the managerial process clifford f. gray eric w. larson developing a project plan chapter 6
TRANSCRIPT
![Page 1: THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Developing a Project Plan Chapter 6](https://reader033.vdocuments.mx/reader033/viewer/2022061506/56649e115503460f94afdbb3/html5/thumbnails/1.jpg)
THE MANAGERIAL PROCESSTHE MANAGERIAL PROCESS
Pr ojec t ManagementPr ojec t Management
Clifford F. Gray
Eric W. Larson
Clifford F. Gray
Eric W. Larson
Developing a Project PlanDeveloping a Project Plan
Chapter 6
![Page 2: THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Developing a Project Plan Chapter 6](https://reader033.vdocuments.mx/reader033/viewer/2022061506/56649e115503460f94afdbb3/html5/thumbnails/2.jpg)
Copyright Copyright © © 2006 The McGraw-Hill Companies. All rights reserved. 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 6McGraw-Hill/Irwin 6––22
![Page 3: THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Developing a Project Plan Chapter 6](https://reader033.vdocuments.mx/reader033/viewer/2022061506/56649e115503460f94afdbb3/html5/thumbnails/3.jpg)
Copyright Copyright © © 2006 The McGraw-Hill Companies. All rights reserved. 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 6McGraw-Hill/Irwin 6––33
Developing the Project PlanDeveloping the Project PlanDeveloping the Project PlanDeveloping the Project Plan
• The Project Network–A flow chart that graphically depicts the sequence,
interdependencies, and start and finish times of the project job plan of activities that is the critical path through the network.
•Provides the basis for scheduling labor and equipment.
•Enhances communication among project participants.
•Provides an estimate of the project’s duration.
•Provides a basis for budgeting cash flow.
• Identifies activities that are critical.
•Highlights activities that are “critical” and can not be delayed.
•Help managers get and stay on plan.
![Page 4: THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Developing a Project Plan Chapter 6](https://reader033.vdocuments.mx/reader033/viewer/2022061506/56649e115503460f94afdbb3/html5/thumbnails/4.jpg)
Copyright Copyright © © 2006 The McGraw-Hill Companies. All rights reserved. 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 6McGraw-Hill/Irwin 6––44
From Work Package to NetworkFrom Work Package to NetworkFrom Work Package to NetworkFrom Work Package to Network
FIGURE 6.1
WBS/Work Packages to Network
![Page 5: THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Developing a Project Plan Chapter 6](https://reader033.vdocuments.mx/reader033/viewer/2022061506/56649e115503460f94afdbb3/html5/thumbnails/5.jpg)
Copyright Copyright © © 2006 The McGraw-Hill Companies. All rights reserved. 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 6McGraw-Hill/Irwin 6––55
From Work Package to Network (cont’d)From Work Package to Network (cont’d)From Work Package to Network (cont’d)From Work Package to Network (cont’d)
FIGURE 6.1 (cont’d)
WBS/Work Packages to Network (cont’d)
![Page 6: THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Developing a Project Plan Chapter 6](https://reader033.vdocuments.mx/reader033/viewer/2022061506/56649e115503460f94afdbb3/html5/thumbnails/6.jpg)
Copyright Copyright © © 2006 The McGraw-Hill Companies. All rights reserved. 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 6McGraw-Hill/Irwin 6––66
Constructing a Project NetworkConstructing a Project NetworkConstructing a Project NetworkConstructing a Project Network
• Terminology
–Activity: an element of the project that requires time.
–Merge Activity: an activity that has two or more preceding activities on which it depends.
–Parallel (Concurrent) Activities: Activities that can occur independently and, if desired, not at the same time.
A
C
B D
![Page 7: THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Developing a Project Plan Chapter 6](https://reader033.vdocuments.mx/reader033/viewer/2022061506/56649e115503460f94afdbb3/html5/thumbnails/7.jpg)
Copyright Copyright © © 2006 The McGraw-Hill Companies. All rights reserved. 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 6McGraw-Hill/Irwin 6––77
Constructing a Project Network (cont’d)Constructing a Project Network (cont’d)Constructing a Project Network (cont’d)Constructing a Project Network (cont’d)
• Terminology
–Path: a sequence of connected, dependent activities.
