the new parliamentary building project - astm international · 2018-06-11 · sieve analysis (astm...
TRANSCRIPT
![Page 1: The New Parliamentary Building Project - ASTM International · 2018-06-11 · Sieve Analysis (ASTM D422, D1140) Atterberg Limits 17. ... •American Society for Testing Materials](https://reader030.vdocuments.mx/reader030/viewer/2022040201/5e61b06ef23869495f7aaa0c/html5/thumbnails/1.jpg)
The Proposed Parliamentary Building Project
![Page 2: The New Parliamentary Building Project - ASTM International · 2018-06-11 · Sieve Analysis (ASTM D422, D1140) Atterberg Limits 17. ... •American Society for Testing Materials](https://reader030.vdocuments.mx/reader030/viewer/2022040201/5e61b06ef23869495f7aaa0c/html5/thumbnails/2.jpg)
2GROUP MEMBERS:
Kadian Brown
Kemoi Bryan
Jerome Clarke
Sasha-Gaye Forbes
![Page 3: The New Parliamentary Building Project - ASTM International · 2018-06-11 · Sieve Analysis (ASTM D422, D1140) Atterberg Limits 17. ... •American Society for Testing Materials](https://reader030.vdocuments.mx/reader030/viewer/2022040201/5e61b06ef23869495f7aaa0c/html5/thumbnails/3.jpg)
OUTLINE
• Introduction
• Foundation & Retaining Wall
• Soil Exploration
• Structural Details and Design
• Water & Drainage
• Traffic
• EIA
• Costing of Project
• Conclusion
• References
3
![Page 4: The New Parliamentary Building Project - ASTM International · 2018-06-11 · Sieve Analysis (ASTM D422, D1140) Atterberg Limits 17. ... •American Society for Testing Materials](https://reader030.vdocuments.mx/reader030/viewer/2022040201/5e61b06ef23869495f7aaa0c/html5/thumbnails/4.jpg)
INTRODUCTION 1
![Page 5: The New Parliamentary Building Project - ASTM International · 2018-06-11 · Sieve Analysis (ASTM D422, D1140) Atterberg Limits 17. ... •American Society for Testing Materials](https://reader030.vdocuments.mx/reader030/viewer/2022040201/5e61b06ef23869495f7aaa0c/html5/thumbnails/5.jpg)
INTRODUCTION
• Problems facing Existing Parliament building:
˟ Lacks space
˟ Not accessible to the disabled community
˟ Posses safety and security problems
5
![Page 6: The New Parliamentary Building Project - ASTM International · 2018-06-11 · Sieve Analysis (ASTM D422, D1140) Atterberg Limits 17. ... •American Society for Testing Materials](https://reader030.vdocuments.mx/reader030/viewer/2022040201/5e61b06ef23869495f7aaa0c/html5/thumbnails/6.jpg)
INTRODUCTION 6
The Gleaner, 2016
![Page 7: The New Parliamentary Building Project - ASTM International · 2018-06-11 · Sieve Analysis (ASTM D422, D1140) Atterberg Limits 17. ... •American Society for Testing Materials](https://reader030.vdocuments.mx/reader030/viewer/2022040201/5e61b06ef23869495f7aaa0c/html5/thumbnails/7.jpg)
JUSTIFICATION OF PROJECT LOCATION
• The George VI Memorial Park Act (1956) states that
Heroes Circle should house Jamaica’s Parliament. (UDC,
2017).
7
![Page 8: The New Parliamentary Building Project - ASTM International · 2018-06-11 · Sieve Analysis (ASTM D422, D1140) Atterberg Limits 17. ... •American Society for Testing Materials](https://reader030.vdocuments.mx/reader030/viewer/2022040201/5e61b06ef23869495f7aaa0c/html5/thumbnails/8.jpg)
PROPOSED LOCATION 8
![Page 9: The New Parliamentary Building Project - ASTM International · 2018-06-11 · Sieve Analysis (ASTM D422, D1140) Atterberg Limits 17. ... •American Society for Testing Materials](https://reader030.vdocuments.mx/reader030/viewer/2022040201/5e61b06ef23869495f7aaa0c/html5/thumbnails/9.jpg)
PROPOSED LOCATION 9
Kadian Brown, 2017
![Page 10: The New Parliamentary Building Project - ASTM International · 2018-06-11 · Sieve Analysis (ASTM D422, D1140) Atterberg Limits 17. ... •American Society for Testing Materials](https://reader030.vdocuments.mx/reader030/viewer/2022040201/5e61b06ef23869495f7aaa0c/html5/thumbnails/10.jpg)
FOUNDATION & RETAINING WALL 2
![Page 11: The New Parliamentary Building Project - ASTM International · 2018-06-11 · Sieve Analysis (ASTM D422, D1140) Atterberg Limits 17. ... •American Society for Testing Materials](https://reader030.vdocuments.mx/reader030/viewer/2022040201/5e61b06ef23869495f7aaa0c/html5/thumbnails/11.jpg)
FOUNDATION
• Type of Foundation : Mat Foundation
• Reason(s) : It is common to use mat
foundations for deep basements and
buildings that carry large loads.
