The Millmerran Simulator An Innovative Cooperative Venture between Simulator Manufacturer, DCS Vendor and Power Plant Customer
Name, department/event, date
![Page 2: The Millmerran Simulator An Innovative Cooperative Venture between Simulator Manufacturer, DCS Vendor and Power Plant Customer Name, department/event,](https://reader030.vdocuments.mx/reader030/viewer/2022033106/56649ec45503460f94bcf24e/html5/thumbnails/2.jpg)
Simulator Manufacturer
© Costec Systems & ABB - February 3, 2011 | Slide ‹2›
DCS Vendor
![Page 3: The Millmerran Simulator An Innovative Cooperative Venture between Simulator Manufacturer, DCS Vendor and Power Plant Customer Name, department/event,](https://reader030.vdocuments.mx/reader030/viewer/2022033106/56649ec45503460f94bcf24e/html5/thumbnails/3.jpg)
© Costec Systems & ABB - February 3, 2011 | Slide ‹3›
Millmerran Power StationLocation (thanks to Google Maps)
![Page 4: The Millmerran Simulator An Innovative Cooperative Venture between Simulator Manufacturer, DCS Vendor and Power Plant Customer Name, department/event,](https://reader030.vdocuments.mx/reader030/viewer/2022033106/56649ec45503460f94bcf24e/html5/thumbnails/4.jpg)
Owners
Intergen Inc (USA)
China Huaneng Corporation (PRC)
2x430MW coal-fired supercritical units
Babcock & Wilcox boiler
Ansaldo turbine
Air-cooled condenser
ABB Harmony DCS
ABB 800xA Process Portal
Millmerran Power StationOverview
© Costec Systems & ABB - February 3, 2011 | Slide ‹4›
![Page 5: The Millmerran Simulator An Innovative Cooperative Venture between Simulator Manufacturer, DCS Vendor and Power Plant Customer Name, department/event,](https://reader030.vdocuments.mx/reader030/viewer/2022033106/56649ec45503460f94bcf24e/html5/thumbnails/5.jpg)
Private venture
No obligation to purchase
No statement of requirements
Support from power station
Support from DCS vendor
Millmerran Simulator ProjectOverview
© Costec Systems & ABB - February 3, 2011 | Slide ‹5›
![Page 6: The Millmerran Simulator An Innovative Cooperative Venture between Simulator Manufacturer, DCS Vendor and Power Plant Customer Name, department/event,](https://reader030.vdocuments.mx/reader030/viewer/2022033106/56649ec45503460f94bcf24e/html5/thumbnails/6.jpg)
Scope of simulation
Requirements and expectations
Project stages
End Result
Millmerran Simulator ProjectEvolution
© Costec Systems & ABB - February 3, 2011 | Slide ‹6›
![Page 7: The Millmerran Simulator An Innovative Cooperative Venture between Simulator Manufacturer, DCS Vendor and Power Plant Customer Name, department/event,](https://reader030.vdocuments.mx/reader030/viewer/2022033106/56649ec45503460f94bcf24e/html5/thumbnails/7.jpg)
Simulator System ArchitectureSoftware
© Costec Systems & ABB - February 3, 2011 | Slide ‹7›
![Page 8: The Millmerran Simulator An Innovative Cooperative Venture between Simulator Manufacturer, DCS Vendor and Power Plant Customer Name, department/event,](https://reader030.vdocuments.mx/reader030/viewer/2022033106/56649ec45503460f94bcf24e/html5/thumbnails/8.jpg)
Simulator System ArchitectureSimulator Management System (SMS)
Executive
Model configuration
Snapshots
Backtrack
Interventions
User management
Diagnostics
© Costec Systems & ABB - February 3, 2011 | Slide ‹8›
![Page 9: The Millmerran Simulator An Innovative Cooperative Venture between Simulator Manufacturer, DCS Vendor and Power Plant Customer Name, department/event,](https://reader030.vdocuments.mx/reader030/viewer/2022033106/56649ec45503460f94bcf24e/html5/thumbnails/9.jpg)
Simulator System ArchitectureNetalyser Plant Model
Networks of standard components
Lumped plant component models
Based on physical principles
Fully configurable
Scalable
Performance
© Costec Systems & ABB - February 3, 2011 | Slide ‹9›
![Page 10: The Millmerran Simulator An Innovative Cooperative Venture between Simulator Manufacturer, DCS Vendor and Power Plant Customer Name, department/event,](https://reader030.vdocuments.mx/reader030/viewer/2022033106/56649ec45503460f94bcf24e/html5/thumbnails/10.jpg)
Simulator System ArchitecturePseudo HMI & Controls
Operator interface components
Control elements
Fully configurable
Allows DCS-independent model testing
© Costec Systems & ABB - February 3, 2011 | Slide ‹10›
![Page 11: The Millmerran Simulator An Innovative Cooperative Venture between Simulator Manufacturer, DCS Vendor and Power Plant Customer Name, department/event,](https://reader030.vdocuments.mx/reader030/viewer/2022033106/56649ec45503460f94bcf24e/html5/thumbnails/11.jpg)
Simulator System ArchitectureInterface – Model side
Transfers data to/from 3rd party DCS
Supports up to 4 OPC servers
Supports custom protocols
Fully configurable
© Costec Systems & ABB - February 3, 2011 | Slide ‹11›
![Page 12: The Millmerran Simulator An Innovative Cooperative Venture between Simulator Manufacturer, DCS Vendor and Power Plant Customer Name, department/event,](https://reader030.vdocuments.mx/reader030/viewer/2022033106/56649ec45503460f94bcf24e/html5/thumbnails/12.jpg)
Simulator System ArchitectureABB DCS – Harmony Training Simulator (HTS)
