The LHC energy: past and future
XXIX Workshop on Recent Advances in Particle Physics and Cosmology,
Saturday, 16 April 2011
Mike Koratzinos, CERN
M. Koratzinos
Introduction
• The LHC has been operating in 2010 and 2011 at 3.5TeV per beam, half its design energy of 7TeV per beam
• We will review the constraints leading to this operating energy and provide an outlook for the years to come.
• Sergio Bertolucci yesterday already gave the landscape.
Acknowledgements: This work would not be possible without the help of a great number of colleagues, amongst which are Andrzej Siemko, Ruediger Schmidt, Arjan Verweij, Zinour Charifoulline, Knud Dahlerup-Petersen, Reiner Denz, Bob Flora, Howie Pfeffer, Jim Strait, Hugues Thiesen, Francesco Bertinelli, Christian Scheuerlein , George Kourkafas, Marta Bajko, Christian Giloux, Jerome Feuvrier, Andrea Apollonio, Pawel Dupert, Per Hagen, Bernard Dubois, Olivier Fournier and others.
M. Koratzinos
The Chamonix workshops• The last couple of years, the subject of beam energy is discussed in the
Chamonix workshop, where all aspects of possibly raising the energy are discussed (physics motivation, measurements, simulations, effect of a possible thermal runaway, etc.). Soon after, a decision is taken as to what the energy should be for the year.
M. Koratzinos
The safe energy of the LHC
• The reason behind the decision about the operating energy of the LHC are linked to risk rather than technical constraints. The main circuits of the LHC have no problem attaining their design current* which gives the design energy. However, there is a risk of an incident which is energy dependent.
*Bar training quenches
The 19 September 2008 incident• We know what is unsafe:
6500 7000 7500 8000 8500 9000 9500 100000
10
20
30
40
50
60
70
heating during PNO, sector 34, 19 Sep 2008
mK/hour
distance (m)
mK
/hour
B25R3
C24R3
Calorimetric analysis of test PLI3.a2 done on 15 September 2008 yields the following value for the excess resistance of the splice:
R 23R3-16R3, excessive = 234 ± 15 nΩ
M. Koratzinos
Powering scheme of high current circuits
• The LHC synchrotron is divided into 8 sectors. • Each sector has three high current (13000A)
circuits (RB, RQD, RQF) powered by one power converter each (24 high power converters total)
• In the case of the RB circuits, 154 magnets are powered in series (around 50 for RQ)
• This necessitates connecting the s/c cable from one magnet to its neighbour in situ in the LHC tunnel ( interconnects or splices)
Energy stored in the magnets• At the LHC, the stored energy is very high. Such an
accelerator commands respectThe energy stored in the LHC magnets at the design energy is 9.4GJ – similar to the kinetic energy of a Nimitz class aircraft carrier (80000 tons) traveling at 35 knots (battle speed)
[Even the energy of the beams is large: 360MJ – like the kinetic energy of a speeding train]
M. Koratzinos
Busbar copper stabilizer
• In case of a quench, the current needs a way to pass through as it cannot go though the superconducting cable
• For this reason, the busbars contain copper stabilizer of sufficient diameter
High current splicesThe main circuits of the LHC (RB, RQD, RQF) have about 24000 splices.
Out of these there are: •10170 interconnect splices and •13796 magnet splices
Interconnect splices are not protected by diodes and in the case of a problem all the current of the circuit passes through them
Nominal interconnect splice resistance:•At cold: 300pΩ•At warm (300K): 10μΩ
For the LHC to operate safely at a certain energy, there is a limit to how big a splice resistance can be
M. Koratzinos
Copper stabilizer continuity
bus U-profile bus
wedgeSolder No solder Bad joint
bus U-profile bus
wedgeSolder No solder
Remnants of solder/oxidation
bus U-profile bus
wedgeSolder No solder
Slightly better joint
Good joint
M. Koratzinos
What can create an incident?
