the lhc access system

19
TS Workshop, Archamps, May 24 – May 26, 2005 The LHC Access System Status report – May 2005 P. Ninin & the Access project team TS/CSE

Upload: vega

Post on 02-Feb-2016

43 views

Category:

Documents


1 download

DESCRIPTION

The LHC Access System. Status report – May 2005 P. Ninin & the Access project team TS/CSE. Agenda. Project overview Architecture Organisation Challenges Conclusion. LHC buildings access. LHC experimental services areas access * ACCESSIBLE during beam operation. LHC sites access. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: The LHC Access System

TS Workshop, Archamps, May 24 – May 26, 2005

The LHC Access System

Status report – May 2005

P. Ninin & the Access project team TS/CSE

Page 2: The LHC Access System

2

Agenda

• Project overview • Architecture • Organisation• Challenges• Conclusion

Page 3: The LHC Access System

3

LHC sites access

LHC buildings access

LHC experimental services areas access * ACCESSIBLE during beam operation

the LHC accelerator and experiment Access Service Access Tunnel Access Experiment NON ACCESSIBLE during beam operation

Page 4: The LHC Access System

4

Scope

LHC Access Control SystemLACS

Off-the-shelf Access Equipement

LHC Access Safety SystemLASS

Interlock SystemBeam => No AccessAccess => No Beam

Integrated concept for LHC Machine & Experiments to protect people against the LHC radiation hazards.

Page 5: The LHC Access System

5

LHC Access Control System

Goals:– Manage access rights

– Identify user

– Verify authorization

– Automatic or remote access control

Status:– Contract running since September 04

– System engineering completed

– Factory Acceptance Test (Cegelec Marseille) May 05

– Site acceptance of the pilot installation “LHC 0” - June 2005

– Organisation of the LHC 8 installation – October 2005

– Organisation of the LHC tunnel doors/grids installation• Done by TS/IC

Page 6: The LHC Access System

6

LHC Access Safety SystemGoals:

– Protect personnel during Beam operation • nobody inside - Stop LHC if a door is forced

– Allow Access operation when safety conditions are met• No radiation hazards (LHC beam, RF).

– Distributed, highly reliable interlock system • Strictly designed according to the prescription of the IEC 61508 • To be demonstrated to the French Nuclear Authority INB

Status:– HW and SW Architecture prototyping (Siemens Safety Matrix).– Good progress on the :

• Project documentation• Cabling • Safety studies.

– Identification of the LHC machine elements that will be interlocked is completed

– Tender for the system realisation, installation and commissioning.

Page 7: The LHC Access System

7

Project Organisation

Responsabilité niveau projet Global LACS LASS

Chef de projet P. NininResponsable sous-projet L. Scibile T. LadzinskiContrat CegelecCoordination technique J-F JugetCablage J-F JugetResponsable Qualité E. Sanchez CorralResponsable sûreté de fonctionnement S. Grau SchneiderResponsable informatique L. Hammouti T. RiescoResponsable prototype LASS M. MunozResponsable exploitation et maintenance J-F JugetResponsable vérification et de validation M. MunozResponsable intégration S. Di LucaResponsable installation L. Scibile T. LadzinskiRelation avec Expérience L. ScibileResponsable plannification et EVM E. Sanchez CorralResponsable Logistique, électricité M. BoffardExpertise et Support externe N. Rama, A. Day, G, Smith, F. Rodriguez Mateos

Page 8: The LHC Access System

8

LHC Access Safety LHC Access Control

ACCESS SAFETY

ACCESS CONTROL

Page 9: The LHC Access System

9

Operational Dosimeter Integration

N. Rama

Page 10: The LHC Access System

10

Page 11: The LHC Access System

11

Man Machine Interface

M. Munoz, L. Hammouti, G. Roy

Page 12: The LHC Access System

12

Page 13: The LHC Access System

13

LHC Elements interlocked

I ntrusion

LHC Access Safety System Beam I nterlock System

Point 1

Point 2

Point 3

Point 4Point 5

Point 6

Point 7

Point 8

Ti 8

Ti 2

LHC

SPS

Beam Dump

Beams injection Ti8:MBI AH, MSI A, MSI B MagnetsTED, SPS Access systemBeams injection Ti2:

MBI BH, MSI A, MSI B MagnetsTED, SPS Access system

Beams circulation:D3/D4 MagnetsAccess Safety Blocks

Beams circulationD3/D4 Magnets

PN/ 24mars04/ arretLHC

Page 14: The LHC Access System

14

Integration & InstallationSafety LASS LACS

Access Safety Specification

Access SafetyArchitecture

Design

INBAIWG

Safety PlanLHC Sectorisation &

Integration Review

AccessControl

Tendering

Preliminary Risk Analysis

Contract

Access Safety realisation

Access ControlSpecification

LHC Access SystemPrinciples (AIWG)

AccessPilot Installation

LHC0

Safety FunctionSpecification

Preliminary Safety Study(Architecture)

Cabling Definition

Access ControlDesign

AccessSafety

Tendering

Contract

Installation

Installation preparation

Page 15: The LHC Access System

15

Installation phases

Installation HW commissioning Machine checkout Beam operation

Surface Access Control Installation + CCC + Wherever possible

Underground Access ControlLimit the constraint of transport

Access Safety validation

LHC AccessCommissioned

INB Tests

Access SafetyProvisional installation

RF Tests

Injection Tests

Page 16: The LHC Access System

16

Open issue/Challenges

• Experiments– Further investigation required

• Pilot installation:– Integration of the numerous technologies involved– Validation of the system by the users

• Safety validation of the global architecture– To ensure that the safety requirements (INB) are met

• Finish the integration (1,2,3,4,5,6) and organise the installation

• Cabling – Strategy and LHC point 8 are OK, – Specify the cabling architecture for the remaining LHC points

• Review and Optimise the full CERN Access « process » – Training, authorizations

Page 17: The LHC Access System

17

Conclusion

• Architecture of the LHC Access System is now designed, and is checked to verify that it meets the safety requirements of the LHC operation and the IEC 61508.

• A pilot installation will be tested in the summer 2005 to validate the concept with the users as well as the integration and performance of the numerous sub-systems.

• The specification of the LHC Access Safety side is completed, the hardware and software architecture has been studied, progressing on the prototype.

• A call for tender has been launched to cope with the LASS programming and installation.

• The identification of the machine elements that will be interlocked is completed.

• Despite the difficulty encountered for the system specification, for the time being:– In line with LHC planning

Page 18: The LHC Access System

18

Thanks to the LHC Access project Collaborators:

T. Pettersson L. ScibileJ.-F. JugetS. Di LucaT. RiescoN. RamaS. Grau

M. Munoz M. Boffard

E. Sanchez-Corral MenaT. Ladzinski

G. SmithA. Day

D. SwobodaF. Rodriguez Mateos

G. Roy

With the help of :CEGELEC – SCHNEIDER - SIEMENS

Page 19: The LHC Access System

19

Access Equipment Integration

S. Di Luca/ EDMS 342649