisscrossing the valley floor. As such, in addition to carrying agricultural return flow, the drains may also receive stormwater from the numerous arroyos that drain the surrounding watershed. Unfortunately, the drains have also been occasionally used as disposal sites for mate-rials ranging from tree limbs to manure and trash.

Both the East Drain and Mesquite Drain have documented elevated levels of E. coli. The results of the source track analysis showed the highest level of E. coli in the study coming from livestock (31%) and sewage (13%) at the East Drain sampling site. The source of both the sewage and livestock E. coli in the East Drain is unknown. The source, both the host and where it is coming from, of elevated E. coli in Mesquite Drain is also unknown.

Modification of drain morphology to create a constructed wetland is an innovative approach that was developed by EBID in recent years out of necessity due to repeated structural damage to a drain by storm flows. The Selden Drain Habitat Restoration and Inline Storage Project was designed with three goals; to provide controlled release of storm flows; mitigation of E. coli; and to create wildlife habitat. It was completed in 2009 and involved reinforc-ing the drain at its confluence with Edwards Arroyo, widening the drain to create an overbank area, and installing a flood control gate. The depth of the original drain channel was kept intact to allow it to function as designed. The resulting small linear retention basin facilitates the attenuation of stormwater, reduces the volume through infiltration to groundwater and improves water quality.

chapter 5

30

Figure 24: Proposed conceptual design of constructed wetland at the Sunland Park WWTP.

Page 41: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

A similar project has been iden-tified to be implemented along Mesquite Drain (Figure 23). The concept has been modified to include a wider floodplain with a secondary channel along the back side to create a sort of oxbow (Figure 25). The drain will be expanded into an adja-cent shallow ponding area that already collects stormwater. The expansion will be below the grade of the existing area and provide an overflow pond-ing area for stormwater coming down the drain from upstream of the site. An overflow drop gate will be installed on the downstream end of the project to facilitate water retention and controlled release. The estimated retention time will increase from 0.3 days to as much as 12 days depending on the volume of the incoming flow. This will facilitate mitigation of E.coli by pro-longed exposure to UV radiation and increased infiltration to groundwater.

A second drain modification project has been identified for the outlet of Montoya Drain located just downstream of the Sunland Park WWTP (Figure 22). Montoya Drain flows through a large concentration of horse farms and the east side of the Sunland Park Racetrack. This project also involves widening the drain, but leaves the drain free flowing without a drop gate. The widened area would be enhanced with wetland vegetation to improve the filtering capability of the project.

Dairy Waste Management- Manure DigesterBoth the Mesquite Drain and the East Drain run parallel, and adjacent to, the area known locally as dairy row (≈ 12 dairies) in the Mesilla Valley of New Mexico (Figure 23). The close location of the drains to the dairies, and the annual occurrence of high wind and dust storms, there is the potential for E. coli to enter the drain. Some of the manure is also sold and, at times, has been stockpiled adjacent to the drains. Any efforts at improving manure management at the dairies may have a beneficial impact on mitigating E. coli in the drains. A development that has occurred since beginning work on this watershed plan is a proposal to install a manure digester to process manure generated by the dairies. This is a separate and distinct effort from work conducted or suggested by the Council and will incorporate a facility that promotes an economical and efficient method of solid waste and liquid waste recycling through anaerobic digestion and composting. Animal solid and liquid waste from dairy cow herds will be transformed into electricity, ammonium products, fertilizer, and compost. The primary impact will be to reduce nutrient impacts to groundwater with a secondary impact of improving water quality in the drains. This effort is supported by the stakeholders as a viable alternative to current dairy waste management. The digester will be privately funded. Additional support to assist producers (dairies) to upgrade facilities to be compatible with the digester will come from National Water Quality Initiative funds under the New Mexico Natural Resources Conservation Service Environmental Quality Incentives Program.

Combined Enforcement Activities and Stakeholder OutreachAs noted above, illegal dumping of manure in the drains has been recognized as a source of fecal contamination.

31

Figure 25: Conceptual design of overflow wetland for Mesquite Drain.

chapter 5

Page 42: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

The physical complexity of the agricultural drainage system, the large surface area it encompasses (both rural and urban) and lack of resources for a comprehensive oversight and enforcement program presents a significant hurdle in mitigating E. coli pollution from illegal dumping. A two pronged approach is in development that would com-bine a cooperative enforcement effort between NMED and EBID and stakeholder outreach.

Beginning in the summer of 2013, NMED and EBID began working jointly to investigate complaints of illegal dumping of manure into the agricultural drains (Figure 26). In the first six months of this effort, three notices of violation were issued by NMED followed by similar notices sent by EBID. These all involved the dumping of horse manure. All three cases were successfully resolved with voluntary cleanup by the alleged violators. The stake-holder outreach component of this BMP will provide information on the importance and function of agri-cultural drains and issues related to illegal dumping.

32

Figure 26: Joint NMED and EBID enforcement with succesful outcome. Horse manure and bedding materials placed adjacent to West Drain (top). The pile was 800’x30’x18”. A closeup of manure in West Drain at the site (middle right) and following cleanup of the site (bottom).

chapter 5

Page 43: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

chapter 5

Potential Load Reductions from Targeted Management MeasuresLoad reductions for E. coli were estimated for all targeted management measures to be implemented in the Rio Grande between Anthony, New Mexico and the international boundary with Mexico (Table 8). Estimated daily loads for the WWTPs were calculated from direct measurements collected from the facility outfalls during the 2011 NMED survey. The estimated daily loads for the East Drain were calculated from data collected during the source tracking study. Estimated daily loads for Montoya Drain were calculated utilizing agricultural census sta-tistics and ground truth surveying. Reductions for management measures were calculated utilizing a combination of data collected from the surveys, and accepted value constants for bacteria found in scientific literature. For a complete description of the process see Appendix I.

Estimating load reductions from the combined enforcement efforts and stakeholder outreach is speculative. How-ever, it is clear that these activities will have a beneficial impact on a major source of E. coli to the system. Based on the current success of the combined enforcement efforts alone and considering only horse manure, a conservative load reduction estimate assumes decreasing the load by 2 horses/day and yields a load reduction of 4.2 x 108 cfu/day E. coli.

General Management MeasuresA comprehensive watershed plan includes a complete analysis of available and practicable management and mit-igation measures to improve the health of the watershed. The following is a summary of BMPs recommended by the stakeholders to improve water quality and watershed health. These include industry standard BMPs, BMPs specifically developed for the local environment and conditions, and several comprehensive management plans directed at improving watershed health. Given the broad scope of application for these management measures, load reductions were not calculated. However, load reductions can be estimated in the future on a sub-watershed scale prior to implementing a given management practice to a specific area. Load reduction potential is presented in Table 9 at the end of this section.

33

SOURCEESTIMATED LOADS

(cfu/day)REDUCTION FROM MANAGEMENT

MEASURES (cfu/day)WWTP Manure Constructed WetlandUpgrade Mgmt. Drain Modification

Sunland Park WWTP* 5.34 x 1010 4.39 x 1010 1.34 x1010

South Central WWTP 2.40 x 1010 1.90 x 1010

East Drain 2.81 x 1012 1.00 x 1011 7.03 x 1011

Cattle 3.93 x 1011 1.00 x 1011 9.83 x 1010

Sewage 3.74 x 1011 9.35 x 1010

Horse 3.37 x 1011 8.43 x 1010

Pets 2.00 x 1011 5.00 x 1010

Montoya Drain

Horse 4.62 x 108 1.16 x 108

Table 8: Expected load reductions from targeted management measures addressing specific sources at a specific location.

Page 44: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

chapter 5

These management measures are primarily directed at mitigating the impacts from stormwater. These stormwater management measures address three main factors: flow control, pollutant removal, and pollutant source reduc-tions to control NPS pollution and reduce E. coli input to the receiving stream in both rural and urban settings. Traditional stormwater management is aimed at conveying stormwater away from infrastructure or property in the most efficient way possible and delivering the water downstream. In this scenario, water is viewed as a nui-sance (Kaspersen 2013). Much of the benefit of infiltrating water back into the groundwater table is lost. It also ef-ficiently delivers increased pollutant loads to the receiving stream. New developments in stormwater management promote water infiltration, reduce pollutant loading, and decrease the capital outlay investment of large storm-water collection systems. This plan recommends an integrated watershed management approach to stormwater management that utilizes new approaches coupled with traditional methods and new innovative techniques. The following management measures have been included in this plan to improve stormwater management and water quality.

Detention Basins- Existing Detention Basin RepairDetention basins are a proven effective method of mitigating numerous forms of pollution by increasing infiltra-tion and reducing the head, as well as the volume, of storm flow entering the receiving stream. Detention basins with short detention times, which are typical for this region, should increase mortality of E. coli resulting from increased exposure to UV light and increased infiltration. This is not always true in wetter environments where infiltration is low and the water persists. Because there are a wide variety of detention basin designs depending on the location, specific design elements are not presented here.

Development of new detention structures is expensive. There are currently numerous aging detention basins in the watershed that are in need of repair. Under the Watershed Protection and Flood Prevention Act (PL-566), the approximately fifty dams installed in the 1960s in the watershed have exceeded their intended lifespan. Dams not hydrologically connected to the Rio Grande or a tributary would not mitigate E. coli pollution in the river. However, some of these structures are hydrologically connected to the Rio Grande and maintenance and repair is warranted as an effective tool for reducing storm flow and mitigating E. coli. There are four specific deten-tion dams that may be of particular importance; Apache-Brazito Dams 1-4, east of Interstate 10 near Mesquite, New Mexico, that discharge their tailwater into Mesquite Drain may be in need of upgrade to obtain maximum efficiency.

Main Stem Rio Grande Management PracticesThe USIBWC is the agency charged with maintaining the levees and the floodplain between the levees on the Rio Grande within the El Paso-Las Cruces watershed. In March 2009, the USIBWC released a document outlining various restoration projects for implementation on the main stem of the Rio Grande. A few restoration proj-ects with the potential to mitigate E. coli have been developed. A template for these designs can be found in the Conceptual Restoration Plan and Cumulative Effects Analysis, Rio Grande—Caballo Dam to American Dam, New Mexico and Texas (www.ibwc.gov/EMD/CanalizationWebpage/RestPlanMarch2009.pdf) commissioned for the USIBWC.

Sub-watershed Management PracticesAs indicated in Figure 6, the BLM is the largest landowner in the watershed, managing over 343,134 hectares (847,899 acres). They are primarily uplands but cover many of the 64 12-digit HUC sub-watersheds. The BLM has recently released the TriCounty Draft Resource Management Plan (RMP) and Draft Environmental Impact State-ment (EIS) for Otero, Sierra and Doña Ana counties which include the El Paso-Las Cruces watershed. This is a comprehensive plan which will guide management of BLM lands in the watershed for the next 20 years. It includes a variety of alternatives for watershed management to improve watershed health. Two management practices identified beneficial to this watershed plan are vegetative management and grade control.

34

Page 45: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

chapter 5

Vegetation Management

Vegetation management in the watershed is primarily directed at restoring native grasslands to increase gound cover. Grassland restoration is difficult in this arid region. However, the BLM has had success under their Restore New Mexico Program to restore upland rangeland. The benefits include decreased sheet flow, increased infiltra-tion, decreased runoff and associated contaminants, reduced erosion and development of a healthier biotic com-munity in the watershed. For further information see http://www.blm.gov/nm/st/en/prog/restore_new_mexico.html.

Grade Control/Stabilization Structures

Grade control and stabilization structures are a useful management tool to reduce ersosion in degrading arroyo systems that the BLM employs to reduce flood velocity, capture sediment, and reduce impacts from erosion. They are also effective at slowing storm flow and increasing infiltration. They are sited on a case by case basis following assessment of individual sub-watersheds.