• The greatest danger for a 19 September 2008-type accident is1. An interconnect with a discontinuity in the copper stabilizer...2. ...coupled to a quench in the vicinity
• (1) alone or (2) alone is not enough to create an accident• So, to define a safe energy of the LHC, we need to know:
1. How good/bad the copper joints are2. How many quenches we will get3. The relationship between resistance and thermal runaway
(derived from a simulation)
nOhms and uOhms• The 19 September 2008 incident happened due to a
interconnect whose resistance at cold was 1000 times more than specification – 300nOhms at cold
• Subsequent analysis and review showed another failure mode: even if the resistance at cold was nominal, a copper discontinuity coupled with a length of ‘bare’ cable could burn out in case of a quench, as the current is forced to go through the (narrow xsection) s/c cable.
• Relationship between length of cable and resistance (at warm now) is about 1cm = 14uOhms at warm
M. Koratzinos
M. Koratzinos
Resistance at cold
• A measuring campaign during 2009 (so-called Maya pyramid campaign) revealed that all resistances at cold do not pose a problem. The highest resistance measured was 3nOhms, low enough so that it can never quench the cable.
• The next question had to do with if such a resistance would deteriorate with time.
M. Koratzinos
s/c interconnects: evolution with time
The plots on the left provide the answer: no deterioration seen on the worst joints during 2010
Noisy board
Zinur Charifoulline
M. Koratzinos
Resistance at warm – non-invasive measurements
• A heroic campaign took place in 2008, where 5 out of 8 sectors were measured at warm (RB circuit)
• An added complication is that a single interconnect cannot be measured; instead a whole busbar segment is measured (around 40m long) where a defective joint is about 2% of the value of the busbar segment
•Busbar segment at warm: 2mOhm•Typical large defect: 50uOhms
M. Koratzinos
Warm non-invasive measurementsS
S S
S S
S
EE111 EE112 EE113
EE211EE219
EE119
EE213 EE212
EE015EE014
EE013 EE012R= 100 W
EE111 EE112 EE113
EE211EE219
EE119
EE213 EE212
EE015EE014
EE013 EE012R= 100 W
MBB line
EE111 EE112 EE113
EE211EE219
EE119
EE213 EE212
EE015EE014
EE013 EE012R= 100 W
MBA line
V
: Interconnect splices
: Voltage taps
Spread (uOhms)
Highest Excess resistance
A12 RB 13.3 39
A34 RB 10.1 36
A45 RB 16.7 53
A56 RB 9.0 19.9
A67 RB 13.6 51
M. Koratzinos
Resistance at warm – invasive measurements
• Unfortunately the resolution of the non-invasive method (around 10-15uOhms) is not good enough to get a good idea of the underlying distribution of splice resistances in the machine
• For this reason, we used the non-invasive method to ‘point’ to possible excessive resistances.
• The joints were then opened and measured very accurately (invasive method) [error less than 1uOhm].
• The distribution thus measured is used to derive the underlying distribution of bad splices in the machine – an exponential fits the cumulative distribution of the data well.
M. Koratzinos
The fitted distribution• Our knowledge comes from a SMALL and most probably BIASED
sample of 134 joints (out of 10000) measured accurately in 2009. Out of these 23 are above 20uOhms. Distribution is shown below.
• Joints could possibly deteriorate with time.
Analysis by Jim Strait + MK
No. of measurements: 134 – in this plot: 23
Extrapolating an (unknown) distribution is always risky!
The sample is from RB only, 5 sectors
M. Koratzinos
Quenches in 2010 • One of the pleasant outcomes of this year’s running, is that we have
observed to date zero unintentional beam-induced quenches. This is due to– A well behaving, reproducible machine– An BLM system that intervened in time and prevented magnet quenches
due to beam losses. • If we were sure that we will get zero quenches next year, running at
ANY energy would be safe from the splices point of view.• However, non-beam-induced quenches have been seen (spurious
quenches related to EM interference during a fast power abort, etc.).• For next year, we simply do not know how many quenches we are
going to get. Therefore in what follows, I have left this as a free parameter.
M. Koratzinos
Quench statistics 2010• This is a rudimentary attempt to look at how many quenches we had in
2010 (thanks to H. Reymond). The PM system is interrogated for cases where– QPS signal present: RB U_QS0> 100mV for 3 successive measurements– High current: I_MEAS>5000A
• This gave a total of 27 events. Manual inspection of those revealed that 9 were not real quenches (no heaters fired) and 3 more quenches were identified. The categories identified were:– Trip during PGC1: 11 quenches– Provoked quench: 3 quenches– Power cut: 2+3 quenches– Other: 2 quenches
• In 2010 we had about 20 quenches of the RB circuits above 5000A, due to various reasons.
