May Revision 001 1 © Sport England 2011 Facility Case Study THE LAKESIDE CENTRE KILLINGWORTH, NORTH TYNESIDE Status: Completed 2007 Client: North Tyneside Council Value: £9.425m Facility Case Study Creating sporting opportunities in every community The Lakeside Centre represents an efficient and compact community wet and dry sports centre with a traditional mix of facilities. The scheme includes a 25 m pool, learner pool, 6 court sports hall, health and fitness suite, dance studio, meeting and club rooms, soft play area and a cafe / foyer area. The design separates the ‘wet’ and ‘dry’ sports areas in the building either side of a dramatic double-height foyer. This bisects the scheme providing the entrance to the facility at one end and an open lakeside viewing terrace to the other. The foyer area offers easy control of the facility from the reception and allows users to understand the facility layout. The pool building provides a shop front and landmark gateway building on the main approach road into the township of Killingworth at both day and night. The overall design, reminiscent of a bird wheeling in flight, was developed with the local community.

Upload: buinhu

Post on 12-Feb-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

May Revision 001 1 © Sport England 2011

FacilityCase Study

THE LAKESIDE CENTREKILLINGWORTH, NORTH TYNESIDEStatus: Completed 2007Client: North Tyneside CouncilValue: £9.425m

FacilityCase Study

Creating sporting opportunities in every community

The Lakeside Centre represents an efficient and compact community wet and dry sports centre with a traditional mix of facilities. The scheme includes a 25 m pool, learner pool, 6 court sports hall, health and fitness suite, dance studio, meeting and club rooms, soft play area and a cafe / foyer area.

The design separates the ‘wet’ and ‘dry’ sports areas in the building either side of a dramatic double-height foyer. This bisects the scheme providing the entrance to the facility at one end and an open lakeside viewing terrace to the other. The foyer area offers easy control of the facility from the reception and allows users to understand the facility layout.

The pool building provides a shop front and landmark gateway building on the main approach road into the township of Killingworth at both day and night. The overall design, reminiscent of a bird wheeling in flight, was developed with the local community.

May Revision 001 2 © Sport England 2011

FacilityCase Study

Killingworth Leisure Centre has exceeded all expectations for predicted user numbers. The fitness membership targets were met shortly after opening.

Wet change

Dry change

Pool hall

Sports hall

Reception / Offices

Vertical access

Soft play / Meeting

Foyer / Circulation

Plant

Terrace

Key123456789101112

ReceptionFoyerExternal TerracePool HallWet ChangingSoft playMeeting RoomSports HallDry ChangingStoragePlantFitness Suite

May Revision 001 3 © Sport England 2011

FacilityCase Study

Circulation

The Lakeside Centre is designed to be compact with no redundant or wasted space and configured to optimise receptions overview of users as they move about the facility.

The scheme design is based around a highly efficient circulation pattern whereby all principle areas are accessed directly off the cafe foyer. There are no long corridors and the only enclosed corridor is the short route to the sport hall entrance foyer which provides access to the changing and meeting room.

The foyer provides direct access into the wet changing area, pool spectators, soft play, administration area, and to an external lakeside viewing deck.

An open stair and lift rise to a bridge across the foyer which provides access directly into the fitness suite. Access is gained to the studio from the fitness suite.

An open balcony to the pool hall provides access to the fitness changing and a further function room, and allows fitness users to access the pool via the end staircase.

The design facilitates excellent staff control, provides a safe environment and creates an attractive sense of visual movement and activity within the building.

General Accommodation / StandardsSwimming Pool 25 m pool x 13 m wide with 6 no. 2 m swimming

lanes and 0.5 m side margins. Fixed depth 1 m shallow end with slope to 2 m deep end. 7 x 13 m learner pool with a fixed depth of 0.9 m and easy going steps to the changing end.

Spectators An efficient arrangement of two rows of 70 no. tip-up spectator seating stepping down to pool surround level with an additional upstand bench to the front and a casual cafe terrace area.

Sports Hall Multi-purpose 6 court sports hall with a general clear height of 7.2 m and 9.1 m over the individual badminton courts.

Health and Fitness Suite 325 m2 fitness suite with 70 stations.

Multi-Function Rooms 9 x 12 m dance studio with 4.5 m clear height. 7 x 9 m meeting / club space used also for spin classes.

Meeting Room 70 m2 meeting room overlooking the lake.

Changing Area Wet changing village with group rooms and dry side changing.

Foyer and Circulation Double height with cafe, views to pool and bridge across.

Soft Play 120 m2 soft play area.

Offices Staff and managers office.

Schedule of AreasGross Site Area 12,500 m2

Building Footprint Area 3,200 m2

Gross Floor Area (all floors) 4,400 m2 - external (GEFA)

4,300 m2 - internal (GIFA)

Circulation Area % of Building Footprint Area (inclusive of foyer and reception)

9 %

May Revision 001 4 © Sport England 2011

FacilityCase Study

Egan’s Report issued the industry with a challenge to commit to change. North Tyneside Council embraced this challenge and abandoned the traditional tender led procurement route for capital works in favour of an improved approach. The strategic, non-contractual framework allows us to work together as a team to deliver the aims and objectives mutually agreed by those involved.

Procurement / ProgrammeTender North Tyneside Partnering

Agreement (NTPA).

Contract Design and Build.

Duration 20 months from mobilisation to practical completion. August 2005 – April 2007

Environmental SustainabilityProvision for future integration of CHP •unit

Biodiversity nature pond•Reed bed planting and lake clearance.•

Summary of Elemental CostsElement Total Cost (£) Cost (£) per m2

1 Substructure 870,000 2002 Superstructure 2,575,000 6003 Finishes 720,000 1654 Fittings and furnishings 245,000 605 Services 2,050,000 4756 External works 830,000 1957 Preliminaries 815,000 1908 Contingencies 280,000 659 Fees 1,040,000 240

TOTAL CONTRACT SUM 9,425,000 2190

Specific Items of InterestElement Area (m2)

Pool Hall (including specs) 900

Sports Halls 890Fitness 325Studio 180Wet Changing Area 270Dry Change 125Fitness Changing 90Ancillary support (including admin, staff, storage)

690

Foyer and circulation (9% of GIFA)

400

Plant (10% of GIFA) 430

General Description of Key Specifications and MaterialsFrame Reinforced concrete, steel frame and glulam

beams (to pool hall).Cladding Terracotta rainscreen panels, curtain walling,

timber cladding, render and PVDF coated aluminium flat panels.

Roofing PVDF coated aluminium standing seam roofing system.

Internal walls and partitions Low-density concrete blockwork.Internal doors Laminate faced timber doorsets (dryside) and

GRP door sets (wetside).Wall finishes Timber cladding / plaster / fair faced blockwork

(dry side) and ceramic tiling / render (wet areas).Floor (sports hall / gym) Semi-sprung beech flooring.Swimming Pool Reinforced waterproof concrete.Lighting Lux levels Type

Pool zone 300lux Metal halide floodlights (direct).Sports hall 300lux Linear fluorescent (set out between

badminton courts).Fitness 500lux Combination of linear fluorescent and

recessed compact fluorescent.

Notes:Costs stated are rounded and based on 21. nd Quarter 2007 costs.Costs include for works to the existing lake.2. Costs do not include any land acquisition costs.3. Costs exclude Client loose furniture, fixtures and equipment of £390k.4. Low Client Contingencies due to framework open book tendering.5.

All photographs provided by FaulknerBrowns and Copyright Image Visual Communications.