Domestic Pet Waste ManagementIt is a common practice throughout the watershed to walk dogs for recreation and exercise. As noted earlier, pet waste does contribute E. coli to the river. Particular areas of concern are recreation areas along the river and the network of irrigation ditches, which are both favorite areas to walk dogs. Owners can be encouraged to be respon-sible and pick up after their dogs and properly dispose of the waste by the following actions:• Post signs encouraging residents to pick up after their pet • Provide small bags for waste collection near riparian recreation areas • Provide trash cans for waste disposal • Support dog waste cleanup events in areas near surface water. • Conduct educational outreach to pet businesses and organizations such as kennels, animal control, etc.

Liquid Waste Management• Connect residents to a centralized sewer system • Tighter liquid waste hauler regulations • Septic system upgrades

Green Infrastructure/Low Impact Development Green infrastructure is an interconnected network of natural areas and open spaces. By preserving and restoring natural landscapes (planting vegetation, establishing natural flow areas), communities can improve water quality while providing outdoor recreation areas and wildlife habitat. On a small scale, practices include rain gardens, porous pavements, green roofs, infiltration planters, trees and tree boxes, and rainwater harvesting. Benefits of green infrastructure include reduced and delayed runoff, enhanced ground water recharge, storm water pollutant reductions, reduced sewer overflow events, reduced air temperatures, creation of wildlife habitat and green space, improved human health, improved air quality (plants remove carbon dioxide), and increased land values.Low Impact Development (LID) practices are now being implemented in urban areas to decrease pollutants in fresh water, increase the use of stormwater for irrigation, and maintain the effectiveness of flood water distribu-tion. LID is effective in new development, reconstruction, and as retrofits in existing development; in other words, LID can be implemented almost anywhere at any time to fit the needs of urban growth and development (Canavan 2010). A few LID methods are used on a municipal level to reduce flooding and pollution. Permeable pavements, green parking lot and highway medians, and vegetated swales are all types of urban infrastructure designed to divert storm water runoff into the surrounding soil. This type of infrastructure is beneficial in a multitude of ways, providing urban developments with natural growth and beautiful landscapes while preventing both flooding and

35

Page 46: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

chapter 5

impacts from NPS pollutants.

Rainwater harvesting incorporates many aspects of green infrastructure and LID and can be implemented on both the large and small scale. There are a wide variety of techniques and strategies. A few of them are mentioned here.

Cisterns

Cisterns harvest rainwater that can be used to collect water for potable use or to water indoor and outdoor plants. Harvesting water for potable use can be high tech and expensive, but simple systems can be installed to augment water used for plants. As with all water capturing systems, cisterns reduce the amount of stormwater leaving a site.

Rain Gardens, Bioswales

Rain gardens or bioswales are depressions that naturally harvest rainwater. They reduce or eliminate the need for supplemental water by using native vegetation. Rain gardens not only pro-vide a beautiful addition to the landscape but they also help to prevent flooding in a way that reduces pollution in fresh water.

Small-scale detention basins – Parks

It has become a common practice to create small green space ar-eas when installing a detention basin and there are examples of this practice on both the small and large scale within the com-munity. This management practice should be encouraged and incorporated into community planning when practicable.

Permeable pavements/walkways

Permeable pavement and walkways are made of porous materi-als that promote infiltration and reduce sheet flow runoff. They can be as small scale as a patio or larger projects such as side-walks and parking lots. This provides the benefits of reducing storm flow, improving infiltration, and reducing the associated pollutant load to surface waters.

36

Figure 27: Rain garden in Mesilla, New Mexico.

Figure 28: Detention basin serving as a park in Mesilla, New Mexico.

Page 47: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

chapter 5

Curb and Gutter – parking medians, road medians

Rather than raising sidewalks, medians, and curbs, one method is to lower or make them the same height as the road, allowing wa-ter to naturally irrigate adjacent landscapes. Another technique is to place cuts in exist-ing curbs and install new curbs with gaps if a more traditional curb and gutter system is desired. This reduces runoff, allows water to infiltrate and reduces the associated pollutant load to surface waters.

Further Develop the Vision 2040 Regional Strategy Anthony, Hatch, Las Cruces, La Mesilla, and Sunland Park, in a cooperative effort with Doña Ana County and local stakeholders, have developed a regional plan entitled One Valley, One Vision 2040 (City of Las Cruces, 2011) that encompasses many factors of the growing community. It includes sections on land use, water demand, trans-portation, housing, utilities and infrastructure, economic growth, the environment, and quality of life. It is a comprehensive document with many general strategies and ideas including promoting water quality, stormwater management, and the principles of LID. The ideas and strategies in the document should be further developed and built upon to improve community buy in and support from the real estate community, the construction and business community, and local governments. The Vision 2040 website and document can be accessed at http://www.las-cruces.org/code/vision_2040/index.html

The Potential for E. coli Loading Reductions from General Management Measures Pollutant loading in the watershed upstream from Leasburg Dam is primarily related to storm related runoff that can best be described as flash flooding. The population density and anthropogenic activity of the surrounding uplands is low. The abundant course-grained, bare soils throughout the watershed restrict infiltration and increase surface runoff. Mitigation measures are restricted in this broad landscape, and load reduction potential is expect-ed to be minimal. Since there is inherent variability in the efficacy related to each of these management measures regarding drainage area, placement, size, BMP efficiency, etc., discreet load reduction values were not directly cal-culated. Project specific load reductions should be calculated for any future mitigation project development using the guidance provided with this plan. Load reduction potentials are presented in Table 9. The table is derived from a technical manual titled A Manual of Conservation Practices to Reduce Pollution Loads Generated from Nonpoint Sources, prepared by Tetra Tech (2004) in cooperation with the Natural Resources Conservation Service (NRCS), and provides a summary of BMPs for pathogenic NPS pollution.

The manual is a useful tool and identifies BMPs that can be used to abate NPS pathogenic pollutants primarily in an agricultural setting. Each BMP has multiple benefits that extend beyond controlling pathogenic pollutants and includes controls for nutrients, salinity, sedimentation, erosion, and several others. Management levels, projected load reduction potentials, targeted sources, and treatment areas are just some of the types of information provided by this guide. The manual suggests that these practices can be implemented in areas immediately adjacent to the stream channel or water body and in upland areas. It also advises that multiple practices be implemented in cho-rus to maximize the effectiveness of pollution control.

37

Figure 29: Curb cuts in a parking lot providing irrigation to median.

Page 48: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

BMP Level of Effort Needed

Load reduction potential

Time for load reduction

TMDL sources

Other pollutants addressed

Treatment areas

Pet waste management

Active management

low up to 2 years domestic pets activities

nutrients low dissolved oxygen

Urban areas, parks, irrigation, canals

Main stem restoration

Active management

moderate up to 2 years drain and irrigation wasteways

sediments, nutrients

USiBWC floodway and EBiD system

Detention basin Moderate engineering

high immediate animal feeding, disturbed areas, storm water

sediments, nutrients, pesticides

Arroyos, urban drainages,

Sub-watershed restoration

Moderate engineering

low up to 2 years rangeland, rural drainages

sediments Range uplands

Liquid waste infrastructure

intense engineering, regulations

high up to 2 years septic systems, liquid waste haulers

sediments, nutrients, salinity, heavy metals, pesticides

Non- incorporated county, rural

Constructed wetland

intense engineering

medium up to 2 years animal feeding, industrial sourc-es, storm water

sediments, nutrients

WWTPs, drains, wasteways, subdrainages

Regional strategy development

intense engineering

medium Greater than 5 years

stream erosion, ag practices

sediments, nutrients

Agricultural lands

Green infrastructure LId

Engineering, active management

medium Greater than 5 years

urban areas, impervious surfaces, storm water

sediments, nutrients, low dissolved oxygen dissolved oxygen, water temp

Streamside, agricultural lands

Waste utilization Active management

low immediate animal feeding ops, ag practices sediments, nutrients, pesticides

sediments, nutrients, pesticides

Agricultural lands

chapter 5

Table 9: Summary of general BMPs to address pathogenic NPS pollution.

38

Page 49: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

The goal of the Outreach Program is to inform stakeholders and the general public about water quality issues in the Rio Grande, and encourage active stakeholder participation in the development of the watershed plan. The objectives are to provide a framework to educate the public on local water quality issues (community awareness), gain stakeholder insight on the nature of the identified water quality issues, obtain stakeholder participation in the development of BMPs to address the identified water quality impairment, and to encourage the use of the BMPs prescribed in the watershed plan. As part of this process, the Council encourages active participation in the wider variety of watershed issues undertaken by Council activities with a goal of increasing Council membership. To facilitate this initially, an innovative approach was used to engage stakeholders through individual stakeholder interviews. These were followed by the development of larger stakeholder meetings that eventually developed into a stakeholder working group.

Initial Outreach Efforts 2006-2007The Council launched its outreach/education program in Phase I of the watershed planning process in the spring of 2006. Stakeholders were engaged in a program to understand the watershed planning process and solicit mean-ingful input to the 319(h) water quality project, taking into consideration the limited understanding of probable sources of the bacterial impairment at the time.

Key Informant InterviewsKey informants were identified who have a direct managerial capacity related to the probable sources of impair-ment in this section of the river. The Outreach Coordinator conducted interviews to learn more about man-agement issues, gain respect and trust from each stakeholder group, and provide a balanced narrative for other stakeholders to learn about each other. Each key informant was interviewed and asked then following series of questions:

• Can you describe the general management practices and guidelines used in your work related to watershed protection? What is the geographic scope?

• What are some of the management practices that have been most effective?

• What are some of your constraints?

• How is information communicated within your area? What are sources of information for you?

• Who is involved in this process?

• Do you have any write ups on this project? Or a website?

• Is GIS and data part of the scope of your work?

• How can our work best complement yours? Are there any considerations that are important to you that we include in writing the WBP?

• Who do you feel might best represent your interests in creating a stakeholder committee that develops crite-ria for next steps and recommended BMPs?

Neighborhood ConversationsThe Outreach Coordinator also engaged additional stakeholders on a neighborhood basis to formulate a priority list of bacterial problems in the watershed. Numerous neighborhood associations throughout the project region that represent various socioeconomic subgroups were approached to discuss such considerations. Residents in

39

Page 50: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

chapter 6

Del Cerro/Vado, near the Armijo Drain in Las Cruces, the West Mesa in Las Cruces, and Radium Springs were approached. This process facilitated communication with individual stakeholders at a different level and yielded valuable information concerning what is required to engage the public in the watershed planning process and to address their concerns. In summary, neighborhood residents wanted the problem to be strategically addressed to motivate others through health concerns, avoid punitive actions, and to encourage grassroots approaches.

Stakeholder EventsMeetings were facilitated throughout the region in order to capture a sense of how local stakeholders viewed the most effective way to address bacterial problems in the river. Two larger stakeholder events were held follow-ing the individual interviews. During the first event, stakeholders were presented with a synthesis of the water quality data analysis, a biological perspective of the watershed, and a summary of stakeholders’ concerns. Partic-ipants were asked to provide input to an approach for future investigations of water quality impairments as well as for developing criteria for BMP options in the watershed. Although there were discussions about the value of a healthy living river that was swimmable and fishable, there was no firm commitment to more ambitious strategies for watershed restoration given the lack of firm data and many of the stakeholders’ unfamiliarity with data analysis and its relationship to ecological health. The second event focused on biological characteristics of the watershed to stakeholders. Also presented were BMP practices from Tetra Tech’s, A Manual of Conservation Practices to Reduce Pollution Load Generated from Nonpoint Sources (2004). The following list is a summary of events that occurred during this time period.

• Discussions and interviews with individual stakeholders.

• Six stakeholder neighborhood conversations.

• Meeting April 24, 2007, hosted by the Council to discuss issues with the 319(h) project.

• Meeting May 17, 2007, in Las Cruces concerning water quality data.

• Meeting June 19, 2007, in Las Cruces concerning biological characteristics.