• Dimensions :
• Df = 6.4m
• Thickness, d = 0.65m
• L = 54.4m ; B = 29.4m
11
Section of Side Elevation of Reinforcement in Mat Foundation
Not Drawn To Scale
![Page 12: The New Parliamentary Building Project - ASTM International · 2018-06-11 · Sieve Analysis (ASTM D422, D1140) Atterberg Limits 17. ... •American Society for Testing Materials](https://reader030.vdocuments.mx/reader030/viewer/2022040201/5e61b06ef23869495f7aaa0c/html5/thumbnails/12.jpg)
TYPICAL CONSTRUCTION OF MAT FOUNDATION 12
Online Civil, 2016
![Page 13: The New Parliamentary Building Project - ASTM International · 2018-06-11 · Sieve Analysis (ASTM D422, D1140) Atterberg Limits 17. ... •American Society for Testing Materials](https://reader030.vdocuments.mx/reader030/viewer/2022040201/5e61b06ef23869495f7aaa0c/html5/thumbnails/13.jpg)
RETAINING WALL
• Retaining Wall : Cantilever Retaining Wall
• Reason: It has much thinner stem and utilizes
the weight of the backfill soil to provide most
of the resistance to sliding and overturning.
Design Parameters
• Unit Weight: ɣ = 14kN/m3
• Angle of friction: ϴ = 20°
• Cohesion: c = 0
13
Side Elevation of Retaining Wall
![Page 14: The New Parliamentary Building Project - ASTM International · 2018-06-11 · Sieve Analysis (ASTM D422, D1140) Atterberg Limits 17. ... •American Society for Testing Materials](https://reader030.vdocuments.mx/reader030/viewer/2022040201/5e61b06ef23869495f7aaa0c/html5/thumbnails/14.jpg)
TYPICAL CONSTRUCTION OF RETAINING WALL 14
ACP Concrete, 2018
![Page 15: The New Parliamentary Building Project - ASTM International · 2018-06-11 · Sieve Analysis (ASTM D422, D1140) Atterberg Limits 17. ... •American Society for Testing Materials](https://reader030.vdocuments.mx/reader030/viewer/2022040201/5e61b06ef23869495f7aaa0c/html5/thumbnails/15.jpg)
SOIL EXPLORATION 3
![Page 16: The New Parliamentary Building Project - ASTM International · 2018-06-11 · Sieve Analysis (ASTM D422, D1140) Atterberg Limits 17. ... •American Society for Testing Materials](https://reader030.vdocuments.mx/reader030/viewer/2022040201/5e61b06ef23869495f7aaa0c/html5/thumbnails/16.jpg)
IMPORTANCE OF SOIL EXPLORATION
• It helped us to determine the bearing capacity
of the soil, in order for us to design a suitable
foundation.
• It helped us to determine the soil parameters
in order for us to design a suitable retaining
wall.