–Critical path: the longest path through the activity network that allows for the completion of all project-related activities; the shortest expected time in which the entire project can be completed. Delays on the critical path will delay completion of the entire project.
C
A B D
(Assumes that minimum of A + B > minimum of C in length of times to complete activities.)
![Page 8: THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Developing a Project Plan Chapter 6](https://reader033.vdocuments.mx/reader033/viewer/2022061506/56649e115503460f94afdbb3/html5/thumbnails/8.jpg)
Copyright Copyright © © 2006 The McGraw-Hill Companies. All rights reserved. 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 6McGraw-Hill/Irwin 6––88
Constructing a Project Network (cont’d)Constructing a Project Network (cont’d)Constructing a Project Network (cont’d)Constructing a Project Network (cont’d)
• Terminology–Event: a point in time when an activity is started or
completed. It does not consume time.–Burst Activity: an activity that has more than one
activity immediately following it (more than one dependency arrow flowing from it).
• Two Approaches–Activity-on-Node (AON)
•Uses a node to depict an activity.
–Activity-on-Arrow (AOA)•Uses an arrow to depict an activity.
B
D
A C
![Page 9: THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Developing a Project Plan Chapter 6](https://reader033.vdocuments.mx/reader033/viewer/2022061506/56649e115503460f94afdbb3/html5/thumbnails/9.jpg)
Copyright Copyright © © 2006 The McGraw-Hill Companies. All rights reserved. 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 6McGraw-Hill/Irwin 6––99
Basic Rules to Follow in Developing Basic Rules to Follow in Developing Project NetworksProject Networks
Basic Rules to Follow in Developing Basic Rules to Follow in Developing Project NetworksProject Networks
• Networks typically flow from left to right.• An activity cannot begin until all of its activities are
complete.• Arrows indicate precedence and flow and can cross over
each other.• Identify each activity with a unique number; this number
must be greater than its predecessors.• Looping is not allowed.• Conditional statements are not allowed.• Use common start and stop nodes.
![Page 10: THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Developing a Project Plan Chapter 6](https://reader033.vdocuments.mx/reader033/viewer/2022061506/56649e115503460f94afdbb3/html5/thumbnails/10.jpg)
Copyright Copyright © © 2006 The McGraw-Hill Companies. All rights reserved. 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 6McGraw-Hill/Irwin 6––1010
Activity-on-Node FundamentalsActivity-on-Node FundamentalsActivity-on-Node FundamentalsActivity-on-Node Fundamentals
FIGURE 6.2
![Page 11: THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Developing a Project Plan Chapter 6](https://reader033.vdocuments.mx/reader033/viewer/2022061506/56649e115503460f94afdbb3/html5/thumbnails/11.jpg)
Copyright Copyright © © 2006 The McGraw-Hill Companies. All rights reserved. 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 6McGraw-Hill/Irwin 6––1111
Activity-on-Node Fundamentals (cont’d)Activity-on-Node Fundamentals (cont’d)Activity-on-Node Fundamentals (cont’d)Activity-on-Node Fundamentals (cont’d)
FIGURE 6.2 (cont’d)
![Page 12: THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Developing a Project Plan Chapter 6](https://reader033.vdocuments.mx/reader033/viewer/2022061506/56649e115503460f94afdbb3/html5/thumbnails/12.jpg)
Copyright Copyright © © 2006 The McGraw-Hill Companies. All rights reserved. 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 6McGraw-Hill/Irwin 6––1212
Network InformationNetwork InformationNetwork InformationNetwork Information
TABLE 6.1
![Page 13: THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Developing a Project Plan Chapter 6](https://reader033.vdocuments.mx/reader033/viewer/2022061506/56649e115503460f94afdbb3/html5/thumbnails/13.jpg)
Copyright Copyright © © 2006 The McGraw-Hill Companies. All rights reserved. 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 6McGraw-Hill/Irwin 6––1313
Koll Business CenterKoll Business Center—Partial Network—Partial NetworkKoll Business CenterKoll Business Center—Partial Network—Partial Network
FIGURE 6.3
![Page 14: THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Developing a Project Plan Chapter 6](https://reader033.vdocuments.mx/reader033/viewer/2022061506/56649e115503460f94afdbb3/html5/thumbnails/14.jpg)
Copyright Copyright © © 2006 The McGraw-Hill Companies. All rights reserved. 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 6McGraw-Hill/Irwin 6––1414
Koll Business CenterKoll Business Center—Complete Network—Complete NetworkKoll Business CenterKoll Business Center—Complete Network—Complete Network
FIGURE 6.4
![Page 15: THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Developing a Project Plan Chapter 6](https://reader033.vdocuments.mx/reader033/viewer/2022061506/56649e115503460f94afdbb3/html5/thumbnails/15.jpg)
Copyright Copyright © © 2006 The McGraw-Hill Companies. All rights reserved. 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 6McGraw-Hill/Irwin 6––1515
Network Computation ProcessNetwork Computation ProcessNetwork Computation ProcessNetwork Computation Process
• Forward Pass—Earliest Times–How soon can the activity start? (early start—ES)
–How soon can the activity finish? (early finish—EF)
–How soon can the project finish? (expected time—ET)
• Backward Pass—Latest Times–How late can the activity start? (late start—LS)
–How late can the activity finish? (late finish—LF)
–Which activities represent the critical path?