“Giraffe” plots
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
0 20 40 60 80 100 120
Burn
-out
cur
rent
[A]
Raddit [mW]
3.5 TeV, tau=50 s
4 TeV, tau=50 s
4 TeV, tau=68 s
4.5 TeV, tau=68 s
(11 kA, tau=100 s)
PB=0.1% 0.05% 0.01% 0.002%2%
Safe max. defect is the rear foot of the giraffe. Strange shape comes from combination of gaseous Helium heating and heating through the busbar
A. Verweij, “Probability of burn-through of defective 13 ka splices at increased energy levels”, Chamonix 2011
M. Koratzinos
A method to present risk
• One way to present how safe it is to run at a specific energy is to calculate how many quenches we need per year before reaching a pre-defined incident probability level.
• I have used 0.1% as the acceptable incident probability level (one incident every 1000 years), but other numbers can also be used.
• In this framework, if the number of quenches we can “afford” is large, then operation is safe, and we would only need to re-asses the situation when this number of quenches is reached.
• If, however, the number of quenches we can “afford” is less than one, getting a single quench would put us above our pre-defined ‘risk’ level.
M. Koratzinos
Types of events• We can have the following types of quench
events:– Prompt quench of the interconnect region (beam
induced) [this is very unlikely since the adjacent magnet has a quench threshold which is 105 lower]
– Busbar propagation quench where the interconnect will quench from the heat propagated through the busbar from the (hot) diode within a few seconds
– Gaseous Helium propagation quench where the interconnect will quench ~20 seconds later from heat transferred through gaseous Helium of a quadrupole magnet:
Very unlikely
New calculation
No. of quenches to reach Pincident=0.1%Energy (TeV) , Tdump (s)
Allowed Rexcess RB(µΩ)
Allowed Rexcess
RQ (µΩ)No. of bad joints above Rexcess RB
No. of bad joints above Rexcess RQ
No. of quenches RB to reach Paccident=0.1%
No. of quenches RQ to reach Paccident=0.1%
Prompt quenches – 2 RB and 4 RQ joints affected3.5, 50s 85 87+ 0.1 0.2 5
4.0, 50s [4.0,68s] 72 [56] 71+ 0.4 [2] 0.9 1.3 [0.6]
4.5, 68s 47 56+ 4 4 0.2
5.0, 68s 44+ 48+ 6 8 0.1
Busbar propagation quenches 1 RB or 2 RQ joints affected3.5, 50s 90 any 0.07 0 46 ∞4.0, 50s [4.0,68s] 74 [55] 71++ 0.3 [2] 0.9 10 [2] 6
4.5, 68s 46 56++ 5 4 0.7 1.3
5.0, 68s 44? 48++ 6 8 0.6 0.6
Gaseous He propagation quenches (RB) – 3 RB and 8 RQ joints affected3.5, 50s 115 any 0.01 0 164
4.0, 50s [4.0,68s] 98 [75] any 0.03 [0.3] 0 33 [4]
4.5, 68s 63 any 1 0 1.2
5.0, 68s 48+ 95+ 4 0.1 0.3
Preliminary
= old calculation (RRR=100) = new calculation + = will increaseM. Koratzinos
On the safe energy of 2011• The most stringent limits come from prompt, beam induced,
quenches, considered unlikely. – if we are confident we will get no prompt quenches, we can ignore the ‘prompt’ quench category.
• The most relevant limits come from the ‘bus propagation’ quenches, calculations on this are new this year.
• Some calculations (for 5TeV or for the RQ) have not been updated with the latest information – will be finished shortly.
• 4TeV with an extraction time of 50 seconds gives us some margin for all types of quenches, therefore 4TeV operation cannot be ruled out from the information we have about the state of the machine.