16
![Page 17: The New Parliamentary Building Project - ASTM International · 2018-06-11 · Sieve Analysis (ASTM D422, D1140) Atterberg Limits 17. ... •American Society for Testing Materials](https://reader030.vdocuments.mx/reader030/viewer/2022040201/5e61b06ef23869495f7aaa0c/html5/thumbnails/17.jpg)
SOIL EXPLORATION
• Tests done:
Vane Shear
Unconfined Compression Test
Sieve Analysis (ASTM D422, D1140)
Atterberg Limits
17
![Page 18: The New Parliamentary Building Project - ASTM International · 2018-06-11 · Sieve Analysis (ASTM D422, D1140) Atterberg Limits 17. ... •American Society for Testing Materials](https://reader030.vdocuments.mx/reader030/viewer/2022040201/5e61b06ef23869495f7aaa0c/html5/thumbnails/18.jpg)
SOIL EXPLORATION
• Results:
• Type of soil : Silty-Clay (Atterberg Test) ; Alluvium (Mines and
Geology Dept.) [ASTM D4318]
• Unit Weight : ɣ = 14 kN/m3
• Bearing Capacity : 345.69 kN/m2
• Well-graded Soil
18
![Page 19: The New Parliamentary Building Project - ASTM International · 2018-06-11 · Sieve Analysis (ASTM D422, D1140) Atterberg Limits 17. ... •American Society for Testing Materials](https://reader030.vdocuments.mx/reader030/viewer/2022040201/5e61b06ef23869495f7aaa0c/html5/thumbnails/19.jpg)
BUILDING DESIGN & DETAILS 4
![Page 20: The New Parliamentary Building Project - ASTM International · 2018-06-11 · Sieve Analysis (ASTM D422, D1140) Atterberg Limits 17. ... •American Society for Testing Materials](https://reader030.vdocuments.mx/reader030/viewer/2022040201/5e61b06ef23869495f7aaa0c/html5/thumbnails/20.jpg)
BUILDING DESIGN 20
![Page 21: The New Parliamentary Building Project - ASTM International · 2018-06-11 · Sieve Analysis (ASTM D422, D1140) Atterberg Limits 17. ... •American Society for Testing Materials](https://reader030.vdocuments.mx/reader030/viewer/2022040201/5e61b06ef23869495f7aaa0c/html5/thumbnails/21.jpg)
BUILDING DESIGN 21
![Page 22: The New Parliamentary Building Project - ASTM International · 2018-06-11 · Sieve Analysis (ASTM D422, D1140) Atterberg Limits 17. ... •American Society for Testing Materials](https://reader030.vdocuments.mx/reader030/viewer/2022040201/5e61b06ef23869495f7aaa0c/html5/thumbnails/22.jpg)
BUILDING DESIGN 22
![Page 23: The New Parliamentary Building Project - ASTM International · 2018-06-11 · Sieve Analysis (ASTM D422, D1140) Atterberg Limits 17. ... •American Society for Testing Materials](https://reader030.vdocuments.mx/reader030/viewer/2022040201/5e61b06ef23869495f7aaa0c/html5/thumbnails/23.jpg)
BASEMENT DESIGN
Basement Parking
• Available Parking Spaces: 66 Spaces
• Required Disabled Spaces: 3 Spaces (based on IBC)
23
![Page 24: The New Parliamentary Building Project - ASTM International · 2018-06-11 · Sieve Analysis (ASTM D422, D1140) Atterberg Limits 17. ... •American Society for Testing Materials](https://reader030.vdocuments.mx/reader030/viewer/2022040201/5e61b06ef23869495f7aaa0c/html5/thumbnails/24.jpg)
BASEMENT DESIGN 24
PLAN VIEW OF
BASEMENT PARKING
Geometric Details
Parking Angle: 0°
Stall Width: 3m
Stall Depth: 6m
Aisle Width: 7.62m
![Page 25: The New Parliamentary Building Project - ASTM International · 2018-06-11 · Sieve Analysis (ASTM D422, D1140) Atterberg Limits 17. ... •American Society for Testing Materials](https://reader030.vdocuments.mx/reader030/viewer/2022040201/5e61b06ef23869495f7aaa0c/html5/thumbnails/25.jpg)
BASEMENT DESIGN
Basement Ventilation
25
Typical Arrangement of Basement
Ventilation Fans
Required Fan Thrust: 82.5N
Use 4 x 25 N fans = 100N
Required Exhaust Rate (Litre/s) = 30,000
![Page 26: The New Parliamentary Building Project - ASTM International · 2018-06-11 · Sieve Analysis (ASTM D422, D1140) Atterberg Limits 17. ... •American Society for Testing Materials](https://reader030.vdocuments.mx/reader030/viewer/2022040201/5e61b06ef23869495f7aaa0c/html5/thumbnails/26.jpg)
FLOOR PLANS
GROUND
FLOOR PLAN
![Page 27: The New Parliamentary Building Project - ASTM International · 2018-06-11 · Sieve Analysis (ASTM D422, D1140) Atterberg Limits 17. ... •American Society for Testing Materials](https://reader030.vdocuments.mx/reader030/viewer/2022040201/5e61b06ef23869495f7aaa0c/html5/thumbnails/27.jpg)