• Watershed tour May 5, 2007, along the Rio Grande from Selden Canyon downstream to Gonzales Dairy in Vado, New Mexico, with stops at Hot Springs Hotel and Selden Canyon, Leasburg Dam, Kerr Irrigation Lateral, Burn Lake, Las Cruces WWTP outfall, Mesilla Valley Bosque State Park, and Mesilla Dam.

• Throughout this period, progress on the 319(h) project was developed with oversight and suggestions from the Council’s Clean Water Subcommittee (22 meetings) and at Council meetings that occurred approximately every six weeks.

Watershed Tour, 2007The watershed tour in summer 2007 was hosted by the World Wildlife Fund and NMDA. The tour was led by Dr. Phil King, Professor and Associate Department Head of Civil Engineering at New Mexico State University (Figure 30). The watershed tour presented stakeholders with a visual representation of water quality issues from Selden Canyon to the Gonzales Dairy in Vado. The is-sues discussed ranged from salt cedar removal to wild ar-royos and agricultural water infrastructure. Land man-agement responsibilities, sediment transport, flooding, water monitoring, irrigation efficiencies, septic systems, and WWTPs were also topics of discussion as the group traveled south through the watershed. Besides providing

40

Figure 30: A stop at Mesilla Dam on the watershed tour, 2007.

Page 51: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

chapter 6

41

an interdisciplinary forum to view watershed issues, the tour strengthened stakeholder relationships as they recog-nized the value of everyone’s input through scheduled commentaries throughout the tour.

Outreach, 2010 – 2012 Stakeholder Working GroupWater quality stakeholders were engaged, and a stakehold-er working group was developed. They met regularly to discuss the watershed planning process, water quality is-sues, and potential remediation practices that could lead to improved water quality in the Rio Grande. Participat-ing agencies/entities on the 319(h) Stakeholder Work-ing Group included representatives of EBID, USIBWC, NMED, NMDA, Doña Ana County, Doña Ana Flood Commission, New Mexico State Parks, Doña Ana Soil and Water Conservation District, the City of Las Cruces and the BLM. In addition, a local rancher and contractor both provided essential input.

Development of Informational MaterialsInformational materials were developed for education and outreach, including a factsheet about the 319(h) project, E. coli as a water quality parameter, BMPs, and general watershed education. Presentations were given at multiple events that described the Council, the watershed planning process, the NPS problem in the Rio Grande, wa-ter quality data and results, and pathogenic NPS remedi-ation practices. Posters were developed for multiple age and focus groups; posters displayed facts about the wa-tershed including geography, function and water quality modeling, E. coli, and water quality improvement practic-es. Display materials for the Council’s booth were updated for use at outreach events. Topics included the Council, the Rio Grande, the watershed planning process, and water quality. An Enviroscape™ watershed model was purchased to demonstrate basic watershed functions, multiple point source and NPS pollution sources, impacts of rainfall, and pollution prevention techniques. Council water bottles were distributed at events throughout the life of the proj-ect. Monthly newsletters were disseminated that included information about point source and NPS pollutants in the watershed and provided tips on remediation activities that members of the community could adopt to reduce water-shed pollutants. The Council’s website is still maintained with information about the 319(h) project, monthly news-letters, meetings and events. The website contains pertinent documents, informational handouts, the Outreach Coordinator’s monthly newsletter (the “Coordinator’s Corner”), and other informational website links.

Figure 32: Cover of the Bacteria in the Rio Grande Basin brochure.

Figure 31: The stakeholder working group discussing the nature of E. coli as an impairment and strategies to develop a water-shed based plan.

Page 52: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

chapter 6

42

Mulitimedia presentations about the 319(h) project were provided to the following groups:

• USEPA staff on a Paso del Norte watershed tour (August 30, 2010). • National Audubon Society volunteers (September 18, 2010). • New Mexico Chapter of the Wildlife Society (September 21, 2010). • New Mexico Watershed Forum (September 24, 2010). • Doña Ana Soil and Water Conservation District (January 13, 2011). • Caballo Soil and Water Conservation District (March 30, 2011, and April 25, 2012). • USIBWC’s Rio Grande Citizen Forum in El Paso, Texas, (December 13, 2010) and in Las Cruces, New Mexico, (January 19, 2011, and January 16, 2013). • Mesilla Valley Audubon Society (February 15, 2011). • U.S. Green Builders Council, Chihuahua Desert Chapter (October 25, 2011). • Texas Watershed Steward Workshop in Socorro, Texas, (May 9, 2012).

Outreach Events, 2010-2012• Watershed tour of the lower Rio Grande from Selden Canyon downstream to Las Cruces (November 19, 2010).• River Day at the New Mexico State Capitol in Santa Fe (March 14, 2011).• Franklin Mountains Poppies Celebration in El Paso (March 26, 2011).• Earth Day in Las Cruces (April 16, 2011).• Raft the Rio on the Rio Grande at Las Cruces (June 11, 2011).• Whole Enchilada Fiesta, Las Cruces (September 23-25, 2011). • Dia del Rio event at Mesilla Valley Bosque State Park (August 12, 2011, and August 6, 2012). Students collected water quality samples and learned how to test them. The Outreach coordinator and members of the Council talked to several school classes about surface water quality. This was part of a Rio Grande basin-wide water quality sampling project.• NRCS Conservation Planning Day at Triple D Farms, Anthony, New Mexico, (February 15, 2012).• Water Festival in Las Cruces at Young Park (March 15, 2012). Approximately 1,000 second and third grade

students attended to learn about water resources. The Outreach Coordinator and staff from the City of Las Cruces demonstrated the NPS watershed model.

Watershed Tour, 2010The watershed tour in November 2010 was held for stakeholders and Council members and began at the Radium Springs Community Center with several pre-sentations on a variety of issues related to understand-ing watershed processes. Gary Esslinger, Manager of EBID, provided background on the nature of the irri-gation system and challenges the communty faces from flooding and stormwater management. Dr. King dis-cussed changing weather patterns, flooding and innova-tive approaches to flood control. Hilary Brinegar with NMDA and a member of the Executive Committee of the Council, laid the groundwork for understanding the steps in developing a watershed based plan to address the E. coli impairment in the watershed. The tour vis-

Figure 33: A stop on the 2010 watershed tour at the Selden Drain Project, an agricultural drain modified to reduce flooding while mitigating NPS pollution (Selden Drain is in the background).

Page 53: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

chapter 6

ited four sites along the Rio Grande starting at Broad Canyon to look at riparian restoration activities. The group then proceeded south to the Selden Drain Hab-itat Restoration and Inline Storage Project where Dr. King provided an overview of the project design and function. The third stop was back along the river where the USIBWC discussed a proposed project from their Conceptual Restoration Plan and Cumulative Effects Analysis, Rio Grande—Caballo Dam to American Dam, New Mexico and Texas. The tour ended at La Llorona Park on the Rio Grande with a group discussion about stormwater management and septic systems. The tour was attended by over 30 stakeholders and was a big suc-cess.

Potential Future Outreach Campaign for the Paso del Norte WatershedOutreach efforts in the lower Rio Grande have indicated a broad concern for water quality and a willingness to work toward improving the condition of the river. Future outreach should build on prior efforts and have several important components for engaging and educating stakeholders on water quality, data analysis, and mitigation practices. This should include the following initiatives:

• Provide continued general watershed outreach that addresses overall health of the watershed by providing basic information on the problems and solutions. This should include several target audiences such as targeted stakeholder groups and students at the elementary, middle, and high school levels. • Develop outreach materials that provides information on the importance and function of agricultural drains

and issues related to illegal dumping. Develop an associated distribution plan to reach a maximum target audience.

• Continue hosting stakeholder meetings quarterly or semiannually to review success and failures to ensure an adaptive management approach in addressing the water quality goals.• Provide e-mail updates to stakeholders on mitigation projects and progress.• Maintain the 319(h) project webpage with current updates on the Council’s website.• Improve understanding of contamination by creating a Citizen’s Water Quality Monitoring Program.• Highlight successful BMP implementation to recognize accomplishments and encourage wider participation.• Continue encouraging wider stakeholder participation in the Council by hosting a series of lectures that would be useful to targeted stakeholders.Engaging stakeholders during the BMP implementation stage should involve linking up with neighborhood associations, community centers, and civic organizations to invite participation. This could mean “adopt-ing” restoration wetland and buffer strip sites by making seed balls, planting and weeding, and performing general maintenance. Agencies and organizations with expertise and experience (such as the Soil and Water Conservation Districts, the NRCS, and other local professionals) in developing BMPs that improve impairments should be promoted to stakeholders and supported collegially and, if possible, financially. A water quality con-versation series is another strategy for engaging water quality stakeholders. Table 10 displays target audiences and possible topics for discussion.

43

Figure 34: At the final stop of the 2010 watershed tour Peter Ben-nett with the City of Las Cruces discusses managing NPS pollution in Las Cruces at La Llorona Park on the Rio Grande.

Page 54: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

chapter 6

44

Site topic Target Audience DetailsFort Selden State Park BMPs to reduce

bacterial loadingHomeowners, ranchers

Rangeland and septic issues

City of Las Cruces BMPs for housing devel-opments along arroyos

Developers, Homeowners, city and county planners

Erosion control, construction techniques, policies

City of Las Cruces How do water quality BMPs link to Vision 2040

City and county planners, open space activists

incorporating BMPs into Vision 2040

mesilla open space in other southwest cities

open space activists Bring someone from Phoenix and Tucson to discuss how open space improves water quality

Sunland Park The 319(h) process in texas

Federal, state, city, and county agencies

How Texas watersheds draining into the river impact New Mexico water quality

Anthony agricultural Bmps Farmers and resource agencies

on-farm practices to re-duce erosion and more

hatch Conservation easements

Farmers and agencies

State and federal opportunities for farmers

mesquite Wastewater BMPs Towns, water utilities Examples of waste water treatment using wetlands and other techniques

Las cruces 319(h) Campaigns PDNWC Council Laura de la Garza from Arroyo, Colorado

Table 10: Suggested conversation series for water quality outreach.

Page 55: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

chapter 7 technIcaL and fInancIaL assIstance

Technical Assistance ResourcesThe Council provides a forum for exchanging information about water quality and quantity, ecosystem integrity, the quality of life, and economic sustainability in the Paso del Norte watershed on the Rio Grande. Within the Coun-cil membership there is wide ranging expertise concerning water quality and watershed issues including engi-neers, hydrologists, economists, biologists, geographers, community planners, and public health experts. Among its members are representatives of nongovernmental organizations, federal and state agencies, water utilities, municipal governments, and universities, as well as private citizens.

In addition to the Council executive committee and associated subcommittees, the following individuals and agencies were identified and engaged during the stakeholder process.

George D. Di Giovanni, Ph.D. Texas AgriLife Research, Texas A&M

Dr. Geoffrey Smith, Biology New Mexico State University

Dr. Phil King, Civil Engineering New Mexico State University

James Narvaez Hydrology Director, EBID

Chris Canavan, Project Officer New Mexico Environment Department

Dr. William Hargrove, Director Center for Environmental Resources Management University of Texas, El Paso

Cory Durr Bureau of Land Management

Cliff Sanchez Natural Resources Conservation Service

Adrian Tafoya Natural Resources Conservation Service

Fernando Cadena, Civil Engineering New Mexico State University (Emeritus)

Andrew Robertson United States Geological Survey

John Unruh United States Geological Survey

Paul Dugie, Director Dona Ana Flood Commission

Jan Kirwan New Mexico State Parks

Lisa Ramirez USIBWC Clean Rivers Program

Tom MobleyRancher, Doña Ana County

45

Page 56: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

chapter 7

Budget Category Unit Description Unit Cost total CostProject ManagementPart time project coordinator (possible student intern) for outreach, grant writing, stakeholder development, organizing meetings (Dia del Rio, Raft the Rio, etc. two days per week)

Salary/year for four years $15,000 $60,000

implementation Project oversight Manager. (fiscal and reporting responsibilities)

Salary/year for four years $20,000 $80,000

Coordinator for WQ Monitoring (24 hrs/month)

Salary/year for four years $12,000 $48,000

Project ImplementationDrain modification one to three projects $120,000-$170,000 $360,000-$521,000Constructed wetland one to three projects $100,000-$200,000 $300,000-$600,000Manure digester infrastructure

initial infrastructure with potential for growth dependent on success

$1,000,000 $1,000,000

Detention basin upgrade or repair one to three projects $50,000-$1,000,000 $150,000-$3,000,000

Grade control/stabilization structures Rock or brush structure $200-$400 n/aUpland vegetation improvement

1 acre brush control, seeding, etc.