–How long can it be delayed? (slack or float—SL)
![Page 16: THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Developing a Project Plan Chapter 6](https://reader033.vdocuments.mx/reader033/viewer/2022061506/56649e115503460f94afdbb3/html5/thumbnails/16.jpg)
Copyright Copyright © © 2006 The McGraw-Hill Companies. All rights reserved. 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 6McGraw-Hill/Irwin 6––1616
Network InformationNetwork InformationNetwork InformationNetwork Information
TABLE 6.2
![Page 17: THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Developing a Project Plan Chapter 6](https://reader033.vdocuments.mx/reader033/viewer/2022061506/56649e115503460f94afdbb3/html5/thumbnails/17.jpg)
Copyright Copyright © © 2006 The McGraw-Hill Companies. All rights reserved. 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 6McGraw-Hill/Irwin 6––1717
Activity-on-Node NetworkActivity-on-Node NetworkActivity-on-Node NetworkActivity-on-Node Network
FIGURE 6.5
![Page 18: THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Developing a Project Plan Chapter 6](https://reader033.vdocuments.mx/reader033/viewer/2022061506/56649e115503460f94afdbb3/html5/thumbnails/18.jpg)
Copyright Copyright © © 2006 The McGraw-Hill Companies. All rights reserved. 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 6McGraw-Hill/Irwin 6––1818
Activity-on-Node Network Forward PassActivity-on-Node Network Forward PassActivity-on-Node Network Forward PassActivity-on-Node Network Forward Pass
FIGURE 6.6
![Page 19: THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Developing a Project Plan Chapter 6](https://reader033.vdocuments.mx/reader033/viewer/2022061506/56649e115503460f94afdbb3/html5/thumbnails/19.jpg)
Copyright Copyright © © 2006 The McGraw-Hill Companies. All rights reserved. 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 6McGraw-Hill/Irwin 6––1919
Forward Pass ComputationForward Pass ComputationForward Pass ComputationForward Pass Computation
• Add activity times along each path in the network (ES + Duration = EF).
• Carry the early finish (EF) to the next activity where it becomes its early start (ES) unless…
• The next succeeding activity is a merge activity, in which case the largest EF of all preceding activities is selected.
![Page 20: THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Developing a Project Plan Chapter 6](https://reader033.vdocuments.mx/reader033/viewer/2022061506/56649e115503460f94afdbb3/html5/thumbnails/20.jpg)
Copyright Copyright © © 2006 The McGraw-Hill Companies. All rights reserved. 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 6McGraw-Hill/Irwin 6––2020
Activity-on-Node Network Backward PassActivity-on-Node Network Backward PassActivity-on-Node Network Backward PassActivity-on-Node Network Backward Pass
FIGURE 6.7
![Page 21: THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Developing a Project Plan Chapter 6](https://reader033.vdocuments.mx/reader033/viewer/2022061506/56649e115503460f94afdbb3/html5/thumbnails/21.jpg)
Copyright Copyright © © 2006 The McGraw-Hill Companies. All rights reserved. 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 6McGraw-Hill/Irwin 6––2121
Backward Pass ComputationBackward Pass ComputationBackward Pass ComputationBackward Pass Computation
• Subtract activity times along each path in the network (LF - Duration = LS).
