The MyOcean Concept

P.Bahurel, project coordinator

Page 2: The MyOcean Concept P.Bahurel, project coordinator

5 driving objectives

1. A core service

2. An integrated capacity

3. A user driven service

4. A methodology for development

5. A pan European organization

In « MyOcean concept document »

Page 3: The MyOcean Concept P.Bahurel, project coordinator

1. A core service

Page 4: The MyOcean Concept P.Bahurel, project coordinator

For intermediate users

SYSTEMSE

RVIC

EINTERMEDIATE

USERS

Marine safety

Marine & coastal environment

Climate seasonal &weather forecasting

Marine Resources

Page 5: The MyOcean Concept P.Bahurel, project coordinator

A comprehensive and consistent description of the ocean

• All areas

• In Situ observations• Satellite Observations• Assimilative Models

• Real-time• Reanalyses

Page 6: The MyOcean Concept P.Bahurel, project coordinator

A catalogue of « common denominator » data

• Currents,• Temperature,• Salinity• Sea Level,• Sea Ice, • Surface winds• Biogeochemistry

• 239 products

Page 7: The MyOcean Concept P.Bahurel, project coordinator

A single and easy access point for users www.myocean.eu

DISCOVER

VIEW

DOWNLOAD

Open & Free

Page 8: The MyOcean Concept P.Bahurel, project coordinator

about the « core service »

• It’s positive– We have a core service – We cover the major part of the requirements– We have users and the service is well received

• But– A fine tuning has to be done now, with users (e.g. list

of products, products definition, portal functions)– Wave products are missing, and reasons are external

Page 9: The MyOcean Concept P.Bahurel, project coordinator

2. An integrated capacity

Page 10: The MyOcean Concept P.Bahurel, project coordinator

A pan-European system organization to produce marine information

5 THEMATIC ASSEMBLY CENTRES

7 MONITORING AND FORECASTING CENTRES

Page 11: The MyOcean Concept P.Bahurel, project coordinator

A hierarchy in production systems, reducing unnecessary duplication

• One nominal system per area to produce the expected information

• Notions of back-up systems

Page 12: The MyOcean Concept P.Bahurel, project coordinator

An information system to manage the data flows

Page 13: The MyOcean Concept P.Bahurel, project coordinator

A common set of information, documentation, content and formats

• System descriptions, Product User Manual and Quality Documents

• Data formats

• Service and change processes

Page 14: The MyOcean Concept P.Bahurel, project coordinator

about the « integrated capacity »

• It’s positive– It is really an « integrated system of systems »– We observed a very good behaviour in operations– We have already reduced a number of redundancies– Roles are well defined

• But– Some components are not fully integrated– This is still a heavy management cost for the teams– Imposing European (MyOcean) specifications on

National systems is not straighforward

Page 15: The MyOcean Concept P.Bahurel, project coordinator

3. A user driven service

Page 16: The MyOcean Concept P.Bahurel, project coordinator

A service desk

Providing assistanceConnecting users and experts

Page 17: The MyOcean Concept P.Bahurel, project coordinator

Service Level Agreements

• Around 1000 standard Service Level Agreements today

• Specific management for major accounts

EEA

Page 18: The MyOcean Concept P.Bahurel, project coordinator

A project organization to work on user’s uptake

• The WP18 in MyOcean, a project in itself to work on user’s uptake– Four areas of benefit

• The Core User Group

• A set of User Requirement Documents (URDs)

Page 19: The MyOcean Concept P.Bahurel, project coordinator

Meetings with users

User Training

BolognaJuly 2011

User Forum

StockholmApril 2011

Page 20: The MyOcean Concept P.Bahurel, project coordinator

about the « user driven »

• It’s positive– We have now a better idea of our users– We have a first experience– We have an organization– We have something to offer, to start the dialogue

• But– We’re not yet really « user driven » : this is one of

the challenges of MyOcean2

Page 21: The MyOcean Concept P.Bahurel, project coordinator

4. A methodology for development

Page 22: The MyOcean Concept P.Bahurel, project coordinator

Milestones, Reviews

• A high-level review group, with EC evaluators and external experts

• A review organization at the project level

• Recommendations, actions and decisions

CDKP

PRR

VARR

Service Transition (V1)

CriticalSub-Systems(MIS & Web Portal)

Impl. V1

Int. CSS Ver.

Deploy. Val.

Service Design

Service DesignService Definition (V1 + V2)

System Definition

Operation of V0

Analysis

Design

Analysis

Design

ServiceDefinition (V1 + V2)

PDR

PDR

SRR

I&VV1

Int. PCs stream1 V1

VARR

Operation of V1

Transition (V1)

Impl. V2 I&V V2 Corrective Maintenance

Service Transition (V2)

Deploy. Val.

V2

I&V PCsstream2 V1

I&V PCs V2

Int. all PCs

Int. CSS Ver.

ServiceDefinition (V1 + V2)

Service Design Service Transition (V1)

Production Centres

Impl. V1Analysis

Design

PDR

I&V V1 Impl. V2 I&V V2 Corrective

Maintenance

Top-Level

V1 V2

KOFF

PCR

VRR VARR

VRR

VARR

VARR VARR

PRR

POR1 POR2

VRR VRR

VRR

VRR

Page 23: The MyOcean Concept P.Bahurel, project coordinator

about the « methodology »

• It’s positive– We went through this mini-revolution– We share a methodology to manage our pan-

European service organization for operational oceanography

• But– The cost is high for the teams, and the work is not

equally shared– We need to simplify and ensure we will work with it

for good reasons for a long time

Page 24: The MyOcean Concept P.Bahurel, project coordinator

5. A pan-European organization

Page 25: The MyOcean Concept P.Bahurel, project coordinator

To run the project

• A project manager

• A project office

• An executive committee

• 18 WorkPackages

• 61 partners

Page 26: The MyOcean Concept P.Bahurel, project coordinator

To run the project

• A project manager

• A project office

• An executive committee

• 18 WorkPackages

• 61 partners

Page 27: The MyOcean Concept P.Bahurel, project coordinator

To run the contract

• REA

• Project Office

• 61 partners and their

administrative dpts

Page 28: The MyOcean Concept P.Bahurel, project coordinator

To run the service!

• A pan-European organization for– The service delivery– The operational production– The quality assessment– Any change in the situation

• Roles and processes defined

Page 29: The MyOcean Concept P.Bahurel, project coordinator

To ensure quality and innovation

• The WP3 in MyOcean, a project in itself to work on common research& development, and innovation

• A Scientific Advisory Committee

• 2 open calls

• MyOcean Science Days

Page 30: The MyOcean Concept P.Bahurel, project coordinator

To govern the present and prepare the future

• Annual meetings with partners

• A Board

• A MyOcean Advisory Committee

• Relations with stakeholders, and EuroGOOSECOMF

Page 31: The MyOcean Concept P.Bahurel, project coordinator

about the « pan-European »

• It’s positive– We are able to work together– We are able to reach our objectives together– We are fairly well organized

• But– We must improve again the overall communication,

consultation, participation, decision– We must foster the links with EuroGOOS and

stakeholders, and progress in our long term structuration

Page 32: The MyOcean Concept P.Bahurel, project coordinator

Conclusion

The MyOcean concept was valid, and we have implemented it successfully.

The MyOcean concept was really challenging and we have not reached the final step.

Improvements will be made in MyOcean2.