$300-$3000 n/a

WWTP UpgradeNorth Sunland Park WWTP(AKA Santa Teresa WWTP)

New treatment plant and infrastructure upgrades

$17,000,000-$20,000,000 $17,000,000-$20,000,000

South Central Regional WWTP one upgrade including infrastructure

$3,000,000-$5,000,000 $3,000,000-$5,000,000

Outreachoutreach materials to address illegal waste disposal in agricultural drains

Develop, print and distrib-ute pamphlets

$4,000-$7,000 $4,000-$7,000

Watershed model Portable model $1,000 $1,000Maintaining website Yearly upkeep of website $1,000 $5,000Watershed tours Two stakeholder tours to

select areas of interest$2,500 $5,000

Workshops (rainwater harvesting, waste management, LiD, etc.)

one workshop every other year beginning 2015

$10,000 $20,000

General outreach materials Event giveaways, literature, and brochures

$2,000 $10,000

Participating in community events outreach at select community events

1,000 5,000

Financial Needs

Table 11: Estimate of Financial Needs for Implementation years 2014-2018.

46

Page 57: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

chapter 7Financial Assistance A variety of funding programs that assist watershed groups in watershed protection and restoration were investi-gated. Information on each program is detailed to provide insight to specific funding opportunities for the Paso del Norte watershed in the lower Rio Grande. USEPA’s Catalog of Federal Funding Sources for Watershed Protec-tion provides an overview of potential federal and nonfederal funding sources.

NPS Implementation Grants [CWA Section 319(h)]The NPS Implementation Grants Program [CWA Section 319(h)] has provided the foundation of financial re-sources for the Council to address water quality issues in southern New Mexico. The 319(h) program funds projects and programs in concurrence with Section 319(h) of the CWA that are geared toward addressing NPS pollution. Projects like the development of a water pollution remediation plan, the design and implementation of BMP’s, hiring watershed coordinators and public outreach and education programs are eligible for 319(h) funding. States are required to provide a 40 percent nonfederal match. NMED releases a request for proposals for 319(h) funding yearly between February and April. Stream and river segments with a written TMDL and included in the NMED 303(d) list are eligible for this funding.

Environmental Quality Incentives Program (EQIP)USDA’s NRCS supports the EQIP financial assistance program. This voluntary program is targeted toward agricul-tural producers for addressing local natural resource needs and goals. The major program goals are enhancing ag-ricultural production and optimizing environmental benefits on lands that, for instance, are affected by problems with soil erosion, water quality and quantity, wetlands, or grazing lands, among others. EQIP contracts can extend the length of one year after project implementation to ten years maximum. A comprehensive plan of operations is developed by NRCS and the applicant to best identify and prioritize suitable conservation practices that would ad-dress specific resource goals. A typical match amount equals 25 to 50 percent; the local average of required match is approximately35 percent. In addition, CWA Section 319(h) funds can also be used as match.

Within the watershed in southern New Mexico, there are two local work groups that are qualified for EQIP fund-ing: the Doña Ana and the Sierra Soil and Water Conservation Districts. These are the entities that approve all local operation plans and provide assistance with the management of EQIP funds. Eligible persons include land-owners, landlords, operators, or tenants of eligible agricultural lands. Also, producers who face threats to their natural resources and those in need of assistance in complying with federal and state environmental law are en-couraged to apply. Examples of projects include watershed management, restoration, monitoring, NPS controls, BMPs, education/outreach, mitigation of ranching impacts, and water conservation efforts.

National Water Quality InitiativeThe National Water Quality Initiative will work in priority watersheds (identified by a state’s 319(h) program) to help farmers, ranchers, and forest landowners improve water quality and aquatic habitats in impaired streams. NRCS will help producers implement conservation and management practices through a system’s approach to control and trap nutrient and manure runoff. Qualified producers will receive assistance for installing conserva-tion practices such as cover crops, filter strips, terraces, and manure management BMPs.

USEPA Targeted Watershed Grants ProgramThis grant is geared toward funding collaborative partnerships aimed at protecting and restoring water resources. Generally, grants are awarded for use in on-the-ground implementation of watershed based projects that contain a strong element of stakeholder collaboration for producing environmental changes. A technically sound water-shed based BMP implementation plan is necessary; this may present itself as a future funding option for member organizations of the Council. A nonfederal match of 25 percent is required. See www.epa.gov/owow/watershed/initiative/ for more information.

47

Page 58: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

chapter 7

Border Environment Cooperation Commission (BECC)North American Development Bank (NADB)Created as interdependent institutions, NADB and BECC function as a team, working with communities and project sponsors to develop, finance and build affordable and self-sustaining municipal drinking water and waste-water projects that have broad community support. Each institution is charged with specific responsibilities. BECC focuses on the technical aspects of project development, while NADB concentrates on project financing and oversight for project implementation. Financing is provided by the USEPA under BEIF. The objective of the BEIF program is to make infrastructure projects affordable by combining grant funds with loans and other forms of financing for communities along the border.

USDA-Rural Develpment AgencyThe USDA Rural Development Agency provides funding opportunities in the form of payments, grants, loans, and loan guarantees, for the development and commercialization of vital utility services. This includes funding rural water and wastewater systems to help address water quality. More information can be found at http://www.rurdev.usda.gov/Utilities_Assistance.html.

New Mexico Finance Authority Colonias Infrastructure ProgramThe Colonias Infrastructure Act was adopted in 2010 to ensure adequate financial resources for infrastructure development for recognized colonia communities, provide for the planning and development of infrastructure in an efficient and cost-effective manner, and develop infrastructure projects to improve quality of life and encourage economic development. More information can be found at http://www.nmfa.net/financing/colonias-loans-and-grants/colonias-infrastructure-board/.

Small Watershed Rehabilitation ProgramThis program is aimed at the rehabilitation of aging dams that were originally constructed under the USDA Water-shed Program in the last 50 years. The goal is to address public health and safety issues, including those associated with NPS pollution. Applications may be submitted year-round and a 35 percent match is required. See http://www.nrcs.usda.gov/programs/WSRehab/ for more information.

National Research Initiative Competitive Grants ProgramUSDA’s Cooperative State Research, Education, and Extension Service support the Water and Watersheds Pro-gram, which is aimed at protecting and enhancing natural resource bases and watershed environments. Specific goals include, but are not limited to, protecting food safety through clean irrigation and livestock drinking water supplies. Long-term goals for this program reduce pathogens from watersheds and maintain adequate water sup-plies for agricultural and livestock production as well as rural water use water supplies. See http://www.csrees.usda.gov/funding/rfas/pdfs/08_nri.doc. for more information.

State Revolving FundsThe State Revolving Fund (SRF) is a fund administered by a U.S. state for the purpose of providing low-interest loans for investments in water and sanitation infrastructure (e.g., sewage treatment, storm water management facilities, and drinking water treatment) as well as for the implementation of NPS pollution control and estuary protection projects. A SRF receives its initial capital from federal grants and state contributions and then emits bonds that are guaranteed by the initial capital. Finally, it "revolves" through the repayment of principal and the payment of interest on outstanding loans. There are currently two SRFs:

1. The Clean Water State Revolving Fund created in 1987 under the Clean Water Act.

2. The Drinking Water State Revolving Fund created in 1997 under the Safe Drinking Water Act.

48

Page 59: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

chapter 8 ImpLementatIon scheduLeand measuraBLe mILestones

Actions 2014 2015 2016 2017 2018Grant Writing to Secure Funding ForDeveloping stakeholder outreach materials to address illegal waste disposal in agri-cultural drains

x x

BMP Project implementation x x xWQ monitoring studies at greater resolution for Mesquite, Del Rio, West, Montoya and East drains

x x

Forge PartnershipsDevelop agreement with fiscal agent for project implementation or foster cooperative partnership between stakeholders

x x x x x

Partner with a Texas entity to address WQ at the bottom of the project area where NPS pollutant sources and impairments are shared. (Texas 319(h) counterpart)

x

Coordinate with the USiBWC Texas Clean Rivers Program on water quality monitor-ing within shared area of New Mexico-Texas border.

x x x x x

Work with USiBWC RoD Committee to further develop management measures and restoration projects

x x x x x

Expand participation with South Central New Mexico Stormwater Coalition x x x x xSeek partnership to develop further E. coli source identification from Courchesne Bridge to above the Anthony 225 Bridge “hotspot area”

x

Project ImplementationSelect implementation project (site selection, management measures, implementation schedule, and estimated load reduction goal derived from WBP)

x x x

Secure funding xBegin project implementation – hire contractors, purchase equipment, etc. xMonitor implementation schedule for progress x x x xReport project results, evaluate project success, and make recommendations x x x xStakeholder EngagementSeek increased participation in Council from larger stakeholder community x x x x xContinue stakeholder workgroup meetings twice a year x x x x xOutreachMaintain www.pdnwc.org with dedicated section on E. coli impairment and restoration projects

x x x x x

Develop and disseminate outreach materials to address illegal waste disposal in agricultural drains

x x x

Provide biannual updates to the USiBWC Rio Grande Citizens Forum as requested x x x x xParticipate in at least one community outreach event annually to promote healthy watersheds, restoration activities, and Council awareness (Earth Day, Raft the Rio, Dia del Rio, etc.)

x x x x x

Table 12: General Implementation Schedule to track progress in accomplishing primary tasks.

The following general implementation schedule (Table 12) was developed to encompass the primary tasks set out in this watershed plan. It includes a series of action items to obtain funding, implement projects and disseminate information. Any action selected for implementation for all years is already in place and ongoing.

49

Page 60: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

chapter 8

The general implementation schedule was developed to provide a framework to implement the watershed plan while recognizing the difficulites in scheduling long term committments in a changing economy. The PdNWC is a non-profit organization without a stable funding stream. Funds are dependant on the aquisition of grant money from a variety of sources. However, the Council membership is comprised of a variety of stakeholders including representatives of governmental agencies including, but not be limited to, the EBID, City of Las Cruces, Doña Ana County, the South Central New Mexico Stormwater Coalition, and the USIBWC. Securing funding is imperative to the success of project implementation, and grant writing to secure funds takes priority in the general implemen-tation schedule. Additional specific projects will be identified as needed and implementation will be conducted following procurement of funding.

Schedule and Measurable Milestones for Specific Implementation ProjectsThe Executive Committee of the Council meets on a regular basis and will be responsible for tracking the progress of the implementation schedule and meeting the measurable milesones. A standing item on the agenda are reports from sub-committees. The Council will use the reports submitted by the Technical Committee and the Clean Wa-ter Committee to track the implementation of this watershed plan.

Oversight of the progress of implementing the general plan and specific projects is imperative to assure success of this plan. Tracking the implementation progress will provide information for a feedback loop to address general deficiencies in the plan as well as the progress of specific projects. To track the progress of the specific projects that have associated load reductions for E. coli that were presented in Chapter 5, a schedule with measurable milestones was developed (Table 13). Monitoring in this instance is intended to address project progress toward implement-ing the management measure and does not refer to measuring project efficacy.