• Carry the late start (LS) to the next activity where it becomes its late finish (LF) unless
• The next succeeding activity is a burst activity, in which case the smallest LF of all preceding activities is selected.
![Page 22: THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Developing a Project Plan Chapter 6](https://reader033.vdocuments.mx/reader033/viewer/2022061506/56649e115503460f94afdbb3/html5/thumbnails/22.jpg)
Copyright Copyright © © 2006 The McGraw-Hill Companies. All rights reserved. 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 6McGraw-Hill/Irwin 6––2222
Determining Slack (or Float)Determining Slack (or Float)Determining Slack (or Float)Determining Slack (or Float)
• Slack (or Float)–The amount of time an activity can be delayed after
the start of a longer parallel activity or activities.
• Total slack–The amount of time an activity can be delayed without
delaying the entire project.
• The critical path is the network path(s) that has (have) the least slack in common.
![Page 23: THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Developing a Project Plan Chapter 6](https://reader033.vdocuments.mx/reader033/viewer/2022061506/56649e115503460f94afdbb3/html5/thumbnails/23.jpg)
Copyright Copyright © © 2006 The McGraw-Hill Companies. All rights reserved. 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 6McGraw-Hill/Irwin 6––2323
Activity-on-Node Network with SlackActivity-on-Node Network with SlackActivity-on-Node Network with SlackActivity-on-Node Network with Slack
FIGURE 6.8
![Page 24: THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Developing a Project Plan Chapter 6](https://reader033.vdocuments.mx/reader033/viewer/2022061506/56649e115503460f94afdbb3/html5/thumbnails/24.jpg)
Copyright Copyright © © 2006 The McGraw-Hill Companies. All rights reserved. 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 6McGraw-Hill/Irwin 6––2424
Practical ConsiderationsPractical ConsiderationsPractical ConsiderationsPractical Considerations
• Network Logic Errors• Activity Numbering• Use of Computers to Develop Networks• Calendar Dates• Multiple Starts and Multiple Projects
![Page 25: THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Developing a Project Plan Chapter 6](https://reader033.vdocuments.mx/reader033/viewer/2022061506/56649e115503460f94afdbb3/html5/thumbnails/25.jpg)
Copyright Copyright © © 2006 The McGraw-Hill Companies. All rights reserved. 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 6McGraw-Hill/Irwin 6––2525
Illogical LoopIllogical LoopIllogical LoopIllogical Loop
FIGURE 6.9
![Page 26: THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Developing a Project Plan Chapter 6](https://reader033.vdocuments.mx/reader033/viewer/2022061506/56649e115503460f94afdbb3/html5/thumbnails/26.jpg)
Copyright Copyright © © 2006 The McGraw-Hill Companies. All rights reserved. 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 6McGraw-Hill/Irwin 6––2626
Air Control ProjectAir Control ProjectAir Control ProjectAir Control Project
FIGURE 6.10
![Page 27: THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Developing a Project Plan Chapter 6](https://reader033.vdocuments.mx/reader033/viewer/2022061506/56649e115503460f94afdbb3/html5/thumbnails/27.jpg)
Copyright Copyright © © 2006 The McGraw-Hill Companies. All rights reserved. 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 6McGraw-Hill/Irwin 6––2727
Air Control Project (cont’d)Air Control Project (cont’d)Air Control Project (cont’d)Air Control Project (cont’d)
FIGURE 6.11
![Page 28: THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Developing a Project Plan Chapter 6](https://reader033.vdocuments.mx/reader033/viewer/2022061506/56649e115503460f94afdbb3/html5/thumbnails/28.jpg)
Copyright Copyright © © 2006 The McGraw-Hill Companies. All rights reserved. 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 6McGraw-Hill/Irwin 6––2828
Extended Network Techniques Extended Network Techniques to Come Close to Realityto Come Close to Reality
Extended Network Techniques Extended Network Techniques to Come Close to Realityto Come Close to Reality
• Laddering–Activities are broken into segments so the following
activity can begin sooner and not delay the work.