Re-hosted control execution environment Windows application Based on Harmony Controller (MFP/BRC) Behavior faithful to physical controller Establishes virtual Loop Communication Emulates MFP/BRC segment control and
Control Way Distributable across multiple PC’s
Direct reuse of plant control configurations Executes the composer config file. (.cfg’s) Monitor\Tune from Engineering Workstation
Supports a comprehensive set of runtime simulator functions
Vendor Independent Model Interface
Switch between multiple simulation projects
© Costec Systems & ABB – February 14, 2011 | Slide 12
![Page 13: The Millmerran Simulator An Innovative Cooperative Venture between Simulator Manufacturer, DCS Vendor and Power Plant Customer Name, department/event,](https://reader030.vdocuments.mx/reader030/viewer/2022033106/56649ec45503460f94bcf24e/html5/thumbnails/13.jpg)
Simulator System ArchitectureABB Harmony Training Simulator (HTS)
HTS Manager Data exchange and communication
coordination Simulation command execution Built-in OPC Server for model interface
Virtual ICI (vICI) Virtual Connection to ABB Consoles Self-building database Unlimited Connections Distributed architecture
Virtual PCU (vPCU) Unlimited # of vPCU’s and Controllers Executes Controller CFG’s Distributed architecture 130+ Function Codes supported
© Costec Systems & ABB – February 14, 2011 | Slide 13
HTS(Harmony Training Simulator)
HTSManager
OP
C S
erve
r vPCU
vICI
![Page 14: The Millmerran Simulator An Innovative Cooperative Venture between Simulator Manufacturer, DCS Vendor and Power Plant Customer Name, department/event,](https://reader030.vdocuments.mx/reader030/viewer/2022033106/56649ec45503460f94bcf24e/html5/thumbnails/14.jpg)
Simulator System ArchitectureABB 800xA Process Portal HMI
Reuse of Plant displays and configurations
Operator Faceplates, dialogs and displays are reused without modifications
Configuration of event/alarm lists, history loggings and trends are reused
Provides identical Operator environment in the simulator system and real control room
Connected to Virtual Controls via a virtual ICI and network.
All fidelity type simulators use the same operator configuration and graphics.
© Costec Systems & ABB – February 14, 2011 | Slide 14
Identical operator environment
![Page 15: The Millmerran Simulator An Innovative Cooperative Venture between Simulator Manufacturer, DCS Vendor and Power Plant Customer Name, department/event,](https://reader030.vdocuments.mx/reader030/viewer/2022033106/56649ec45503460f94bcf24e/html5/thumbnails/15.jpg)
Simulator System ArchitectureTypical Hardware Configuration
© Costec Systems & ABB - February 3, 2011 | Slide ‹15›
![Page 16: The Millmerran Simulator An Innovative Cooperative Venture between Simulator Manufacturer, DCS Vendor and Power Plant Customer Name, department/event,](https://reader030.vdocuments.mx/reader030/viewer/2022033106/56649ec45503460f94bcf24e/html5/thumbnails/16.jpg)
Hosted Simulator
High fidelity
Accessibility Minimal delay Any time Guaranteed
System support Minimal Automatic updates
Customised training
Minimal simulator footprint
Financial No capital outlay Reliable budgeting Try before you buy
© Costec Systems & ABB - February 3, 2011 | Slide ‹16›
User perspective - Pros
![Page 17: The Millmerran Simulator An Innovative Cooperative Venture between Simulator Manufacturer, DCS Vendor and Power Plant Customer Name, department/event,](https://reader030.vdocuments.mx/reader030/viewer/2022033106/56649ec45503460f94bcf24e/html5/thumbnails/17.jpg)
Hosted Simulator User perspective - Cons
Not site specific
Constraints on availability
Fixed configuration
Fixed training scenarios
© Costec Systems & ABB - February 3, 2011 | Slide ‹17›
![Page 18: The Millmerran Simulator An Innovative Cooperative Venture between Simulator Manufacturer, DCS Vendor and Power Plant Customer Name, department/event,](https://reader030.vdocuments.mx/reader030/viewer/2022033106/56649ec45503460f94bcf24e/html5/thumbnails/18.jpg)
Hosted Simulator Supplier benefits
Market size
Acceptance
Technical support Centralised Updates
Billing options
Usage fees
© Costec Systems & ABB - February 3, 2011 | Slide ‹18›
![Page 19: The Millmerran Simulator An Innovative Cooperative Venture between Simulator Manufacturer, DCS Vendor and Power Plant Customer Name, department/event,](https://reader030.vdocuments.mx/reader030/viewer/2022033106/56649ec45503460f94bcf24e/html5/thumbnails/19.jpg)
Hosted SimulatorTechnology
Web-based simulation
Remote Desktop Services
Tightly integrated
Multiple monitors
Obliging DCS & HMI software
© Costec Systems & ABB - February 3, 2011 | Slide ‹19›
![Page 20: The Millmerran Simulator An Innovative Cooperative Venture between Simulator Manufacturer, DCS Vendor and Power Plant Customer Name, department/event,](https://reader030.vdocuments.mx/reader030/viewer/2022033106/56649ec45503460f94bcf24e/html5/thumbnails/20.jpg)
Hosted SimulatorSupplier challenges
User expectations
© Costec Systems & ABB - February 3, 2011 | Slide ‹20›