50

Management Measure Project Design

Secure Funding

Begin Project

Begin Monitoring

Project Completion

WWTP Upgrade(s)North Sunland Park WWTP1 2013 2014 2015 2014 2016South Central Regional WWTP 2016 2016-2018 2018 2016 2021Constructed WetlandMesquite Drain1 2014 2015 2015 2015 2018Montoya Drain 2015 2016 2017 2016 2019Constructed Wetland for Main Sunland Park WWTP2 2014 2 2 2 2

Dairy Waste Management-Manure Digester 2012 20133 3 3 3

Combined Enforcement Activities 2013 2013 2013 n/a n/aOutreachDevelop targeted stakeholder outreach materials addressing illegal waste disposal in agricultural drains

2014 2015 2015 2014 2015

Disseminate outreach materials developed to ad-dress illegal waste disposal in agricultural drains n/a 2015 2015 2015 2015

Seek partnership to develop further E. coli source identification from Courchesne Bridge to above the Anthony 225 Bridge “hotspot” area

2015 2016 2017 2017 2020

Table 13: Schedule and measurable milestones for specific Implementation Projects.1 Both the North Sunland Park WWTP and the Mesquite Drain Project have completed project designs. The North Sunland Park WWTP has secured funding and is in final stages of public outreach and design approval. 2 Conceptual design has been completed. Securing funding has not been forthcoming, but efforts have continued.3 NWQI funding for infrastructure was secured in 2013. Securing funding for the digester has stalled, but efforts continue.

Page 61: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

chapter 9 EVALUATioN CRiTERiA AND monItorInG pLan

The goal of this watershed based planning effort is to address the bacteriological impairment of E. coli and meet the New Mexico water quality standards for the Rio Grande in southern New Mexico. To attain this goal, measurable milestones were developed (Chapter 8). A set of evaluation criteria and a monitoring program were developed to monitor progress toward achieving the goals and objectives outlined in this WBP.

Evaluation CriteriaThe following evaluation criteria have been developed to determine if the project objectives are making progress toward meeting the overall goal.

• Implementation Project Oversight – Was the management measure implemented as intended and designed?• Mitigation Performance – What was the percent efficiency/effectiveness of the management measure toward

meeting load reduction expectations for that practice?• Mitigation Performance – What was the percent reduction in E. coli loading for a particular management

measure relative to the TMDL target load? • Mitigation Performance – If applicable-What was the performance of a management measure relative to

other measures? Which are most efficient and economical?• Watershed-Based Plan Performance – Are the prescribed management measures being implemented and

performing as expected?• Overall Load Reduction – What is the combined impact of the implemented management measures? Have

the combined management measures reduced the E. coli loading down to the target TMDL load?

Periodic assessment of the implementation of The Paso del Norte Watershed Based Plan – Mitigation Measures to Reduce Bacterial Pollution in the Rio Grande will determine the progress toward attaining the goal of meeting the state water quality standard for E. coli in the Rio Grande in southern New Mexico. This assessment will also be used to determine the strong points and weaknesses of the WBP and provide the information necessary to make changes and improvements to facilitate success in meeting the project goal. The Executive Committee of the Council will utilize the Evaualtion Criteria in conjunction with the Implementation Schedule and Milestones to track progress through reporting from the Technical and Clean Water subcommittees.

Monitoring Program Goals and ObjectivesThe goal of the monitoring plan is to determine if The Paso del Norte Watershed Based Plan – Mitigation Measures to Reduce Bacterial Pollution in the Rio Grande is achieving the goal of reducing the bacteriological impairment of E. coli in the Rio Grande in southern New Mexico. The monitoring should also continue to complement and, where practicable, coordinate with the assessment monitoring conducted by NMED. The following set of objectives is identified to facilitate development of the monitoring program.

• Continue the baseline monitoring program. • Continue to delineate the sources of E. coli at a higher resolution to assist in further development of management measures.• Monitor for effectiveness of implementation of the prescribed management measures of the WBP.• Provide sufficient data to evaluate implementation of the WBP and provide the appropriate information to modify the WBP where needed.• Provide sufficient quality data to meet the above objectives.

51

Page 62: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

chapter 9

Modify Current Monitoring EffortsThe current E. coli monitoring effort began in 2008 for routine monitoring of select sites. The sampling stations were chosen to target potential inflows of E. coli into the main stem of the Rio Grande. Each river station was lo-cated at a stream gaging station and chosen to provide good spatial distribution. The drain sampling stations were chosen to provide data on perennial inflows into the river. Many of the drain sampling stations are also co-located with a stream gage. This provided flow measurements to evaluate pollutant loading. The recommended monitor-ing program is a continuation of that effort. A component of this monitoring effort should also be to continue to coordinate with the sampling efforts of the USIBWC Texas Clean Rivers Program sites from Anthony, New Mexi-co, to the American Dam in El Paso, Texas.

While it is recommended that the mainstem Rio Grande sampling sites be retained for the monitoring program to capture changing hydrologic conditions in the watershed, the monitoring program should be updated to include more intensive monitoring in the hotspot areas that were identified. This includes East Drain, Mesquite Drain, and Montoya Drain. This will provide greater resolution to the E. coli loading within these areas. The objectives of this monitoring effort are outlined in Table 14.

The current E. coli monitoring effort was initially conducted under the guidance of NMED and the NMED Quality Assurance Project Plan (QAPP). This was followed by the development of a project specific QAPP which describes the sampling stations and rationale, the monitoring frequency, sampling procedures and data management (Ap-pendix II). A preliminary task would be to update the QAPP to address changes to the water quality objectives.

The routine monitoring should continue indefinately as long as funding is available. Once results have been through the QA process, all monitoring data should be shared with NMED and the Texas Clean Rivers Program annually.

Monitoring Targeted Management MeasuresMonitoring the targeted management measures is critical to determining if mitigation efforts are reducing the E. coli pollutant loading as intended. This may involve two different types of assessments: first, to determine if the management measure is functioning as intended and producing the intended results; second, to determine the

52

Objective Question Outcome Decision CriteriaDetermine the primary sub-watersheds where E. coli loading is likely to originate (spatial).

Have the geographic sources of E. colibeen adequately identified?

Identification of the sub-watersheds contributing to the E. coli impairment.

Are the data sufficient to support geographic identification of E. coli loading?

Determine the seasonal conditions when increased E. coli loading occurs (temporal).

Have the temporal trends for E. colidistribution been identified?

Comparison of E. coliloading between wet versus dry conditions (ie storm events).

Are the data sufficient to determine seasonal trends for E. coliloading?

Determine the percent contribution of E. coliloading from both spatial and temporal sources.

Have the percent contribution of E. coliloading from spatial and temporal trends been identified?

Estimates of E. coliloading from identified sub-watersheds under both wet and dry conditions.

Are the data sufficient to estimate E. coliloading from the identified sources?

Further characterize the spatial distributionof E. coli within the “hotspot” area.

Has the spatial distribution of E. coliwithin the “hotspot”area been identified?

Identification of the distribution of E. coliwithin the “hotspot”area.

Are the data sufficient to determine the distribution of E. coliwithin the “hotspot”area?

Table 14: Monitoring objectives for a modiifed routine monitoring program.

Page 63: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

chapter 9

contribution the management measure is making to the overall reduction to E. coli loading to the Rio Grande. In conjunction with the routine sampling data, this information can then be used to determine if the prescribed amanagment measures are achieving the goal of reducing the bacteriological impairment of E. coli in the Rio Grande in southern New Mexico. Given the diversity of the targeted management measures an array of approach-es is recommended to determine efficacy of a specific management measure. This will include, but not be limit-ed to: monitoring for E. coli upstream and downstream of the implementation project, monitoring flow (where applicable) upstream and downstream of the project area, and evaluation of the load reduction produced by the mitigation measure. The following components of monitoring targeted management measures is recommended:

• Evaluate the DMRs of the WWTPs following facility replacement or upgrade.• Monitor the river for E. coli below WWTP discharge points.• Monitor the E. coli load above and below constructed wetlands to assess their efficacy.• Follow the progress of the manure digestor project and the number of participating producers.• Record the number of enforcement actions and assess the results of subsequent mitgation plans.• Track distribution of stakeholder outreach materials addressing illegal waste disposal in agricultural drains.

Monitoring of targeted management measures should last no fewer than three years following implementation. Once results have been through the QA process targeted monitoring data should be shared with NMED and the USIBWC Texas Clean Rivers Program.

Higher Resolution E. coli Monitoring- RecommendationsIt is clear there are still still data gaps concerning E. coli pollution in the drainage system, especially in the south-ern end of the watershed where elevated levels of E. coli seem more persistent. There is not currently funding to support recommended efforts to fill these data gaps. Several approaches are recommended by the stakeholder working group. should funding become available.

Level IAn initial strategy would be to conduct a thorough ground survey inspecting the drains for unauthorized discharge of waste, which may be in the form of actual dedicated discharge locations (pipes) and illegal waste disposal sites. Depending on the level of funding available, this should also include a survey of all the drains on both sides of the Rio Grande between Mesquite, New Mexico, and Corchesne Bridge in El Paso, Texas. Once potential sources have been identified, the locations should be mapped and a further mitigation strate-gy developed to include educational outreach, cleanup, and possibly enforcement of violators. To accompany this program, bimonthly E. coli sampling May through October is recommended to determine if mitigation measures are effective. Depending on the level of monitoring frequency, this preliminary approach would require little technical assistance and a relatively low level of funding.

Level IIA second, more expensive and technically challenging approach would be to develop a more intensive E. coli survey to include a refined source tracking analysis. Initial sites should be selected longitudinally along the East and Mesquite drains starting just above the confluence with the Rio Grande below Anthony, Texas, and sampled for E. coli. Identified “hotspots” would be sampled for further source tracking analysis to obtain a higher resolution than prior efforts. Additional sampling sites should also include select points along the riv-er from above the New Mexico 225 Bridge in Anthony downstream to the Rio Grande at El Paso USGS gage at Courchesne Bridge. Depending on the level of funding available, sampling for E. coli is recommended in each of the drains in the southern end of the New Mexico portion of the Rio Grande just upstream of each drain

53

Page 64: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

confluence with the river.

Level IIIA study should also be conducted on the sediments of the East Drain to determine if there is a viable popu-lation of E. coli present. If E. coli is surviving and reproducing in the sediments, as studies have suggested in other areas (Hardina and Fujioka 1991; Fujikoa 1999; Ishii et al. 2006; Byappanahalli et. al. 2012), then the potential for E. coli effluxing into the water column exists (Garzio-Hadzick et al. 2010). If this is occurring, it could have a profound impact on mitigation.

54

Page 65: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

55

REFERENCESAckerly, Neal, 1992. Irrigation systems in the Mesilla Valley : An Historical Overview. Center for Anthropological Research New Mexico State University, Las Cruces, New Mexico.

Brzozowski, Carol, 2012. Rain Garden Monitoring in Stormwater. The Journal for Surface Water Quality Professionals. Vol. 13, No 5, Forester Media Inc, Santa Barbara, California.

Byappanahalli, Muruleedhara N; Yan, T; Matthew, J. H.; Ishii, S.; Fujioka, R.S.; Whitman, R.L.; and M.J. Sadowsky, 2012. The population structure of Escherichia coli isolated from subtropical and temperate soils. USGS Staff Published Research. Paper 505.

Canavan, Allie, 2012. Low Impact Development in the Southwest. Clearing the Waters Newsletter. Vol. 15 No. 2. Summer 2010. New Mexico Environment Department, ftp://ftp.nmenv.state.nm.us/www/swqb/WPS/CTW/ClearingTheWaters-Summer2010.pdf

Clary, Jane, Jones, J.; Urbonas, B; Quigley, M.; Strecker, E. and Todd Wagner, 2008. Can Stormwater BMPs Remove Bacteria? New Findings from International Stormwater BMP Database. Stormwater: The Journal for Surface Water Quality Professionals. Vol. 9, No 3, Forester Media Inc, Santa Barbara, California.