• Lags–The minimum amount of time a dependent activity
must be delayed to begin or end.•Lengthy activities are broken down to reduce the
delay in the start of successor activities.•Lags can be used to constrain finish-to-start, start-to-
start, finish-to-finish, start-to-finish, or combination relationships.
![Page 29: THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Developing a Project Plan Chapter 6](https://reader033.vdocuments.mx/reader033/viewer/2022061506/56649e115503460f94afdbb3/html5/thumbnails/29.jpg)
Copyright Copyright © © 2006 The McGraw-Hill Companies. All rights reserved. 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 6McGraw-Hill/Irwin 6––2929
Example of Laddering Using Example of Laddering Using Finish-to-Start RelationshipFinish-to-Start Relationship
Example of Laddering Using Example of Laddering Using Finish-to-Start RelationshipFinish-to-Start Relationship
FIGURE 6.12
![Page 30: THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Developing a Project Plan Chapter 6](https://reader033.vdocuments.mx/reader033/viewer/2022061506/56649e115503460f94afdbb3/html5/thumbnails/30.jpg)
Copyright Copyright © © 2006 The McGraw-Hill Companies. All rights reserved. 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 6McGraw-Hill/Irwin 6––3030
Use of LagsUse of LagsUse of LagsUse of Lags
FIGURE 6.13
FIGURE 6.14
Finish-to-Start Relationship
Start-to-Start Relationship
![Page 31: THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Developing a Project Plan Chapter 6](https://reader033.vdocuments.mx/reader033/viewer/2022061506/56649e115503460f94afdbb3/html5/thumbnails/31.jpg)
Copyright Copyright © © 2006 The McGraw-Hill Companies. All rights reserved. 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 6McGraw-Hill/Irwin 6––3131
Use of Lags Cont’dUse of Lags Cont’dUse of Lags Cont’dUse of Lags Cont’d
FIGURE 6.15
Use of Lags to Reduce Detail
![Page 32: THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Developing a Project Plan Chapter 6](https://reader033.vdocuments.mx/reader033/viewer/2022061506/56649e115503460f94afdbb3/html5/thumbnails/32.jpg)
Copyright Copyright © © 2006 The McGraw-Hill Companies. All rights reserved. 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 6McGraw-Hill/Irwin 6––3232
New Product Development New Product Development ProcessProcess
New Product Development New Product Development ProcessProcess
FIGURE 6.16
![Page 33: THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Developing a Project Plan Chapter 6](https://reader033.vdocuments.mx/reader033/viewer/2022061506/56649e115503460f94afdbb3/html5/thumbnails/33.jpg)
Copyright Copyright © © 2006 The McGraw-Hill Companies. All rights reserved. 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 6McGraw-Hill/Irwin 6––3333
Use of Lags (cont’d)Use of Lags (cont’d)Use of Lags (cont’d)Use of Lags (cont’d)
FIGURE 6.17
FIGURE 6.18
FIGURE 6.19
Finish-to-Finish Relationship
Start-to-Finish Relationship
CombinationRelationship
![Page 34: THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Developing a Project Plan Chapter 6](https://reader033.vdocuments.mx/reader033/viewer/2022061506/56649e115503460f94afdbb3/html5/thumbnails/34.jpg)
Copyright Copyright © © 2006 The McGraw-Hill Companies. All rights reserved. 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 6McGraw-Hill/Irwin 6––3434
Network Using LagsNetwork Using LagsNetwork Using LagsNetwork Using Lags
FIGURE 6.20
![Page 35: THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Developing a Project Plan Chapter 6](https://reader033.vdocuments.mx/reader033/viewer/2022061506/56649e115503460f94afdbb3/html5/thumbnails/35.jpg)
Copyright Copyright © © 2006 The McGraw-Hill Companies. All rights reserved. 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 6McGraw-Hill/Irwin 6––3535
Hammock ActivitiesHammock ActivitiesHammock ActivitiesHammock Activities
• Hammock Activity
–An activity that spans over a segment of a project.
–Duration of hammock activities is determined after the network plan is drawn.
–Hammock activities are used to aggregate sections of the project to facilitate getting the right amount of detail for specific sections of a project.