FLOOR PLANS
FIRST FLOOR
PLAN
![Page 28: The New Parliamentary Building Project - ASTM International · 2018-06-11 · Sieve Analysis (ASTM D422, D1140) Atterberg Limits 17. ... •American Society for Testing Materials](https://reader030.vdocuments.mx/reader030/viewer/2022040201/5e61b06ef23869495f7aaa0c/html5/thumbnails/28.jpg)
FLOOR PLANS 28
MEZZANINE
FLOOR PLAN
![Page 29: The New Parliamentary Building Project - ASTM International · 2018-06-11 · Sieve Analysis (ASTM D422, D1140) Atterberg Limits 17. ... •American Society for Testing Materials](https://reader030.vdocuments.mx/reader030/viewer/2022040201/5e61b06ef23869495f7aaa0c/html5/thumbnails/29.jpg)
STRUCTURAL DESIGN & DETAILS
Design Loads Included
• Dead Load
• Live Load
• Dynamic Load
• Wind Load
• Earthquake Load
29
![Page 30: The New Parliamentary Building Project - ASTM International · 2018-06-11 · Sieve Analysis (ASTM D422, D1140) Atterberg Limits 17. ... •American Society for Testing Materials](https://reader030.vdocuments.mx/reader030/viewer/2022040201/5e61b06ef23869495f7aaa0c/html5/thumbnails/30.jpg)
STRUCTURAL DESIGN & DETAILS
Beam Reinforcement Detail
![Page 31: The New Parliamentary Building Project - ASTM International · 2018-06-11 · Sieve Analysis (ASTM D422, D1140) Atterberg Limits 17. ... •American Society for Testing Materials](https://reader030.vdocuments.mx/reader030/viewer/2022040201/5e61b06ef23869495f7aaa0c/html5/thumbnails/31.jpg)
STRUCTURAL DESIGN & DETAILS 31
Column Reinforcement Details
![Page 32: The New Parliamentary Building Project - ASTM International · 2018-06-11 · Sieve Analysis (ASTM D422, D1140) Atterberg Limits 17. ... •American Society for Testing Materials](https://reader030.vdocuments.mx/reader030/viewer/2022040201/5e61b06ef23869495f7aaa0c/html5/thumbnails/32.jpg)
MATERIAL SPECIFICATIONS
Concrete
• Design Strength: 20 Mpa
• Type of Cement: Type I Ordinary Portland Cement (ASTM C150)
• Tests to be performed:1. Slump Test
2. Compressive Test
![Page 33: The New Parliamentary Building Project - ASTM International · 2018-06-11 · Sieve Analysis (ASTM D422, D1140) Atterberg Limits 17. ... •American Society for Testing Materials](https://reader030.vdocuments.mx/reader030/viewer/2022040201/5e61b06ef23869495f7aaa0c/html5/thumbnails/33.jpg)
MATERIAL SPECIFICATIONS
Slump Test
• Used to test the workability and consistency of a fresh concrete mix
• Can also be used as an indicator of an improperly mixed batch
• Different types of construction will require different degrees of workability
• Slump tests should meet the standard as set out by ASTM C143
![Page 34: The New Parliamentary Building Project - ASTM International · 2018-06-11 · Sieve Analysis (ASTM D422, D1140) Atterberg Limits 17. ... •American Society for Testing Materials](https://reader030.vdocuments.mx/reader030/viewer/2022040201/5e61b06ef23869495f7aaa0c/html5/thumbnails/34.jpg)
MATERIAL SPECIFICATIONS
Slump Test
![Page 35: The New Parliamentary Building Project - ASTM International · 2018-06-11 · Sieve Analysis (ASTM D422, D1140) Atterberg Limits 17. ... •American Society for Testing Materials](https://reader030.vdocuments.mx/reader030/viewer/2022040201/5e61b06ef23869495f7aaa0c/html5/thumbnails/35.jpg)
MATERIAL SPECIFICATIONS 35
Typical Interpretation of slump Test
Results
![Page 36: The New Parliamentary Building Project - ASTM International · 2018-06-11 · Sieve Analysis (ASTM D422, D1140) Atterberg Limits 17. ... •American Society for Testing Materials](https://reader030.vdocuments.mx/reader030/viewer/2022040201/5e61b06ef23869495f7aaa0c/html5/thumbnails/36.jpg)
MATERIAL SPECIFICATIONS
Typical Types of Slump Results
![Page 37: The New Parliamentary Building Project - ASTM International · 2018-06-11 · Sieve Analysis (ASTM D422, D1140) Atterberg Limits 17. ... •American Society for Testing Materials](https://reader030.vdocuments.mx/reader030/viewer/2022040201/5e61b06ef23869495f7aaa0c/html5/thumbnails/37.jpg)
MATERIAL SPECIFICATIONS
Compressive Strength Test
• Determines if a batch of concrete meets the designed/required compressive strength.