City of Las Cruces, 2011. One Valley, One Vision 2040: Doña Ana County, New Mexico Regional Plan. http://www.las-cruces.org/code/vision_2040/documents/plan.pdf

Cudia, Chris. 2012. “Best” Best Management Practices. Clearing the Waters Newsletter. Vol. 17 No. 1. Summer 2010. New Mexico Environment Department. ftp://ftp.nmenv.state.nm.us/www/swqb/WPS/CTW/ ClearingTheWaters-Summer2012.pdf

Doyle, Michael, P. and Marilyn C. Erickson. 2005. Closing the Door on the Fecal Coliform Assay. Microbe/ Vol. 1, No. 4.

Ernst, A.E., S. Schrader, V. Lopez, J. Prior-Magee, K. Boykin, B. Thompson, D. Schrupp, L. O’Brien, W. Kepner, K. Thomas, and J. Lowry. 2007. Land Stewardship. Chapter 4. In: J.S. Prior-Magee, K.G. Boykin, D.F. Bradford, W.G. Kepner, J.H. Lowry, D.L. Schrupp, K.A. Thomas, and Bruce C. Thompson (eds). Southwest Regional Gap Analysis Final Report. U.S. Geological Survey, Gap Analysis Program, Moscow, ID (2007).

Fujioka R, Sian-Denton C, Borja M, Castro J, and K. Morphew. 1999. Soil: the environmental source of Escherichia coli and enterococci in Guam's streams. J Appl Microbiol Symp Suppl 1999;85:83S–9S.

Garzio-Hadzick, A., Shelton, D.R., Hill, R.L., Pachepsky, Y.A., Guber, A.K., and R. Rowland. 2010. Survival of manure-borne E. coli in streambed sediment: Effects of temperature and sediment properties. Water Research 44 (9), pp. 2753-2762.

Hardina CM, and R. S. Fujioka. Soil: the environmental source of Escherichia coli and enterococci in Hawaii's streams. Environ Toxicol Water Qual 1991;6:185–95.

Ishii S, Ksoll WB, Hicks RE, and Sadowsky. 2006. Presence and growth of naturalized Escherichia coli in temperate soils from Lake Superior watersheds. Appl Environ Microbiol 2006a;72:612–21.

Hawley, John. 2004. Creation of a digital hydrogeologic framework model of the Mesilla Basin and southern Jornada del Muerto Basin. New Mexico Water Resources Research Institute, New Mexico State University. Technical Completion Report #332.

Kasperson, Janice, 2013. Too Much or Too Little. Stormwater: The Journal for Surface Water Quality Professionals. Vol. 14, No 2, Forester Media Inc, Santa Barbara, California.

Kelly, Pat. 1986. River of Lost Dreams : Navigation on the Rio Grande. University of Nebraska Press, Lincoln Nebraska. 149 p.

Page 66: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

56

King, J. Phillip and Julie Maitland. 2003. Water for River Restoration: Potential for Collaboration between Agricultural and Environmental Water Users in the Rio Grande Project Area. Report Prepared for the World Wildlife Fund. http://www.globalrestorationnetwork.org/uploads/files/LiteratureAttachments/470_water-for- river-restoration---rio-grande-project-area.pdf

Las Cruces, 2011. www.las-cruces.org/code/vision_2040/documents/plan.pdf 2011

Pérez de Luxán, Diego. 1929. Expedition into New Mexico made by Antonio de Espejo, 1582-1583, as revealed in the journal of Diego Pérez de Luxán, a member of the party. Translated, with introd. and notes, by George Peter Hammond and Agapito Rey. The Quivera Society, Las Angeles, California.

New Mexico Environment Department. 2007. Total Maximum Daily Load (TMDL) for the Main Stem of the Lower Rio Grande (from The International Boundary with Mexico to Elephant Butte Dam). ftp://ftp.nmenv.state.nm.us/www/swqb/LRG/TMDL/LowerRioGrandeTMDL.pdf

New Mexico Environment Department. 2012. Standards for Interstate and Intrastate Surface Waters, New Mexico Water Quality Control Commission, 20.6.4 NMAC, November 20, 2012).

Smith, Geoffrey B. Bacterial Source Tracking Study in the Cimarron New Mexico Watershed May, 2007. http://www.cimarronwatershed.org/info/AnnualReport2007_pp_1-24.pdf

Stotz, Nancy G., 2000. Historic Reconstruction of the Ecology of the Rio Grande/Rio Bravo Channel Floodplain in the Chihuahuan Desert. Chihuahuan Desert Program, World wildlife Fund. http://bva.colech.edu.mx/xmlui/bitstream/handle/123456789/HASH011881a4ea6f4251ce76a0ad/bio020.pdf?sequence=3

Tetra Tech, 2004. A Manual of Conservation Practices to Reduce Pollution Loads Generated from Nonpoint Sources. http://smiley.nmsu.edu/pdnwc/docs/BMPImplementationAppendix.pdf.

U.S. Census 2010. http://www.census.gov/2010census/data/

USEPA. 2001. Protocol for Developing Pathogen TMDLs. First Edition. United States Environmental Protection Agency, Office of Water, Nonpoint Source Control Branch, Washington D.C. 20460. EPA 841-R-00-002. http://www.epa.gov/owow/tmdl/pathogen_all.pdf

USEPA. 2005. Microbial Source Tracking Guide Document. United States Environmental Protection Agency, Office of Research and Development, Cincinnati, Ohio. EPA/600-R-05-064. http://twri.tamu.edu/docs/ bacteria-tmdl/epa%20mstguide%206-05.pdf

USEPA. 2008. Handbook for Developing Watershed Plans to Restore and Protect Our Water United States Environmental Protection Agency, Office of Water, Nonpoint Source Control Branch, Washington D.C. 20460. EPA 841-B-08-002. http://water.epa.gov/polwaste/nps/handbook_index.cfm

USEPA. 2012. Identifying and Protecting Healthy Watersheds: Concepts, Assessments and Management Approaches United States Environmental Protection Agency, Office of Water, Office of Wetlands, Oceans and Watersheds, Washington D.C. 20460. EPA 841-B-11-002. http://water.epa.gov/polwaste/nps/watershed/upload/hwi-watersheds-complete.pdf

Varma, Jay K., Greene K.D., Reller M.E., DeLong S.E., Janine Trottier, J., Nowicki, S.F., DiOrio, M., Koch, E. M., Bannerman, T.L., York, S.T., Lambert-Fair, M, Wells, J.G. and P.S. Mead. 2003. An Outbreak of Escherichia coli O157 Infection Following Exposure to a Contaminated Building. The Journal of the American Medical Association.Vol. 290. N0 20. pp 2709-2712.

Wilson, S.C., Morrow-Tesch, J., Straus, D.C., Cooley, J.D., Wong, W. C., Mitlohner, F.M., and J.J. Mcglone. 2002. Airborne Microbial Flora in an Cattle Feedlot. Applied and Environmental Microbiology, Vol. 68, No. 7 p. 3238-3242.

Page 67: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

APPENDIX I

57

ESTIMATING POLLUTANT LOADS

Pollutant loading estimates for E. coli were determined by several methods. Actual estimated daily loads for the Sunland Park, and South Central Regional WWTPs were calculated from direct measurements collected from the facility outfalls during the 2011 NMED survey. Pollutant load estimations allowed under the NPDES permit were calculated for Sunland Park, and South Central Regional WWTPs. Daily loads were estimated for cattle, sewage, pet and horse sources in the East Drain as well as horse sources in Montoya Drain. The estimated daily loads for the East Drain were calculated from data collected during the source tracking study. The estimated daily loads for Montoya Drain were calculated utilizing agricultural census statistics and ground truth survey-ing. Estimates were determined utilizing methods outlined in the Protocol for Developing Pathogen TMDLs (EPA, 2001).

Relevant Unit Conversions

1 gallon = 0.134 cubic feet 1 mL =0 .000264 gallons 100 mL = 0.0264 gallons

WWTP daily discharge flows

Sunland Park (2.0 MG/day)(3785mL/gal) = 7.57 x 109 mL/day

South Central Regional (1.05 MG/day)(3785 mL/gal) = 3.97 x 109 mL/day

NPDES Permit Limits for each WWTP

Sunland Park (7.57 x 109 mL/day)(126 cfu/100mL) = 9.54 x 109 cfu/day

South Central Regional (3.97 x 109 mL/day)(126 cfu/100mL) = 5.00 x 109 cfu/dayEstimates of Actual Load for each WWTPSunland Park exceeded E. coli standard four out of six times (3 at 2,420, 1 at 1,203)

=avg 1,410 cfu/100mLSouth Central Regional exceeded E. coli standard three out of six times at 2,420 cfu/100mL =avg 1,210 cfu/100mL

Assuming a conservative number of half the observed discharge from the limited samples collected at each facility and the equation (discharge)(observed cfu/100mL)(0.5) = cfu/day

Sunland Park (7.57 x 109 mL/day)(1,410 cfu/100mL)(0.5) = 5.34 x 1010 cfu/day

South Central Regional (3.97 x 107 mL/day)(1,210 cfu/100mL)(0.5) = 2.40 x 1010cfu/day

East Drain (actual load from BST study) = 2.81 x 1012 cfu/day

Cattle (14%)(2.81 x 1012 cfu/day) = 3.93 x 1011 cfu/day

Sewage (13.3%)(2.81 x 1012 cfu/day) = 3.74 x 1011 cfu/day

Pets (7.1%)(2.81 x 1012 cfu/day) = 2.00 x 1011 cfu/day

Horse (12%)(2.81 x 1012 cfu/day) = 3.37 x 1011 cfu/day

Page 68: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

Estimated E. coli Load from Dairies

Assumptions

One dairy cow produces 1 x 1011 cfu/day (fecal coliform) Thereis≈50%E.coli in fecal coliform/cow (EPA 2002, Doyle and Erickson, 2006). Thereare≈20,000dairycowsalong“dairyrow” Therefore (20,000)(1 x 1011)(0.5) = E.coli/day = 1.00 x 1015 cfu/day Assume 0.01% of the E. coli is transmitted to drain (2 cows) = 1.00 x 1011 cfu/day

Estimated Horse E. coli l load (Montoya Drain) There have been observed discharges of horse fecal material into Montoya Drain in the vicinity of the racetrack. There are two bridges leading from paddocks to the track over Montoya Drain w/o BMPs. Washing of blankets and other racing equipment discharged to street then to drain.

Assumptions

2,206 horses in Dona Ana County (NMDA Census, 2007) Primary concentration (75%) of horses is in the vicinity of the racetrack (1,655). Fecal material from 0.15% (2.5) horses/day discharged to Montoya Drain.One horse produces 4.2 x 108 cfu/day (fecal coliform)Thereis≈50%E. coli in fecal coliform (EPA 2002, Doyle and Erickson, 2006).

