the paramount building series was developed as a heavy snow...

2
The No Compromise Fabric Structure 1.800.852.2638 www.winklerstructures.com The Paramount building series was developed as a heavy snow load, trussed solution for the agriculture and heavy industrial sectors. Our High Profile Paramount utilizes a straight leg frame, which can maximize square footage and allow for side entry doors. Common Building Uses Salt storage Sand storage Hay storage Equipment storage Vehicle storage Dairy operations Livestock confinement Agriculture storage Advantages: Engineered for heavy snowfall Custom leg heights for side entry access Utilizes industry-leading corrosion resistant steel Foundation Options: Concrete piles Concrete spread footings Concrete blocks Poured concrete walls Precast concrete walls I-beam steel supports Screw piles Wood pony wall Wood post

Upload: others

Post on 09-Sep-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: The Paramount building series was developed as a heavy snow …winklerstructures.com/.../10/Paramount-Brochure-May-2017.pdf · 2017. 10. 4. · The No Compromise Fabric Structure

The No Compromise

Fabric Structure

1.800.852.2638www.winklerstructures.com

The Paramount building series was developed as a heavy snow load, trussed solution for the agriculture and heavy industrial sectors.

Our High Profile Paramount utilizes a straight leg frame, which can maximize square footage and allow for side entry doors.

Common Building Uses

� Salt storage � Sand storage � Hay storage � Equipment storage � Vehicle storage � Dairy operations � Livestock confinement � Agriculture storage

Advantages:

� Engineered for heavy snowfall

� Custom leg heights for side entry access

� Utilizes industry-leading corrosion resistant steel

Foundation Options:

� Concrete piles � Concrete spread footings � Concrete blocks � Poured concrete walls � Precast concrete walls � I-beam steel supports � Screw piles �Wood pony wall �Wood post

Page 2: The Paramount building series was developed as a heavy snow …winklerstructures.com/.../10/Paramount-Brochure-May-2017.pdf · 2017. 10. 4. · The No Compromise Fabric Structure

The No Compromise

Fabric Structure

1.800.852.2638www.winklerstructures.com

Paramount

Paramount High Profile

Paramount Low Profile

Structure Add-ons and Options:

� Front, back, and side entry doors � Man doors � Ventilation � Eaves � Lighting � Fire suppression � Catwalks and conveyors suspended from rafters

� Insulation