Page 1: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,

The Microgeneration Certification Scheme (MCS)

Richard PhillipsBRE Global

Page 2: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,

Benefits of Microgeneration Systems

• Provide a useful proportion of a building’s energy demand

• Help reduce CO2 emissions• Help achieve higher sustainability ratings

(e.g. for BREEAM and CSH)• Help satisfy planners’ and home owners’

expectations for sustainability • Be good value for clients’ and taxpayers’

money• Enhance the reputation of the industry

– Encourage uptake

When correctly designed, manufactured and installed micro renewable systems can:

Page 3: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,

Why MCS?

• Replacement needed for Clear Skies and PV schemes– More robust

• Protect reputation of the industry

• UKAS accreditation– Independent

• Protect consumers by providing robust criteria for:– Quality of products– Quality of installations

• Mitigate Risks

Page 4: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,

Risks• Things can go wrong!• Little knowledge amongst homeowners • Poor performance can

– Increase running costs– Cause discomfort– Reduce, or even reverse, emissions

savings• Poor design and installation can:

– Be unsafe– Reduce system performance – Damage the building envelope

• Any of the above could turn a positive vision into a negative image

Page 5: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,

The Microgeneration Certification Scheme

MCS Mark:

• MCS mark owned by Secretary of State (DECC)• Mark licensed to Gemserv (MCS administrator)• Sub licensed to Certification bodies• Certification bodies issue mark to certificated

companies

Page 6: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,

The Microgeneration Certification Scheme

Gemserv

Certification bodies

Certificated companies

MCS Steering Group

Technical Working groups etc

DECC

UKAS

Scheme documents & standards etc

Stakeholders:Industry

Trade assoc.s

Consumer groups

Grant bodies

DECC

UCAS

Etc. etc.

Page 7: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,

The MCS Installer Scheme• Certification of companies not individuals• Scope

– Design, supply, installation, set to work, commissioning and handover of microgeneration systems

• Assessments conducted in two parts:• Office Assessment

– MCS 001– Quality control– Membership of an OFT approved consumer code of

conduct (e.g. REAL)• On-site Installation Assessment

– Technology specific installation standard (MIS 300X)– Estimate of annual energy performance

• Certification is maintained through surveillance assessments (usually annually)

Page 8: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,

MCS Simply Explained

• Say what you do,…– Have written procedures

• …do what you say,…– Follow your procedures

• …prove it.– Get MCS certification

Page 9: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,

Office Assessment

• Quality manual appropriate to the business– Don’t be intimidated! A small business

probably doesn’t need a complex quality manual (but a large one might)

– Feedback suggests a good quality manual improves the business

– Needs to be a controlled document• Formal approval & sign-off = ‘ownership’• Issue number and date• ‘Singing from the same hymn sheet’

Page 10: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,

Office Assessment

• Assesses procedures for a number of activities including:– Who is responsible for each activity– Document control

• e.g. keeping up with changes in regulations and standards

– Customer contracts• Very important

– Equipment and calibration– Training and competence

• Written procedures ensure quality and consistency

• Full requirements are detailed in MCS001– Annex A, Table 1

Page 11: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,

On-site Assessment

• Technology specific installation standards

• Assessment of competence to install, not the installation itself

• Proof of knowledge and competence

• Needs to be a recent installation completed by the installer

Page 12: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,

The MCS Product Scheme

• Scheme covers:– Solar Collectors (MCS 004)– Solar Photovoltaic Modules (MCS 005)– Micro and Small Wind Turbines (MCS 006)– Heat Pumps (MCS 007)– Biomass (MCS 008)– Heat-led Micro-cogeneration Packages

(MCS 014)– Fuel Cells and Micro Hydro are in

preparation• Scope

– Not exceeding 50kW for electricity generators

– Not exceeding 45kW for heat

Page 13: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,

The MCS Product Scheme

• Product approval is generally in two parts:

• Technical evaluation– Review of test reports– Checks on the validity & completeness– Establish build status of product(s)

• Factory production control– Quality management system– Consistency of manufacture of certificated

products– Annual surveillance– Change control

Page 14: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,

Product Testing

• Acceptance criteria for test reports described in MCS 011

• UKAS or equivalent test laboratories– Testing must be in scope of accreditation

• Unaccredited independent test laboratories or manufacturers own testing facilities:– Assessment of laboratory by certification body

• Confirmation of correct equipment, procedures & competence etc. at the time of testing

• Witness testing

Page 15: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,

Certification• Contractors and products that meet

the relevant requirements will be MCS certificated– Listing on websites e.g.

www.greenbooklive.comwww.microgenerationcertification.org

– Eligibility for FITs etc.– Use of MCS and Certification

Body marks• Differentiation

Page 16: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,

BRE Global Certification Scheme

• Scheme operating for: – Solar Thermal– Solar PV– Micro-wind– Heat pumps – Biomass – Micro-CHP– Other standards under development

• Full UKAS accreditation achieved• 410+ installers Certificated by BRE Global

– Business improvements• 500+ products approved• Further information:

www.greenbooklive.com/microgen

Current status:

Page 17: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,

Summary• MCS in place to underpin and enhance

confidence in the industry by setting minimum requirements for:– Standard of installations– Product performance

• Installer and product schemes established– Annual energy calculations– Consumer code of conduct– Minimum performance requirements

• Initial assessment followed by surveillance• A number of certification bodies now

operating MCS– Robustness of the schemes needs to be

maintained

Page 18: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,

THANK YOU

Richard PhillipsBRE GlobalBucknalls LaneGarstonWatfordWD25 9XX

01923 [email protected]