Horse Fecal Load/day = (4.2 x 108)(2.5)(0.5) = 5.25 x 108 cfu/day

POTENTIAL LOAD REDUCTIONS FROM MANAGEMENT MEASURES

Load Reduction from WWTP Upgrades

(estimated load from sampling)-(permit limit)

Sunland Park = 4.39 x 1010 cfu/day

South Central Regional = 1.90 x 1010 cfu/day

\Constructed Wetland (East Drain) (Assume 25% efficiency)

Total Load (total load)(0.25) = (2.81 x 1012)(0.25) = 7.0 x 1011 cfu/day

Cattle Load (% cattle load)(0.25) = (3.93 x 1011)(0.25) = 9.83 x 1010 cfu/day

Sewage Load (% sewage load)(0.25) = (3.74 x 1011)(0.25) = 9.35 x 1010 cfu/day

Pets (% pets load)(.25) = (2.00 x 1011)(0.25) = 5.00 x 1010 cfu/day

Horse (% horse load)(0.25) = (3.37 x 1011)(0.25) = 8.43 x 1010 cfu/day

Constructed Wetland (Montoya Drain) (Assume 25% efficiency)

Horse Load (Equine load)(0.25) = (5.25 x 108 cfu/day)(0.25) = 1.31 x 108 cfu/day

58

Page 69: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

59

Constructed Wetland (Sunland Park WWTP) (Assume 25% efficiency)

Sunland Park WWTP (5.34 x 1010 cfu/day)(0.25) = 1.34 x 1010 cfu/day

Enforcement and Stakeholder Outreach

To date all enforcement activities have involved horse manure. Any positive effects from this BMP would like-ly have a larger impact, but only E. coli from horses is considered. A conservative estimate on load reduction assumes decreasing the load by 2 horses/day utilizing the following equation:

(4.2 x 108)(2)(0.5) = 4.2 x 108 cfu/day

Page 70: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

APPENDIX II

60

Project Quality Assurance Project Plan

Water Quality Monitoring to Determine Pollutant Loading Sources

for the

Paso del Norte Watershed Based Plan Project

Clean Water Act Section 319 Grant No. C9-996101-13

Submitted by

New Mexico Environment Department

Surface Water Quality Bureau

APPROVAL PAGE

Chris Canavan

Project officer, SWQB Watershed Protection Sectiondate

tim michael

interim Quality Assurance officer, SWQBdate

Abe Franklin

Program Manager, SWQB Watershed Protection Sectiondate

Sharon Daugherty

Environmental Protection Specialist, WQPD, EPA Region 6date

Curry Jones

Chief, State and Tribal Programs Section, WQPD, EPA Region 6date

Page 71: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

TABLE OF CONTENTS

APPROVAL PAGE .........................................................................................................................................iTABLE OF CONTENTS ..............................................................................................................................iiiACRONYMS ...............................................................................................................................................iv

1.0 PROJECT MANAGEMENT ...............................................................................................................11.1 Distribution List ..............................................................................................................................1

Table 1 .............................................................................................................................................11.2 Project Organization .......................................................................................................................2

Figure 1 ............................................................................................................................................21.3 Problem Definition/Background ......................................................................................................31.4 Project/Task Description .................................................................................................................3

Figure 2 ............................................................................................................................................4Table 2 .............................................................................................................................................5Table 3 .............................................................................................................................................6

1.5 Quality Objectives and Criteria for Measurement Data ...................................................................71.6 Special Training/Certification ..........................................................................................................71.7 Documents and Records ..................................................................................................................7

2.0 DATA GENERATION AND ACQUISITION .......................................................................................82.1 Sampling Design ..............................................................................................................................82.2 Sampling Methods ...........................................................................................................................82.3 Sample Handling and Chain of Custody ..........................................................................................82.4 Analytical Methods ..........................................................................................................................82.5 Quality Control ...............................................................................................................................92.6 Instrument/Equipment Testing, Inspection and Maintenance ...........................................................92.7 Instrument Calibration and Frequency ...........................................................................................92.8 Data Management ...........................................................................................................................9

3.0 ASSESSMENT AND OVERSIGHT .................................................................................................103.1 Assessment and Response Actions ..................................................................................................103.2 Reports to Management ................................................................................................................10

4.0 DATA VALIDATION AND USABILITY ............................................................................................104.1 Data Review, Validation and Verification .......................................................................................104.2 Validation and Verification Methods ..............................................................................................104.3 Reconciliation with User Requirements .........................................................................................10

5.0 REFERENCES ..................................................................................................................................11

61

Page 72: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

ACRONYMS

EBiD Elephant Butte irrigation District

E. coli Escherichia coli

EPA Untied States Environmental Protection Agency

MST Microbial Source Tracking

NMED New Mexico Environment Department

PQAPP Project Quality Assurance Project Plan

QA Quality Assurance

QAo Quality Assurance officer

SWQB Surface Water Quality Bureau

TMDL Total Maximum Daily Load

WQPD Water Quality Protection Division

62

Page 73: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

1.0 PROJECT MANAGEMENT

1.1 Distribution List

table 1

Distribution List and Project Roles and Responsibilities

name organization Title/Role Responsibility Contact informationabe Franklin SWQB WPS Program

Manager

Reviewing and approving PQAPP, managing project personnel and resources

(505) 827-2793

[email protected]

Bessie SWQB office and Admin Supervisor Maintaining project files

(505) 827-0584

[email protected] michael SWQB interim QA officer Reviewing and approving

PQAPP

(505) 476-3799

[email protected]

chris Canavan SWQB Project officer

Preparing PQAPP, project reporting, coordinating with contractors.

(575) 647-7926

[email protected]

hilary Brinegar* nmda

Water and Natural Resource Policy specialist

Project oversight, project reporting, coordinating with contractors and report writing.

(575) 646-2642

[email protected]

James Narvaez* eBId Hydrology Director

oversee water quality sampling team in data collection and record keeping, submitting reports.

(575) 526-6671 (ext 430)

[email protected]

Patrick Lopez* eBId SCADA Supervisor,

Hydrology Dept Supervise water quality sampling team

(575) 526-6671 (ext 431)

[email protected]

Sharon daugherty epa

Environmental Protection Specialist

WQPD, Region 6Reviewing and approving PQAPP

(214) 665-2259

[email protected]

Curry Jones epa

Chief, State and Tribal Programs Section

WQPD, Region 6Reviewing and approving PQAPP

(214) 665-6793

[email protected]

*The Project Officer will require those marked with and asterisk to sign the PQAPP Acknowledgement Statement.

63

Page 74: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

1.2 Project Organization

The Bureau QMP (NMED/SWQB 2009) documents the independence of the QAO from this project. The QAO is responsible for maintaining the official approved PQAPP.

Figure 1

Organization Chart

Paso del Norte Watershed Based Plan Monitoring Project

Glenn Saums

Acting Chief

SWQB

Abe Franklin

Program Manager

SWQB/WPS

Tim Michael

Interim QA Officer

SWQB

Chris Canavan

Project Officer

SWQB

Bessie Muzumdar

Office and Admin Supervisor

SWQB

James Narvaez

Hydrology Director

EBID

Hilary Brinegar

Water and Natural Resource Policy Specialist

NMDA Patrick Lopez

SCADA Supervisor

Hydrology Department

EBID

Curry Jones

Chief

State and Tribal Programs WQPD

EPA Region 6

Sharon Daugherty

Environmental

Protection Specialist WQPD

EPA Region 6

64

Page 75: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

1.3 Problem Definition/BackgroundThis PQAPP documents the quality requirements for Water Quality Monitoring to Determine Pollutant Loading Sources for the Paso del Norte Watershed Based Plan Project.

When changes affect the scope, implementation or assessment of the outcome, this PQAPP will be revised to keep project information current. The Project officer, with the assistance of the QA officer, will determine the impact of any changes on the technical and quality objectives of the project. This Project Plan will be reviewed annually by the Project officer to determine the need for revision.

Objective

The objectives of the environmental monitoring are to identify the primary spatial and temporal locations of Escherichia coli (E. coli) impairment in the El Paso-Las Cruces Watershed (USGS HUC 13030102), to estimate the associated pollutant loading from those locations and to identify the host organisms.

Background

The El Paso-Las Cruces Watershed was surveyed by the SWQB Monitoring and Assessment Section in 2004 as part of an intensive water quality survey of the lower Rio Grande in New Mexico. As a result of this survey, a Total Maximum Daily Load (TMDL) for E. coli was developed for the main stem of the Rio Grande from the New Mexico-Texas state line at the international boundary with Mexico, upstream to one mile below Caballo Reservoir. While this survey resulted in a TMDL, the scope of the assessment was not sufficient to specifically identify the sources of E coli on either a spatial or temporal scale, or from which hosts the E. coli emanated.

in 2005, the Paso del Norte Watershed Council applied for a grant to develop a watershed plan to address the E. coli impairment. This portion (Phase i) of the Paso del Norte Watershed Based Plan was completed in December 2007. This effort, which included an extensive review of existing data, identified data gaps that indicated a need for a water quality survey designed to further delineate the E. coli sources.

in 2008, the New Mexico Department of Agriculture on behalf of the Paso del Norte Watershed Council submitted the Work Plan for Phase ii of the Paso del Norte Watershed Based Plan (Phase ii WBP). The objective of this phase, as stated under Section 7, Project Description, Addressing Water Quality Data Gaps, is as follows:

The objective of the Phase ii WBP process is to identify more specifically the subbasins or areas within the watershed that may be contributing to the water quality exceedance.

As a result, a water quality survey was initiated to examine the potential inputs of E. coli into the main stem of the Rio Grande in south central New Mexico below Caballo dam. The sampling outlined in the FSP is part of that effort.

1.4 Project/Task Description

Description

Sites will be sampled monthly or quarterly for the purpose of determining spatial and seasonal variability in E. coli due to events such as storms, drought, manure application, etc. During the monsoon months of July through october, when runoff is expected to be greatest, additional sampling will occur as the opportunity arises. Data collected in the first year will be used to adjust the sampling program in the second year to focus on hotspots. Samples will also be collected to estimate pollutant loadings and to identify the host organisms.

65

Page 76: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

Location

Figure 2

66

Page 77: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

Schedule

table 2

Sampling Schedule

ActivitySpring 2010

Summer 2010

Fall

2010Winter

2010-2011Spring 2011

Summer 2011

Fall

2011Winter

2011-2012Spring 2012

Data collection & submittal of samples for analysis.

============================►

Data Verification & Validation, Assessment of data

============================►

Sampling will continue through October 2011 with monthly samples collected from seven stations in the Rio Grande from Caballo Dam to Sunland Park, and quarterly from seven stations in agricultural drains along the same reach. Drain samples will be collected quarterly (July, October, January, and April) from 12 stations. The stream gauge data will provide accurate flow measurements that will be utilized to calculate the pollutant load at a given station. Additional opportunistic sampling may occur during the summer monsoon season in major ephemeral drainages, or within the river downstream of the point at which the flow enters the river.

The above sampling scheme will be utilized for the duration of the project. However, following the first year of sampling and an initial analysis of the data, four stations will be identified for analysis with microbial source tracking (MST) techniques. Sampling of these stations will be more rigorous and increased sampling events will take place during the monsoon season of 2011. For each sampling event at each of these stations, five samples will be taken five minutes apart to give five replicate analyses for each event.

67

Page 78: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

Sampling Stations and Rationale

Sampling stations were chosen to target potential inflows of E. coli into the main stem of the Rio Grande. All river stations are located at a stream gauging station and were chosen to provide good spatial distribution. The drain sampling stations were chosen to provide data on the primary perennial inflows into the river. The sampling points in the drains will be located upstream of the confluence with the Rio Grande and most all the drain sampling stations are also co-located with a stream gauge. Opportunistic samples will also be collected following intense thunderstorms during the summer monsoon season in an attempt to capture storm flow in ephemeral drainages. Four locations will be chosen for sampling during the summer of 2011 for MST analysis.

table 3

Station Locations and Rationale

Station Name Type Location Station Rationale

Caballo Dam Cable river

n 32.884608

W 107.292800 Located at the top of the watershed.

Garfield Drain Drain

n 32.750100

W 107.269000 Perennial tributary

Hatch Drain Drain

n 32.657008

W 107.130710 Perennial tributary

Rincon Drain Drain

n 32.656833

W 107.068942 Perennial tributary

Haynor Bridge river

n 32.613417

W 107.020450 Downstream of three major drain inflows.

Leasburg cable river

n 32.476992

W 106.919769 Located at the break between the NMED assessment units.