• American Society for Testing Materials ASTM C39/C39M provides Standard Test
• Six cube samples are taken and left in a curing tank for 7 days, after which they are tested for compression
![Page 38: The New Parliamentary Building Project - ASTM International · 2018-06-11 · Sieve Analysis (ASTM D422, D1140) Atterberg Limits 17. ... •American Society for Testing Materials](https://reader030.vdocuments.mx/reader030/viewer/2022040201/5e61b06ef23869495f7aaa0c/html5/thumbnails/38.jpg)
MATERIAL SPECIFICATIONS
Compressive Test Apparatus
Cube Mold Curing Tank Compressive Test Machine
![Page 39: The New Parliamentary Building Project - ASTM International · 2018-06-11 · Sieve Analysis (ASTM D422, D1140) Atterberg Limits 17. ... •American Society for Testing Materials](https://reader030.vdocuments.mx/reader030/viewer/2022040201/5e61b06ef23869495f7aaa0c/html5/thumbnails/39.jpg)
MATERIAL SPECIFICATIONS
Typical Strength Characteristics of Various grades of Concrete
![Page 40: The New Parliamentary Building Project - ASTM International · 2018-06-11 · Sieve Analysis (ASTM D422, D1140) Atterberg Limits 17. ... •American Society for Testing Materials](https://reader030.vdocuments.mx/reader030/viewer/2022040201/5e61b06ef23869495f7aaa0c/html5/thumbnails/40.jpg)
MATERIAL SPECIFICATIONS
Asphalt Pavement
• Should have adequate strength to distribute the wheel loads to the soil without undue deflection, compaction or consolidation.
• Should be water resistant and have sufficient surface friction to avoid skidding
• Should be compliant with AASHTO guidelines
• Thickness of approximately 6 inches
![Page 41: The New Parliamentary Building Project - ASTM International · 2018-06-11 · Sieve Analysis (ASTM D422, D1140) Atterberg Limits 17. ... •American Society for Testing Materials](https://reader030.vdocuments.mx/reader030/viewer/2022040201/5e61b06ef23869495f7aaa0c/html5/thumbnails/41.jpg)
MATERIAL SPECIFICATIONS
Typical Layers of Asphalt Road Pavement
![Page 42: The New Parliamentary Building Project - ASTM International · 2018-06-11 · Sieve Analysis (ASTM D422, D1140) Atterberg Limits 17. ... •American Society for Testing Materials](https://reader030.vdocuments.mx/reader030/viewer/2022040201/5e61b06ef23869495f7aaa0c/html5/thumbnails/42.jpg)
WATER & DRAINAGE 5
![Page 43: The New Parliamentary Building Project - ASTM International · 2018-06-11 · Sieve Analysis (ASTM D422, D1140) Atterberg Limits 17. ... •American Society for Testing Materials](https://reader030.vdocuments.mx/reader030/viewer/2022040201/5e61b06ef23869495f7aaa0c/html5/thumbnails/43.jpg)
WATER & DRAINAGE 43
Downtown
Kingston
and Port
Royal
Redevelopm
ent
Plan 2010-
2030
Water Distr.
System
Urban Dev.
Corp,22-12-
2012
![Page 44: The New Parliamentary Building Project - ASTM International · 2018-06-11 · Sieve Analysis (ASTM D422, D1140) Atterberg Limits 17. ... •American Society for Testing Materials](https://reader030.vdocuments.mx/reader030/viewer/2022040201/5e61b06ef23869495f7aaa0c/html5/thumbnails/44.jpg)
WATER & DRAINAGE
• Pressure in main pipe : Approximately 60 psi
• Tank info : The National Water Commission encourages the use a
tank storage of water for buildings two (2) storeys and more ; to aid
in supply for users and fire suppression.
• Specifications: Cap. of 2000 gal, Height of 110 in., Diameter of 80.75 in.,
Outlet 1.5in
• Water Table: Rest water level– 135ft
44
![Page 45: The New Parliamentary Building Project - ASTM International · 2018-06-11 · Sieve Analysis (ASTM D422, D1140) Atterberg Limits 17. ... •American Society for Testing Materials](https://reader030.vdocuments.mx/reader030/viewer/2022040201/5e61b06ef23869495f7aaa0c/html5/thumbnails/45.jpg)
WATER & DRAINAGE
FIRE PROTECTION WATER SUPPLIES
507.1 Required water supply. An approved water supply capable of supplying the required
fire flow for fire protection shall be provided to premises upon which facilities, buildings or
portions of buildings are hereafter constructed or moved into or within the jurisdiction
507.2 Type of water supply. A water supply shall consist of reservoirs, pressure tanks,
elevated tanks, water mains or other fixed systems capable of providing the required fire
flow (IFC, 2015).