![Page 36: THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Developing a Project Plan Chapter 6](https://reader033.vdocuments.mx/reader033/viewer/2022061506/56649e115503460f94afdbb3/html5/thumbnails/36.jpg)
Copyright Copyright © © 2006 The McGraw-Hill Companies. All rights reserved. 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 6McGraw-Hill/Irwin 6––3636
Hammock Activity ExampleHammock Activity ExampleHammock Activity ExampleHammock Activity Example
FIGURE 6.21
![Page 37: THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Developing a Project Plan Chapter 6](https://reader033.vdocuments.mx/reader033/viewer/2022061506/56649e115503460f94afdbb3/html5/thumbnails/37.jpg)
Copyright Copyright © © 2006 The McGraw-Hill Companies. All rights reserved. 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 6McGraw-Hill/Irwin 6––3737
Key TermsKey TermsKey TermsKey Terms
Activity
Activity-on-arrow (AOA)
Activity-on-node (AON)
Burst activity
Concurrent engineering
Critical path
Early and late times
Gantt chart
Hammock activity
Lag relationship
Merge activity
Network sensitivity
Parallel activity
Slack/float—total and free
![Page 38: THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Developing a Project Plan Chapter 6](https://reader033.vdocuments.mx/reader033/viewer/2022061506/56649e115503460f94afdbb3/html5/thumbnails/38.jpg)
Copyright Copyright © © 2006 The McGraw-Hill Companies. All rights reserved. 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 6McGraw-Hill/Irwin 6––3838
Activity-on-Arrow Network Building BlocksActivity-on-Arrow Network Building BlocksActivity-on-Arrow Network Building BlocksActivity-on-Arrow Network Building Blocks
FIGURE A6.1
![Page 39: THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Developing a Project Plan Chapter 6](https://reader033.vdocuments.mx/reader033/viewer/2022061506/56649e115503460f94afdbb3/html5/thumbnails/39.jpg)
Copyright Copyright © © 2006 The McGraw-Hill Companies. All rights reserved. 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 6McGraw-Hill/Irwin 6––3939
Activity-on-Arrow Network FundamentalsActivity-on-Arrow Network FundamentalsActivity-on-Arrow Network FundamentalsActivity-on-Arrow Network Fundamentals
FIGURE A6.2
![Page 40: THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Developing a Project Plan Chapter 6](https://reader033.vdocuments.mx/reader033/viewer/2022061506/56649e115503460f94afdbb3/html5/thumbnails/40.jpg)
Copyright Copyright © © 2006 The McGraw-Hill Companies. All rights reserved. 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 6McGraw-Hill/Irwin 6––4040
Activity-on-Arrow Network FundamentalsActivity-on-Arrow Network FundamentalsActivity-on-Arrow Network FundamentalsActivity-on-Arrow Network Fundamentals
FIGURE A6.2 (cont’d)
![Page 41: THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Developing a Project Plan Chapter 6](https://reader033.vdocuments.mx/reader033/viewer/2022061506/56649e115503460f94afdbb3/html5/thumbnails/41.jpg)
Copyright Copyright © © 2006 The McGraw-Hill Companies. All rights reserved. 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 6McGraw-Hill/Irwin 6––4141
Koll Center Project: Network InformationKoll Center Project: Network InformationKoll Center Project: Network InformationKoll Center Project: Network Information
TABLE A6.3
![Page 42: THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Developing a Project Plan Chapter 6](https://reader033.vdocuments.mx/reader033/viewer/2022061506/56649e115503460f94afdbb3/html5/thumbnails/42.jpg)
Copyright Copyright © © 2006 The McGraw-Hill Companies. All rights reserved. 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 6McGraw-Hill/Irwin 6––4242
Partial Koll Business Center AOA NetworkPartial Koll Business Center AOA NetworkPartial Koll Business Center AOA NetworkPartial Koll Business Center AOA Network
FIGURE A6.3
![Page 43: THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Developing a Project Plan Chapter 6](https://reader033.vdocuments.mx/reader033/viewer/2022061506/56649e115503460f94afdbb3/html5/thumbnails/43.jpg)