Seldon Drain Drain

n 32.471530

W 106.893160 Perennial tributary

Picacho Bridge river

n 32.296258

W 106.824186 Above the Las Cruces WWTP

mesilla dam river

n 32.210194

W 106.771786 Below Las Cruces and Mesilla

Picacho Drain Drain

n 32.248700

W106.822200 Perennial tributary

Del Rio Drain Drain

n 32.104017

W 106.893160 Perennial tributary

La Mesa Drain Drain

n 32. 043311

W 106.662878 Perennial tributary

Anthony Bridge river

n 32.999500

W 106.636222 Below Anthony WWTP, and two major drain discharges

East Drain Drain

n 32.002131

W 106.609131 Perennial tributary

Anthony Drain Drain

n 31.999620

W106.627033 Perennial tributary

Newmexas Drain Drain

n 31.945836

W 106.628535 Perennial tributary

West Drain Drain

n 31.853297

W 106.622119 Perennial tributary

Montoya Drain Drain

n 31.806150

W106.552011 Perennial tributary

Sunland Park river

n 32.799119,

W 106.556.397 Bottom station on the reach, and below the Sunland Park WWTP

68

Page 79: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

1.5 Quality Objectives and Criteria for Measurement Data

Question/Decision

The questions to be answered by the sampling are: For E. coli, what are the spatial and temporal locations of high concentrations, what is the loading from the major source locations, and what are the host organisms?

The decision is whether or not the subbasins or areas within the watershed that may be contributing to the water quality exceedance have been adequately identified. More specifically:

• Have the locations been identified adequately to determine spatial distribution on a large scale (urban, rural, rangeland) and to a smaller scale or “hotspots” (subwatersheds, drains, 12 digit HUC, etc.)?

• Have temporal trends of E. coli distribution been identified?

• Has sufficient information been collected to estimate the loading of E. coli from the identified “hotspots”?

• Have the sources within specific” hotspots” been identified adequately to determine the activity or host organism that is generating the E. coli?

Data Quality Objectives

1. The data quality of the E. coli sampling will be sufficient to answer the study question; that is, the data quality will be sufficient to identify the spatial and temporal locations of high concentrations of E. coli, the locations of major E. coli loadings, and the E. coli host organisms.

2. The data quality of both the E. coli sampling and the turbidimeter and sonde measurements will be sufficient to meet the requirements of the NMED Surface Water Quality Bureau for data to be used for water quality assessment purposes.

Measurement Quality Objectives

The measurement quality objectives will be sufficient to achieve the Data Quality objective and will be in conformance with those listed in the Surface Water Quality Bureau QAPP.

1.6 Special Training/Certification

No special training or certification is required. Sampling will be conducted by the Elephant Butte irrigation District (EBiD) hydrology department personnel who conduct routine water quality sampling and have received prior training.

1.7 Documents and Records

The Project officer will make copies of this PQAPP and any subsequent revisions available to all individuals on the distribution list.

Documents and records will include the PQAPP, field notebooks, project specific data collection sheets, spreadsheets generated for analysis, validation and verification records, the final monitoring report, and the project final report.

69

Page 80: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

2.0 DATA GENERATION AND ACQUISITION

2.1 Sampling Design

The sampling stations were chosen to target potential inflows of E. coli into the main stem of the Rio Grande. All river stations are located at a stream gauging station and were chosen to provide good spatial distribution. The drain sampling stations were chosen to provide data on the primary perennial inflows into the river. The sampling point in the drains will be located just upstream of the confluence with the Rio Grande and most of the drain sampling stations are also co-located with a stream gauge. The stream gauge data will provide flow measurements that will be utilized to calculate the pollutant load at a given station. Additional opportunistic sampling may occur during the summer monsoon season in major ephemeral drainages, or within the river downstream of the point at which the flow enters the river.

Following the first year of sampling and an initial analysis of the data, four stations will be selected for collection of samples for analysis with microbial source tracking (MST) techniques, in order to identify the E. coli host organisms. Samples will be collected at these stations during the monsoon season of 2011.

2.2 Sampling Methods

Sampling will be in accordance with “Microbial Methods for Monitoring the Environment” (Bordner and Winter, 1978) with the following modifications: E. coli samples will be collected in certified sterile containers that do not contain sodium thiosulfate. The sodium thiosulfate dechlorination agent is not used because the water samples are not expected to contain residual chlorine. Samples will be collected utilizing a swing sampler mounted on an extension pole. This sampler is designed with a quick release clamp to hold the sample container, and facilitates sampling from a bridge and allows the technician to collect a sample from further out in the stream away from the bank.

Samplers will wear clean powder free, disposable, gloves while collecting and processing samples. Samples will be labeled, cooled to 4°C and transported to the laboratory for analysis within 6 hours of sample collection, per the analytical method requirements (Hach Method 10029).

A second sample will be collected in a separate container for the field measurement of turbidity using a Hach 2100 portable turbidimeter.

Separate samples (using separate containers) will be collected for MST analysis. For each MST sampling event five samples will be collected five minutes apart to give five replicate analyses for each event.

Site water parameters will be measured for temperature, pH, conductivity, and dissolved oxygen with a submersible sonde.

2.3 Sample Handling and Chain of Custody

As a component of collecting field notes, a sample chain of custody is filled out by the field technician prior to leaving the sampling station. The chain of custody is submitted with the sample upon delivery to the laboratory, and following relinquishment and receipt of the sample, the form is photocopied and a copy is provided to the field technician for the project records.

2.4 Analytical Methods

E. coli samples will be analyzed by EPA-approved Hach Method 10029 (m-ColiBlue24®) that incorporates specific non-coliform growth inhibitors and a selective enzymatic indicator to allow for simultaneous detection and quantitation of both E. coli and total coliforms. This procedure involves filtering the water sample (or the serial dilution) through a 0.45μm membrane filter, placing the filter in a Petri dish containing a filter pad and m-ColiBlue24® nutrient broth and incubating at 35 ± 0.5°C for 24 hours. immediately following incubation, all blue colonies are enumerated as E. coli and red colonies are enumerated as total coliforms. Positive and negative bacterial controls are routinely run in parallel with the m-ColiBlue24® analyses.

E. coli samples analyzed for MST will require separate water samples. once the E. coli samples have been processed as described above, the membrane filters will be stored at 4˚C for up to five days and then sent in insulated Styrofoam mailers overnight express to the institute of Environmental Health (iEH) lab. At the iEH labs, the presumptive E. coli will be transferred and tested for E. coli confirmation, and then chromosomal DNA will be extracted and analyzed by Pulsed Field Gel Electrophoresis to identify the probable E. coli host organism.

70

Page 81: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

2.5 Quality Control

Field Quality Control

Each sampling run will include a field blank, which will consist of a sample bottle filled with distilled water and then placed on ice for transport to the analytical lab where it will be analyzed the same as any other sample. The E. coli blank count will be recorded as are other sample results. if the blank shows a detection of E. coli, then all of the samples for that sampling run will be flagged. Decisions regarding retention or rejection of flagged data will be made based on the use of the data.

Laboratory Quality Control

Samples that are not analyzed within the period allowed by the method (6 hours) will be flagged.

incubation temperature and time should be within the method requirements (35°C ± 0.5°C for 24 ± 4 hours) and should be recorded. The incubator temperature should be recorded at the beginning and at the end of the incubation period.

Quality control for E. coli samples analyzed for MST is the responsibility of the iEH laboratory.

2.6 Instrument/Equipment Testing, Inspection and Maintenance

The instruments used to collect the data that may require testing and maintenance are the turbidimeter and the sonde. All instruments will be tested, inspected and maintained in accordance with the manufacturer’s specifications as included in the user’s manual.

2.7 Instrument Calibration and Frequency

The Hatch turbidimeter will be calibrated each sampling day. Sondes will be calibrated according to a standard procedure.

2.8 Data Management

The data will be maintained in the project file.

3.0 ASSESSMENT AND OVERSIGHT

3.1 Assessment and Response Actions

The SWQB Project officer will provide project oversight by periodically assisting with and/or reviewing data collection efforts. A review of the sampling efforts will take place monthly. Quarterly reports will describe the progress of the project tasks and any potential problems with task implementation or schedule. This process includes justification for adjusting the task, or the task schedule, and making adjustments to the timeline if applicable. The SWQB Project officer will be responsible for approving any changes and ensuring changes are implemented by the designated party. All problems and adjustments to the project plan will be documented in the project file and included in the final report.

3.2 Reports to Management

Quarterly reports are submitted by the contractor to the SWQB Project officer and include progress of project implementation and any available data. Printouts, status reports or special reports for SWQB or EPA will be prepared upon request. Separate annual monitoring reports will also be provided and included in the final report. The SWQB Project officer will be responsible for maintaining project progress in the EPA Grants Reporting and Tracking System and the final report, and all other required project deliverables to be submitted to the EPA under this grant.

4.0 DATA VALIDATION AND USABILITY

4.1 Data Review, Validation and Verification

Data will be considered usable if there is reasonable evidence that the requirements of this PQAPP were followed.

71

Page 82: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

4.2 Validation and Verification Methods

The SWQB Project officer will ensure that valid and representative data are acquired. Verification of field sampling and analytical results will occur in the review of data performed by the SWQB Project officer. in the event questionable data are found, the SWQB Project officer will consult with project personnel to determine the validity of the data. Results of the verification process will be included in the final reports.

4.3 Reconciliation with User Requirements

The user requirement is a restatement of the data quality objective: the data will be sufficient to identify the spatial and temporal locations of high concentrations of E. coli, the locations of major E. coli loadings and the E. coli host organisms in the El Paso-Las Cruces watershed.

if the data do not meet this requirement, then steps will be taken to determine if it is possible to adjust the sampling plan, or if more data or if data of higher quality will be needed to obtain the data quality objective.

5.0 REFERENCES

Bordner, Robert and John Winter. (1978). Microbiological Methods for Monitoring The Environment. Environmental Monitoring and Support Laboratory, office of Research and Development, U. S. Environmental Protection Agency, Cincinnati, ohio 45268

Hach Method 10029

https://www.nemi.gov/apex/f?p=237:38:5158424281211745::::P38_METHOD_ID:5577

Descriptive Name: E. coli by m-ColiBlue24 Broth Procedure for Membrane Filtration Official Name: Coliforms: Membrane Filtration (simultaneous detection) in: Hach Analytical Procedures. m-ColiBlue24 Broth Procedure for Membrane Filtration. Hach Product Literature #8433. Hach: Loveland, Co.

NMED/SWQB 2009. Quality Management Plan for New Mexico Environment Department Surface Water Quality Bureau Environmental Data Operations 2010. New Mexico Environment Department/Surface Water Quality Bureau, october 2009.

72

Page 83: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

APPENDIX III

List of Acronyms

BECC Border Environmental Cooperation Commission

BEIF Border Environmental Infrastructure Fund

BLM United States Bureau of Land Management

BMP Best Management Practice

BOD Biological Oxygen Demand

BST Bacterial Source Tracking

CAFO Confined Animal Feeding Operation

cfs Cubic Feet per Second

cfu Coliform Forming Units

CRRUA Camino Real Regional Utility Authority

CWA Clean Water Act

DMR Discharge Monitoring Report

DOD Department of Defense

E. coli Escherichia coli

EBID Elephant Butte Irrigation District

EQIP Environmental Quality Incentives Program

GLO Government Land Office

HB House Bill

LID Low Impact Development

MDL Method Detection Limit

MGD Million Gallons per Day

NADB North American Development Bank

NMAC New Mexico Administrative Code

NMDA New Mexico Department of Agriculture

NMED New Mexico Environment Department

73

Page 84: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

NOAA National Oceanic and Atmospheric Administration

NPDES National Pollutant Discharge Elimination System

NRCS Natural Resources Conservation Service

QAPP Quality Assurance Project Plan

RGDIC Rio Grande Dam and Irrigation Company

SRF State Revolving Fund

SWQB Surface Water Quality Bureau

TDS Total Dissolved Solids

TMDL Total Maximum Daily Load

USBR United States Bureau of Reclamation

USEPA United States Environmental Protection Agency

USFS United States Forest Service

USIBWC United States International Boundary and Water Commission

UV Ultra Violet

74

Page 85: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse

tt

Page 86: The Paso del Norte Watershed Based Plan Mitigation ...smiley.nmsu.edu/pdnwc/docs/2014/PdNWC_WBP_revision_5-27-14.pdf · ico’s streams and rivers. NPS pollution is caused by diffuse