45
![Page 46: The New Parliamentary Building Project - ASTM International · 2018-06-11 · Sieve Analysis (ASTM D422, D1140) Atterberg Limits 17. ... •American Society for Testing Materials](https://reader030.vdocuments.mx/reader030/viewer/2022040201/5e61b06ef23869495f7aaa0c/html5/thumbnails/46.jpg)
WATER & DRAINAGE 46
Downtown
Kingston
and Port
Royal
Redevelopme
nt
Plan 2010-
2030
Existing &
Proposed
Sewer Lines
Urban Dev.
Corp,22-12-
2012
![Page 47: The New Parliamentary Building Project - ASTM International · 2018-06-11 · Sieve Analysis (ASTM D422, D1140) Atterberg Limits 17. ... •American Society for Testing Materials](https://reader030.vdocuments.mx/reader030/viewer/2022040201/5e61b06ef23869495f7aaa0c/html5/thumbnails/47.jpg)
WATER & DRAINAGE 47
Downtown
Kingston
and Port
Royal
Redevelopm
ent
Plan 2010-
2030
Existing &
Proposed
Sewer Lines
Urban Dev.
Corp,22-12-
2012
![Page 48: The New Parliamentary Building Project - ASTM International · 2018-06-11 · Sieve Analysis (ASTM D422, D1140) Atterberg Limits 17. ... •American Society for Testing Materials](https://reader030.vdocuments.mx/reader030/viewer/2022040201/5e61b06ef23869495f7aaa0c/html5/thumbnails/48.jpg)
WATER & DRAINAGE 48
![Page 49: The New Parliamentary Building Project - ASTM International · 2018-06-11 · Sieve Analysis (ASTM D422, D1140) Atterberg Limits 17. ... •American Society for Testing Materials](https://reader030.vdocuments.mx/reader030/viewer/2022040201/5e61b06ef23869495f7aaa0c/html5/thumbnails/49.jpg)
WATER & DRAINAGE 49
![Page 50: The New Parliamentary Building Project - ASTM International · 2018-06-11 · Sieve Analysis (ASTM D422, D1140) Atterberg Limits 17. ... •American Society for Testing Materials](https://reader030.vdocuments.mx/reader030/viewer/2022040201/5e61b06ef23869495f7aaa0c/html5/thumbnails/50.jpg)
PROPOSED SITE PLAN 50
![Page 51: The New Parliamentary Building Project - ASTM International · 2018-06-11 · Sieve Analysis (ASTM D422, D1140) Atterberg Limits 17. ... •American Society for Testing Materials](https://reader030.vdocuments.mx/reader030/viewer/2022040201/5e61b06ef23869495f7aaa0c/html5/thumbnails/51.jpg)
WATER & DRAINAGE 51
![Page 52: The New Parliamentary Building Project - ASTM International · 2018-06-11 · Sieve Analysis (ASTM D422, D1140) Atterberg Limits 17. ... •American Society for Testing Materials](https://reader030.vdocuments.mx/reader030/viewer/2022040201/5e61b06ef23869495f7aaa0c/html5/thumbnails/52.jpg)
WATER & DRAINAGE 52
Section of
Trap Gully
![Page 53: The New Parliamentary Building Project - ASTM International · 2018-06-11 · Sieve Analysis (ASTM D422, D1140) Atterberg Limits 17. ... •American Society for Testing Materials](https://reader030.vdocuments.mx/reader030/viewer/2022040201/5e61b06ef23869495f7aaa0c/html5/thumbnails/53.jpg)
WATER & DRAINAGE 53
Section of
Manhole
![Page 54: The New Parliamentary Building Project - ASTM International · 2018-06-11 · Sieve Analysis (ASTM D422, D1140) Atterberg Limits 17. ... •American Society for Testing Materials](https://reader030.vdocuments.mx/reader030/viewer/2022040201/5e61b06ef23869495f7aaa0c/html5/thumbnails/54.jpg)
WATER & DRAINAGE 54
Section of
Grease
Trap
![Page 55: The New Parliamentary Building Project - ASTM International · 2018-06-11 · Sieve Analysis (ASTM D422, D1140) Atterberg Limits 17. ... •American Society for Testing Materials](https://reader030.vdocuments.mx/reader030/viewer/2022040201/5e61b06ef23869495f7aaa0c/html5/thumbnails/55.jpg)
WATER & DRAINAGE 55
Section of
Grease
Trap
(Retrieved from http://www.cpda.co.uk/design/layouts/).