Copyright Copyright © © 2006 The McGraw-Hill Companies. All rights reserved. 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 6McGraw-Hill/Irwin 6––4343
Partial AOA Koll NetworkPartial AOA Koll NetworkPartial AOA Koll NetworkPartial AOA Koll Network
FIGURE A6.4
![Page 44: THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Developing a Project Plan Chapter 6](https://reader033.vdocuments.mx/reader033/viewer/2022061506/56649e115503460f94afdbb3/html5/thumbnails/44.jpg)
Copyright Copyright © © 2006 The McGraw-Hill Companies. All rights reserved. 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 6McGraw-Hill/Irwin 6––4444
Partial AOA Koll Network (cont’d)Partial AOA Koll Network (cont’d)Partial AOA Koll Network (cont’d)Partial AOA Koll Network (cont’d)
FIGURE A6.4 (cont’d)
![Page 45: THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Developing a Project Plan Chapter 6](https://reader033.vdocuments.mx/reader033/viewer/2022061506/56649e115503460f94afdbb3/html5/thumbnails/45.jpg)
Copyright Copyright © © 2006 The McGraw-Hill Companies. All rights reserved. 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 6McGraw-Hill/Irwin 6––4545
Activity-on-Arrow NetworkActivity-on-Arrow NetworkActivity-on-Arrow NetworkActivity-on-Arrow Network
FIGURE A6.5
![Page 46: THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Developing a Project Plan Chapter 6](https://reader033.vdocuments.mx/reader033/viewer/2022061506/56649e115503460f94afdbb3/html5/thumbnails/46.jpg)
Copyright Copyright © © 2006 The McGraw-Hill Companies. All rights reserved. 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 6McGraw-Hill/Irwin 6––4646
Activity-on-Arrow Network Forward PassActivity-on-Arrow Network Forward PassActivity-on-Arrow Network Forward PassActivity-on-Arrow Network Forward Pass
FIGURE A6.6
![Page 47: THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Developing a Project Plan Chapter 6](https://reader033.vdocuments.mx/reader033/viewer/2022061506/56649e115503460f94afdbb3/html5/thumbnails/47.jpg)
Copyright Copyright © © 2006 The McGraw-Hill Companies. All rights reserved. 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 6McGraw-Hill/Irwin 6––4747
Activity-on-Arrow Network Backward PassActivity-on-Arrow Network Backward PassActivity-on-Arrow Network Backward PassActivity-on-Arrow Network Backward Pass
FIGURE A6.7
![Page 48: THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Developing a Project Plan Chapter 6](https://reader033.vdocuments.mx/reader033/viewer/2022061506/56649e115503460f94afdbb3/html5/thumbnails/48.jpg)
Copyright Copyright © © 2006 The McGraw-Hill Companies. All rights reserved. 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 6McGraw-Hill/Irwin 6––4848
Activity-on-Arrow Network Backward Pass, Activity-on-Arrow Network Backward Pass, Forward Pass, and SlackForward Pass, and Slack
Activity-on-Arrow Network Backward Pass, Activity-on-Arrow Network Backward Pass, Forward Pass, and SlackForward Pass, and Slack
FIGURE A6.8
![Page 49: THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Developing a Project Plan Chapter 6](https://reader033.vdocuments.mx/reader033/viewer/2022061506/56649e115503460f94afdbb3/html5/thumbnails/49.jpg)
Copyright Copyright © © 2006 The McGraw-Hill Companies. All rights reserved. 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 6McGraw-Hill/Irwin 6––4949
Air Control Inc. Custom Order ProjectAir Control Inc. Custom Order Project——AOA Network DiagramAOA Network Diagram
Air Control Inc. Custom Order ProjectAir Control Inc. Custom Order Project——AOA Network DiagramAOA Network Diagram
FIGURE A6.9
![Page 50: THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Developing a Project Plan Chapter 6](https://reader033.vdocuments.mx/reader033/viewer/2022061506/56649e115503460f94afdbb3/html5/thumbnails/50.jpg)
Copyright Copyright © © 2006 The McGraw-Hill Companies. All rights reserved. 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 6McGraw-Hill/Irwin 6––5050
Comparison of AON and AOA Comparison of AON and AOA MethodsMethods
Comparison of AON and AOA Comparison of AON and AOA MethodsMethods
TABLE A6.2