the inner sydney regional bicycle network
TRANSCRIPT
![Page 1: The Inner Sydney Regional Bicycle Network](https://reader036.vdocuments.mx/reader036/viewer/2022062904/5878945a1a28ab375f8b6443/html5/thumbnails/1.jpg)
City of Sydney Inner Sydney Regional Bike NetworkBryony CooperFiona Campbell
![Page 2: The Inner Sydney Regional Bicycle Network](https://reader036.vdocuments.mx/reader036/viewer/2022062904/5878945a1a28ab375f8b6443/html5/thumbnails/2.jpg)
/ Insert footer2
• Network covering 15 LGAs
• 284 kms• 10 km radius of CBD• Now an IA Initiative
(near term)
ISRBN
![Page 3: The Inner Sydney Regional Bicycle Network](https://reader036.vdocuments.mx/reader036/viewer/2022062904/5878945a1a28ab375f8b6443/html5/thumbnails/3.jpg)
/ Insert footer3
![Page 4: The Inner Sydney Regional Bicycle Network](https://reader036.vdocuments.mx/reader036/viewer/2022062904/5878945a1a28ab375f8b6443/html5/thumbnails/4.jpg)
/ Insert footer4
By 2031:• +434,800 residents• +368,400 jobs
Major employment locations including Sydney city centre, North Sydney, airport and Port Botany
ISRBN
![Page 5: The Inner Sydney Regional Bicycle Network](https://reader036.vdocuments.mx/reader036/viewer/2022062904/5878945a1a28ab375f8b6443/html5/thumbnails/5.jpg)
/ Insert footer5
Productivity benefits
• 7% National GDP
• 30% Greater Sydney GDP
• Global Economic Corridor
ISRBN
![Page 6: The Inner Sydney Regional Bicycle Network](https://reader036.vdocuments.mx/reader036/viewer/2022062904/5878945a1a28ab375f8b6443/html5/thumbnails/6.jpg)
/ Insert footer6
70% of NSW residents said they would like to ride more and would if it was safe and convenient…
![Page 7: The Inner Sydney Regional Bicycle Network](https://reader036.vdocuments.mx/reader036/viewer/2022062904/5878945a1a28ab375f8b6443/html5/thumbnails/7.jpg)
/ Insert footer7
ISRBNNetwork Effect
The ISRBN aims to achieve a network effect with sufficient scale and density to realise a step change in use, increasing the overall network value.
“The whole is greater than the sum of the parts.”
![Page 8: The Inner Sydney Regional Bicycle Network](https://reader036.vdocuments.mx/reader036/viewer/2022062904/5878945a1a28ab375f8b6443/html5/thumbnails/8.jpg)
/ Insert footer8
ISRBNBenefits (2010)
BCR: 3.88
![Page 9: The Inner Sydney Regional Bicycle Network](https://reader036.vdocuments.mx/reader036/viewer/2022062904/5878945a1a28ab375f8b6443/html5/thumbnails/9.jpg)
/ Insert footer9
ISRBNBenefits (2010)
• A study for the NSW Government estimated that net benefits of cycling equate to 48.22 cents per bicycle kilometre travelled (Price Waterhouse Coopers, 2009).
• A similar study undertaken for the Queensland Department of Transport and Main Roads estimated net benefits of $1.43 per kilometre cycled including $1.12 in health benefits where cycling infrastructure is included in other transport infrastructure projects (Queensland Department of Transport and Main Roads, 2011).
![Page 10: The Inner Sydney Regional Bicycle Network](https://reader036.vdocuments.mx/reader036/viewer/2022062904/5878945a1a28ab375f8b6443/html5/thumbnails/10.jpg)
/ Insert footer10
ISRBNBenefits (2010)
Benefits: • Decongestion• Travel time savings• Absenteeism and productivity• Reduced mortality• Vehicle operating cost savings• Public transport long run marginal cost savings• Car accident costs
![Page 11: The Inner Sydney Regional Bicycle Network](https://reader036.vdocuments.mx/reader036/viewer/2022062904/5878945a1a28ab375f8b6443/html5/thumbnails/11.jpg)
/ Insert footer11
ISRBNBenefits (2010)
Traditional benefits• Decongestion benefit – $97.8m• Travel time savings – $143.6m• Vehicle operating cost savings - $53.3m• Public transport long run marginal cost savings - $62.5m
• Car accident costs - $22.7m
![Page 12: The Inner Sydney Regional Bicycle Network](https://reader036.vdocuments.mx/reader036/viewer/2022062904/5878945a1a28ab375f8b6443/html5/thumbnails/12.jpg)
/ Insert footer12
ISRBNBenefits (2010)
Non-traditional benefits• Absenteeism and productivity - $107.1m• Reduced mortality - $40.2m
![Page 13: The Inner Sydney Regional Bicycle Network](https://reader036.vdocuments.mx/reader036/viewer/2022062904/5878945a1a28ab375f8b6443/html5/thumbnails/13.jpg)
/ Insert footer13
ISRBNWhat next?
• Review and update of the network, forecasting and BCR
• Final business case to IA–Detailed planning and design–Refine implementation strategy–Delivery
![Page 14: The Inner Sydney Regional Bicycle Network](https://reader036.vdocuments.mx/reader036/viewer/2022062904/5878945a1a28ab375f8b6443/html5/thumbnails/14.jpg)
/ Insert footer14
ISRBNWhat next?
Questions?