![Page 56: The New Parliamentary Building Project - ASTM International · 2018-06-11 · Sieve Analysis (ASTM D422, D1140) Atterberg Limits 17. ... •American Society for Testing Materials](https://reader030.vdocuments.mx/reader030/viewer/2022040201/5e61b06ef23869495f7aaa0c/html5/thumbnails/56.jpg)
TRAFFIC MANAGEMENT PLAN 6
![Page 57: The New Parliamentary Building Project - ASTM International · 2018-06-11 · Sieve Analysis (ASTM D422, D1140) Atterberg Limits 17. ... •American Society for Testing Materials](https://reader030.vdocuments.mx/reader030/viewer/2022040201/5e61b06ef23869495f7aaa0c/html5/thumbnails/57.jpg)
TRAFFIC MANAGEMENT PLAN
• A suitable transport system is an integral factor in the
development of an effective Parliament Building.
• With the construction of the new Parliament Building as well
as the complex to house other Government Agencies it is
expected that the traffic volume of vehicles which use the area
increases by no less than 100%.
![Page 58: The New Parliamentary Building Project - ASTM International · 2018-06-11 · Sieve Analysis (ASTM D422, D1140) Atterberg Limits 17. ... •American Society for Testing Materials](https://reader030.vdocuments.mx/reader030/viewer/2022040201/5e61b06ef23869495f7aaa0c/html5/thumbnails/58.jpg)
ENVIRONMENTAL IMPACT 58
![Page 59: The New Parliamentary Building Project - ASTM International · 2018-06-11 · Sieve Analysis (ASTM D422, D1140) Atterberg Limits 17. ... •American Society for Testing Materials](https://reader030.vdocuments.mx/reader030/viewer/2022040201/5e61b06ef23869495f7aaa0c/html5/thumbnails/59.jpg)
COMPARISON OF AIR QUALITY 59
Criteria Air Pollutants
(CAPs)
Annual Reading from Air
Monitoring Station (𝜇𝑔/𝑚3)
National Ambient Air
Quality Standards
(NEPA) (𝜇𝑔/𝑚3)
Particulate Matter less than 10µm
[𝑃𝑀𝟏𝟎
]
46.07 50
Nitrogen Dioxide [𝑵𝑶𝟐] 24.32 100
Sulphur Dioxide [ 𝑆𝑂2 ] 22.51 80
![Page 60: The New Parliamentary Building Project - ASTM International · 2018-06-11 · Sieve Analysis (ASTM D422, D1140) Atterberg Limits 17. ... •American Society for Testing Materials](https://reader030.vdocuments.mx/reader030/viewer/2022040201/5e61b06ef23869495f7aaa0c/html5/thumbnails/60.jpg)
TRAFFIC COUNT OF EAST STREET
![Page 61: The New Parliamentary Building Project - ASTM International · 2018-06-11 · Sieve Analysis (ASTM D422, D1140) Atterberg Limits 17. ... •American Society for Testing Materials](https://reader030.vdocuments.mx/reader030/viewer/2022040201/5e61b06ef23869495f7aaa0c/html5/thumbnails/61.jpg)
PICTURES OF CURRENT TRAFFIC SYSTEM
![Page 62: The New Parliamentary Building Project - ASTM International · 2018-06-11 · Sieve Analysis (ASTM D422, D1140) Atterberg Limits 17. ... •American Society for Testing Materials](https://reader030.vdocuments.mx/reader030/viewer/2022040201/5e61b06ef23869495f7aaa0c/html5/thumbnails/62.jpg)
PROPOSED PLAN
• The workable traffic system proposed to improve the efficiency of traffic in the
area would be achieved through the reduction of its opposing lane vehicular
conflict.
• This would be done through the conversion of Heroes Circle into a one-way
clockwise loop and the expansion of the circle to accommodate one additional lane
of travel.
• The project would also entail the conversion of all the minor access roads
adjoining Heroes Circle into an alternating pattern of one-way roads.