Page 19: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,

Home Insulation • Wind Power • Solar Energy • Heat Harvesting • Energy Advice

Mark Group Project

Case Studies

Page 20: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,

Home Insulation • Wind Power • Solar Energy • Heat Harvesting • Energy Advice

Solar Hot Water

Page 21: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,

Home Insulation • Wind Power • Solar Energy • Heat Harvesting • Energy Advice

Outline Brief

• 10 Nursing Homes• All in need of refurbishment• High hot water & heating requirement• Concern about rising energy costs• Mixed fuel types – Gas & Electric• Vulnerable customers / priority groups• Budget constraints

Page 22: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,

Home Insulation • Wind Power • Solar Energy • Heat Harvesting • Energy Advice

Initial Scope

Mark Group met the client to agree –

• Aims of the project• To identify key problem areas• Order of priority• Budget

– More added to scope because of LCBP potential funding

• Project risks/ Feasibility• Communication to the Residents

Page 23: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,

Home Insulation • Wind Power • Solar Energy • Heat Harvesting • Energy AdviceAppropriate Roof/s for Panels ?

Site Assessment

Page 24: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,

Home Insulation • Wind Power • Solar Energy • Heat Harvesting • Energy AdviceAccess ?

Page 25: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,

Home Insulation • Wind Power • Solar Energy • Heat Harvesting • Energy Advice

Space in Plant Room

for Water Storage ?

Page 26: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,

Home Insulation • Wind Power • Solar Energy • Heat Harvesting • Energy AdviceSpace in Loft for Pumps and Pipes ?

Page 27: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,

Home Insulation • Wind Power • Solar Energy • Heat Harvesting • Energy Advice

Safe Loft Access ?

Page 28: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,

Home Insulation • Wind Power • Solar Energy • Heat Harvesting • Energy Advice

Solution Design

Page 29: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,

Home Insulation • Wind Power • Solar Energy • Heat Harvesting • Energy Advice

?

Solution Design

HeatingNeeds

Budget /Funding

HotWaterNeeds

Timescale ExistingSystems

SolarWater

Heating

Page 30: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,

Home Insulation • Wind Power • Solar Energy • Heat Harvesting • Energy Advice

Pre-Installation

Communication with

• Council• Site Manager/s• Residents

Page 31: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,

Home Insulation • Wind Power • Solar Energy • Heat Harvesting • Energy Advice

Installation

Installation of:

• Pumps• Cylinders• Pipework• Panels

Page 32: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,

During

After

Before

Page 33: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,

Home Insulation • Wind Power • Solar Energy • Heat Harvesting • Energy Advice

Results – Post Install

• Funding from LCBP programme– received in accordance with the offer

• Happy users– who were involved all the way

• Happy client– fuel usage reduction of ~30%

• Further 4 installs ordered and planned– further LCBP funding offers approved

• Other properties at survey stage

Page 34: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,

Home Insulation • Wind Power • Solar Energy • Heat Harvesting • Energy Advice

Summary

Mark Group provided client with:–

• The best technology solution to meet their needs• A full service from inception to completion• Assistance with funding application• A positive outcome

Page 35: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,

Home Insulation • Wind Power • Solar Energy • Heat Harvesting • Energy Advice

Solar Electricity

Page 36: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,

Home Insulation • Wind Power • Solar Energy • Heat Harvesting • Energy Advice

Outline Brief

• Modern Secondary School• High electric usage and costs• Concern about rising energy costs• Budget constraints• Educational opportunity

Page 37: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,

Home Insulation • Wind Power • Solar Energy • Heat Harvesting • Energy Advice

Initial Scope

Mark Group met the Headmaster to agree –

• Aims of the project• To identify key risk areas• Budget

LCBP funding / Feed-in TariffPower Purchase Agreement

• Project plan• Communication to the Pupils and Staff

Page 38: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,

Appropriate Roof/s for Panels ?

Site Assessment

Page 39: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,

Access ?

Page 40: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,

Plant Room Access ?

Page 41: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,

Solution Design

Page 42: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,

?

Solution Design

ElectricalNeeds

Budget /Funding

EducationNeeds

Timescale ExistingSystems

SolarPhotovoltaic

System

Page 43: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,

Home Insulation • Wind Power • Solar Energy • Heat Harvesting • Energy Advice

Pre-Installation

Communication with

• Headmaster• Staff• Pupils

Page 44: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,

Home Insulation • Wind Power • Solar Energy • Heat Harvesting • Energy Advice

Installation

Installation of:

• Brackets• Framework• Panels

Page 45: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,

Home Insulation • Wind Power • Solar Energy • Heat Harvesting • Energy Advice

Installation of:

• Inverters• Isolators• Meters

Page 46: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,

Before

Page 47: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,

During

Page 48: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,

After

Page 49: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,

Home Insulation • Wind Power • Solar Energy • Heat Harvesting • Energy Advice

Results – Post Install

• Funding from LCBP/FIT– received in accordance with the offer

• Happy Headmaster– green electric supply of 35,000 kWh’s

• Educated pupils / staff– integrated lesson plans

• Other schools at survey / planning stages

Page 50: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,

Home Insulation • Wind Power • Solar Energy • Heat Harvesting • Energy Advice

Summary

Mark Group provided client with:–

• The best technology solution to meet their needs• A full service from inception to completion• Assistance with funding application• A positive outcome

Page 51: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,

Home Insulation • Wind Power • Solar Energy • Heat Harvesting • Energy Advice

Thank YouQuestions and Answers