• However, limits are more stringent than for 3.5TeV operation. Therefore, running at a higher energy needs to be balanced against pushing for higher luminosity this year, that might result in a larger number of quenches than in 2010.M. Koratzinos
Decision to run at 3.5TeV for 2011
M. Koratzinos
Is there something we can do to be able to run at a higher energy in 2012?• Since 2012 will be a year with LHC operations, it
makes sense to try and see if something can be done that fits in a period of (an expended perhaps) shutdown, that might allow us to run at 5TeV for 2012.
• A promising possibility is the ‘Thermal Amplifier’ idea. It is a qualification tool that would allow us to run at the highest possible energy with near-zero risk.
• The CSCM (as it is officially called) is now an official CERN project
M. Koratzinos
Why Thermal Amplifier?• The knowledge of the state of the copper stabilizer joints in
the main circuit is very poor: – Not all sectors have been measured– Different sectors can have very different joint quality– Time degradation has not been studied and is a worry
• The current safe energy analysis is based on a lot of assumptions – mostly pessimistic – this is to counteract our lack of knowledge of the copper stabilizer joints
• We should not underestimate the engineering complexity of such a project: There is a series of engineering challenges to be solved before we can put such a method into production.
• Proof of principle successfully performed in 2010. Conceptual work continues to simplify the project.
M. Koratzinos
Thermal amplifier principle• The thermal amplifier uses a pulse of high current (order
6000A) to selectively warm up bad splices in a sector.• Current flows through the diodes, so very little energy is
stored in the circuit (= safe).• It is a direct measurement of a thermal runaway at the exact
conditions of a joint.• Temperature of operation: around 20K
2.7kA pulses at 41K
The GREEN voltage contains a 50uOhm defect.The BLUE and RED voltages are across perfect joints
RB: a typical bad joint has excess resistance of 2% - if we warm it up, its resistance grows by ~200 times – easy to detect!
REAL DATA
M. Koratzinos
Thermal amplifier proof of principle• A series of tests were performed in September 2010
in the Block 4 test facility (special thanks to M. Bajko, C. Giloux, J. Feuvrier).
• A defective joint (about 50uOhms) and a series of perfect joints were monitored as high current (2000A to 4000A) passed through the copper at temperatures varying from 20K to 40K.
• What was measured agreed with simulations (program of A. Verweij) and valuable experience was gained.
Comparison of simulation (blue) and real data (red). Current in this test (bottom) was 3200A. Initial temperature was 42K
M. Koratzinos
The CSCM project• February 2011: Project approved. The core team has
taken the first decisions regarding some important parameters.
• An external review will be performed early autumn 2011.
• Period of the tests: xmas technical stop 2011-2012• First estimates for the time needed for the tests: 12
weeks. We are working on streamlining this.
A word of caution: the Thermal amplifier is not a ‘carte blanche’ to run at 5TeV; it will tell us however with some certainty what is the maximum safe energy of the LHC, or it will give us precise probabilities of an incident in case of a quench. It will always be up to the CERN management to decide at what level of risk, if any, the LHC should run
M. Koratzinos
Splice consolidation
• During 2013-2014 an extensive campaign will take place so that all 10,000 splices will all be opened up, inspected, repaired if necessary and a shunt fitted.
• This new design will allow us to completely forget copper continuity problems.
• This will allow the LHC to operate with a minimal number of training quenches at around 6.5TeV
M. Koratzinos
The crystal ball
• Although the future is tricky to predict, regarding the LHC energy the future could be something like the following (this is a purely a personal ‘best bet’):– 2011: operation at 3.5TeV– 2012: operation at 5TeV, if lucky, 3.5TeV if unlucky– 2015: operation at 6.5TeV, then over a period of a
couple of years slowly reach the design energy of 7TeV
M. Koratzinos
Conclusions
• The condition of the copper stabilizer around the main circuit interconnects limits the maximum safe energy of the LHC
• Given the (lack of) knowledge of the excess resistance of the copper stabilizer joints, running at any energy carries a certain risk.
• A lot more has been learned on the subject since the accident of 19 September 2008
• The “Thermal Amplifier” idea can qualify the machine to the highest safe energy with minimal risk – this is planned for Xmas 2011 and if we are lucky 2012 can be a 5+5TeV run