![Page 63: The New Parliamentary Building Project - ASTM International · 2018-06-11 · Sieve Analysis (ASTM D422, D1140) Atterberg Limits 17. ... •American Society for Testing Materials](https://reader030.vdocuments.mx/reader030/viewer/2022040201/5e61b06ef23869495f7aaa0c/html5/thumbnails/63.jpg)
EXAMPLE OF PROPOSED PLAN AT INTERSECTIONS
![Page 64: The New Parliamentary Building Project - ASTM International · 2018-06-11 · Sieve Analysis (ASTM D422, D1140) Atterberg Limits 17. ... •American Society for Testing Materials](https://reader030.vdocuments.mx/reader030/viewer/2022040201/5e61b06ef23869495f7aaa0c/html5/thumbnails/64.jpg)
ZONE OF EFFECT 64
Roads that will be significantly affected :
• Slipe Road
• Old Hope Road
![Page 65: The New Parliamentary Building Project - ASTM International · 2018-06-11 · Sieve Analysis (ASTM D422, D1140) Atterberg Limits 17. ... •American Society for Testing Materials](https://reader030.vdocuments.mx/reader030/viewer/2022040201/5e61b06ef23869495f7aaa0c/html5/thumbnails/65.jpg)
INTERNAL DESIGN
• One special entrance to the north side of Heroes Circle from which
dignitaries and Parliamentarians will enter and travel directly to
underground parking beneath the Parliament Building.
• Two (two-way) entrances/exits to the East and West sides of Heroes
Circle (opposite Tarrington Avenue (west) and Opposite Hitchen Street
(east).
• Both would lead to a central roundabout which would be located just
south of the parliament building.
![Page 66: The New Parliamentary Building Project - ASTM International · 2018-06-11 · Sieve Analysis (ASTM D422, D1140) Atterberg Limits 17. ... •American Society for Testing Materials](https://reader030.vdocuments.mx/reader030/viewer/2022040201/5e61b06ef23869495f7aaa0c/html5/thumbnails/66.jpg)
PROPOSED SITE PLAN 66
![Page 67: The New Parliamentary Building Project - ASTM International · 2018-06-11 · Sieve Analysis (ASTM D422, D1140) Atterberg Limits 17. ... •American Society for Testing Materials](https://reader030.vdocuments.mx/reader030/viewer/2022040201/5e61b06ef23869495f7aaa0c/html5/thumbnails/67.jpg)
COSTING 67
Description Amount
Master Summary
Structure $ 326,751,543
Windows and Doors $ 728,425
Equipment $28,118,000
Wall & Ceiling $ 3,235,300
Professional Fees $ 75,674,791
Plumbing $ 1,283,460
Drainage $ 30,000,000
Road Works $ 57,000,000
Maintenance $ 2,274,800
Construction Overheads $ 64,283,065
Total $ 589,349,383
![Page 68: The New Parliamentary Building Project - ASTM International · 2018-06-11 · Sieve Analysis (ASTM D422, D1140) Atterberg Limits 17. ... •American Society for Testing Materials](https://reader030.vdocuments.mx/reader030/viewer/2022040201/5e61b06ef23869495f7aaa0c/html5/thumbnails/68.jpg)
CONCLUSION
• Project : Proposed Parliament Building at Heroes
Circle, Kingston.
• Type of Structure : Reinforced Concrete
• Type of Foundation : Mat Foundation
• Proposed External Traffic: One-way clockwise
loop around the Heroes Circle.
68
![Page 69: The New Parliamentary Building Project - ASTM International · 2018-06-11 · Sieve Analysis (ASTM D422, D1140) Atterberg Limits 17. ... •American Society for Testing Materials](https://reader030.vdocuments.mx/reader030/viewer/2022040201/5e61b06ef23869495f7aaa0c/html5/thumbnails/69.jpg)
REFERENCES
• The Gleaner. (2016, August 26). Retrieved April 30, 2018, from http://jamaica-gleaner.com/article/lead-stories/20160829/government-approves-construction-new-parliament-building
• Das, B. M. (2016). Principles of Foundation Engineering. Boston,USA: Global Engineering: Timothy L. Anderson.
• ACI 18-95
• ASCE 7-10
• BS 8110
• IBC
• Water Resource Authority
• National Works Agency
• Kingston and St. Andrew and the Pedro Cays Provisional Development Order. (2017). Kingston, Jamaica: National Environmental and Planning Agency.
• International Fire Code (2015).
69
![Page 70: The New Parliamentary Building Project - ASTM International · 2018-06-11 · Sieve Analysis (ASTM D422, D1140) Atterberg Limits 17. ... •American Society for Testing Materials](https://reader030.vdocuments.mx/reader030/viewer/2022040201/5e61b06ef23869495f7aaa0c/html5/thumbnails/70.jpg)
70